CN214462394U - High-altitude overhanging scaffold - Google Patents

High-altitude overhanging scaffold Download PDF

Info

Publication number
CN214462394U
CN214462394U CN202022912494.4U CN202022912494U CN214462394U CN 214462394 U CN214462394 U CN 214462394U CN 202022912494 U CN202022912494 U CN 202022912494U CN 214462394 U CN214462394 U CN 214462394U
Authority
CN
China
Prior art keywords
scaffold
plane formed
steel
floor
upright
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022912494.4U
Other languages
Chinese (zh)
Inventor
汪家美
陈东辉
王培敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Gaoxin Energy Saving Co ltd
Original Assignee
Shanghai Gaoxin Energy Saving Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Gaoxin Energy Saving Co ltd filed Critical Shanghai Gaoxin Energy Saving Co ltd
Priority to CN202022912494.4U priority Critical patent/CN214462394U/en
Application granted granted Critical
Publication of CN214462394U publication Critical patent/CN214462394U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

A high-altitude overhanging scaffold comprises a plurality of transverse parallel I-shaped steels which are fixed on a floor slab, the longitudinal front and rear ends of the I-shaped steels are positioned at the same position and are at the same interval, and the rear ends of the I-shaped steels are nested with hoops and fixed by layer penetrating screws; a plurality of scaffold upright posts arranged on the front end of the I-shaped steel; the plurality of floor sweeping rods are arranged on the inner side of the scaffold upright rod and are longitudinally and transversely distributed; a plurality of scaffold frame horizontal poles of setting on scaffold frame pole setting middle part inboard position space, the scaffold frame horizontal pole is vertical and horizontal distribution and forms trilateral perpendicular with the scaffold frame pole setting, and the plane that plane and the I-steel that the scaffold frame horizontal pole constitutes are parallel with the plane that the pole constitutes of sweeping the floor, the rear end of scaffold frame horizontal pole can also with building main body stand connects. Through fixing each part of scaffold frame on building subject indirectly or directly, reach the purpose that reduces the curtain installation work degree of difficulty and increase workman's operation security.

Description

High-altitude overhanging scaffold
Technical Field
The utility model relates to a building curtain field, in particular to high altitude scaffold frame of encorbelmenting.
Background
The construction difficulty of the outer wall of the high-rise building is high, and the bottleneck of realizing various building models is always limited. Different from creeping formwork construction of a civil engineering structure, a curtain wall system is one of the technical difficulties in the construction of the outer wall of a high-rise building, the construction needs to be carried out in the space outside a floor slab, small-sized hoisting equipment is generally adopted for mounting the curtain wall unit after the curtain wall unit is hoisted, when the curtain wall unit meets a special building modeling surface, a mode of erecting a scaffold is required for mounting, and the construction efficiency and the operation risk are further reduced.
SUMMERY OF THE UTILITY MODEL
In order to realize the purpose of the utility model, the utility model adopts the technical scheme that:
a high altitude cantilever scaffold comprising:
the I-steel fixing device comprises a plurality of I-steel fixing devices, wherein the I-steel fixing devices are fixed on a floor slab in a transverse parallel mode, the longitudinal front and rear ends of the I-steel fixing devices are identical in position and are equal in spacing, the rear end of the I-steel is nested with a hoop, and the hoop, the floor slab and the I-steel fixing devices are fixed from bottom to top through layer penetrating screws;
a plurality of scaffold upright posts arranged on the front end of the I-shaped steel;
the floor sweeping rods are longitudinally and transversely distributed, three sides of each floor sweeping rod and the corresponding scaffold upright rod are perpendicular, and a plane formed by the floor sweeping rods is parallel to a plane formed by the I-shaped steel;
the scaffold cross bars are longitudinally and transversely distributed and are perpendicular to the three sides of the scaffold upright stanchions, the plane formed by the scaffold cross bars is parallel to the plane formed by the I-beams and the plane formed by the sweeping poles, and the rear ends of the scaffold cross bars are also connected with the building main body upright posts;
and the operating platform is arranged on the upper part of the scaffold upright rod, and is parallel to the plane formed by the scaffold cross rod, the plane formed by the I-shaped steel and the plane formed by the sweeping rod.
In a preferred embodiment of the present invention, the height of the scaffold upright is higher than that of the operation platform, and a handrail is disposed on the top of the scaffold upright.
In a preferred embodiment of the present invention, a scaffold outer vertical surface net is further disposed between the scaffold upright rods.
In a preferred embodiment of the present invention, the inner side of the operation platform is further provided with a ladder for connecting with the floor.
The beneficial effects of the utility model reside in that:
the utility model provides a high altitude scaffold frame of encorbelmenting through with each part of scaffold frame indirect or direct fix in the building subject, reaches the purpose that reduces the curtain installation work degree of difficulty and increase workman's operation security.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below.
Fig. 1 is a front view of the present invention.
Detailed Description
The detailed structure of the present invention will be further described with reference to the accompanying drawings and the detailed description.
Referring to fig. 1, in the high-altitude overhanging scaffold, the rear end of an i-steel 2 is arranged on a floor slab 1, the front end of the i-steel extends to the outer side of the floor slab 1 and is suspended in the air, an anchor ear 2a is arranged on the i-steel 2, and a layer penetrating screw 2b penetrates through the floor slab 1 from the lower part to be connected with the i-steel 2 and the anchor ear 2a, so that the i-steel 2 is fixed on the floor slab 1. The floor slab 1 is provided with a plurality of I-shaped steel 2 which are transversely parallel, equal in longitudinal front and rear ends and equidistant in distance, and the layer penetrating screws 2b can be M16 bolts.
The multiple vertical scaffold upright posts 4c are vertically arranged at the front end of the I-shaped steel 2, the multiple floor sweeping rods 4a are arranged at the lowest ends of the inner sides of the vertical scaffold posts 4c, the floor sweeping rods 4a are longitudinally and transversely arranged to form a three-side vertical relation with the vertical scaffold posts 4c, and the function of increasing the overall longitudinal tension of the scaffold is achieved. A plurality of scaffold cross rods 4h are arranged in the space at the inner side of the middle of the scaffold upright rod 4c, the scaffold cross rods 4h are also longitudinally and transversely arranged and form a three-side vertical relation with the scaffold upright rod 4c, and the horizontal plane direction of the scaffold cross rods is parallel to the plane where the sweeping rod 4a and the I-shaped steel 2 are located. The rear end of the scaffold cross rod 4h can also be connected with the main body upright post 3, so that the scaffold cross rod 4h is fixed on the building main body, and the overall stability of the scaffold is further improved. A scaffold operating platform 4d is also arranged on the upper part of the scaffold upright rod 4c, and workers can stand on the scaffold operating platform 4d for operation. The top of the scaffold upright stanchion 4c is higher than the scaffold operating platform 4d, and the top thereof can also be provided with a handrail 4e for workers to use during operation, thereby increasing the operation safety. A ladder 4f is provided at the rear end of the scaffold console 4d for workers to enter and exit the scaffold console 4 d. And a scaffold outer vertical surface hanging net 4g is arranged between the scaffold upright rods 4c and used for preventing sundries from being blown to the outside.

Claims (4)

1. The utility model provides a high altitude scaffold frame of encorbelmenting which characterized in that includes:
the I-steel fixing device comprises a plurality of I-steel fixing devices, wherein the I-steel fixing devices are fixed on a floor slab in a transverse parallel mode, the longitudinal front and rear ends of the I-steel fixing devices are identical in position and are equal in spacing, the rear end of the I-steel is nested with a hoop, and the hoop, the floor slab and the I-steel fixing devices are fixed from bottom to top through layer penetrating screws;
a plurality of scaffold upright posts arranged on the front end of the I-shaped steel;
the floor sweeping rods are longitudinally and transversely distributed, three sides of each floor sweeping rod and the corresponding scaffold upright rod are perpendicular, and a plane formed by the floor sweeping rods is parallel to a plane formed by the I-shaped steel;
the scaffold cross bars are longitudinally and transversely distributed and are perpendicular to the three sides of the scaffold upright stanchions, the plane formed by the scaffold cross bars is parallel to the plane formed by the I-beams and the plane formed by the sweeping poles, and the rear ends of the scaffold cross bars are also connected with the building main body upright posts;
and the operating platform is arranged on the upper part of the scaffold upright rod, and is parallel to the plane formed by the scaffold cross rod, the plane formed by the I-shaped steel and the plane formed by the sweeping rod.
2. The high altitude cantilever scaffold as claimed in claim 1, wherein the scaffold upright is higher than the operation platform, and a handrail is provided on top of the scaffold upright.
3. The high altitude overhanging scaffold according to claim 1, wherein a scaffold outer vertical surface net is further arranged between the scaffold upright rods.
4. The high altitude overhanging scaffold according to claim 1, wherein a ladder is further provided inside the operation platform to connect with the floor.
CN202022912494.4U 2020-12-08 2020-12-08 High-altitude overhanging scaffold Active CN214462394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022912494.4U CN214462394U (en) 2020-12-08 2020-12-08 High-altitude overhanging scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022912494.4U CN214462394U (en) 2020-12-08 2020-12-08 High-altitude overhanging scaffold

Publications (1)

Publication Number Publication Date
CN214462394U true CN214462394U (en) 2021-10-22

Family

ID=78186975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022912494.4U Active CN214462394U (en) 2020-12-08 2020-12-08 High-altitude overhanging scaffold

Country Status (1)

Country Link
CN (1) CN214462394U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023208250A1 (en) * 2022-06-02 2023-11-02 中铁七局集团有限公司 Curtain wall construction platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023208250A1 (en) * 2022-06-02 2023-11-02 中铁七局集团有限公司 Curtain wall construction platform

Similar Documents

Publication Publication Date Title
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN113931313B (en) Construction method of super high-rise core tube horizontal structure
CN209942196U (en) Cantilever support system for large-volume concrete structure
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN214462394U (en) High-altitude overhanging scaffold
CN109469083B (en) Foundation beam reinforcement cage assembling system and construction method thereof
CN212507296U (en) High formwork system
CN211736290U (en) Shell cross-section large-span cornice high-altitude formwork erecting operation platform
CN107059641B (en) Goods shelf type pier body outer scaffold
CN211923448U (en) Construction equipment of steel construction
CN210369895U (en) Indoor super-high and large template Bailey beam supporting system for building
CN212129932U (en) A supplementary construction operation platform for creeping formwork
CN216276830U (en) Super high-rise core tube formwork lowering construction device
CN219118718U (en) Climbing frame horizontal protection
CN215948853U (en) Building courtyard lifting construction platform
CN210685313U (en) Safe convenient house steel connection structure
CN215670928U (en) Elevator shaft construction platform
CN217897215U (en) Upright post shaping operation platform
CN211340477U (en) Hang basket convenient to installation
CN211472208U (en) Segmental beam longitudinal tensioning operation platform device
CN219138362U (en) Formwork system of high-altitude suspended beam
CN219343938U (en) Large-span detachable formwork steel platform structure
CN217782775U (en) Scaffold for civil engineering construction
CN218369137U (en) Temporary placement equipment in prefabricated external wall panel field

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant