CN102102365B - Slurry protection wall bored pile concrete casting device - Google Patents

Slurry protection wall bored pile concrete casting device Download PDF

Info

Publication number
CN102102365B
CN102102365B CN 201010590960 CN201010590960A CN102102365B CN 102102365 B CN102102365 B CN 102102365B CN 201010590960 CN201010590960 CN 201010590960 CN 201010590960 A CN201010590960 A CN 201010590960A CN 102102365 B CN102102365 B CN 102102365B
Authority
CN
China
Prior art keywords
chassis
hopper
concrete casting
lift
protection wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010590960
Other languages
Chinese (zh)
Other versions
CN102102365A (en
Inventor
卢侃
王辉
胡金洲
黄文亭
叶建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN 201010590960 priority Critical patent/CN102102365B/en
Publication of CN102102365A publication Critical patent/CN102102365A/en
Application granted granted Critical
Publication of CN102102365B publication Critical patent/CN102102365B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a slurry protection wall bored pile concrete casting device, which comprises a base plate, a stander, a winch, a hoisting system, a hopper and a guide pipe. The slurry protection wall bored pile concrete casting device is characterized in that: the stander is connected with the base plate through a bolt pin; the material outlet at the bottom of the hopper is connected with the upper end of the guide pipe; and the winch drives the hopper and the guide pipe to be lifted or descended through the transmission of the hoisting system. The slurry protection wall bored pile concrete casting device has the advantages that: (1) the site construction can be performed continuously so that a poring machinery and a concrete casting machinery cannot be used together to fulfill the aim of special machinery for special use; (2) the severe quality problems, such as pile breakage caused by overlarge up-pull degree of the guide pipe can be avoided; (3) the device is easy adj convenient to manufacture; (4) the slurry protection wall bored pile concrete casting device can be reused and is convenient to transport; and (5) the engineering cost is lowered.

Description

Slurry protection wall bored pile concrete casting device
Technical field
The present invention relates to a kind of slurry protection wall bored pile concrete casting device.
Background technology
At the realm of building construction, along with height and the scale of construction of agent structure constantly increases, bored pile is widely used with the little bearing capacity advantages of higher of its sedimentation, concrete pouring quality is one of key point of bored pile pile quality, the boring frame of conventional method employing engineering driller or small crane are transferred and are promoted conduit and carry out the concreting operation, the method will affect the utilization rate of on-the-spot machinery, reduce work efficiency, increase engineering cost.If not at the uniform velocity, affect pile quality, and cost is higher when adopting small crane to build to cause tremie to promote.
Summary of the invention
Technical problem to be solved by this invention provides a kind of slurry protection wall bored pile concrete casting device; can guarantee tremie hoisting velocity and height, guarantee concrete pouring quality, not take engineering driller and small crane simultaneously; improve operation rate of machinery, save construction costs.
Technical problem to be solved by this invention is achieved through the following technical solutions:
A kind of slurry protection wall bored pile concrete casting device, comprise chassis, frame, hoist engine, Lift-on/Lift-off System, hopper and conduit, it is characterized in that: described frame is connected with the chassis by pin, the feed hopper bottom discharging opening is connected with the conduit upper end, and hoist engine promotes or transfers by transmission drive hopper and the conduit of Lift-on/Lift-off System.
Described steel chassis is welded by shaped steel, and hoist engine is bolted in the shaped steel stull at middle part, chassis.
Described frame comprises gallows frame, diagonal brace and fixed pulley, and the diagonal brace upper end is connected with the vertical rod top of gallows frame by pin, and the diagonal brace lower end is connected with the chassis by pin.
Described gallows frame comprises crossbeam and column, and crossbeam and two root post tops are welded to form portal frame; The column middle part adopts flange with the docking of two splicing steel pipes, and the Plate Welding shutoff is adopted at two ends up and down, and soldering pin ties fitting on plugging plate.
Described diagonal brace middle part adopts flange with the docking of two splicing steel pipes, and the Plate Welding shutoff is adopted at two ends up and down, and soldering pin ties fitting on plugging plate.
Described Lift-on/Lift-off System is comprised of lifting rope and suspension hook, and the lifting rope two ends are connected with hoist engine and suspension hook respectively by the fixed pulley that is fixed on the crossbeam, and suspension hook is connected with hopper.
The chassis skeleton on described chassis is by i iron and weldering, the middle part adds the stull of weldering i iron, the steel grid that the dead slot position adopts round steel to make covers, two i iron top soldering pin about the chassis is in apart from each 1.5m of rear and front end ties fitting, and chassis four welded corner joint steel crotches are used for the transition lifting.
Described hopper upper end is cylindrical, and the lower end is taper, and sectional dimension diminishes gradually, and bottom discharge mouth lower end is connected with conduit by screw thread, and described conduit is multistage, and every section pipe joint place adopts mantle fiber to connect, and adds rubber sheet gasket and carries out waterproofing work.
The present invention has following advantage: (1) can make site operation carry out continuously, accomplishes that pore-forming and concreting separate special computer for special use; (2) prevent the excessive serious quality problems such as broken pile that cause of the amount of pulling out on the conduit; (3) simple for production; (4) can reuse convenient transport; (5) reduce construction costs.
Description of drawings
Fig. 1 is side elevation schematic diagram of the present invention
Fig. 2 is the positive elevational schematic view of the present invention
Fig. 3 is the invention top view
Fig. 4 is hopper and conduit sectional drawing
Among the figure: 1-chassis, 2-frame, 3-hoist engine, 4-Lift-on/Lift-off System, 5-hopper, 6-conduit, 7-gallows frame, 8-diagonal brace, 9-fixed pulley, 10-lifting rope, 11-suspension hook, 12-pin connector, 13-crotch, 14-crossbeam, 15-column, 16-build mouth.
The specific embodiment
The invention will be further described below in conjunction with Figure of description.
Shown in Fig. 1-4, a kind of slurry protection wall bored pile concrete casting device, comprise chassis 1, frame 2, hoist engine 3, Lift-on/Lift-off System 4, hopper 5, conduit 6, it is characterized in that: described frame 2 is connected with chassis 1 by pin, hopper 5 bottom discharge mouths are connected 6 with the conduit upper end, and hopper 5 promotes and transfers by the Lift-on/Lift-off System 4 that is connected on the frame 2.
Described steel chassis 1 is welded by shaped steel, and hoist engine 3 is bolted in the shaped steel stull at 1 middle part, chassis.
Described frame 2 comprises gallows frame 7, diagonal brace 8 and fixed pulley 9, and diagonal brace 8 upper ends are connected with vertical rod 15 tops of gallows frame 7 by pin, and diagonal brace 8 lower ends are connected with chassis 1 by pin.
Described gallows frame 7 comprises crossbeam 14 and column 15, and crossbeam 14 and two root posts, 15 tops are welded to form portal frame; Column 15 middle parts adopt flange with the docking of two splicing steel pipes, and the Plate Welding shutoff is adopted at two ends up and down, and soldering pin ties fitting 12 on plugging plate.
Described diagonal brace 8 adopts flange with the docking of two splicing steel pipes by the middle part, and the Plate Welding shutoff is adopted at two ends up and down, and soldering pin ties fitting 12 on plugging plate.
Described Lift-on/Lift-off System 4 is comprised of lifting rope 10 and suspension hook 11, and lifting rope 10 two ends are connected with hoist engine 3 and suspension hook 11 respectively by the fixed pulley 9 that is fixed on the crossbeam 14, and suspension hook 11 is connected with hopper 5.
The chassis skeleton on described chassis 1 is by i iron and weldering, the middle part adds the stull of weldering i iron, the steel grid that the dead slot position adopts round steel to make covers, two i iron top soldering pin about chassis 1 is in apart from each 1.5m of rear and front end ties fitting 12, and chassis four welded corner joint steel crotches 13 are used for the transition lifting.
Described hopper 5 upper ends are cylindrical, and the lower end is taper, and sectional dimension diminishes gradually, and bottom discharge mouth lower end is connected with conduit 6 upper ends by screw thread, and described conduit 6 is multistage, and every section pipe joint place adopts mantle fiber to connect, and adds rubber sheet gasket and carries out waterproofing work.

Claims (3)

1. slurry protection wall bored pile concrete casting device, comprise chassis (1), frame (2), hoist engine (3), Lift-on/Lift-off System (4), hopper (5) and conduit (6), it is characterized in that: described frame (2) is connected with chassis (1) by pin, hopper (5) bottom discharge mouth is connected with conduit (6) upper end, and hoist engine (3) promotes or transfers by transmission drive hopper (5) and the conduit (6) of Lift-on/Lift-off System (4); Described hopper (5) upper end is cylindrical, the lower end is taper, sectional dimension diminishes gradually, bottom discharge mouth lower end is connected with conduit (6) by screw thread, described conduit (6) is that multistage is assembled, every section pipe joint place adopts mantle fiber to connect, and adds rubber sheet gasket and carries out waterproofing work;
Described frame (2) comprises gallows frame (7), diagonal brace (8) and fixed pulley (9), diagonal brace (8) upper end is connected with column (15) top of gallows frame (7) by pin, and diagonal brace (8) lower end is connected with chassis (1) by pin; Described diagonal brace (8) middle part adopts flange that two splicing steel pipes are docked, and diagonal brace (8) up and down two ends adopts the Plate Welding shutoff, and soldering pin ties fitting (12) on plugging plate;
The chassis skeleton on described chassis (1) is by i iron and weldering, the middle part adds the stull of weldering i iron, the steel grid that the dead slot position adopts round steel to make covers, two i iron top soldering pin about chassis (1) is in apart from each 1.5m of rear and front end ties fitting (12), and chassis four welded corner joint steel crotches (13) are used for the transition lifting.
2. slurry protection wall bored pile concrete casting device as claimed in claim 1, it is characterized in that: described gallows frame (7) comprises crossbeam (14) and column (15), crossbeam (14) and the welding of two root posts (15) top form portal frame; Column (15) middle part adopts flange that two splicing steel pipes are docked, and column (15) up and down two ends adopts the Plate Welding shutoff, and soldering pin ties fitting (12) on plugging plate.
3. slurry protection wall bored pile concrete casting device as claimed in claim 2, it is characterized in that: described Lift-on/Lift-off System (4) is comprised of lifting rope (10) and suspension hook (11), lifting rope (10) two ends are connected with hoist engine (3) and suspension hook (11) respectively by the fixed pulley (9) that is fixed on the crossbeam (14), and suspension hook (11) is connected with hopper (5).
CN 201010590960 2010-12-16 2010-12-16 Slurry protection wall bored pile concrete casting device Expired - Fee Related CN102102365B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010590960 CN102102365B (en) 2010-12-16 2010-12-16 Slurry protection wall bored pile concrete casting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010590960 CN102102365B (en) 2010-12-16 2010-12-16 Slurry protection wall bored pile concrete casting device

Publications (2)

Publication Number Publication Date
CN102102365A CN102102365A (en) 2011-06-22
CN102102365B true CN102102365B (en) 2013-02-06

Family

ID=44155405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010590960 Expired - Fee Related CN102102365B (en) 2010-12-16 2010-12-16 Slurry protection wall bored pile concrete casting device

Country Status (1)

Country Link
CN (1) CN102102365B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352628A (en) * 2011-10-13 2012-02-15 中土木(北京)技术检测有限公司 Cast-in-place pile concrete guide pipe mounting and dismounting device and construction method thereof
CN103835294A (en) * 2012-11-26 2014-06-04 五冶集团上海有限公司 Concrete casting frame for construction of cast-in-place pile and using method
CN104532847B (en) * 2014-12-12 2015-12-02 张桂琴 A kind of concrete pouring structure
CN104532846B (en) * 2014-12-12 2015-12-02 梁夏萍 The cast-in-place concrete pile of self-regulation mixing width can build device
CN104612159B (en) * 2014-12-12 2015-12-02 车富发 The cast-in-place concrete pile with agitator builds device
CN108775153A (en) * 2018-05-22 2018-11-09 浙江省送变电工程有限公司 Conduit lifting device and method for the perfusion of power transmission tower concrete filled steel tube high-altitude
CN109322300A (en) * 2018-11-23 2019-02-12 中铁六局集团有限公司 A kind of major diameter device for casting and major diameter method for filling

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2201445Y (en) * 1994-02-01 1995-06-21 程天森 Underwater concrete pouring equipment
CN2233945Y (en) * 1995-11-02 1996-08-28 吴康来 Concrete pouring device for hole pile
CN2354993Y (en) * 1999-01-06 1999-12-22 王继忠 Apparatus for cast-in-situ concrete piles

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2548980B2 (en) * 1988-12-29 1996-10-30 株式会社ジオトップ Judgment of performance / quality of foundation piles, design method, and ground performance measurement device
JPH0772467B2 (en) * 1989-05-31 1995-08-02 克巳 北中 Earth auger and its auger head for cast-in-place pile

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2201445Y (en) * 1994-02-01 1995-06-21 程天森 Underwater concrete pouring equipment
CN2233945Y (en) * 1995-11-02 1996-08-28 吴康来 Concrete pouring device for hole pile
CN2354993Y (en) * 1999-01-06 1999-12-22 王继忠 Apparatus for cast-in-situ concrete piles

Also Published As

Publication number Publication date
CN102102365A (en) 2011-06-22

Similar Documents

Publication Publication Date Title
CN102102365A (en) Slurry protection wall bored pile concrete casting device
CN109098178A (en) A kind of concrete-spouting plant
CN203145192U (en) Auxiliary hoisting and jointing device for steel structural box columns
CN111749259B (en) A construction method suitable for rock-embedded construction of offshore wind power high pile cap foundation
CN107142954B (en) A steel hanging box hoisting system for overall hoisting and hoisting method thereof
CN113529724B (en) Foundation pit concrete pouring construction method
CN110606439A (en) A small swing arm type electric hoist suitable for transferring materials between floors in the reverse method
CN102352628A (en) Cast-in-place pile concrete guide pipe mounting and dismounting device and construction method thereof
CN210917317U (en) Underground rock soil grouting reinforcement device
CN220264894U (en) Rectangular reinforcement cage lifting support
CN206108724U (en) Simple and easy installing support device of long large -diameter pile base steel reinforcement cage self -control
CN201645413U (en) Simple gin-pole mechanism for demolishing internal climbing tower crane
CN216809891U (en) Pile pulling device for hydraulic engineering construction
CN217323070U (en) Multifunctional hole digging pile lifting device
CN216038251U (en) Foundation ditch supports under interim road surface apron and demolishs construction and use vertical hoisting system
CN105089496A (en) Multifunctional rotary drilling rig
CN214192283U (en) Large-diameter pipe jacking lifting device
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN213508425U (en) Filling frame for constructing inclined filling pile
CN205476501U (en) Device is pour fast to multi -functional concrete
CN215516375U (en) Manhole hoisting device for foundation reinforcement cage
CN212356327U (en) Traction device for dismounting and mounting large tower crane
CN211110630U (en) Multifunctional lifting appliance for lifting high-speed rail concrete box girder
CN221545650U (en) Sand bag backfilling device for underground diaphragm wall
CN215624167U (en) Over-and-under type hopper system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130206

Termination date: 20191216