CN216475772U - Curtain is decorated to building outer wall - Google Patents

Curtain is decorated to building outer wall Download PDF

Info

Publication number
CN216475772U
CN216475772U CN202122723669.1U CN202122723669U CN216475772U CN 216475772 U CN216475772 U CN 216475772U CN 202122723669 U CN202122723669 U CN 202122723669U CN 216475772 U CN216475772 U CN 216475772U
Authority
CN
China
Prior art keywords
ceramic
ceramic brick
cushion block
stainless steel
cushion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122723669.1U
Other languages
Chinese (zh)
Inventor
宁东
梁永学
江幸莲
郭兆坚
覃冠
黄琳
李丽君
温世锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Pearl River Decoration Engineering Co ltd
Original Assignee
Guangzhou Pearl River Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Pearl River Decoration Engineering Co ltd filed Critical Guangzhou Pearl River Decoration Engineering Co ltd
Priority to CN202122723669.1U priority Critical patent/CN216475772U/en
Application granted granted Critical
Publication of CN216475772U publication Critical patent/CN216475772U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a building outer wall decorative curtain wall, which relates to the technical field of building curtain walls and comprises a fixed mounting structure and a plurality of stainless steel supporting rods, wherein the stainless steel supporting rods are equidistantly arranged on the fixed mounting structure, the curtain wall structure also comprises a plurality of ceramic bricks, first cushion block ceramic bricks and second cushion block ceramic bricks, the first cushion block ceramic bricks and the second cushion block ceramic bricks are respectively provided with a plurality of ceramic bricks, the first cushion block ceramic bricks are equidistantly arranged on the left sides of the stainless steel supporting rods, the second cushion block ceramic bricks are equidistantly arranged on the right sides of the stainless steel supporting rods, the ceramic bricks are equidistantly arranged on the stainless steel supporting rods in a staggered mode, and each ceramic brick, the first cushion block ceramic brick and the second ceramic cushion block are respectively provided with nylon. After the curtain wall is installed, the front side of the curtain wall generates a three-dimensional visual effect, the decorative effect of the curtain wall is improved, and the visual effect of the curtain wall is highlighted under the cooperation of subsequent night light.

Description

Curtain is decorated to building outer wall
Technical Field
The utility model relates to the technical field of building curtain walls, in particular to a building outer wall decorative curtain wall.
Background
The curtain wall is an outer wall enclosure of a building, is a light wall body with a decoration effect commonly used by modern large and high-rise buildings, and can be composed of various facing materials such as glass, metal, ceramics, ceramic bricks and the like and a supporting structure thereof according to the requirement of decoration design, wherein the ceramic brick curtain wall is favored due to the stability and elegance of the ceramic brick curtain wall. However, the existing curtain wall has poor decoration effect and single three-dimensional appearance, so that a building outer wall decoration curtain wall needs to be provided for use.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model aims to provide a building outer wall decorative curtain wall to solve the problems in the prior art.
In order to achieve the purpose, the technical scheme adopted by the utility model is as follows: the utility model provides a curtain is decorated to building outer wall, includes fixed mounting structure and a plurality of stainless steel support bar, and is a plurality of stainless steel support bar equidistant setting still includes the curtain structure on fixed mounting structure, the curtain structure includes ceramic brick, first cushion ceramic brick and second cushion ceramic brick, first cushion ceramic brick and second cushion ceramic brick all are equipped with a plurality ofly, and are a plurality of equidistant setting in the left side of a plurality of stainless steel support bar of first cushion ceramic brick is a plurality of equidistant setting in the right side of a plurality of stainless steel support bar of second cushion ceramic brick is a plurality of the equidistant setting of ceramic brick is crisscross on a plurality of stainless steel support bar, every ceramic brick, first cushion ceramic brick and second cushion ceramic brick all are equipped with the nylon cushion.
Preferably, the ceramic tile is in a right trapezoid shape, the first cushion block ceramic tile is in a rectangular shape, and the second cushion block ceramic tile is in a square shape.
Preferably, the ceramic brick is provided with two symmetrically arranged clamping holes, and the first cushion block ceramic brick and the second cushion block ceramic brick are also provided with the clamping holes.
Preferably, the nylon cushion block is sleeved above the clamping holes in the ceramic brick, the first cushion block ceramic brick and the second cushion block ceramic brick.
Preferably, the nylon cushion block is cylindrical, the outer diameter of the nylon cushion block is larger than the diameter of the clamping hole, and the inner diameter of the nylon cushion block is larger than the diameter of the stainless steel supporting rod.
Preferably, be crisscross the setting between the ceramic brick, the nylon cushion block in the joint hole on the left of the ceramic brick of ceramic brick right side and lower floor is connected on the stainless steel bracing piece of same vertical setting.
Preferably, the first cushion block ceramic tile is positioned between two ceramic tiles staggered from the upper layer to the lower layer on the left side, and the second cushion block ceramic tile is positioned between two ceramic tiles staggered from the upper layer on the right side.
Compared with the prior art, the utility model has the beneficial effects that: when installing the ceramic brick, install the right-angle side of right trapezoid's ceramic brick at the back that is located whole curtain, install the hypotenuse of right trapezoid's ceramic brick in the front that is located whole curtain, make the front of curtain produce three-dimensional visual effect after the installation is accomplished, increased the decorative effect of curtain, under the cooperation of follow-up light at night, the visual effect of highlighting curtain.
Drawings
FIG. 1 is a schematic perspective view of an assembled unit ceramic brick dry-hanging curtain wall system;
FIG. 2 is a schematic perspective view of a prefabricated unit ceramic tile dry-hanging curtain wall system;
FIG. 3 is a front view of an assembled unit ceramic tile dry-hang curtain wall system;
FIG. 4 is a top view of an assembled unit ceramic tile dry-hang curtain wall system;
FIG. 5 is a first perspective view of a curtain wall structure;
FIG. 6 is a schematic perspective view of a curtain wall structure;
FIG. 7 is a third schematic perspective view of a curtain wall structure;
FIG. 8 is a fourth schematic perspective view of a curtain wall structure;
FIG. 9 is a first perspective view of a ceramic tile;
FIG. 10 is a schematic perspective view of a second embodiment of the ceramic tile;
FIG. 11 is a perspective view of the mounting connection structure;
FIG. 12 is a schematic perspective view of a stainless steel sleeve;
FIG. 13 is a perspective view of a mounting structure
Fig. 14 is a schematic view of the alternative ceramic tile before and after installation.
In the figure: fixed mounting structure 1, vertical fossil fragments 11, crossbeam 12, curtain wall construction 2, ceramic brick 21, first cushion ceramic brick 22, second cushion ceramic brick 23, joint hole 24, installation connection structure 3, stainless steel bracing piece 31, stainless steel sleeve 32, go up installation section 33, lower installation section 34, installation nut 35, nylon cushion 4, replacement ceramic brick 5, first replacement hole 51, second replacement hole 52.
Detailed Description
The utility model will be further described with reference to the accompanying drawings, figures 1 to 14, and the detailed description of the utility model: the utility model provides an assembled unit ceramic brick hangs curtain system futilely, includes fixed mounting structure 1, curtain structure 2 and erection joint structure 3, curtain structure 2 cover is on erection joint structure 3, curtain structure 2 and erection joint structure 3 sliding fit, erection joint structure 3 is located fixed mounting structure 1, erection joint structure 3 is connected with fixed mounting structure 1 detachable.
Specifically, fixed mounting structure 1 includes two vertical keel 11 and three crossbeams 12, two vertical keel 11 is the symmetry setting, and three crossbeams 12 equidistant arrangement are on two vertical keel 11, crossbeam 12 is the level setting, the both ends of crossbeam 12 are passed through the bolt and are connected with two vertical keel 11, crossbeam 12 is T type structure. The two vertical keels 11 may be fixed and installed to an embedded part of an existing building structure, and the three beams 12 are used to support and arrange a plurality of bricks 21, a first cushion block brick 22, and a second cushion block brick 23.
Specifically, the stainless steel support rod structure further comprises a plurality of stainless steel support rods 31, the stainless steel support rods 31 are arranged on the three cross beams 12 at equal intervals, stainless steel sleeves 32 in threaded connection with the stainless steel support rods 31 are arranged at the top, the bottom and the middle of each stainless steel support rod 31, threaded sections are arranged at the top, the bottom and the middle of each stainless steel support rod 31, and the stainless steel support rods 31 are fixed on the cross beams 12 through the stainless steel sleeves 32. The stainless steel support rods 31 are used to support the ceramic bricks 21, the first mat ceramic brick 22 and the second mat ceramic brick 23 by being installed through the nylon mat 4.
Specifically, an external thread section and an internal thread section are respectively arranged on the outer side wall and the inner side wall of the stainless steel sleeve 32; the stainless steel sleeve 32 is in threaded connection with the mounting hole on the cross beam 12; the thread section on the stainless steel support rod 31 is in threaded connection with the inner thread section on the stainless steel sleeve 32; the stainless steel sleeve 32 is divided into an upper mounting section 33, a lower mounting section 34 and a mounting nut 35, and the length of the upper mounting section 33 is smaller than that of the lower mounting section 34. Use at stainless steel support rod 31, through stainless steel sleeve 32's lower erection section 34 threaded connection on crossbeam 12, can drive stainless steel sleeve 32's rotation through rotatory mounting nut 35, fix stainless steel support rod 31 on crossbeam 12, when assembling the curtain to co-altitude, only need rotate the bottom of stainless steel support rod 31 to the internal thread in stainless steel sleeve 32's the last erection section 33 for but stainless steel support rod 31 vertical installation is on stainless steel sleeve 32. Moreover, the stainless steel support rods 31 with proper height can be installed according to different heights of the curtain walls, so that the curtain walls with different heights can be installed, and different use requirements can be met.
Specifically, curtain wall construction 2 includes ceramic tile 21, first cushion ceramic tile 22 and second cushion ceramic tile 23, ceramic tile 21, first cushion ceramic tile 22 and second cushion ceramic tile 23 all are equipped with a plurality ofly, and are a plurality of first cushion ceramic tile 22 equidistant setting is in the left side of a plurality of stainless steel support rods 31, and is a plurality of second cushion ceramic tile 23 equidistant setting is on the right side of a plurality of stainless steel support rods 31, and is a plurality of ceramic tile 21 equidistant setting is established crisscross on a plurality of stainless steel support rods 31, every ceramic tile 21, first cushion ceramic tile 22 and second cushion ceramic tile 23 all are equipped with nylon cushion block 4. The nylon mat 4 is used for protecting the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23, when the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 are installed, the clamping holes 24 on the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 are damaged due to the shaking of the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 on the stainless steel support rod 31, when the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 are installed, the nylon mat 4 can protect the clamping holes 24 on the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23, and also can limit the positions of the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 to prevent the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 from being damaged after the installation, and the first and second ceramic tiles 22 and the second mat ceramic tiles 23 are arranged at equal intervals in a staggered manner, intermittent gaps are formed at the left end and the right end of the curtain wall, and the first cushion block ceramic tile 22 and the second cushion block ceramic tile 23 can be used for filling the intermittent gaps, so that the auxiliary installation of the ceramic tiles 21 is realized.
Specifically, the ceramic tile 21 is in a right trapezoid shape, the first cushion block ceramic tile 22 is in a rectangular shape, and the second cushion block ceramic tile 23 is in a square shape; the ceramic brick 21 is provided with two symmetrically arranged clamping holes 24, and the first cushion block ceramic brick 22 and the second cushion block ceramic brick are also provided with the clamping holes 24; the nylon cushion block 4 is sleeved above the clamping holes 24 on the ceramic bricks 21, the first cushion block ceramic brick 22 and the second cushion block ceramic brick 23; the nylon cushion block 4 is cylindrical, the outer diameter of the nylon cushion block 4 is larger than the diameter of the clamping hole 24, and the inner diameter of the nylon cushion block 4 is larger than the diameter of the stainless steel support rod 31; the ceramic bricks 21 are arranged in a staggered manner, and the clamping holes 24 on the right side of the ceramic bricks 21 and the nylon cushion blocks 4 on the clamping holes 24 on the left side of the lower ceramic bricks 21 are connected to the same vertically arranged stainless steel support rod 31; the first cushion block ceramic tile 22 is positioned between the two staggered ceramic tiles 21 on the upper layer and the lower layer on the left side, and the second cushion block ceramic tile 23 is positioned between the two staggered ceramic tiles 21 on the upper layer on the right side; when installing ceramic brick 21, install the right-angle side of right trapezoid's ceramic brick 21 at the back that is located whole curtain, install the hypotenuse of right trapezoid's ceramic brick 21 in the front that is located whole curtain, make the front of curtain produce three-dimensional visual effect after the installation is accomplished, increased the decorative effect of curtain, under the cooperation of follow-up night light, realize the visual effect of curtain.
The stainless steel support rod replacing device is characterized by further comprising a replacing ceramic brick 5, wherein the replacing ceramic brick 5 is in a right trapezoid shape, the replacing ceramic brick 5 is provided with a first replacing hole 51 and a second replacing hole 52, the first replacing hole 51 is located on the high length side of the right trapezoid, the second replacing hole 52 is located on the lower bottom side of the right trapezoid, and the distance between the first replacing hole 51 and the second replacing hole 52 is equal to the distance between two adjacent stainless steel support rods 31; the first replacing hole 51 is of a mirror-image L-shaped structure, the long side of the first replacing hole 51 is an open side, and the short side of the first replacing hole 51 is in a circular shape; the right-angle edge of the L-shaped structure is chamfered with a round angle; the round corners are beneficial to the subsequent installation of the replacement ceramic bricks 5 during replacement, and the second replacement holes 52 are U-shaped open; the first replacement hole 51 and the second replacement hole 52 have a diameter larger than the outer diameter of the nylon insert 4. When the monolithic ceramic brick 21 of curtain wall has the damage and needs to be changed, the straight flange of the replacement ceramic brick 5 of right trapezoid shape is installed at the back of the curtain wall, the hypotenuse of the replacement ceramic brick 5 of right trapezoid shape is installed at the front of the curtain wall, open end with first replacement hole 51 and second replacement hole 52 faces two nylon cushion blocks 4 on two stainless steel support rods 31, make two nylon cushion blocks 4 parcel in first replacement hole 51 and second replacement hole 52, will replace ceramic brick 5 and move to the right after placing, make two nylon cushion blocks 4 parcel in first replacement hole 51 and second replacement hole 52 completely, after putting correctly in the position, put the breach shutoff of first replacement hole 51 and second replacement hole 52 through glued material, make replacement ceramic brick 5 fix together with two nylon cushion blocks 4 completely, accomplish the change of damaging ceramic brick 21.
An assembly type unit ceramic brick dry hanging curtain wall system and a construction method thereof are disclosed, wherein the construction method comprises the following steps:
the first step is as follows: fixing two vertical keels 11 with the existing embedded parts through bolts, so that the positions of the two vertical keels 11 are fixed, and horizontally connecting the cross beam 12 positioned at the lower layer to the two vertical keels 11 through the bolts;
the second step is that: after the beam 12 at the lower layer is fixed, sleeving a stainless steel sleeve in a mounting hole on the beam 12, mounting a stainless steel sleeve 32 at the bottom of a stainless steel support rod 31 and at the bottom of the beam 12 at the lower layer, fixing the stainless steel support rod 31 and the beam 12 at the lower layer, and then sequentially mounting a plurality of stainless steel sleeves 32 on the beam 12 at the lower layer, so that the stainless steel support rods 31 and the beam 12 at the lower layer are fixed together;
the third step: after two nylon cushion blocks 4 are placed at the tops of two clamping holes 24 of a ceramic brick 21, the ceramic brick 21, a first cushion block ceramic brick 22 and a second cushion block ceramic brick 23 are sequentially installed on a plurality of stainless steel support rods 31 at equal intervals through the two nylon cushion blocks 4, after the ceramic brick 21, the first cushion block ceramic brick 22 and the second cushion block ceramic brick 23 are installed at the middle position, a cross beam 12 at the middle position is connected with two vertical keels 11 through bolts, the cross beam 12 at the middle position is fixed on the two vertical keels 11, and then the two ceramic bricks 21 are sequentially installed on the plurality of stainless steel support rods 31 at equal intervals through the two nylon cushion blocks 4;
the fourth step: after the installation of the ceramic tiles 21 is completed, the cross beam 12 positioned on the upper layer is fixed on the two vertical keels 11 through bolts, and after the installation of the cross beam 12 is completed, the stainless steel support rods 31 are fixed on the cross beam 12 positioned on the upper layer through the stainless steel sleeves 32, so that the installation of the assembled unit ceramic tile dry-hanging curtain wall system is completed.
When using, need not carry out the concrete, moreover, the steam generator is simple in structure, high durability and convenient operation, can be quick install and dismantle the curtain, equidistant crisscross installation between a plurality of ceramic bricks 21 for the front of curtain produces three-dimensional visual effect, the decorative effect of curtain has been increased, under the cooperation of follow-up light at night, realize the visual effect of curtain, can be according to the not co-altitude needs of curtain installation, install the stainless steel bracing piece 31 of suitable height can, in order to realize the installation to the not co-altitude curtain, satisfy different user demands.
Various other modifications and changes may be made by those skilled in the art based on the above-described technical solutions and concepts, and all such modifications and changes should fall within the scope of the claims of the present invention.

Claims (7)

1. The utility model provides a curtain is decorated to building outer wall, includes fixed mounting structure (1) and a plurality of stainless steel support rod (31), and is a plurality of stainless steel support rod (31) equidistant setting is on fixed mounting structure (1), its characterized in that: still include curtain wall construction (2), curtain wall construction (2) are including ceramic brick (21), first cushion ceramic brick (22) and second cushion ceramic brick (23), ceramic brick (21), first cushion ceramic brick (22) and second cushion ceramic brick (23) all are equipped with a plurality ofly, and are a plurality of first cushion ceramic brick (22) equidistant setting is in the left side of a plurality of stainless steel bracing pieces (31), and is a plurality of second cushion ceramic brick (23) equidistant setting is on the right side of a plurality of stainless steel bracing pieces (31), and is a plurality of ceramic brick (21) equidistant setting is established crisscross on a plurality of stainless steel bracing pieces (31), every ceramic brick (21), first cushion ceramic brick (22) and second cushion ceramic brick (23) all are equipped with nylon cushion (4).
2. The building exterior wall decorative curtain wall as claimed in claim 1, wherein: the ceramic brick (21) is in a right trapezoid shape, the first cushion block ceramic brick (22) is in a rectangular shape, and the second cushion block ceramic brick (23) is in a square shape.
3. The building exterior wall decorative curtain wall as claimed in claim 1, wherein: the ceramic brick is characterized in that two clamping holes (24) symmetrically arranged are formed in the ceramic brick (21), and the first cushion block ceramic brick (22) and the second cushion block ceramic brick are also provided with the clamping holes (24).
4. The building exterior wall decorative curtain wall as claimed in claim 3, wherein: the nylon cushion block (4) is sleeved above the clamping holes (24) in the ceramic brick (21), the first cushion block ceramic brick (22) and the second cushion block ceramic brick (23).
5. The building exterior wall decorative curtain wall as claimed in claim 4, wherein: the nylon cushion block (4) is cylindrical, the outer diameter of the nylon cushion block (4) is larger than the diameter of the clamping hole (24), and the inner diameter of the nylon cushion block (4) is larger than the diameter of the stainless steel supporting rod (31).
6. The building exterior wall decorative curtain wall as claimed in claim 5, wherein: the ceramic brick is characterized in that the ceramic bricks (21) are arranged in a staggered mode, and the clamping holes (24) on the right side of the ceramic bricks (21) and the nylon cushion blocks (4) on the clamping holes (24) on the left side of the ceramic bricks (21) on the lower layer are connected to the stainless steel supporting rod (31) which is vertically arranged.
7. The building exterior wall decorative curtain wall as claimed in claim 1, wherein: the first cushion block ceramic tile (22) is positioned between two staggered ceramic tiles (21) on the upper layer and the lower layer on the left side, and the second cushion block ceramic tile (23) is positioned between two staggered ceramic tiles (21) on the upper layer on the right side.
CN202122723669.1U 2021-11-08 2021-11-08 Curtain is decorated to building outer wall Active CN216475772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122723669.1U CN216475772U (en) 2021-11-08 2021-11-08 Curtain is decorated to building outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122723669.1U CN216475772U (en) 2021-11-08 2021-11-08 Curtain is decorated to building outer wall

Publications (1)

Publication Number Publication Date
CN216475772U true CN216475772U (en) 2022-05-10

Family

ID=81446295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122723669.1U Active CN216475772U (en) 2021-11-08 2021-11-08 Curtain is decorated to building outer wall

Country Status (1)

Country Link
CN (1) CN216475772U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof
CN115370052B (en) * 2022-09-07 2023-09-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Similar Documents

Publication Publication Date Title
CN104895318A (en) Aluminum alloy template system and construction method of same
CN216475772U (en) Curtain is decorated to building outer wall
KR101611595B1 (en) Rail-type installation structure of aluminum composite panels
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN207194619U (en) A kind of assembled regeneration concrete enclosure wall
CN113882565B (en) Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof
CN110952749A (en) Keel frame type overhead floor
CN216475797U (en) Connecting device for dry-hanging curtain wall
CN216475773U (en) Opening ceramic brick curtain wall structure suitable for dry construction
CN102587665B (en) Pouring method of coupled shear wall structure
CN111502069A (en) Convenient positioning structure and installation method for building assembly type prefabricated wall
CN207177467U (en) Prefabricated enclosure wall
CN113463801A (en) Gabion curtain wall structure and construction method thereof
CN201649373U (en) Hanging structure of inter-storey unit type curtain wall board
CN101225683B (en) Method for connecting and installing unit curtain walls
CN210316075U (en) Assembled integral shear wall
CN215483897U (en) Stone cage curtain wall structure
CN219671793U (en) String hanging type hollow building outer wall structure
CN219825762U (en) Novel mounting structure of ceramic tile curtain wall string hanging system
CN215564978U (en) Transformer substation is with assembled enclosure
CN204492171U (en) A kind of concrete blinding tool-type frame supported system
CN217079303U (en) Hollow clay brick building curtain wall structure
CN113585657B (en) BIM-based dry-hanging clay brick external facing installation structure and installation method
CN2392834Y (en) Adjustable curtain-wall fitting assembly
CN117513640B (en) Arched dry-hanging grouting ceramic tile ceiling and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant