CN216104038U - Novel construction site rubbish pond - Google Patents

Novel construction site rubbish pond Download PDF

Info

Publication number
CN216104038U
CN216104038U CN202122352551.2U CN202122352551U CN216104038U CN 216104038 U CN216104038 U CN 216104038U CN 202122352551 U CN202122352551 U CN 202122352551U CN 216104038 U CN216104038 U CN 216104038U
Authority
CN
China
Prior art keywords
stabilizing
crushing
box
case
axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122352551.2U
Other languages
Chinese (zh)
Inventor
任文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Han Xinliang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122352551.2U priority Critical patent/CN216104038U/en
Application granted granted Critical
Publication of CN216104038U publication Critical patent/CN216104038U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/10Waste collection, transportation, transfer or storage, e.g. segregated refuse collecting, electric or hybrid propulsion

Landscapes

  • Crushing And Pulverization Processes (AREA)

Abstract

The utility model relates to the technical field of building construction, and discloses a novel garbage pool for a building construction site, which comprises a stabilizing box, wherein a stabilizing funnel is installed at the top end of the stabilizing box, the left end of the stabilizing box is fixedly connected with a crushing box, the right end of the crushing box is provided with a stabilizing through groove penetrating into the stabilizing box, the right end of the stabilizing box is hinged with a filter plate, the left end of the filter plate is hinged with a sliding plate, the front end and the rear end of the sliding plate are slidably connected with the front end and the rear end of the stabilizing through groove, the bottom end of the stabilizing through groove is provided with a connecting groove, the bottom end of the connecting groove is fixedly connected with an electric telescopic rod, the top end of the electric telescopic rod is fixedly connected with the bottom end of the sliding plate, the left end of the crushing box is fixedly connected with a supporting plate, a front crushing shaft drives a rear crushing shaft to rotate through a stabilizing gear, so that the crushing of garbage is completed, and the efficiency of liquid separation in the garbage is improved, the subsequent probability that the construction waste cannot be recovered is reduced.

Description

Novel construction site rubbish pond
Technical Field
The utility model relates to the technical field of building construction, in particular to a novel building construction site garbage pool.
Background
As is known, building construction refers to production activities in the construction and implementation stage of engineering construction, and is a construction process of various buildings, or a process of changing various lines on a design drawing into a real object at a designated place, and a large amount of garbage is generated in the construction process of the building, and is placed in a garbage pool.
Through the retrieval, chinese patent publication is CN 211726512U's utility model patent discloses a novel construction site rubbish pond, comprising a main body, the inside one side of main part is provided with first cell body, the inside one side of keeping away from first cell body of main part is provided with the second cell body, the bottom of first cell body and second cell body one side all is provided with the discharge gate, one side that the main part top is located first cell body is provided with the screening plate, the below that the both ends of main part are located the screening plate is provided with the multiunit spout, the both sides at screening plate both ends all are provided with the slider that runs through to the spout inside, one side that the main part is close to first cell body is provided with first backup pad.
The device filters the classification to rubbish through the removal of screening board, has most liquid that construction used in the building rubbish, after fusing with the building rubbish, inconvenient and separate, and increase crushing degree of difficulty when retrieving in the crushing of follow-up building rubbish.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a novel construction site garbage pool which is convenient for separating liquid in garbage.
(II) technical scheme
In order to achieve the purpose, the utility model provides the following technical scheme: a novel garbage pool for construction sites comprises a stabilization box, wherein a stabilization funnel is installed at the top end of the stabilization box, a crushing box is fixedly connected at the left end of the stabilization box, a stabilization through groove penetrating through the interior of the stabilization box is formed in the right end of the crushing box, a filter plate is hinged at the right end of the interior of the stabilization box, a sliding plate is hinged at the left end of the filter plate, the front end and the rear end of the sliding plate are slidably connected with the front end and the rear end of the interior of the stabilization through groove, a connecting groove is formed in the bottom end of the interior of the stabilization through groove, an electric telescopic rod is fixedly connected at the bottom end of the interior of the connecting groove, the top end of the electric telescopic rod is fixedly connected with the bottom end of the sliding plate, a supporting plate is fixedly connected at the left end of the crushing box, a supporting block is fixedly connected with the bottom end of the supporting plate, a supporting through hole is formed in the left end of the supporting block, and a first motor is fixedly connected in the interior of the supporting through hole, the right side output end fixedly connected with of first motor stabilizes the axle, the right-hand member of stabilizing the axle extends to the inside of stabilizing the case, the right-hand member of stabilizing the axle rotates with the left end of stabilizing the case and is connected, install the transport flood dragon on the outer wall of stabilizing the axle, smash the inside right-hand member front side of incasement and right-hand member rear side and all rotate and be connected with crushing roller, two the left end of crushing roller extends to the left end of smashing the case, is located the front side all the cover is equipped with the belt pulley, two on the outer wall of crushing roller and on the outer wall of stabilizing the axle install between the belt pulley and stabilize the belt, two all install stable gear on the outer wall of the left end of crushing roller, two it meshes mutually to stabilize the gear, two all the cover is equipped with crushing roller on the outer wall of crushing roller.
Preferably, the left end of the crushing box is provided with a hot air blower.
Further, stabilize the inside bottom of case and install and stabilize three hornblocks, stabilize the right-hand member downside of case and install drainage pipe, install drainage valve on drainage pipe's the outer wall.
Still further, the front end of stabilizing the case is installed with the observation window.
On the basis, a discharge hole is arranged at the lower side of the front end of the crushing box.
Further on the basis, the bottom front side and the bottom rear side of the stabilizing box and the bottom front side and the bottom rear side of the crushing box are provided with stabilizing support angles.
(III) advantageous effects
Compared with the prior art, the utility model provides a novel construction site garbage pool, which has the following beneficial effects:
this novel building construction site rubbish pool, through the inside of empting the stable case with rubbish, liquid separates in with rubbish through the filtration of filter, under electric telescopic handle's function, overturn sliding plate and filter, and then make surplus moisture peel off in the rubbish, under the function through first motor, first motor drives the stable axle and rotates, the stable axle drives carries the flood dragon and carries the inside of smashing the case with rubbish, and then make front side crushing axle rotate through belt pulley and stabilizing belt under the rotation of stable axle, front side crushing axle drives rear side crushing axle through stabilizing gear and rotates, and then accomplish the crushing to rubbish, improve the efficiency to liquid separation in the rubbish, reduce the subsequent unable probability of retrieving of building rubbish.
Drawings
FIG. 1 is a schematic front sectional view of the present invention;
FIG. 2 is an enlarged view of a portion of FIG. 1A;
FIG. 3 is a schematic front view of the present invention;
FIG. 4 is a right side view of the crushing box according to the present invention.
In the figure: 1. a stabilization box; 2. a stabilizing funnel; 3. a crushing box; 4. a filter plate; 5. a sliding plate; 6. an electric telescopic rod; 7. a support plate; 8. a support block; 9. a first motor; 10. a stabilizing shaft; 11. conveying a flood dragon; 12. a crushing shaft; 13. a belt pulley; 14. stabilizing the belt; 15. a stabilizing gear; 16. a crushing roller; 17. a hot air blower; 18. stabilizing the triangular blocks; 19. a water discharge pipeline; 20. a drain valve; 21. an observation window; 22. a discharge port; 23. and (5) stabilizing the supporting angle.
Detailed Description
Referring to fig. 1-4, a novel construction site garbage pool comprises a stabilization box 1, a stabilization funnel 2 is installed at the top end of the stabilization box 1, a crushing box 3 is fixedly connected at the left end of the stabilization box 1, a stabilization through groove penetrating through the stabilization box 1 is arranged at the right end of the crushing box 3, a filter plate 4 is hinged at the right end of the stabilization box 1, a sliding plate 5 is hinged at the left end of the filter plate 4, the front end and the rear end of the sliding plate 5 are slidably connected with the front end and the rear end of the stabilization through groove, a connecting groove is arranged at the bottom end of the stabilization through groove, an electric telescopic rod 6 is fixedly connected at the bottom end of the connecting groove, the top end of the electric telescopic rod 6 is fixedly connected with the bottom end of the sliding plate 5, a support plate 7 is fixedly connected at the left end of the crushing box 3, a support block 8 is fixedly connected at the bottom end of the support plate 7, and a support through hole is arranged at the left end of the support block 8, the inside of the supporting through hole is fixedly connected with a first motor 9, the right side output end of the first motor 9 is fixedly connected with a stabilizing shaft 10, the right end of the stabilizing shaft 10 extends into the stabilizing box 1, the right end of the stabilizing shaft 10 is rotatably connected with the left end of the stabilizing box 1, the outer wall of the stabilizing shaft 10 is provided with a conveying auger 11, the front side of the right end and the rear side of the right end in the pulverizing box 3 are rotatably connected with pulverizing shafts 12, the left ends of the two pulverizing shafts 12 extend to the left end of the pulverizing box 3, belt pulleys 13 are respectively sleeved on the outer wall of the front pulverizing shaft 12 and the outer wall of the stabilizing shaft 10, a stabilizing belt 14 is arranged between the two belt pulleys 13, stabilizing gears 15 are respectively arranged on the outer walls of the left ends of the two pulverizing shafts 12, the two stabilizing gears 15 are meshed with each other, pulverizing rollers 16 are respectively sleeved on the outer walls of the two pulverizing shafts 12, the garbage is dumped into the stabilizing box 1, and the liquid in the garbage is separated through the filtration of the filter plate 4, under the function through electric telescopic handle 6, overturn electric sliding plate 5 and filter 4, and then make remaining moisture in the rubbish peel off, under the function through first motor 9, first motor 9 drives and stabilizes axle 10 and rotates, stabilize axle 10 and drive the inside of carrying flood dragon 11 with rubbish to smash case 3, and then make front side crushing axle 12 rotate through belt pulley 13 and stabilizing belt 14 under the rotation through stabilizing axle 10, front side crushing axle 12 drives rear side crushing axle 12 through stabilizing gear 15 and rotates, and then accomplish the crushing to rubbish, improve the efficiency to the liquid separation in the rubbish, reduce the subsequent unable probability of retrieving of building rubbish.
It should also be noted that, the air heater 17 is installed at the left end of the crushing box 3, the stabilizing triangular block 18 is installed at the bottom end inside the stabilizing box 1, the drainage pipeline 19 is installed at the lower side of the right end of the stabilizing box 1, the drainage valve 20 is installed on the outer wall of the drainage pipeline 19, the observation window 21 is installed at the front end of the stabilizing box 1, the inside of the stabilizing box 1 can be checked more conveniently, the discharge port 22 is installed at the lower side of the front end of the crushing box 3, the stabilizing supporting angle 23 is installed at the front end and the rear end of the bottom end of the stabilizing box 1 and the front end and the rear end of the bottom end of the crushing box 3, the whole device is supported, and the stability of the whole device is improved.
In this embodiment, the first motor 9 is a known device directly purchased from the market and used by a person skilled in the art, and we do not improve the structure and function of the device, and we will not describe in detail here, and the first motor 9 is provided with a control switch matched with the first motor, and the installation position of the control switch is selected according to the actual use requirement, so that the operation and control of an operator are facilitated.
To sum up, when the novel garbage pool for the construction site is used, garbage is firstly dumped into the stabilizing box 1, liquid in the garbage is separated through the filtration of the filter plate 4, under the operation of the electric telescopic rod 6, the electric sliding plate 5 and the filter plate 4 are overturned, so that the residual moisture in the garbage is stripped, under the operation of the first motor 9, the first motor 9 drives the stabilizing shaft 10 to rotate, the stabilizing shaft 10 drives the conveying flood dragon 11 to convey the garbage into the crushing box 3, further, the front crushing shaft 12 is rotated by the rotation of the stabilizing shaft 10 through the belt pulley 13 and the stabilizing belt 14, the front crushing shaft 12 rotates the rear crushing shaft 12 through the stabilizing gear 15, and then accomplish the crushing to rubbish, improve the efficiency to liquid separation in the rubbish, reduce the subsequent probability that can't retrieve of building rubbish.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a novel construction site rubbish pond, includes stable case (1), its characterized in that: the utility model discloses a crushing device, including stabilizing case (1), stabilizing hopper (2), stabilizing case (1), filter plate (4), sliding plate (5), stabilizing through groove, connecting groove, electric telescopic handle (6), backup pad (7), backup pad (8), stabilizing hopper (2), stabilizing case (1), stabilizing case (3), stabilizing case (1), filter plate (4), sliding plate (5), stabilizing through groove, supporting plate (7), supporting block (8), the left end of supporting shoe (8) is provided with a supporting through hole, the inside fixedly connected with first motor (9) of supporting through hole, the right side output end fixedly connected with of first motor (9) stabilizes axle (10), the right-hand member of stabilizing axle (10) extends to the inside of stabilizing case (1), the right-hand member of stabilizing axle (10) rotates with the left end of stabilizing case (1) and is connected, install on the outer wall of stabilizing axle (10) and carry flood dragon (11), the right-hand member front side and the right-hand member rear side of crushing case (3) inside all rotate and are connected with crushing axle (12), two the left end of crushing axle (12) extends to the left end of crushing case (3), be located the front side all the cover is equipped with belt pulley (13) on the outer wall of crushing axle (12) and on the outer wall of stabilizing axle (10), two stabilize belt (14) is installed between belt pulley (13), two all install stabilizing gear (15), two on the left end outer wall of crushing axle (12) stabilizing gear (15) mesh mutually, two all the cover is equipped with crushing roller (16) on the outer wall of crushing axle (12).
2. The novel construction site garbage pool of claim 1, wherein: an air heater (17) is arranged at the left end of the crushing box (3).
3. The novel construction site garbage pool of claim 2, wherein: stabilize case (1) inside bottom and install and stabilize three hornblocks (18), stabilize the right-hand member downside of case (1) and install drainage pipe (19), install drain valve (20) on the outer wall of drainage pipe (19).
4. The novel construction site garbage pool of claim 3, wherein: an observation window (21) is installed at the front end of the stabilizing box (1).
5. The novel construction site garbage pool of claim 4, wherein: a discharge hole (22) is arranged at the lower side of the front end of the crushing box (3).
6. The novel construction site garbage pool of claim 5, wherein: the bottom front side and the bottom rear side of the stabilizing box (1) and the bottom front side and the bottom rear side of the crushing box (3) are provided with stabilizing support angles (23).
CN202122352551.2U 2021-09-27 2021-09-27 Novel construction site rubbish pond Expired - Fee Related CN216104038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122352551.2U CN216104038U (en) 2021-09-27 2021-09-27 Novel construction site rubbish pond

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122352551.2U CN216104038U (en) 2021-09-27 2021-09-27 Novel construction site rubbish pond

Publications (1)

Publication Number Publication Date
CN216104038U true CN216104038U (en) 2022-03-22

Family

ID=80689229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122352551.2U Expired - Fee Related CN216104038U (en) 2021-09-27 2021-09-27 Novel construction site rubbish pond

Country Status (1)

Country Link
CN (1) CN216104038U (en)

Similar Documents

Publication Publication Date Title
CN207829141U (en) A kind of drainage pipeline anti-blocking system
CN212468243U (en) Construction waste crushing equipment
CN212681137U (en) Intelligent sorting device for household garbage treatment
CN214417282U (en) Sewage garbage filtering device for sewage treatment plant
CN108978559A (en) A kind of road garbage cleans and collection device
CN112179733A (en) Soil sampling pretreatment device for environment detection
CN209795765U (en) gardens are with view lake surface garbage collection device
CN216104038U (en) Novel construction site rubbish pond
CN113101725A (en) Debris splitter for sewage treatment
CN112604753B (en) Biomass waste treatment equipment
CN213669682U (en) Afforestation discarded object sorting and crushing device
CN206716703U (en) A kind of fixed-end forces device
CN112403626A (en) Dehydration and crushing device for kitchen waste treatment and using method thereof
CN213355679U (en) Solid-liquid garbage separation device for bioengineering
CN113649108A (en) Artificial intelligence building site waste sorting reducing mechanism
CN112206912A (en) Assembled is waste collection device for interior decoration
CN211988849U (en) Construction waste treatment device
CN207434275U (en) A kind of dustbin convenient for dumping rubbish
CN220405893U (en) Movable type construction waste recycling equipment
CN111284423A (en) Special sanitary equipment of car as a house
CN220696035U (en) Filtration equipment for river channel garbage disposal
CN216604379U (en) Underground sewage treatment equipment
CN213669778U (en) Assembled is waste collection device for interior decoration
CN214086038U (en) Special afforestation rubbish recovery unit
CN217027408U (en) Rainwater regulation is discharged and is used infiltration drainage canal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Han Xinliang

Inventor after: Geng Keyan

Inventor after: Ren Wentao

Inventor before: Ren Wentao

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220512

Address after: 063600 No. 301, gate 5, building 314, Jiankang Jiayuan, Jiankang Road, leting Town, leting County, Tangshan City, Hebei Province

Patentee after: Han Xinliang

Address before: 510000 No. 18, Sanxiang, Sansha South Street, Sansha village, Dongyong Town, Nansha District, Guangzhou City, Guangdong Province

Patentee before: Ren Wentao

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220322