CN205476501U - Device is pour fast to multi -functional concrete - Google Patents
Device is pour fast to multi -functional concrete Download PDFInfo
- Publication number
- CN205476501U CN205476501U CN201521142038.9U CN201521142038U CN205476501U CN 205476501 U CN205476501 U CN 205476501U CN 201521142038 U CN201521142038 U CN 201521142038U CN 205476501 U CN205476501 U CN 205476501U
- Authority
- CN
- China
- Prior art keywords
- concrete
- blanking hopper
- pouring device
- fast pouring
- multifunctional concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Revetment (AREA)
Abstract
The utility model belongs to the concrete application, concretely relates to device is pour fast to multi -functional concrete, be the unloading hopper that cylinder structure, lower part are the cone structure including upper portion, unloading hopper top is provided with uncovered unclosed's concrete feed inlet, the lower part of unloading hopper cone extend have with the communicating discharge opening of unloading hopper, discharge opening upper portion is provided with the baffle switch that can extract, discharge opening lower part outer wall is provided with the bayonet socket, the discharge opening passes through bayonet socket and the hose connection that is used for guiding concrete income template. The utility model provides a device is pour fast to multi -functional concrete simple structure, convenient, the transportation facility of preparation satisfy the quick concreting construction's of concrete among the frame construction requirement, realize the concrete and are under construction fast.
Description
Technical field
This utility model relates to a kind of multifunctional concrete fast pouring device.Belong to concrete application,
Concrete fast pouring construction be applicable to frame structure, is particularly suited for the height that speed of application requirement is higher
Layer concatemer side chamber structure.
Background technology
In the work progress of high-rise concatemer side chamber structure, generally use slding form operation, concrete construction one
It is directly emphasis therein and Technology Difficulties, owing to the pumping height of current domestic existing concrete sky pump is limited,
Just can only be by traditional material distributing machine or utilize suspension bucket to carry out coagulation when running into the high level side's chamber structure more than 60 meters
Soil pours.And as constructed with traditional cloths machine, during material distributing machine construction, produced vibrations usually can affect
The arrangement of reinforcing bar and the stability of template, produce great potential safety hazard;And as executed with traditional suspension bucket
Work, can only pour the single side regions of a Fang Cangzhong the most every time, and speed of perfusion is the slowest, and occupies tower for a long time
Hang, affect the normal construction of remaining operation, reduce efficiency of construction, as when concreting is spaced between storehouse, side
Between long, the square storehouse concrete that early stage pours first solidifies, and the square storehouse concrete that the later stage pours does not solidifies, will
Can directly result in the chamber structure slding form operation failure of high-rise concatemer side, conjuncted square storehouse quantity is the most, construction difficulty
Spend the biggest.Therefore, it is necessary to the concreting method to high-rise concatemer side chamber structure improves, enter
And on the premise of ensureing construction safety and quality, accelerating construction progress, improves efficiency of construction.
Have at present high-rise frame tubing string concrete casting device (CN102704687B), be use suspension rod,
Plugging device integral type opening and closing mode, when storage bin falls on ground support, feed opening by self-closed,
After storage bin insert tubing string, fall suspension rod after rise, utilize the gravity of suspension rod weight and concrete to automatically open up feed opening,
Pour the most capable of hoisting liter of storage bin of complete lifting suspension rod.This structure carries in the concreting of high-rise frame tubing string
High efficiency of construction, reduces waste of material and contamination phenomenon, but can not improve the speed of perfusion of concrete.
In sum, in order to realize rapid concrete construction, need a kind of of many uses, structure of invention at present badly
Simply, easy to make, transport is convenient, and on the premise of ensureing construction quality, accelerates concreting
Journey, Optimizing construction progress, improves efficiency of construction, it is achieved multiple spot, many merits of multizone Pouring concrete at the same time
Can concrete fast pouring device.
Utility model content
The utility model proposes a kind of of many uses, simple structure, easy to make, transport facility, and protecting
On the premise of card construction quality, accelerate concreting process, Optimizing construction progress, improve efficiency of construction,
Realize the multifunctional concrete fast pouring device of multiple spot, multizone Pouring concrete at the same time, solve existing
Can only pour a region in technology, speed of perfusion is the slowest, and affects the normal construction of remaining operation every time,
The problems such as efficiency of construction is low.
In order to solve above-mentioned technical problem, the technical solution of the utility model is:
A kind of multifunctional concrete fast pouring device, including top be cylindrical structure, bottom be cone knot
The blanking hopper of structure, described blanking hopper top is provided with uncovered untight concrete charging aperture, described under
The bottom cone of material hopper is extended with the discharge port communicated with described blanking hopper, and described discharge port top is arranged
Having the isolating switch that can extract, described discharge port bottom outer wall to be provided with bayonet socket, described discharge port is by described
Bayonet socket enters the hose connection of template with for guiding concrete.
Further, described discharge port is set to more than 2.
Described blanking hopper top uniform welding at equal intervals has the hanger for lifting by crane transport.
Described blanking feed hopper bottom is provided with vertical feed opening, and described vertical feed opening is additionally provided with switch.
Described blanking hopper top circumferentially uniform welding has two or more and described blanking hopper mating shapes
Supporting leg, described supporting leg is L-shaped, and the welding position of described supporting leg is between adjacent described flexible pipe.
The bottom of adjacent described supporting leg carries out affixed by angle steel, and described angle steel can square crossing or parallel.
The described angle steel of square crossing is bolted to connection.
Described blanking hopper uses steel plate to make, and the inwall of described blanking hopper and discharge port is shiny surface.
This utility model has following feature and a beneficial effect:
In this utility model multifunctional concrete fast pouring device by arrange top be cylindrical structure,
Bottom is the gravitional force that the blanking hopper of cone structure utilizes concrete, accelerates the gravity flow of concrete, blanking
The discharge port that hopper bottom cone extends is set to multiple, can meet the concreting of zones of different, accelerates
The concreting of whole job site, improve efficiency of construction, reduce the engineering time, discharge port be provided with every
Switching plate can control the break-make of concreting, Optimizing construction progress, it is achieved multiple spot, multizone pour simultaneously
Concrete.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below by right
In embodiment or description of the prior art, the required accompanying drawing used is briefly described, it should be apparent that below,
Accompanying drawing in description is only embodiments more of the present utility model, for those of ordinary skill in the art,
On the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the axonometric chart of this utility model a kind of multifunctional concrete fast pouring device;
Fig. 2 is the elevation of this utility model a kind of multifunctional concrete fast pouring device;
Fig. 3 is the plane graph of this utility model a kind of multifunctional concrete fast pouring device.
In figure, 1-blanking hopper;2-concrete charging aperture;The vertical feed opening of 3-;4-switchs;5-discharge port;
6-isolating switch;7-bayonet socket;8-flexible pipe;9-hanger;10-supporting leg;11-angle steel;12-bolt.
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described further.Explanation is needed at this
, the explanation of these embodiments is adapted to assist in and understands this utility model, but be not intended that this reality
With novel restriction.Additionally, technology involved in each embodiment of this utility model disclosed below
Just can be mutually combined as long as feature does not constitutes conflict each other.
Axonometric chart with reference to a kind of multifunctional concrete fast pouring device shown in Fig. 1.A kind of multi-functional mixed
Solidifying soil fast pouring device, including top be cylindrical structure, bottom be the blanking hopper 1 of cone structure, institute
Stating blanking hopper 1 uses steel plate to make, and the inwall of described blanking hopper 1 and discharge port 5 is shiny surface, interior
The setting of wall shiny surface decrease concrete during gravity flow with the friction of blanking hopper, accelerate concrete
Gravity flow speed.Described blanking hopper 1 top is provided with uncovered untight concrete charging aperture 2, and concrete enters
Material mouth 2 can be connected with concrete pump.Be provided with vertical feed opening 3 bottom described blanking hopper 1, described vertically
Feed opening 3 is additionally provided with switch 4, and vertical feed opening 3 can remove concrete and the impurity of residual.
Elevation with reference to a kind of multifunctional concrete fast pouring device shown in Fig. 2.Described blanking hopper 1
Bottom cone be extended with the discharge port 5 communicated with described blanking hopper 1, described discharge port 5 top is provided with
The isolating switch 6 that can extract, described discharge port 5 bottom outer wall is provided with bayonet socket 7, and described discharge port leads to 5 mistakes
Described bayonet socket 7 is connected with the flexible pipe 8 entering template for guiding concrete.Described discharge port 5 is set to two
Above.Multiple discharge ports 5 can meet the concreting of zones of different, accelerates the coagulation of whole job site
Soil pours, and improves efficiency of construction, reduces the engineering time.
Plane graph with reference to a kind of multifunctional concrete fast pouring device shown in Fig. 3.Described blanking hopper 1
Top uniform welding at equal intervals has the hanger 9 for lifting by crane transport, convenient multi-functional concrete fast pouring device
Convenient transportation.Described blanking hopper 1 top circumferentially uniform welding has two or more and described blanking hopper 1
The supporting leg 10 of mating shapes, described supporting leg 10 is L-shaped, and the welding position of described supporting leg 10 is positioned at adjacent
Between described flexible pipe 8.The bottom of adjacent described supporting leg 10 carries out affixed by angle steel 11, described angle steel 11
Can square crossing or parallel.The described angle steel 11 of square crossing connects by bolt 12 is fixing.Supporting leg 10,
The setting of angle steel 11 ensure that the placement safety of multifunctional concrete fast pouring device, and safety benefit is notable.
In this utility model multifunctional concrete fast pouring device by arrange top be cylindrical structure,
Bottom is the gravitional force that the blanking hopper 1 of cone structure utilizes concrete, accelerates the gravity flow of concrete, unloads
The isolating switch 6 that material mouth 5 is provided with can control the break-make of concreting, Optimizing construction progress.Whole many merits
Energy concrete fast pouring device simple structure, easy to make, transport facility, meet mixing in frame structure
The requirement of solidifying soil fast pouring construction, it is achieved rapid concrete construction, it is achieved multiple spot, multizone pour simultaneously
Concrete.
Above in association with accompanying drawing, embodiment of the present utility model is explained in detail, but this utility model does not limits
In described embodiment.For a person skilled in the art, without departing from this utility model principle
In the case of spirit, these embodiments are carried out multiple change, revises, replace and modification, still fall within
In protection domain of the present utility model.
Claims (8)
1. a multifunctional concrete fast pouring device, it is characterised in that include top be cylindrical structure,
Bottom is the blanking hopper of cone structure, and described blanking hopper top is provided with uncovered untight concrete and enters
Material mouth, the bottom cone of described blanking hopper is extended with the discharge port communicated with described blanking hopper, described in unload
Material mouth top be provided with the isolating switch that can extract, described discharge port bottom outer wall is provided with bayonet socket, described in unload
Material mouth enters the hose connection of template by described bayonet socket with for guiding concrete.
Multifunctional concrete fast pouring device the most according to claim 1, it is characterised in that described in unload
Material mouth is set to more than 2.
Multifunctional concrete fast pouring device the most according to claim 1, it is characterised in that under described
Material hopper top uniform welding at equal intervals has the hanger for lifting by crane transport.
Multifunctional concrete fast pouring device the most according to claim 1, it is characterised in that under described
Material feed hopper bottom is provided with vertical feed opening, and described vertical feed opening is provided with switch.
5., according to the multifunctional concrete fast pouring device described in claim 1 or 2 or 3 or 4, it is special
Levy and be that described blanking hopper top circumferentially uniform welding has two or more and described blanking hopper shape phase
The supporting leg joined, described supporting leg is L-shaped, and the welding position of described supporting leg is between adjacent described flexible pipe.
Multifunctional concrete fast pouring device the most according to claim 5, it is characterised in that adjacent institute
The bottom stating supporting leg carries out affixed by angle steel, and described angle steel can square crossing or parallel.
7. according to according to the multifunctional concrete fast pouring device described in claim 6, it is characterised in that vertically hand over
The described angle steel of fork is bolted to connection.
8. fill according to the multifunctional concrete fast pouring described in claim 1 or 2 or 3 or 4 or 6 or 7
Put, it is characterised in that described blanking hopper uses steel plate to make, and the inwall of described blanking hopper and discharge port is
Shiny surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521142038.9U CN205476501U (en) | 2015-12-31 | 2015-12-31 | Device is pour fast to multi -functional concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521142038.9U CN205476501U (en) | 2015-12-31 | 2015-12-31 | Device is pour fast to multi -functional concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205476501U true CN205476501U (en) | 2016-08-17 |
Family
ID=56663370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521142038.9U Active CN205476501U (en) | 2015-12-31 | 2015-12-31 | Device is pour fast to multi -functional concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205476501U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507593A (en) * | 2015-12-31 | 2016-04-20 | 广州市第四建筑工程有限公司 | Multifunctional fast concrete pouring device |
CN110253738A (en) * | 2019-07-16 | 2019-09-20 | 中交路桥北方工程有限公司 | A kind of prefabricated box culvert casting concrete equipment |
-
2015
- 2015-12-31 CN CN201521142038.9U patent/CN205476501U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105507593A (en) * | 2015-12-31 | 2016-04-20 | 广州市第四建筑工程有限公司 | Multifunctional fast concrete pouring device |
CN110253738A (en) * | 2019-07-16 | 2019-09-20 | 中交路桥北方工程有限公司 | A kind of prefabricated box culvert casting concrete equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105507593A (en) | Multifunctional fast concrete pouring device | |
CN209323990U (en) | Concrete blanking device | |
CN202498631U (en) | High speed stirring pulping bench vehicle | |
CN204960332U (en) | Conveyer pipe is pour perpendicularly to concrete | |
CN205476501U (en) | Device is pour fast to multi -functional concrete | |
CN204800848U (en) | Construction concrete mixing bucket | |
CN110306774A (en) | A kind of installation method and device of spigot-and-socket builder's jack | |
CN205466731U (en) | Dry -mixed mortar jar with cavity configuration in combination of interval formula | |
CN205840345U (en) | A kind of embedded type tower crane funnel | |
CN203403420U (en) | Concrete vertical conveying pouring system | |
CN104339452A (en) | Novel separation-resisting dry-mixed mortar material storage tank | |
CN104746875B (en) | A kind of portable block-shaped discarded concrete pours device | |
CN109057859B (en) | Mould bag type concentration filling device and method for mine end | |
CN206329043U (en) | A kind of concrete shunts slot device | |
CN205776322U (en) | A kind of steel tower with novel foundation structure | |
CN207891060U (en) | A kind of processing unit of alumina producing exsolution red mud | |
CN206299129U (en) | A kind of large-sized concrete cloth system | |
CN208122325U (en) | A kind of assembled architecture Liftable type material distributing machine | |
CN208039845U (en) | A kind of vertical blanking device of new concrete | |
CN207014559U (en) | A kind of High Pressure Reinforced Concrete pump truck agitating device | |
CN207660286U (en) | Large-span industrial building device and concrete vertical transport | |
CN207485467U (en) | Tailings buffers overflow device | |
CN206828956U (en) | A kind of bridge ponding funnel | |
CN206843074U (en) | A kind of polycrystalline diamond purifying plant | |
CN215978495U (en) | Tobacco pipe type column core concrete lateral pouring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |