CN105507593A - Multifunctional fast concrete pouring device - Google Patents

Multifunctional fast concrete pouring device Download PDF

Info

Publication number
CN105507593A
CN105507593A CN201511033905.XA CN201511033905A CN105507593A CN 105507593 A CN105507593 A CN 105507593A CN 201511033905 A CN201511033905 A CN 201511033905A CN 105507593 A CN105507593 A CN 105507593A
Authority
CN
China
Prior art keywords
pouring device
blanking hopper
concrete
discharge port
fast pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511033905.XA
Other languages
Chinese (zh)
Inventor
江涌波
秦龙海
林君伟
周艳芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU FOURTH CONSTRUCTION Co Ltd
Original Assignee
GUANGZHOU FOURTH CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU FOURTH CONSTRUCTION Co Ltd filed Critical GUANGZHOU FOURTH CONSTRUCTION Co Ltd
Priority to CN201511033905.XA priority Critical patent/CN105507593A/en
Publication of CN105507593A publication Critical patent/CN105507593A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/025Buckets specially adapted for use with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention belongs to the field of concrete application, and particularly relates to a multifunctional fast concrete pouring device. The multifunctional fast concrete pouring device comprises a discharge hopper with the upper portion of a cylindrical structure and the lower portion being of a conical structure, an open concrete feed inlet is arranged at the top end of the discharge hopper, the lower cone of the discharge hopper extends to form discharge outlets communicated with the discharge hopper, the upper portion of each discharge outlet is provided with a drawable baffle switch, the outer wall of the lower portion of each discharge outlet is provided with a bayonet, and each discharge outlet is connected with a hose used for leading concrete into a template through the corresponding bayonet. The multifunctional fast concrete pouring device is simple in structure and convenient to produce and transport, the requirement for fast concreting construction in a frame structure is met, and fast concrete construction is realized.

Description

A kind of multifunctional concrete fast pouring device
Technical field
The present invention relates to a kind of multifunctional concrete fast pouring device.Belong to concrete application, be applicable to the concrete fast pouring construction in frame construction, be particularly useful for the high-rise concatermer side chamber structure that speed of application requirement is higher.
Background technology
In the work progress of high-rise concatermer side chamber structure, usual employing slding form operation, concrete construction is Focal point and difficult point technology wherein always, because the pumping height of current domestic existing concrete sky pump is limited, when running into the high level side's chamber structure more than 60 meters, just or suspension bucket can only be utilized to carry out concreting by traditional material distributing machine.And as constructed with traditional cloths machine, the vibrations produced during material distributing machine construction usually can affect the arrangement of reinforcing bar and the stability of template, produce great potential safety hazard; And as constructed with traditional suspension bucket, then can only build the single side regions of a Fang Cangzhong, speed of perfusion is excessively slow, and occupies tower crane for a long time at every turn, affect the normal construction of all the other operations, reduce efficiency of construction, as between square storehouse, concreting is long for interval time, the square storehouse concrete that early stage builds first solidifies, and the square storehouse concrete that the later stage builds does not solidify, directly will cause the chamber structure slding form operation failure of high-rise concatermer side, conjuncted square storehouse quantity is more, and difficulty of construction is larger.Therefore, be necessary to improve the concreting method of high-rise concatermer side chamber structure, and then under the prerequisite ensureing construction safety and quality, accelerating construction progress, improves efficiency of construction.
Existing high-rise frame tubing string concrete casting device (CN102704687B) at present, adopt suspension rod, plugging device integral type opening and closing mode, when storage bin drops on ground support, feed opening is by self-closed, suspension rod is fallen after rise after storage bin inserts tubing string, utilize suspension rod weight and concrete gravity automatically to open feed opening, build that complete lift suspension rod is just capable of hoisting rises storage bin.This structure improves efficiency of construction in the concreting of high-rise frame tubing string, reduces waste of material and contamination phenomenon, but can not improve concrete speed of perfusion.
In sum, in order to realize rapid concrete construction, need invention a kind of of many uses, simple structure, easy to make, transport facility at present badly, and under the prerequisite ensureing construction quality, accelerate concreting process, Optimizing construction progress, improves efficiency of construction, realizes the multifunctional concrete fast pouring device of multiple spot, multizone Pouring concrete at the same time.
Summary of the invention
The present invention proposes a kind of of many uses, simple structure, easy to make, transport facility, and under the prerequisite ensureing construction quality, accelerate concreting process, Optimizing construction progress, improves efficiency of construction, realizes the multifunctional concrete fast pouring device of multiple spot, multizone Pouring concrete at the same time, solve in prior art and can only build a region at every turn, speed of perfusion is excessively slow, and affects the normal construction of all the other operations, the problems such as efficiency of construction is low.
In order to solve the problems of the technologies described above, technical scheme of the present invention is:
A kind of multifunctional concrete fast pouring device, comprise the blanking hopper that top is cylindrical structure, bottom is cone structure, described blanking hopper top is provided with uncovered untight concrete charging aperture, the bottom cone of described blanking hopper is extended with the discharge port communicated with described blanking hopper, described discharge port top is provided with the isolating switch that can extract, described discharge port bottom outer wall is provided with bayonet socket, and described discharge port is connected with the flexible pipe entering template for guiding concrete by described bayonet socket.
Further, described discharge port is set to more than 2.
Hanger for lifting by crane transport is arranged at described blanking hopper top at equal intervals uniform welding.
Described blanking feed hopper bottom is provided with vertical feed opening, and described vertical feed opening is also provided with switch.
The supporting leg of two or more and described blanking hopper mating shapes is arranged at described blanking hopper top circumferentially uniform welding, and described supporting leg is L-type, and the welding position of described supporting leg is between adjacent described flexible pipe.
The bottom of adjacent described supporting leg is undertaken affixed by angle steel, and described angle steel can square crossing or parallel.
The described angle steel of square crossing is bolted to connection.
Described blanking hopper adopts steel plate to make, and the inwall of described blanking hopper and discharge port is shiny surface.
The present invention has following feature and beneficial effect:
The blanking hopper that top by arranging in multifunctional concrete fast pouring device of the present invention is cylindrical structure, bottom is cone structure utilizes concrete gravitional force, accelerate concrete gravity flow, the discharge port that blanking hopper bottom cone extends is set to multiple, the concreting of zones of different can be met, accelerate the concreting of whole job site, improve efficiency of construction, reduce the engineering time, the isolating switch that discharge port is provided with can control the break-make of concreting, Optimizing construction progress, realizes multiple spot, multizone Pouring concrete at the same time.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the stereogram of a kind of multifunctional concrete fast pouring of the present invention device;
Fig. 2 is the elevation of a kind of multifunctional concrete fast pouring of the present invention device;
Fig. 3 is the plan view of a kind of multifunctional concrete fast pouring of the present invention device.
In figure, 1-blanking hopper; 2-concrete charging aperture; The vertical feed opening of 3-; 4-switch; 5-discharge port; 6-isolating switch; 7-bayonet socket; 8-flexible pipe; 9-hanger; 10-supporting leg; 11-angle steel; 12-bolt.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described further.It should be noted that at this, the explanation for these embodiments understands the present invention for helping, but does not form limitation of the invention.In addition, if below in described each embodiment of the present invention involved technical characteristic do not form conflict each other and just can mutually combine.
With reference to the stereogram of a kind of multifunctional concrete fast pouring device shown in Fig. 1.A kind of multifunctional concrete fast pouring device, comprise the blanking hopper 1 that top is cylindrical structure, bottom is cone structure, described blanking hopper 1 adopts steel plate to make, the inwall of described blanking hopper 1 and discharge port 5 is shiny surface, the setting in inner wall smooth face decrease concrete in gravity flow process with the friction of blanking hopper, accelerate concrete gravity flow speed.Described blanking hopper 1 top is provided with uncovered untight concrete charging aperture 2, and concrete charging aperture 2 can be connected with concrete pump.Be provided with vertical feed opening 3 bottom described blanking hopper 1, described vertical feed opening 3 is also provided with switch 4, and vertical feed opening 3 can remove residual concrete and impurity.
With reference to the elevation of a kind of multifunctional concrete fast pouring device shown in Fig. 2.The bottom cone of described blanking hopper 1 is extended with the discharge port 5 communicated with described blanking hopper 1, described discharge port 5 top is provided with the isolating switch 6 that can extract, described discharge port 5 bottom outer wall is provided with bayonet socket 7, and described discharge port leads to the described bayonet socket 7 of 5 mistake and is connected with the flexible pipe 8 entering template for guiding concrete.Described discharge port 5 is set to two or more.Multiple discharge ports 5 can meet the concreting of zones of different, accelerate the concreting of whole job site, improve efficiency of construction, reduce the engineering time.
With reference to the plan view of a kind of multifunctional concrete fast pouring device shown in Fig. 3.Hanger 9 for lifting by crane transport is arranged at described blanking hopper 1 top at equal intervals uniform welding, the convenient transportation of convenient multi-functional concrete fast pouring device.The supporting leg 10 of two or more and described blanking hopper 1 mating shapes is arranged at described blanking hopper 1 top circumferentially uniform welding, and described supporting leg 10 is in L-type, and the welding position of described supporting leg 10 is between adjacent described flexible pipe 8.The bottom of adjacent described supporting leg 10 is undertaken affixed by angle steel 11, and described angle steel 11 can square crossing or parallel.The described angle steel 11 of square crossing is fixedly connected with by bolt 12.The setting of supporting leg 10, angle steel 11 ensure that the placement safety of multifunctional concrete fast pouring device, and safety benefit is remarkable.
The blanking hopper 1 that top by arranging in multifunctional concrete fast pouring device of the present invention is cylindrical structure, bottom is cone structure utilizes concrete gravitional force, accelerate concrete gravity flow, the isolating switch 6 that discharge port 5 is provided with can control the break-make of concreting, Optimizing construction progress.Whole multifunctional concrete fast pouring device simple structure, easy to make, transport facility, meet the requirement of the concrete fast pouring construction in frame construction, realize rapid concrete construction, realize multiple spot, multizone Pouring concrete at the same time.
Below by reference to the accompanying drawings embodiments of the present invention are explained in detail, but the invention is not restricted to described embodiment.For a person skilled in the art, when not departing from the principle of the invention and spirit, multiple change, amendment, replacement and modification being carried out to these embodiments, still falls within the scope of protection of the present invention.

Claims (8)

1. a multifunctional concrete fast pouring device, it is characterized in that comprising the blanking hopper that top is cylindrical structure, bottom is cone structure, described blanking hopper top is provided with uncovered untight concrete charging aperture, the bottom cone of described blanking hopper is extended with the discharge port communicated with described blanking hopper, described discharge port top is provided with the isolating switch that can extract, described discharge port bottom outer wall is provided with bayonet socket, and described discharge port is connected with the flexible pipe entering template for guiding concrete by described bayonet socket.
2. multifunctional concrete fast pouring device according to claim 1, is characterized in that described discharge port is set to more than 2.
3. multifunctional concrete fast pouring device according to claim 1, it is characterized in that described blanking hopper top at equal intervals uniform welding have the hanger for lifting by crane transport.
4. multifunctional concrete fast pouring device according to claim 1, it is characterized in that described blanking feed hopper bottom is provided with vertical feed opening, described vertical feed opening is provided with switch.
5. the multifunctional concrete fast pouring device according to claim 1 or 2 or 3 or 4, it is characterized in that described blanking hopper top circumferentially uniform welding have the supporting leg of two or more and described blanking hopper mating shapes, described supporting leg is L-type, and the welding position of described supporting leg is between adjacent described flexible pipe.
6. multifunctional concrete fast pouring device according to claim 5, it is characterized in that the bottom of adjacent described supporting leg is undertaken affixed by angle steel, described angle steel can square crossing or parallel.
7., according to according to multifunctional concrete fast pouring device according to claim 6, it is characterized in that the described angle steel of square crossing is bolted to connection.
8. the multifunctional concrete fast pouring device according to claim 1 or 2 or 3 or 4 or 6 or 7, it is characterized in that described blanking hopper adopts steel plate to make, the inwall of described blanking hopper and discharge port is shiny surface.
CN201511033905.XA 2015-12-31 2015-12-31 Multifunctional fast concrete pouring device Pending CN105507593A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511033905.XA CN105507593A (en) 2015-12-31 2015-12-31 Multifunctional fast concrete pouring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511033905.XA CN105507593A (en) 2015-12-31 2015-12-31 Multifunctional fast concrete pouring device

Publications (1)

Publication Number Publication Date
CN105507593A true CN105507593A (en) 2016-04-20

Family

ID=55715865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511033905.XA Pending CN105507593A (en) 2015-12-31 2015-12-31 Multifunctional fast concrete pouring device

Country Status (1)

Country Link
CN (1) CN105507593A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105818267A (en) * 2016-04-25 2016-08-03 朱德仲 Concrete precipitation preventing lifting box
CN109594781A (en) * 2018-12-12 2019-04-09 湖南易兴建筑有限公司 Running gate system
CN109667271A (en) * 2019-01-21 2019-04-23 中建八局第建设有限公司 A kind of architectural engineering concrete placing installation
CN110565536A (en) * 2019-10-18 2019-12-13 中冶建工集团有限公司 Hollow thin-wall high-pier discharging device
CN111608390A (en) * 2020-05-12 2020-09-01 中铁十四局集团建筑工程有限公司 Concrete pouring equipment and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001088308A1 (en) * 2000-05-15 2001-11-22 Rensel Torbjoern Device for jointing of concrete elements
EP1830017A1 (en) * 2006-03-02 2007-09-05 Obrist Baugeräte AG Crane bucket for transport of pourable construction material, like concrete, gravel, sand
CN201128656Y (en) * 2008-03-16 2008-10-08 山东新城建工股份有限公司 Multifunctional hopper for construction
CN204199708U (en) * 2014-09-24 2015-03-11 中国核工业第二二建设有限公司 Concrete divides hopper
CN205476501U (en) * 2015-12-31 2016-08-17 广州市第四建筑工程有限公司 Device is pour fast to multi -functional concrete

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001088308A1 (en) * 2000-05-15 2001-11-22 Rensel Torbjoern Device for jointing of concrete elements
EP1830017A1 (en) * 2006-03-02 2007-09-05 Obrist Baugeräte AG Crane bucket for transport of pourable construction material, like concrete, gravel, sand
CN201128656Y (en) * 2008-03-16 2008-10-08 山东新城建工股份有限公司 Multifunctional hopper for construction
CN204199708U (en) * 2014-09-24 2015-03-11 中国核工业第二二建设有限公司 Concrete divides hopper
CN205476501U (en) * 2015-12-31 2016-08-17 广州市第四建筑工程有限公司 Device is pour fast to multi -functional concrete

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105818267A (en) * 2016-04-25 2016-08-03 朱德仲 Concrete precipitation preventing lifting box
CN109594781A (en) * 2018-12-12 2019-04-09 湖南易兴建筑有限公司 Running gate system
CN109594781B (en) * 2018-12-12 2021-10-29 湖南易兴建筑有限公司 Pouring system
CN109667271A (en) * 2019-01-21 2019-04-23 中建八局第建设有限公司 A kind of architectural engineering concrete placing installation
CN109667271B (en) * 2019-01-21 2024-01-26 中建八局第一建设有限公司 A kind of construction engineering concrete pouring equipment
CN110565536A (en) * 2019-10-18 2019-12-13 中冶建工集团有限公司 Hollow thin-wall high-pier discharging device
CN111608390A (en) * 2020-05-12 2020-09-01 中铁十四局集团建筑工程有限公司 Concrete pouring equipment and using method thereof

Similar Documents

Publication Publication Date Title
CN105507593A (en) Multifunctional fast concrete pouring device
CN103470046A (en) Concrete pouring device and method for ultrahigh steel pipe concrete column by using conduit method
CN204960332U (en) Conveyer pipe is pour perpendicularly to concrete
CN203320963U (en) Detachable discharging cylinder for concrete casting
CN108756890A (en) A kind of sliding mode system being in the milk for vertical shaft concreting and rock mass
CN204492198U (en) Concrete slip cylinder
CN102102365B (en) Slurry protection wall bored pile concrete casting device
CN205743021U (en) A kind of civil engineering concrete funnel
CN205476501U (en) Device is pour fast to multi -functional concrete
CN205840345U (en) A kind of embedded type tower crane funnel
CN203403420U (en) Concrete vertical conveying pouring system
CN202220435U (en) Reverse construction underground concrete structure formwork descending equipment
CN213296424U (en) Reverse construction method wall of a well concrete device of putting in storage
CN205935691U (en) Storehouse face concrete placement system
CN104746875B (en) A kind of portable block-shaped discarded concrete pours device
CN203847334U (en) Built-in fitting
CN206329043U (en) A kind of concrete shunts slot device
CN206052692U (en) A kind of bored concrete pile suspension rod
CN203905002U (en) Device for reducing aggregate segregation of high-head roller compacted concrete
CN207485467U (en) Tailings buffers overflow device
CN215978495U (en) Tobacco pipe type column core concrete lateral pouring device
CN108035356A (en) A kind of building concrete, which pours, uses automatic positioning equipment
CN208790387U (en) waste bin
CN217556927U (en) Concrete pouring device for underground structures
CN205776322U (en) A kind of steel tower with novel foundation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160420