CN215978495U - Tobacco pipe type column core concrete lateral pouring device - Google Patents

Tobacco pipe type column core concrete lateral pouring device Download PDF

Info

Publication number
CN215978495U
CN215978495U CN202122421744.9U CN202122421744U CN215978495U CN 215978495 U CN215978495 U CN 215978495U CN 202122421744 U CN202122421744 U CN 202122421744U CN 215978495 U CN215978495 U CN 215978495U
Authority
CN
China
Prior art keywords
pipe
concrete
pouring device
conical barrel
discharge pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122421744.9U
Other languages
Chinese (zh)
Inventor
张立新
彭志峰
张大伟
李金涛
袁朋成
唐莉
张龙
胡树林
韩玉柱
张欣
刘文凭
边曙光
聂德民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Construction Engineering Group Bohai Construction Co ltd
Original Assignee
Beijing Construction Engineering Group Bohai Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Construction Engineering Group Bohai Construction Co ltd filed Critical Beijing Construction Engineering Group Bohai Construction Co ltd
Priority to CN202122421744.9U priority Critical patent/CN215978495U/en
Application granted granted Critical
Publication of CN215978495U publication Critical patent/CN215978495U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The application relates to a tobacco pipe type column core concrete lateral pouring device, which relates to the field of steel structure column concrete pouring and comprises a receiving hopper and a discharging pipe communicated with the receiving hopper; the receiving hopper comprises a conical barrel, and the small end of the conical barrel is fixedly connected with one end of the discharge pipe; the edge of the discharge pipe exceeds the edge of the conical barrel in the horizontal direction; the other end of the discharge pipe is arranged at a height lower than the arrangement height of the end of the discharge pipe connected with the conical barrel. This application has the effect of more conveniently pouring concrete in to the steel-pipe column.

Description

Tobacco pipe type column core concrete lateral pouring device
Technical Field
The utility model belongs to the technical field of steel construction column concrete placement and specifically relates to a tobacco pipe formula column core concrete lateral pouring device is related to.
Background
When the concrete in the steel pipe column is poured, the concrete is generally poured from top to bottom, so that a complete construction scheme is formed. However, in some specific cases, for example, local reinforcement of vertical members, casting of concrete members under a floor slab, casting height not too large but high of steel pipe column, etc., so that the concrete casting cannot be vertically cast into a mold, a construction method of casting with a lateral opening is generally adopted. And when the construction method of pouring with lateral openings is adopted, the construction is generally a high building, and concrete to be poured is generally hoisted by using a crane and is continuously conveyed.
When pouring, the constructor sets up circular hole at the steel-pipe column lateral wall, then uses the tower crane hoist and mount concrete transportation fill, installs the conveying pipeline on concrete transportation fill, and when highly moving of concrete transportation fill was higher than circular hole, aligns conveying pipeline and circular hole, pours into the steel-pipe column lateral wall into the concrete in the concrete transportation fill via conveying pipeline and circular hole.
In view of the above-mentioned related technologies, the inventor believes that, when concrete is poured, it takes time to align the nozzle of the material delivery pipe with the circular hole every time the concrete is poured, and when the concrete is poured, once alignment deviation occurs or a gap exists between the nozzle of the material delivery pipe and the circular hole, a part of the concrete is scattered.
SUMMERY OF THE UTILITY MODEL
In order to make the concrete be difficult for spilling when pouring, this application provides a pipe column core concrete lateral direction pouring device.
The application provides a tobacco pipe formula column core concrete lateral direction pouring device adopts following technical scheme:
a tobacco pipe type column core concrete lateral pouring device comprises a bearing hopper and a discharge pipe communicated with the bearing hopper;
the receiving hopper comprises a conical barrel, and the small end of the conical barrel is fixedly connected with one end of the discharge pipe; the edge of the discharge pipe exceeds the edge of the conical barrel in the horizontal direction;
the other end of the discharge pipe is arranged at a height lower than the arrangement height of the end of the discharge pipe connected with the conical barrel.
Through adopting above-mentioned technical scheme, the discharging pipe with accept fill inside intercommunication, get into the inside concrete inflow discharging pipe of a toper section of thick bamboo, discharge via the discharging pipe.
When concrete is poured into the round hole formed in the side wall of the steel pipe column, the discharge pipe is inserted into the round hole, then the concrete lifted by the crane is poured into the conical barrel, and the concrete enters the steel pipe column through the discharge pipe and the round hole, so that the process of pouring the concrete in the steel pipe column is completed. Through setting up to hold and connect fill and discharging pipe, convert concrete placement's entry into by side slope or horizontally angle and hold the ascending structure of fill opening, can make things convenient for pouring of concrete, concrete placement's time and increase the area that the regional was accepted to the concrete when shortening and pour, conveniently pour into the concrete into the steel-pipe column, reduce spilling out of concrete.
Optionally, a plurality of enclosing plates are fixedly connected to the upper end face of the conical cylinder, the enclosing plates enclose an annular shape, and the enclosing plates and the conical cylinder are concentric.
Through adopting above-mentioned technical scheme, a plurality of bounding walls increase the volume of a toper section of thick bamboo for can hold more concrete in the holding fill, and then when making the loop wheel machine carry the concrete, the loop wheel machine can more orderly transportation concrete.
Optionally, the enclosing plates are arranged in an inclined manner, and the diameter of the upper side of a ring enclosed by the enclosing plates is larger than that of the lower side.
Through adopting above-mentioned technical scheme, when pouring into and hold the concrete in fighting and the bounding wall contact, the gliding more easily, and the bounding wall slope is arranged, enlarges the bore of bounding wall, makes things convenient for the concrete to pour into and holds in fighting.
Optionally, the outer side of the enclosing plate is fixedly connected with a hanging ring.
Through adopting above-mentioned technical scheme, under the effect of rings, can increase the application of force point on the bearing fill, make the staff lift the bearing fill more easily.
Optionally, an auxiliary pipe is mounted at one end of the discharge pipe, which is far away from the conical barrel.
Through adopting above-mentioned technical scheme, the auxiliary tube is used for increasing the length of discharging pipe, when making discharging pipe and auxiliary tube insert in the steel-pipe column, the mouth of pipe that gets into the auxiliary tube in the steel-pipe column is more close to the bottom of steel-pipe column, makes things convenient for the concrete to get into in the steel-pipe column, and along with the continuous injection of concrete, the concrete is high ascending in the steel-pipe column, and the concrete that gets into after still strikes the stirring to preceding concrete, increase concrete placement's effect.
Optionally, the auxiliary pipe is connected with the discharge pipe through a flange.
Through adopting above-mentioned technical scheme, flange joint can be so that the connection between auxiliary pipe and the discharging pipe is more firm for impact when the concrete flows through can not make auxiliary pipe and discharging pipe take place to separate. The discharging pipe can be connected with the outer side of the steel pipe column by using a flange, and the installation of the bearing hopper is reinforced.
Optionally, a bracket is fixedly connected to the lower side of the conical cylinder.
Through adopting above-mentioned technical scheme, the support with accept to fight and be connected, support accepting the fill, and accept to fight and to be connected with scaffold frame can use when arranging, to accepting the fill and consolidate, accept when making concreting to fight and arrange more firmly.
Optionally, the discharge pipe is fixedly connected with the support.
Through adopting above-mentioned technical scheme, the support consolidates the support to the discharging pipe, keeps the stability of arranging when discharging pipe concreting.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by arranging the receiving hopper and the discharge pipe, an inlet for pouring concrete is converted into a structure with an upward opening of the receiving hopper from a laterally inclined or horizontal angle, so that the pouring of the concrete can be facilitated;
2. the volume of the receiving hopper is increased by arranging the enclosing plate;
3. through setting up the auxiliary tube, increase the live length of discharging pipe.
Drawings
FIG. 1 is a schematic view of a pipe column core concrete lateral casting device in example 1;
FIG. 2 is a schematic view of the inside of a hopper according to embodiment 1;
FIG. 3 is a schematic view showing a structure of a receiving hopper hidden on a steel pipe column in example 1;
fig. 4 shows a pipe column core concrete lateral pouring device in example 2.
Description of reference numerals: 1. a receiving hopper; 11. a tapered barrel; 12. enclosing plates; 13. a hoisting ring; 2. a discharge pipe; 21. an auxiliary tube; 3. and (4) a bracket.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses cigarette pipe formula post core concrete side direction pouring device. Referring to fig. 1, the pipe column core concrete lateral pouring device comprises a bearing bucket 1 and a discharge pipe 2 connected with the bearing bucket 1. Discharging pipe 2 with accept 1 inside intercommunication of fill, the inside concrete that gets into and hold fill 1 can flow into discharging pipe 2, discharge via discharging pipe 2, when pouring concrete into the circular hole that the steel-pipe column lateral wall was seted up, insert discharging pipe 2 in the circular hole, then pour concrete into and hold fill 1 in, the concrete pours into the steel-pipe column into via discharging pipe 2 and circular hole in to accomplish the process of pouring concrete in the steel-pipe column. Through setting up the bearing fill 1 and discharging pipe 2, convert concrete placement's entry into by side slope or horizontally angle and hold 1 ascending structure of opening of hopper, can make things convenient for pouring of concrete, concrete placement's time and increase the area that the region was accepted to the concrete when shortening and pouring make things convenient for the concrete to pour into the steel-pipe column, reduce spilling out of concrete.
Example 1
Referring to fig. 1 and 2, the receiving bucket 1 includes a conical barrel 11, a large end of the conical barrel 11 is opened upward, and a small end of the conical barrel 11 is opened downward. The upper side of the conical barrel 11 is fixedly connected with a plurality of coamings 12, the coamings 12 are encircled to form a ring shape, the coamings 12 are fixedly connected with the upper surface of the conical barrel 11, and the coamings 12 are encircled in the center of the conical barrel 11 and are concentrically arranged with the conical barrel 11. Wherein the coamings 12 are arranged obliquely, and the distance between the lower side edges of the coamings 12 is smaller than the distance between the upper side edges. When pouring concrete, the concrete is poured between the plurality of enclosing plates 12, enters the tapered cylinder 11 from between the plurality of enclosing plates 12, so that the concrete enters the tapered cylinder 11 from the large end of the tapered cylinder 11 and is discharged through the small end of the tapered cylinder 11. The coaming 12 increases the arrangement height of the conical barrel 11, so that more concrete can be accommodated in the receiving hopper 1 at one time, and the turnover of the concrete is facilitated.
The outer wall of the enclosing plate 12 is fixedly connected with hanging rings 13, the hanging rings 13 are arranged on two sides of a ring formed by the enclosing plate 12, two hanging rings 13 are arranged, and the two hanging rings 13 are arranged in an aligned mode. Wherein the suspension loops 13 are arranged on the enclosing plates 12, and wherein two suspension loops 13 are arranged on opposite enclosing plates 12.
One end of the discharge pipe 2 is fixedly connected with the small end of the conical barrel 11, the discharge pipe 2 is communicated with the interior of the conical barrel 11, the highest end of the discharge pipe 2 is lower than the lowest end of the conical barrel 11 in height, and concrete entering the conical barrel 11 conveniently flows into the discharge pipe 2 under the action of self gravity. The discharging pipe 2 is obliquely arranged, and the arrangement height of the other end of the discharging pipe 2 is lower than that of the end connected with the conical barrel 11. The vertical surface formed by the end of the tapping pipe 2 remote from the conical cylinder 11 exceeds the vertical surface formed by the edge of the shroud 12.
When concrete is poured, the discharge pipe 2 is inserted into a circular hole formed in the side face of the steel pipe column, and the concrete in the bearing hopper 1 is guided to enter the steel pipe column.
Still install auxiliary pipe 21 at the tip of discharging pipe 2, through flange joint between the tip of auxiliary pipe 21 and discharging pipe 2, auxiliary pipe 21 is used for increasing the length of discharging pipe 2, increase the degree of depth that discharging pipe 2 inserted in the steel-pipe column, when making the concrete get into the steel-pipe column via discharging pipe 2 and auxiliary pipe 21, the mouth of pipe of the auxiliary pipe 21 that gets into in the steel-pipe column is more close to the bottom of steel-pipe column, along with the continuous injection of concrete, the concrete highly rises in the steel-pipe column, and the concrete that gets into later still strikes the stirring to preceding concrete.
When using to hold and connect fill 1 and discharging pipe 2 and leading-in steel-pipe column of concrete in, in the circular hole that discharging pipe 2 and steel-pipe column side were seted up earlier, and will accept the edge and the steel-pipe column side laminating of fill 1, make the degree of depth that discharging pipe 2 can insert in the steel-pipe column darker, then use steel pipe on the scaffold frame etc. to support accepting fill 1, and tie up accepting fill 1 and scaffold frame together, consolidate the arranging of accepting fill 1, when making accepting fill 1 and steel-pipe column connection, there is higher stability.
In the embodiment 1, the implementation principle of the pipe type column core concrete lateral pouring device is as follows: referring to fig. 3, aligning the discharge pipe 2 with a circular hole formed in the side surface of the steel pipe column, installing the receiving hopper 1 on the side surface of the steel pipe column, inserting the discharge pipe 2 into the steel pipe column, reinforcing the receiving hopper 1, and maintaining the stability of the installation of the receiving hopper 1 and the discharge pipe 2 on the steel pipe column. Then pour into the concrete into the bearing fill 1, the concrete in the bearing fill 1 is in the continuous entering steel-pipe column of discharging pipe 2, and the loop wheel machine is at the in-process of transportation concrete, and bearing fill 1 need not pull down from the steel-pipe column for make things convenient for the staff to pour concrete into in the steel-pipe column, but also can reduce the time of aliging, spill when reducing concrete placement.
Example 2
Referring to fig. 4, the lower side of the receiving hopper 1 is fixedly connected with a support 3, the support 3 is used for supporting the receiving hopper 1, and when the receiving hopper 1 is connected with the side surface of a steel pipe column, the support 3 is connected with a scaffold, so that more binding points exist when the scaffold is connected with the receiving hopper 1, and the reinforcement of the receiving hopper 1 is more convenient.
Fixed connection between support 3 and discharging pipe 2, support 3 reinforces discharging pipe 2's arrangement, increases discharging pipe 2's stability when concrete flows through in discharging pipe 2.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited thereto, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a tobacco pipe formula column core concrete side direction pouring device which characterized in that: comprises a receiving hopper (1) and a material obtaining pipe (2) communicated with the receiving hopper (1);
the receiving hopper (1) comprises a conical barrel (11), and the small end of the conical barrel (11) is fixedly connected with one end of the discharge pipe (2); the edge of the discharge pipe (2) exceeds the edge of the conical barrel (11) in the horizontal direction;
the other end of the discharge pipe (2) is arranged at a height lower than the arrangement height of the end of the discharge pipe (2) connected with the conical barrel (11).
2. The pipe type column core concrete lateral pouring device of claim 1, characterized in that: the upper end face of the conical barrel (11) is fixedly connected with a plurality of enclosing plates (12), the enclosing plates (12) enclose into a ring shape, and the enclosing plates (12) are concentric with the conical barrel (11).
3. The pipe type column core concrete lateral pouring device of claim 2, characterized in that: the coamings (12) are obliquely arranged, and the diameter of the upper side of a ring enclosed by the coamings (12) is larger than that of the lower side.
4. The pipe type column core concrete lateral pouring device of claim 2, characterized in that: and the outer side of the enclosing plate (12) is fixedly connected with a hanging ring (13).
5. The pipe type column core concrete lateral pouring device of claim 1, characterized in that: an auxiliary pipe (21) is arranged at one end, far away from the conical barrel (11), of the discharge pipe (2).
6. The pipe type column core concrete lateral pouring device of claim 5, characterized in that: the auxiliary pipe (21) is connected with the discharge pipe (2) through a flange.
7. The pipe type column core concrete lateral pouring device of claim 1, characterized in that: the lower side of the conical cylinder (11) is fixedly connected with a bracket (3).
8. The pipe column core concrete lateral pouring device of claim 7, wherein: the discharge pipe (2) is fixedly connected with the support (3).
CN202122421744.9U 2021-10-08 2021-10-08 Tobacco pipe type column core concrete lateral pouring device Active CN215978495U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122421744.9U CN215978495U (en) 2021-10-08 2021-10-08 Tobacco pipe type column core concrete lateral pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122421744.9U CN215978495U (en) 2021-10-08 2021-10-08 Tobacco pipe type column core concrete lateral pouring device

Publications (1)

Publication Number Publication Date
CN215978495U true CN215978495U (en) 2022-03-08

Family

ID=80509196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122421744.9U Active CN215978495U (en) 2021-10-08 2021-10-08 Tobacco pipe type column core concrete lateral pouring device

Country Status (1)

Country Link
CN (1) CN215978495U (en)

Similar Documents

Publication Publication Date Title
CN108756890A (en) A kind of sliding mode system being in the milk for vertical shaft concreting and rock mass
CN102102365B (en) Slurry protection wall bored pile concrete casting device
CN105507593A (en) Multifunctional fast concrete pouring device
CN215978495U (en) Tobacco pipe type column core concrete lateral pouring device
CN205677249U (en) A kind of casting concrete constructional column hopper
CN208309610U (en) One kind exempting from bottom concrete steel lifted trunk bottom plate and steel pile casting attachment device
CN208650086U (en) A kind of movable type streetlamp foundation
CN203782863U (en) Frame type draining well
CN205476501U (en) Device is pour fast to multi -functional concrete
CN210369938U (en) A can have enough to meet need sleeve for pouring stake core
CN212153397U (en) Reinforced structure of crooked column cap on steel lattice column
CN108625364A (en) A kind of foundation pit steel pipe post stake concrete pouring is anti-to stream construction method
CN208039845U (en) A kind of vertical blanking device of new concrete
CN209482299U (en) The bolt-type hangs muscle component that can be reused
CN208933972U (en) A kind of concrete-spouting plant
CN111502288A (en) Hoistway climbing type material distribution device and construction method thereof
CN205242407U (en) A cluster pipe, chute combination system for deep basal pit concrete placement
CN205776322U (en) A kind of steel tower with novel foundation structure
CN220847589U (en) Filling construction device for piling
CN218267700U (en) Reinforced structure of cement pipe end
CN208202223U (en) A kind of assembled architecture shear wall structure
CN104988941B (en) Large bearing platform type foundation hanging formwork and construction method thereof
CN213142769U (en) Assembled stand foundation structure
CN207686294U (en) Wall pours the undertaking Template Location bracing means with aluminum alloy pattern plate
CN218292018U (en) Unsettled tower crane foundation base supports reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant