CN216920032U - Cast-in-place bridge tuyere construction dolly - Google Patents

Cast-in-place bridge tuyere construction dolly Download PDF

Info

Publication number
CN216920032U
CN216920032U CN202123217648.9U CN202123217648U CN216920032U CN 216920032 U CN216920032 U CN 216920032U CN 202123217648 U CN202123217648 U CN 202123217648U CN 216920032 U CN216920032 U CN 216920032U
Authority
CN
China
Prior art keywords
frame
bridge
cast
construction
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123217648.9U
Other languages
Chinese (zh)
Inventor
邓晓峰
程朝龙
曹科
容敏
孙广辉
肖锐
张彪
全成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ No 2 Engineering Co Ltd
Original Assignee
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ No 2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Guangzhou Engineering Group Co Ltd CRECGZ, CRECGZ No 2 Engineering Co Ltd filed Critical China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Priority to CN202123217648.9U priority Critical patent/CN216920032U/en
Application granted granted Critical
Publication of CN216920032U publication Critical patent/CN216920032U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a cast-in-place bridge tuyere construction trolley which comprises a construction trolley, wherein the construction trolley comprises a first frame, a second frame and a third frame; the second frame is fixed between the first frame and the third frame, the first walking mechanism is installed on the first frame, one end, far away from the second frame, of the first frame is connected with a reverse-pulling component, and the second walking mechanism is arranged at one end, far away from the second frame, of the third frame. This application has the effect that improves bridge tuyere structure efficiency of construction.

Description

Cast-in-place bridge tuyere construction dolly
Technical Field
The application relates to the technical field of bridge construction, in particular to a cast-in-place bridge tuyere construction trolley.
Background
When the bridge is under construction, need be according to the designing requirement construction tuyere structure in the bridge side, tuyere structure is the sharp mouth form more, and it mainly is in order to reduce the resonance that strong wind arouses bridge floor structure.
For cast-in-place stayed cable bridges, in order to facilitate the simplicity of the construction of the cast-in-place bridges, rear-mounted air nozzles are generally adopted, namely, the air nozzle structure is usually carried out after the support of the cast-in-place bridge is dismantled and the side span stayed cables are hung. However, this causes difficulty in installation work of the tuyere and limits the use of the construction machine, thereby deteriorating the efficiency of construction. Therefore, there is room for improvement.
SUMMERY OF THE UTILITY MODEL
The application provides a cast-in-place bridge tuyere construction dolly, it provides construction environment for the constructor to can effectively improve the efficiency of construction treating installation tuyere structure department back-and-forth movement.
The application provides a cast-in-place bridge tuyere construction dolly adopts following technical scheme:
a cast-in-place bridge tuyere construction trolley comprises a construction trolley, wherein the construction trolley comprises a first frame, a second frame and a third frame; the second frame is fixed between the first frame and the third frame, a first walking mechanism is installed on the first frame, one end, far away from the second frame, of the first frame is connected with a reverse-pulling component, and one end, far away from the second frame, of the third frame is provided with a second walking mechanism.
By adopting the technical scheme, during construction, the construction vehicle is hoisted to the tuyere structure to be constructed, the first traveling mechanism is in contact with the bridge deck, the second traveling mechanism is in contact with the side face of the bridge, then the reverse-pull member is fixed on the bridge, and the first frame is connected with the reverse-pull member, so that the installation of the construction vehicle is completed. When the construction vehicle needs to be moved, the trailer is connected with the first frame, then the first frame and the counter-pull component are detached, and then the construction vehicle is dragged to move. The construction vehicle not only provides the efficiency of construction of working space in order to improve the tuyere structure for the constructor, but also conveniently removes, further improves the efficiency of construction of tuyere structure.
Preferably, the reverse-pulling member comprises a fixing strip, the fixing strip is laid along the length direction of the bridge, one end, far away from the second frame, of the first frame is connected with the fixing strip in a sliding mode along the length direction of the fixing strip, and the first frame is connected with the fixing strip in a locking mode through a fastener.
By adopting the technical scheme, when the construction vehicle needs to be moved, a section of fixing strip is spliced on the bridge floor along the advancing direction of the construction vehicle, then the fastening piece between the first frame and the fixing strip is dismantled, and the construction vehicle can be dragged to move by utilizing the trailer. During the period, the former group of reverse-pulling components still provide pulling force for the construction vehicle, so that the construction vehicle cannot incline towards one side in the moving process, and the stability of the construction vehicle in the moving process is improved.
Preferably, one side of the fixing strip, which is far away from the first frame, is fixedly connected with an adjusting part, a fixing part is embedded in the bridge, and the adjusting part is detachably connected with the fixing part.
Through adopting above-mentioned technical scheme, when can providing stable pulling force to the construction car, make things convenient for the dismouting fixed strip.
Preferably, the regulating part includes adjusting bolt and adjusting nut, adjusting bolt passes adjusting nut, the mounting is for fixing the fixed pipe on the bridge, fixed pipe is provided with the internal thread, adjusting bolt and fixed pipe threaded connection.
Through adopting above-mentioned technical scheme, make things convenient for dismouting fixed strip.
Preferably, the length of the first frame is greater than the length of the second frame.
Through adopting above-mentioned technical scheme for first frame and counter-pull component provide sufficient counter-pull for construction car and the constructor that is located the construction car.
Preferably, the travelling mechanism further comprises a guide rail, the guide rail is mounted on the bridge along the moving direction of the first travelling mechanism, and the first travelling mechanism is connected with the guide rail in a sliding mode.
Through adopting above-mentioned technical scheme, the moving track of first running gear is injectd to the guide rail to make the construction car more stable at the removal in-process.
Preferably, be connected with a plurality of supporting screw rods on the first frame, when the construction car is installed on the bridge, the projection of supporting screw rod on the horizontal plane is located the upper surface of bridge and is located the side department that is close to the bridge.
By adopting the technical scheme, the supporting screw shares part of pressure, so that the first travelling mechanism is not easy to deform.
Preferably, a ladder stand is arranged in the construction vehicle.
Through adopting above-mentioned technical scheme, make things convenient for the staff to pass in and out the construction car.
Preferably, side frames are fixedly connected to both ends of the second frame, and the side frames are fixed between the first frame and the third frame.
By adopting the technical scheme, the construction vehicle and the bridge are enclosed into a relatively closed space, so that the construction safety is improved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present application.
Description of reference numerals:
1. a first frame; 2. a second frame; 3. a third frame; 4. a side frame; 5. a first travel mechanism; 6. a second traveling mechanism; 7. a reverse pull member; 71. a fixing strip; 72. a fixing plate; 73. an adjustment member; 731. adjusting the bolt; 732. adjusting the nut; 74. a fixed tube; 8. a guide rail; 9. a dovetail groove; 10. a connecting strip; 11. a support screw; 12. a first ladder stand; 13. a second ladder stand; 14. a walking platform; 15. a bridge.
Detailed Description
The present application is described in further detail below with reference to fig. 1.
The embodiment of the application discloses cast-in-place bridge tuyere construction trolley. Referring to fig. 1, a construction vehicle is included, and the construction vehicle includes a first frame 1, a second frame 2, and a third frame 3. Wherein, first frame 1 and second frame 2 parallel arrangement, second frame 2 are fixed between the one end of first frame 1 and third frame 3, and the equal fixedly connected with side frame 4 in both ends of second frame 2, side frame 4 is fixed between the side of first frame 1, third frame 3. Thus, after the construction vehicle is installed on the side surface of the bridge 15, a relatively closed space is formed between the construction vehicle and the side surface of the bridge 15, so that construction and installation are improved.
One side of the first frame 1 close to the third frame 3 is provided with a first walking mechanism 5, and one end of the third frame 3 far away from the second frame 2 is provided with a second walking mechanism 6. The length of the first frame 1 is greater than that of the third frame 3, one end of the first frame 1, which is far away from the second frame 2, is connected with a counter-pulling member 7, and the counter-pulling member 7 is used for being connected with a bridge 15. During construction, the construction vehicle is hoisted to the tuyere to be constructed, so that the first traveling mechanism 5 is in contact with the bridge deck of the bridge 15, the second traveling mechanism 6 is in contact with the side face of the bridge deck, and a space for construction personnel to move is limited by the construction vehicle and the side face of the bridge 15. The construction vehicle is then fixed to the bridge 15 by means of the counter-pulling elements 7, so that the first frame 1 can bear the weight of the entire construction vehicle and the construction personnel, since the length of the first frame 1 is greater than the length of the third frame 3.
Specifically, the first traveling mechanism 5 and the second traveling mechanism 6 have the same structure and are both provided as rollers. Wherein a guide rail 8 is laid on the deck of the bridge 15, and the first travel mechanism 5 slides in the guide rail 8. The guide rail 8 provides a predetermined moving track for the first traveling mechanism 5 so as to prevent the construction vehicle from shaking during the moving process.
The counter-pulling member 7 comprises a fixing strip 71, the fixing strip 71 is laid along the length direction of the bridge 15, one side of the fixing strip 71 is fixedly connected with a fixing plate 72, the fixing plate 72 is horizontally arranged, and the length of the fixing plate 72 is equal to that of the fixing strip 71. The fixed plate 72 is connected with an adjusting part 73, a fixed part is embedded in the bridge surface of the bridge 15, and the adjusting part 73 is detachably connected with the fixed part.
Specifically, the adjusting member 73 includes an adjusting bolt 731, an upper end of the adjusting bolt 731 is connected to an adjusting nut 732, and a lower end of the adjusting bolt 731 penetrates the fixing plate 72. The fixing member is a fixing pipe 74 buried in the deck of the bridge 15, the fixing pipe 74 is provided with internal threads, and the adjusting bolt 731 is in threaded connection with the fixing pipe 74. The adjusting bolts 731 and the fixing tubes 74 are provided in plural groups and spaced side by side to enhance the counter-pulling force to the construction vehicle.
One side of the fixing strip 71, which is far away from the fixing plate 72, is provided with a dovetail groove 9, and the dovetail groove 9 is arranged along the length direction of the fixing strip 71 and penetrates through two ends of the fixing strip 71. One end of the first frame 1, which is far away from the second frame 2, is fixedly connected with a connecting strip 10, the shape of the cross section of the connecting strip 10 is matched with the shape of the cross section of the dovetail groove 9, and the connecting strip 10 is connected with the dovetail groove 9 in a sliding mode. The connecting bar 10 is locked with the fixing bar 71 by bolts.
When the construction vehicle needs to be moved, the bolts between the connecting bars 10 and the fixing bars 71 are removed, then the fixing bars 71 are continuously connected in the advancing direction of the construction vehicle, and then the construction vehicle is dragged to advance on the bridge floor by using a trailer. Because the former reverse-pulling component 7 continuously provides tensile force for the construction vehicle in the moving process of the construction vehicle, the construction vehicle cannot incline towards one side, and the trailer can drag the construction vehicle.
The first frame 1 is also connected with a plurality of supporting screw rods 11, the supporting screw rods 11 are perpendicular to the first frame 1 and are in threaded connection with the first frame 1, and the supporting screw rods 11 are connected with matched nuts. In the embodiment of the present application, two support screws 11 are provided, and the two support screws are arranged side by side at intervals along the moving direction of the first frame 1. When the construction vehicle is mounted on the bridge 15, the projection of the support screw 11 in the horizontal plane is located on the deck of the bridge 15 and adjacent to the side of the bridge 15. After the construction vehicle is connected with the reverse-pulling member 7, the support screw 11 is rotated to make the support screw 11 abut against the bridge floor, and then the support screw 11 is locked with the first frame 1 by using a nut. The presence of the supporting screw 11 is able to withstand a portion of the pressure, so that the first travel mechanism 5 is less prone to deformation.
The construction vehicle is also internally provided with a ladder stand which comprises a first ladder stand 12 and a second ladder stand 13. Specifically, a walking platform 14 is fixedly connected to the middle of the second frame 2, the walking platform 14 is fixed between the two side frames 4, the first ladder stand 12 is fixed between the upper surface of the walking platform 14 and the first frame 1, and the second ladder stand 13 is fixed between the lower surface of the walking platform 14 and the third frame 3. The first ladder stand 12 and the second ladder stand 13 are obliquely arranged and form a V-shaped structure so as to construct a tuyere structure of a bridge 15.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a cast-in-place bridge tuyere construction dolly which characterized in that: the construction vehicle comprises a first frame (1), a second frame (2) and a third frame (3); the second frame (2) is fixed between the first frame (1) and the third frame (3), a first walking mechanism (5) is installed on the first frame (1), one end, far away from the second frame (2), of the first frame (1) is connected with a counter-pulling component (7), and one end, far away from the second frame (2), of the third frame (3) is provided with a second walking mechanism (6).
2. The cast-in-place bridge tuyere construction trolley of claim 1, characterized in that: the reverse-pulling member (7) comprises a fixing strip (71), the fixing strip (71) is laid along the length direction of the bridge (15), one end, far away from the second frame (2), of the first frame (1) is connected with the fixing strip (71) in a sliding mode along the length direction of the fixing strip (71), and the first frame (1) is connected with the fixing strip (71) in a locking mode through a fastener.
3. The cast-in-place bridge tuyere construction trolley of claim 2, characterized in that: one side of the fixing strip (71) far away from the first frame (1) is fixedly connected with an adjusting piece (73), a fixing piece is embedded in the bridge (15), and the adjusting piece (73) is detachably connected with the fixing piece.
4. The cast-in-place bridge tuyere construction trolley of claim 3, characterized in that: the adjusting piece (73) comprises an adjusting bolt (731) and an adjusting nut (732), the adjusting bolt (731) penetrates through the adjusting nut (732), the fixing piece is a fixing pipe (74) fixed on the bridge (15), the fixing pipe (74) is provided with internal threads, and the adjusting bolt (731) is in threaded connection with the fixing pipe (74).
5. The cast-in-place bridge tuyere construction trolley of claim 1, characterized in that: the length of the first frame (1) is greater than the length of the second frame (2).
6. The cast-in-place bridge tuyere construction trolley of claim 1, characterized in that: the bridge is characterized by further comprising a guide rail (8), wherein the guide rail (8) is installed on the bridge (15) along the moving direction of the first travelling mechanism (5), and the first travelling mechanism (5) is in sliding connection with the guide rail (8).
7. The cast-in-place bridge tuyere construction trolley of claim 1, characterized in that: be connected with a plurality of supporting screw (11) on first frame (1), when the construction car is installed on bridge (15), supporting screw (11) projection on the horizontal plane is located the upper surface of bridge (15) and is located the side department that is close to bridge (15).
8. The cast-in-place bridge tuyere construction trolley of claim 1, characterized in that: a ladder stand is arranged in the construction vehicle.
9. The cast-in-place bridge tuyere construction trolley of claim 1, characterized in that: both ends of the second frame (2) are fixedly connected with side frames (4), and the side frames (4) are fixed between the first frame (1) and the third frame (3).
CN202123217648.9U 2021-12-17 2021-12-17 Cast-in-place bridge tuyere construction dolly Active CN216920032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123217648.9U CN216920032U (en) 2021-12-17 2021-12-17 Cast-in-place bridge tuyere construction dolly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123217648.9U CN216920032U (en) 2021-12-17 2021-12-17 Cast-in-place bridge tuyere construction dolly

Publications (1)

Publication Number Publication Date
CN216920032U true CN216920032U (en) 2022-07-08

Family

ID=82252618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123217648.9U Active CN216920032U (en) 2021-12-17 2021-12-17 Cast-in-place bridge tuyere construction dolly

Country Status (1)

Country Link
CN (1) CN216920032U (en)

Similar Documents

Publication Publication Date Title
CN204174541U (en) Continuous girder bridge suspended casting suspended basket push unit
CN101446068B (en) Method for erecting suspension bridge main girder by segmenting and jacking and adopted device for rolling and moving heavy objects
CN101718066B (en) Fast rail-exchanging vehicle for jointless track and rail-exchanging method
WO2021003903A1 (en) Stepping-type multipoint incremental launching construction device and incremental launching construction method for steel box girder
DE102009011884A1 (en) Heat exchanger system e.g. cooling system such as air condensation system, for use in chemical industry, has climbing safety device, and cleaning device provided with rails, ropes or chains used for securing operators
CN216920032U (en) Cast-in-place bridge tuyere construction dolly
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN211498465U (en) Bridge detects uses mobile device
CN201678918U (en) Steel rail picking and laying device of seamless line rapid rail change operation vehicle
CN214396490U (en) Novel cable laying device for ring network between metro sections
CN113022812B (en) Light-duty high-speed intelligent trailer
CN205636517U (en) Steel longeron construction and installation operation platform
CN201711387U (en) Walking cover plate device of coil car
CN210686053U (en) Equipment train system of fully mechanized coal mining face
CN210404563U (en) Automatic wire tightening device
CN210477296U (en) Special guardrail of mould and special mould is pour to high security roof beam body
CN111392629A (en) Wind generating set ring chain electric block assembly
CN212803272U (en) Tunnel drainage plate paving and hanging trolley
CN220952977U (en) Accurate positioning and mounting device for partial cable-stayed bridge cable guide pipe
CN215402634U (en) Portal crane crossbeam convenient to maintenance installation
CN216993976U (en) Equipment for replacing and transition of railway contact net support column
CN221029877U (en) Detachable sleeper face ballast cleaning device
CN211958578U (en) Novel single-rail high-voltage cable laying device
CN219910871U (en) Self-high-strength ditch cover plate
CN214575822U (en) Construction equipment that steel construction abnormal shape aluminum plate cornices is encorbelmented to roofing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant