CN214362896U CN202022400678.2U CN202022400678U CN214362896U CN 214362896 U CN214362896 U CN 214362896U CN 202022400678 U CN202022400678 U CN 202022400678U CN 214362896 U CN214362896 U CN 214362896U
Authority
CN
China
Prior art keywords
rod
plate
pier
template
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022400678.2U
Other languages
Chinese (zh)
Inventor
杨若凡
周聪
刘献明
叶绍其
吴燎
李洪锐
刘华全
彭颇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
5th Engineering Co Ltd of MBEC
Original Assignee
5th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 5th Engineering Co Ltd of MBEC filed Critical 5th Engineering Co Ltd of MBEC
Priority to CN202022400678.2U priority Critical patent/CN214362896U/en
Application granted granted Critical
Publication of CN214362896U publication Critical patent/CN214362896U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a detachable pier stud template work platform, including pier shaft template, triangle bracket, straightway step board and the curve section step board of waiting to water the section, pier shaft template all includes panel, little rib, braces and flange board, and triangle bracket includes pole setting, horizon bar, down tube, fender rod, link plate. The whole pier body template of the section to be poured is a whole with an oval pier column structure in the middle formed by connecting two straight templates and two arc templates through bolts, the triangular bracket is installed on a strap of the pier body template through a hanging plate, and a straight section step plate and a curve section step plate are laid and installed on the triangular bracket. The utility model discloses it is convenient to be under construction, and safe and reliable has improved the ann of operation platform effectively and has torn efficiency open, shortens construction period by a wide margin, provides safe, comfortable inspection platform for site operation personnel, has improved comprehensive benefit. The utility model provides a current pier stud template operation platform bolt ann tear open loaded down with trivial details, and be difficult for the inspection, the big technical problem of construction potential safety hazard.

Description

Detachable pier stud template work platform
Technical Field
The utility model relates to a bridge construction technical field especially relates to a detachable pier stud template work platform.
Background
With the continuous innovation and development of bridge construction technology, the number of bridges with high piers and large span structures is gradually increased. A conventional pier column formwork operation platform is fixed on a pier body formwork through a plurality of groups of bolts, the operation platform is complex and tedious to set up and remove, the potential safety hazard of high-altitude construction of the bolts is large, the construction efficiency is low, whether the bolts are screwed down is difficult to check, and the safety quality accidents of formwork inclination and collapse are easily caused.
Disclosure of Invention
An object of the utility model is to provide a detachable pier stud template work platform for ensure construction safety, accelerate the construction progress.
The purpose of the utility model is realized like this:
the utility model provides a detachable pier stud template work platform, the characteristic is: including treating pier shaft template, triangle bracket, straightway flier and the curve section flier of watering the section, pier shaft template includes panel, small rib, braces and flange board, and triangle bracket includes pole setting, horizon bar, down tube, fender rod, link plate. The pier body template of the whole section to be poured is a whole body with an oval pier column structure in the middle formed by connecting two straight templates and two arc templates through bolts, a triangular bracket is arranged on a strap of the pier body template through a hanging plate, a straight line section step plate and a curve section step plate are laid and arranged on the triangular bracket, and the straight line section step plate and the curve section step plate are connected into a whole body through bolts;
the pier body template comprises a panel, small ribs, braces and flange plates, wherein the inner wall of the panel is polished smooth and coated with a release agent, the flange plates are arranged on two sides of the panel and are respectively fixed with the outer wall of the panel in a full-welding manner, a plurality of spaced small ribs are vertically arranged between the two flange plates and are welded on the outer wall of the panel in a discontinuous manner, and a plurality of spaced braces are horizontally arranged on the small ribs and are fixed with the tops of the small ribs in the full-welding manner;
the triangular bracket comprises an upright rod, a horizontal rod, an inclined rod, a protective rod and a hanging plate, wherein the upper end of the upright rod is welded and fixed with the lower part of one end of the horizontal rod, the lower end of the vertically placed protective rod is welded and fixed with the upper part of the other end of the horizontal rod, one end of the inclined rod is welded and fixed with the lower end of the upright rod, the other end of the inclined rod is welded and fixed with the other end of the horizontal rod, and the inclined rod plays a role in supporting the upright rod and the horizontal rod to be stable; a hanging plate is welded and fixed at the upper end and the lower end of the upright stanchion respectively, and a bayonet capable of being clamped on the braces is arranged at the lower end of the hanging plate; the triangular bracket is arranged on the braces of the pier body template through the hanging plate;
the straight line step plate is a straight line frame consisting of a cross beam and a longitudinal beam, and a steel mould net is laid on the straight line frame to ensure the safety of constructors;
the curve section step plate is a curve frame consisting of arc beams and stiffening plates, and a steel mould net is laid on the curve frame.
The vertical rod, the horizontal rod and the diagonal rod are all angle steel, and the hanging plate is a steel plate with the thickness of 20 mm.
The cross beam, the longitudinal beam and the arc-shaped beam are all angle steels, and the stiffening plate is a steel plate with the thickness of 8 mm.
Compared with the prior art, the utility model has the advantages that:
the pier stud template operation platform is convenient to construct, safe and reliable, the installing and dismantling efficiency of the operation platform is effectively improved, the construction period is greatly shortened, a safe and comfortable inspection platform is provided for field construction personnel, and the comprehensive benefit is improved.
The utility model provides a current pier stud template operation platform bolt ann tear open loaded down with trivial details, and be difficult for the inspection, the big technical problem of construction potential safety hazard.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic plan view of FIG. 1 taken at A-A;
fig. 3 is a block diagram of a pier shaft template;
FIG. 4 is a block diagram of a tripod rest;
FIG. 5 is a structural view of a straightly-sectioned step plate;
FIG. 6 is a block diagram of a curved tread plate;
FIG. 7 is a structural view of the hanging plate;
in the figure: the pier body formwork comprises a pier body formwork 1, a triangular bracket 2, a straight-line-section step plate 3, a curve-section step plate 4, a panel 101, small ribs 102, braces 103, flange plates 104, upright rods 201, horizontal rods 202, inclined rods 203, guard rods 204, hanging plates 205, bayonets 206, cross beams 301, longitudinal beams 302, a steel die net 303, arc-shaped beams 401 and stiffening plates 402.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1 and 2, a detachable pier stud formwork operation platform comprises a pier stud formwork 1 to be poured, a triangular bracket 2, a straight step plate 3 and a curved step plate 4, wherein each pier stud formwork 1 comprises a panel 101, a small rib 102, a strap 103 and a flange plate 104, and each triangular bracket 2 comprises an upright rod 201, a horizontal rod 202, an inclined rod 203, a guard rod 204 and a hanging plate 205. The whole pier shaft template of section of waiting to water is the whole that is oval pier stud structure in the middle of passing through bolted connection by two straight templates and two circular arc templates, and triangle bracket 2 is installed on the braces 103 of pier shaft template 1 through link plate 205, lays on triangle bracket 2 and installs straightway step board 3 and curve section step board 4, connects into whole through the bolt between straightway step board 3 and the curve section step board 4.
As shown in fig. 3, the pier body formwork 1 comprises a panel 101, small ribs 102, straps 103 and flange plates 104, wherein the inner wall of the panel 101 is polished smooth and coated with a release agent, the flange plates 104 are arranged on two sides of the panel 101 and are respectively fixed with the outer wall of the panel 101 in a full-welding manner, a plurality of spaced small ribs 102 are vertically arranged between the two flange plates 101 and are welded on the outer wall of the panel 101 in an intermittent manner, and a plurality of spaced straps 103 are horizontally arranged on the small ribs 102 and are fixed with the tops of the small ribs 102 in a full-welding manner.
As shown in fig. 4, the triangular bracket 2 includes an upright 201, a horizontal rod 202, an inclined rod 203, a guard rod 204, and a hanging plate 205, wherein the upper end of the upright 201 is welded and fixed with the lower part of one end of the horizontal rod 202, the lower end of the vertically placed guard rod 204 is welded and fixed with the upper part of the other end of the horizontal rod 202, one end of the inclined rod 203 is welded and fixed with the lower end of the upright 201, the other end of the inclined rod 203 is welded and fixed with the other end of the horizontal rod 202, and the inclined rod 203 plays a role in supporting the upright 201 and the horizontal rod 202; a hanging plate 205 is welded and fixed at the upper end and the lower end of the upright rod 201 respectively, and a bayonet 206 capable of being clamped on the braces 103 is arranged at the lower end of the hanging plate 205; the triangular bracket 2 is arranged on the braces 103 of the pier body template 1 through the hanging plate 205; the upright rods 201, the horizontal rods 202 and the inclined rods 203 are all angle steels, and the hanging plates 205 are steel plates with the thickness of 20 mm.
As shown in fig. 2, 5 and 6, the tread plates are mounted on the triangular bracket 2 and comprise a linear tread plate 3 and a curved tread plate 4. The straight-line step plate 3 is a straight-line frame consisting of cross beams 301 and longitudinal beams 302, and a steel mould net 303 is laid on the straight-line frame to ensure the safety of constructors; the curve section step plate 4 is a curve frame formed by an arc beam 401 and a stiffening plate 402, and a steel mould net 303 is laid on the curve frame. The cross beam 301, the longitudinal beam 302 and the arc-shaped beam 401 are all angle steel, and the stiffening plate 402 is a steel plate with the thickness of 8 mm.
When the pier stud formwork operation platform is constructed, the triangular bracket 2 is hoisted by a crane firstly, the triangular bracket 2 is fixed with the braces 103 of the pier body formwork 1 by the hanging plate 205, the straight-line step plates 3 and the curve step plates 4 are hoisted in sequence, and the step plates are installed and laid on the triangular bracket 2.
The present invention is not limited to the above-described embodiments, and a person skilled in the art can make several modifications and adaptations without departing from the relevant scope of protection as defined by the claims, and these modifications and adaptations are also considered to be within the scope of protection of the invention.

Claims (3)

1. The utility model provides a detachable pier stud template work platform which characterized in that: the device comprises a pier body template of a section to be poured, a triangular bracket, a straight-line step plate and a curve-section step plate, wherein the pier body template comprises a panel, small ribs, braces and flange plates; the pier body template of the whole section to be poured is a whole body with an oval pier column structure in the middle formed by connecting two straight templates and two arc templates through bolts, a triangular bracket is arranged on a strap of the pier body template through a hanging plate, a straight line section step plate and a curve section step plate are laid and arranged on the triangular bracket, and the straight line section step plate and the curve section step plate are connected into a whole body through bolts;
the pier body template comprises a panel, small ribs, braces and flange plates, wherein the inner wall of the panel is polished smooth and coated with a release agent, the flange plates are arranged on two sides of the panel and are respectively fixed with the outer wall of the panel in a full-welding manner, a plurality of spaced small ribs are vertically arranged between the two flange plates and are welded on the outer wall of the panel in a discontinuous manner, and a plurality of spaced braces are horizontally arranged on the small ribs and are fixed with the tops of the small ribs in the full-welding manner;
the triangular bracket comprises an upright rod, a horizontal rod, an inclined rod, a protective rod and a hanging plate, wherein the upper end of the upright rod is welded and fixed with the lower part of one end of the horizontal rod, the lower end of the vertically placed protective rod is welded and fixed with the upper part of the other end of the horizontal rod, one end of the inclined rod is welded and fixed with the lower end of the upright rod, the other end of the inclined rod is welded and fixed with the other end of the horizontal rod, and the inclined rod plays a role in supporting the upright rod and the horizontal rod; a hanging plate is welded and fixed at the upper end and the lower end of the upright stanchion respectively, and a bayonet capable of being clamped on the braces is arranged at the lower end of the hanging plate; the triangular bracket is arranged on the braces of the pier body template through the hanging plate;
the linear step plate is a linear frame consisting of a cross beam and a longitudinal beam, and a steel mould net is laid on the linear frame;
the curve section step plate is a curve frame consisting of arc beams and stiffening plates, and a steel mould net is laid on the curve frame.
2. The detachable pier stud template operation platform according to claim 1, wherein: the vertical rod, the horizontal rod and the diagonal rod are all angle steel, and the hanging plate is a steel plate with the thickness of 20 mm.
3. The detachable pier stud template operation platform according to claim 1, wherein: the cross beam, the longitudinal beam and the arc-shaped beam are all angle steels, and the stiffening plate is a steel plate with the thickness of 8 mm.
CN202022400678.2U 2020-10-26 2020-10-26 Detachable pier stud template work platform Active CN214362896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022400678.2U CN214362896U (en) 2020-10-26 2020-10-26 Detachable pier stud template work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022400678.2U CN214362896U (en) 2020-10-26 2020-10-26 Detachable pier stud template work platform

Publications (1)

Publication Number Publication Date
CN214362896U true CN214362896U (en) 2021-10-08

Family

ID=77969587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022400678.2U Active CN214362896U (en) 2020-10-26 2020-10-26 Detachable pier stud template work platform

Country Status (1)

Country Link
CN (1) CN214362896U (en)

Similar Documents

Publication Publication Date Title
CN107217839A (en) Cast-in-situ concrete beam plate form bracing system and its construction method
CN109989347A (en) A kind of bridge hollow pier cantilever form and its construction method
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN211472143U (en) Pier steel form
CN214362896U (en) Detachable pier stud template work platform
CN209976016U (en) Combined steel formwork keel support with steel bar protection layer support
CN211006341U (en) Assembled strength nature skeleton suitable for mound tower reinforcing bar location
CN207332305U (en) Climbing frame in a kind of king-post construction
CN212247875U (en) Stand construction equipment
CN212926984U (en) Movable suspension operating platform
CN210977265U (en) Can have enough to meet need unitized lattice tower crane basis and go up people's device
CN211689927U (en) Operating platform device for construction in bridge tower
CN210177369U (en) Supplementary platform of pouring of precast beam board
CN210589859U (en) Movable precast beam concrete cloth construction platform
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN219972953U (en) Cable tower reinforcing steel bar mounting platform
CN211447721U (en) Movable work platform for working on overhanging structure
CN202467021U (en) Novel mobile scaffold
CN110118014A (en) A kind of outer wall template system and its construction method for exempting from external scaffolding
CN219364328U (en) Bridge floor die block is dismantled and bridge overhauls simple and easy device
CN110565518A (en) assembled stiff skeleton suitable for pier tower steel bar positioning and use method thereof
CN212895943U (en) Operation platform device for binding small-section pier column reinforcing steel bars
CN220789446U (en) Assembled guy rope hanging basket tensioning construction platform
CN214882974U (en) Unit template and integrated device for assembling and combining vase pier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant