CN107217839A - Cast-in-situ concrete beam plate form bracing system and its construction method - Google Patents

Cast-in-situ concrete beam plate form bracing system and its construction method Download PDF

Info

Publication number
CN107217839A
CN107217839A CN201710623212.9A CN201710623212A CN107217839A CN 107217839 A CN107217839 A CN 107217839A CN 201710623212 A CN201710623212 A CN 201710623212A CN 107217839 A CN107217839 A CN 107217839A
Authority
CN
China
Prior art keywords
bar
support
screw mandrel
steel bar
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710623212.9A
Other languages
Chinese (zh)
Inventor
刘家静
陈刚
程涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
ANHUI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical ANHUI CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201710623212.9A priority Critical patent/CN107217839A/en
Publication of CN107217839A publication Critical patent/CN107217839A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of cast-in-situ concrete beam plate form bracing system and its construction method, it is characterized in that setting steel bar truss floor support plate, it is that truss is constituted by the reinforcing bar that winds up, lower edge reinforcing bar and abdomen muscle, steel bar girder bed die passes through the removable bottom for being fixed on truss of connecting piece;Adjustable supports structure under beam is set, enabling be adjusted according to the difference of depth of beam, width, clear height and beam slab clear height, realizes that beam-slab template is supported;Steel bar girder bed die is dismountable structure in the present invention, is greatly improved efficiency of construction;Adjustable supports structure makes beam width, beam slab base absolute altitude can adjust under its beam, it is not necessary to take the method blocked to meet length requirement, is substantially shorter the construction period, saves construction costs.

Description

Cast-in-situ concrete beam plate form bracing system and its construction method
Technical field
The present invention relates to the realm of building construction in civil engineering, a kind of reinforced concrete girder slab shuttering supporting body is specifically referred to System and its construction method.
Background technology
Traditional formwork system is to use flitch vertically and horizontally supporting construction in construction industry, using wooden model as template, according to design Length carries out formwork by the method for amputating and setting up, wood consumption is big, reusing is low, adjustability is poor, workload is big, Working face is complicated, construction speed is slow.In recent years, traditional plank sheathing is often replaced to be used for concrete with plastic formwork and steel form Engineering is poured, but be there are and be difficult to cut, pacify and tear the shortcomings such as inconvenience open.To improve efficiency of construction, construction is realized Green, environmental protection and energy-conservation.Chinese Patent Application No. is 201410055360.1, and publication date is on May 21st, 2014, discloses one Kind of the adjustable early-dismantling form of construction work of three-dimensional space, mainly including template part, secondary beam part, girder part, hollow Leading screw is double to adjust formula of shooting down early to tear supporting head part point, freestanding portion and spider section open, and it need not block and meet bearing length It is required that, save labour cost and fee of material, support is used in turn often, but it is that stability is not enough the problem of exist;China Number of patent application is 2012103923739, and publication date is on March 20th, 2013, discloses a kind of form surfacing detachable and thick Adjustable Combined type reinforced truss floor support plate is spent, is mainly included:Steel bar girder, form surfacing and supporting fastener, are which overcomed scattered Branch dissipates the problem of tearing big formwork system materials'use amount, serious waste of resources open, and form surfacing can repeatedly be had enough to meet the need, but it can not be realized Beam forms is connected with the fine of template die plate.
The content of the invention
The present invention be for avoid the weak point present in above-mentioned prior art there is provided a kind of stability it is good, simple in construction, Convenient dismounting, can repeatedly use, and realize beam forms size adjustable cast-in-situ concrete beam plate form bracing system and its Construction method.
The present invention adopts the following technical scheme that to solve technical problem:
Cast-in-situ concrete beam plate form bracing system of the present invention is structurally characterized in that:Include in the support system:
Steel bar truss floor support plate, is to constitute truss by the reinforcing bar that winds up, lower edge reinforcing bar and abdomen muscle, steel bar girder bed die passes through connection Tie the removable bottom for being fixed on truss of part;
Adjustable supports structure under beam, a pair of support rails are connected by lateral adjustments screw mandrel, and are supported by diagonal brace, in support Support wood stupefied, scaffold cross bar and beam bottom board is fixedly mounted in the top of cross bar successively;The bottom of diagonal brace and adjustable stand column inner tube Welding, adjustable stand column inner tube is downwardly into adjustable stand column outer tube, and is fixedly connected by fine-tuning nut and alignment pin;It is described can Adjust column inner tube to be connected upwardly through vertical adjustment screw mandrel with support bar, beam is installed between the support bar and side template Grid;Diagonal brace outer tube adjusts screw mandrel by diagonal brace and articulated elements is supported on adjustable stand column inner tube and adjustable stand column of the office in both sides Between outer tube, bridging is formed;
For office in the steel bar truss floor support plate of beam both sides, connected between the reinforcing bar that winds up using seat shoulder bar colligation of winding up Connect, between lower edge reinforcing bar using the colligation of lower edge seat shoulder bar connect, vertical support reinforcing bar respectively with reinforcing bar and the lower edge steel of winding up Muscle is welded to connect, and the vertical support reinforcing bar and steel bar girder bed die are supported on into the top of the support bar and positioned at top On beam grid, bearing rod, which is located at, to wind up between seat shoulder bar and lower edge seat shoulder bar, and is connected with stirrup colligation.
The design feature of cast-in-situ concrete beam plate form bracing system of the present invention is lain also in:Steel bar truss floor support plate is along length Direction is not less than 50mm on the top of support bar and the bearing length on the beam grid at top, and not less than 5d, d is lower edge The diameter of reinforcing bar.
The design feature of cast-in-situ concrete beam plate form bracing system of the present invention is lain also in:The steel bar girder bed die is plating Zinc steel plate.
The characteristics of construction method of cast-in-situ concrete beam plate form bracing system of the present invention is to carry out as follows:
Step 1:Adjustable supports structure under mounting rail, is adjusted respectively according to the design height and width of beam behind leveling solidification place Whole diagonal brace regulation screw mandrel, vertical adjustment screw mandrel and lateral adjustments screw mandrel;
Step 2:Fixed support wood stupefied and scaffold cross bar, install beam forms, by the good beam steel fix in position of colligation;
Step 3:Steel bar truss floor support plate is installed, mounted steel bar girder bed die is placed on beam grid, fine setting is oblique Support regulation screw mandrel, vertical adjustment screw mandrel and lateral adjustments screw mandrel and reach design requirement, respectively colligation wind up seat shoulder bar and Lower edge seat shoulder bar;
Step 4:Casting concrete, when board concrete maintenance reaches the intensity for meeting form removal requirement, removes connecting piece simultaneously Fine setting support regulation screw mandrel, removes steel bar girder bed die;
Step 5:After beam concrete reaches the 100% of design strength, regulation diagonal brace regulation screw mandrel and vertical adjustment screw mandrel, Adjustable supports structure under beam forms and beam is removed, construction is completed.
Compared with the prior art, the present invention has the beneficial effect that:
1st, steel bar truss floor support plate in the present invention, its steel bar girder bed die is dismountable structure, is greatly improved construction effect Rate.
2nd, adjustable supports structure under central sill of the present invention, it makes beam width, beam slab base absolute altitude can adjust, it is not necessary to take The method blocked meets length requirement, and constructing operation is convenient, flexible, is substantially shorter the construction period, saves construction costs.
3rd, the present invention is overlapped closely between template die plate and beam forms, removes convenient.
4th, the inventive method steel bar girder bed die is torn open to be early, and can greatly improve steel bar girder bed die is used in turn number of times, Input amount of template is saved, fee of material is reduced, reduces the correlative charges such as transport, the stacking of template.
5th, the present invention is replaced plank sheathing with steel form, is greatlyd save consumption of wood, be beneficial to bracing members substitution wood support Resource environment is protected, its punching block is reused, realize green, the environmental protection of construction.
Brief description of the drawings
Fig. 1 is cast-in-situ concrete beam plate form bracing system structural representation in the present invention;
Fig. 2 is steel bar truss floor support plate upward view in the present invention;
Fig. 3 is adjustable stand column outer tube in the present invention and adjustable stand column inner tube adjustment structure schematic diagram;
Label in figure:Outside 1 firm banking, 2 adjustable stand column outer tubes, 3 alignment pins, 4 fine-tuning nuts, 5 regulation handles, 6 diagonal braces Pipe, 7 diagonal braces regulation screw mandrel, 8 articulated elements, 9 diagonal braces, 10 cross bars regulation screw mandrel, 11 support rails, 12 support wood stupefieds, 13 scaffolds Cross bar, 14 support regulation screw mandrels, 15 adjustable stand column inner tubes, 16 beam bottom boards, 17 support bars, 18 beam grids, 19 side templates, 20 steel Muscle truss bed die, 21 lower edge reinforcing bars, 22 wind up reinforcing bar, 23 abdomen muscle, 24 vertical support reinforcing bars, 25 stirrups, 26 bearing rods, 27 bearings Negative reinforcement, 28 bed die through holes, 29 connecting pieces.
Embodiment
Referring to Fig. 1 and Fig. 3, the structure type of cast-in-situ concrete beam plate form bracing system is in the present embodiment:
Steel bar truss floor support plate is set, is that truss, steel bar girder are constituted by the reinforcing bar 22 that winds up, lower edge reinforcing bar 21 and abdomen muscle 23 Bed die 20 is by the removable bottom for being fixed on truss of connecting piece 29, and steel bar girder bed die 20 is galvanized steel plain sheet.
Adjustable supports structure under beam is set, and a pair of the support rails 11 longitudinally set in a row are connected by cross bar regulation screw mandrel 10 Connect, and supported by diagonal brace 9, screw mandrel 10 is adjusted according to the width adjusting cross bar of beam, the support of beam forms side form is realized;It is horizontal in support The top of bar 11 is fixed with support wood stupefied 12, scaffold cross bar 13 and beam bottom board 16 successively;The bottom of diagonal brace 9 and adjustable stand column Inner tube 15 is welded, and realizes firmly connection, it is to avoid the excessive phenomenon of deflection deformation occur because beam is overweight in casting process;Adjustable stand column Inner tube 15 passes downwardly through fine-tuning nut 4 and alignment pin 3 is inserted in adjustable stand column outer tube 2, real by fine-tuning nut 4 and alignment pin 3 Now it is fixedly connected, regulation handle 5 is used to rotate fine-tuning nut 4, and fine-tuning nut 4 and alignment pin 3 are adjusted according to the absolute altitude of beam base, Ensure that support rail 11 can support beam bottom board;Adjustable stand column inner tube 15 connects upwardly through vertical adjustment screw mandrel 14 with support bar 17 Connect, beam grid 18 is installed between support bar 17 and side template 19;Diagonal brace outer tube 6 adjusts screw mandrel 7 by diagonal brace and is hinged Part 8 is supported on office between the adjustable stand column inner tube 15 and adjustable stand column outer tube 2 of both sides, forms the diagonal brace of bridging form, According to beam base absolute altitude and beam width regulation diagonal brace regulation screw mandrel 7, the support of beam forms is realized.
For office in the steel bar truss floor support plate of beam both sides, tied up between the reinforcing bar 22 that winds up using the seat shoulder bar 27 that winds up Prick connection, between lower edge reinforcing bar 21 using the colligation of lower edge seat shoulder bar connect, vertical support reinforcing bar 24 respectively with the reinforcing bar that winds up 22 and lower edge reinforcing bar 21 be welded to connect, make to wind up reinforcing bar 22 and the synchronous stress of lower edge reinforcing bar 21, adjusts vertical according to depth of beam Screw mandrel 14 is adjusted, vertical support reinforcing bar 24 and steel bar girder bed die 20 is supported on the top of support bar 17 and the beam positioned at top On grid 18, the construction loads of whole plate is supported, the support to steel bar truss floor support plate is realized;Bearing rod 26 is located at the bearing that winds up Between negative reinforcement 27 and lower edge seat shoulder bar, and it is connected with the colligation of stirrup 25.
As depicted in figs. 1 and 2, in specific implementation, bottom and the bed die through hole 28 on steel bar girder bed die 20 of abdomen muscle 23 Position correspond.Steel bar truss floor support plate is along its length on the top of support bar 17 and on the beam grid 18 at top Bearing length be not less than 50mm, and not less than 5d, d is the diameter of lower edge reinforcing bar 21, to avoid because disturbing for plate spends big appearance The phenomenon that floor support plate departs from support bar 17, reduces the risk of steel bar truss floor support plate unstability.
In the present embodiment cast-in-situ concrete beam plate form bracing system can according to depth of beam, the width of beam, the clear height of beam, The difference of beam slab clear height is adjusted, and realizes the purpose of beam-slab template support;In steel bar girder upper junction plate template, realize that plate is applied The self-supporting of load during work, and transferred the load to by steel bar girder on beam support, while being realized by connecting piece Freely dismantling for steel bar girder bed die, reaches reduction construction workload, reduces support and mould material consumption, purifies construction working Environment, realizes green, the purpose of environmental protection of construction.
The construction method of cast-in-situ concrete beam plate form bracing system is to carry out as follows in the present embodiment:
Step 1:Adjustable supports structure under mounting rail, is adjusted respectively according to the design height and width of beam behind leveling solidification place Whole diagonal brace regulation screw mandrel 7, vertical adjustment screw mandrel 14 and lateral adjustments screw mandrel 10.
Step 2:Fixed support wood stupefied 12 and scaffold cross bar 13, install beam forms 16, the good beam steel of colligation are fixed In place.
Step 3:Steel bar truss floor support plate is installed, mounted steel bar girder bed die 20 is placed on beam grid 18, it is micro- Oblique adjusting support regulation screw mandrel 7, vertical adjustment screw mandrel 14 and lateral adjustments screw mandrel 10 are to reach design requirement, and colligation respectively is winded up branch Seat negative reinforcement 27 and lower edge seat shoulder bar.
Step 4:Casting concrete, when board concrete maintenance reaches the intensity for meeting form removal requirement, removes connecting piece 29 And support regulation screw mandrel 14 is finely tuned, steel bar girder bed die 20 falls because of Action of Gravity Field, so as to realize freely loading and unloading for bed die;Will Reuse can be put into after the leveling of steel bar girder bed die 20 of dismounting.
Step 5:After beam concrete reaches the 100% of design strength, regulation diagonal brace regulation screw mandrel 7 and fine-tuning nut 4 are torn open Except adjustable supports structure under beam forms and beam, construction is completed.

Claims (4)

1. a kind of cast-in-situ concrete beam plate form bracing system, it is characterized in that:Include in the support system:
Steel bar truss floor support plate, is to constitute truss, steel bar girder bottom by the reinforcing bar that winds up (22), lower edge reinforcing bar (21) and abdomen muscle (23) Mould (20) passes through the removable bottom for being fixed on truss of connecting piece (29);
Adjustable supports structure under beam, a pair of support rails (11) are connected by lateral adjustments screw mandrel (10), and are propped up by diagonal brace (9) Support, support wood stupefied (12), scaffold cross bar (13) and beam bottom board (16) are fixedly mounted in the top of support rail (11) successively; The bottom of diagonal brace (9) is welded with adjustable stand column inner tube (15), and adjustable stand column inner tube (15) is downwardly into adjustable stand column outer tube (2) In, and be fixedly connected by fine-tuning nut (4) and alignment pin (3);The adjustable stand column inner tube (15) is upwardly through vertical adjustment silk Bar (14) is connected with support bar (17), and beam grid (18) is provided between the support bar (17) and side template (19);Tiltedly Support outer tube (6) adjusts screw mandrel (7) by diagonal brace and articulated elements (8) is supported on office in the adjustable stand column inner tube (15) of both sides and can Adjust between column tube (2), form bridging;
For office in the steel bar truss floor support plate of beam both sides, tied up between the reinforcing bar that winds up (22) using the seat shoulder bar that winds up (27) Connection is pricked, is connected between lower edge reinforcing bar (21) using the colligation of lower edge seat shoulder bar, vertical support reinforcing bar (24) is respectively with winding up Reinforcing bar (22) and lower edge reinforcing bar (21) are welded to connect, and the vertical support reinforcing bar (24) and steel bar girder bed die (20) are supported on The top of the support bar (17) and on the beam grid (18) at top, bearing rod (26) be located at wind up seat shoulder bar (27) and Between lower edge seat shoulder bar, and it is connected with stirrup (25) colligation.
2. cast-in-situ concrete beam plate form bracing system according to claim 1, it is characterized in that:Steel bar truss floor support plate edge Length direction is not less than 50mm on the top of support bar (17) and the bearing length on the beam grid (18) at top, and not small In 5d, d is the diameter of lower edge reinforcing bar (21).
3. cast-in-situ concrete beam plate form bracing system according to claim 1, it is characterized in that:The steel bar girder bed die (20) it is galvanized steel plain sheet.
4. the construction method of the cast-in-situ concrete beam plate form bracing system described in a kind of claim 1, it is characterized in that by as follows Step is carried out:
Step 1:Adjustable supports structure under mounting rail, is adjusted tiltedly respectively according to the design height and width of beam behind leveling solidification place Support regulation screw mandrel (7), vertical adjustment screw mandrel (14) and lateral adjustments screw mandrel (10);
Step 2:Fixed support wood stupefied (12) and scaffold cross bar (13), install beam forms (16), the good beam steel of colligation are consolidated Determine in place;
Step 3:Steel bar truss floor support plate is installed, mounted steel bar girder bed die (20) is placed on beam grid (18), it is micro- Oblique adjusting support regulation screw mandrel (7), vertical adjustment screw mandrel (14) and lateral adjustments screw mandrel (10) are to reach design requirement, respectively in colligation String seat shoulder bar (27) and lower edge seat shoulder bar;
Step 4:Casting concrete, when board concrete maintenance reaches the intensity for meeting form removal requirement, removes connecting piece (29) simultaneously Fine setting support regulation screw mandrel (14), removes steel bar girder bed die (20);
Step 5:After beam concrete reaches the 100% of design strength, regulation diagonal brace regulation screw mandrel (7) and vertical adjustment screw mandrel (14) adjustable supports structure under beam forms (16) and beam, is removed, construction is completed.
CN201710623212.9A 2017-07-27 2017-07-27 Cast-in-situ concrete beam plate form bracing system and its construction method Pending CN107217839A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710623212.9A CN107217839A (en) 2017-07-27 2017-07-27 Cast-in-situ concrete beam plate form bracing system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710623212.9A CN107217839A (en) 2017-07-27 2017-07-27 Cast-in-situ concrete beam plate form bracing system and its construction method

Publications (1)

Publication Number Publication Date
CN107217839A true CN107217839A (en) 2017-09-29

Family

ID=59954475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710623212.9A Pending CN107217839A (en) 2017-07-27 2017-07-27 Cast-in-situ concrete beam plate form bracing system and its construction method

Country Status (1)

Country Link
CN (1) CN107217839A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938522A (en) * 2017-12-29 2018-04-20 北京华横新技术开发公司 Formwork for placing support device and its application method
CN108625487A (en) * 2018-06-04 2018-10-09 浙江中益建材科技有限公司 A kind of across frame structure end support node structure of steel bar girder plate
CN108625486A (en) * 2018-06-04 2018-10-09 浙江中益建材科技有限公司 A kind of across frame structure edge support node structure of steel bar girder plate
CN108979150A (en) * 2018-06-23 2018-12-11 台州市铭泰建设有限公司 A kind of construction method of reinforced concrete girder slab
CN109339319A (en) * 2018-10-17 2019-02-15 西安理工大学 Steel plate concrete composite coupling beams with two-way concrete slab truss floor support plate
CN109577491A (en) * 2018-06-04 2019-04-05 浙江中益建材科技有限公司 A kind of steel bar girder plate and framework template support node structure
CN109610817A (en) * 2018-11-29 2019-04-12 山东金城建设有限公司 Cross beam falsework and its design and construction method
CN109898849A (en) * 2017-12-07 2019-06-18 广宏建设集团有限公司 A kind of support device and its application method of the formwork system using Bailey bracket
CN111206509A (en) * 2020-03-04 2020-05-29 重庆铁固工程科技有限公司 Assembled bridge slope-adjusting support system
CN111236533A (en) * 2020-02-22 2020-06-05 凌池英 Steel structure supporting beam for building construction
CN111877138A (en) * 2020-08-10 2020-11-03 漯河市公路事业发展中心 Adjustable high-rigidity diaphragm plate device
CN112523100A (en) * 2020-12-09 2021-03-19 中冶京诚工程技术有限公司 Template supporting structure of overhead concrete cantilever beam
CN113250317A (en) * 2021-06-21 2021-08-13 重庆电子工程职业学院 Double-concrete-beam and concrete frame column connecting structure for building design
CN113914614A (en) * 2021-10-29 2022-01-11 中冶建工集团有限公司 Construction process for pouring large-volume reinforced concrete beam at one time
CN115042298A (en) * 2022-07-18 2022-09-13 中铁二局集团有限公司 Manufacturing method of subway vehicle section assembled reinforced concrete beam
CN115199029A (en) * 2022-09-13 2022-10-18 中国建筑第二工程局有限公司 Cast-in-place beam-slab structure formwork system and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8503323A (en) * 1985-12-02 1987-07-01 Petrus Johannes Lambertus De L FLOOR FORMATION SYSTEM.
CN201635419U (en) * 2010-02-02 2010-11-17 周德新 Formwork support for steel deposit concrete
CN102425306A (en) * 2011-03-17 2012-04-25 建研科技股份有限公司 Construction method of steel bar truss floor bearing plate and steel bar truss floor bearing plate
CN104652809A (en) * 2015-01-07 2015-05-27 福建工程学院 Construction method of support system for templates of concrete beams and slabs
CN105625713A (en) * 2015-12-30 2016-06-01 青建集团股份公司 Outer sleeve type molding board early removing bracket
CN206942131U (en) * 2017-07-27 2018-01-30 安徽建工集团有限公司 Cast-in-situ concrete beam plate form bracing system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8503323A (en) * 1985-12-02 1987-07-01 Petrus Johannes Lambertus De L FLOOR FORMATION SYSTEM.
CN201635419U (en) * 2010-02-02 2010-11-17 周德新 Formwork support for steel deposit concrete
CN102425306A (en) * 2011-03-17 2012-04-25 建研科技股份有限公司 Construction method of steel bar truss floor bearing plate and steel bar truss floor bearing plate
CN104652809A (en) * 2015-01-07 2015-05-27 福建工程学院 Construction method of support system for templates of concrete beams and slabs
CN105625713A (en) * 2015-12-30 2016-06-01 青建集团股份公司 Outer sleeve type molding board early removing bracket
CN206942131U (en) * 2017-07-27 2018-01-30 安徽建工集团有限公司 Cast-in-situ concrete beam plate form bracing system

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898849A (en) * 2017-12-07 2019-06-18 广宏建设集团有限公司 A kind of support device and its application method of the formwork system using Bailey bracket
CN107938522A (en) * 2017-12-29 2018-04-20 北京华横新技术开发公司 Formwork for placing support device and its application method
CN108625487A (en) * 2018-06-04 2018-10-09 浙江中益建材科技有限公司 A kind of across frame structure end support node structure of steel bar girder plate
CN108625486A (en) * 2018-06-04 2018-10-09 浙江中益建材科技有限公司 A kind of across frame structure edge support node structure of steel bar girder plate
CN109577491A (en) * 2018-06-04 2019-04-05 浙江中益建材科技有限公司 A kind of steel bar girder plate and framework template support node structure
CN108979150A (en) * 2018-06-23 2018-12-11 台州市铭泰建设有限公司 A kind of construction method of reinforced concrete girder slab
CN109339319A (en) * 2018-10-17 2019-02-15 西安理工大学 Steel plate concrete composite coupling beams with two-way concrete slab truss floor support plate
CN109610817A (en) * 2018-11-29 2019-04-12 山东金城建设有限公司 Cross beam falsework and its design and construction method
CN111236533A (en) * 2020-02-22 2020-06-05 凌池英 Steel structure supporting beam for building construction
CN111206509A (en) * 2020-03-04 2020-05-29 重庆铁固工程科技有限公司 Assembled bridge slope-adjusting support system
CN111877138A (en) * 2020-08-10 2020-11-03 漯河市公路事业发展中心 Adjustable high-rigidity diaphragm plate device
CN112523100A (en) * 2020-12-09 2021-03-19 中冶京诚工程技术有限公司 Template supporting structure of overhead concrete cantilever beam
CN113250317A (en) * 2021-06-21 2021-08-13 重庆电子工程职业学院 Double-concrete-beam and concrete frame column connecting structure for building design
CN113914614A (en) * 2021-10-29 2022-01-11 中冶建工集团有限公司 Construction process for pouring large-volume reinforced concrete beam at one time
CN113914614B (en) * 2021-10-29 2022-09-23 中冶建工集团有限公司 Construction process for pouring large-volume reinforced concrete beam at one time
CN115042298A (en) * 2022-07-18 2022-09-13 中铁二局集团有限公司 Manufacturing method of subway vehicle section assembled reinforced concrete beam
CN115199029A (en) * 2022-09-13 2022-10-18 中国建筑第二工程局有限公司 Cast-in-place beam-slab structure formwork system and construction method thereof

Similar Documents

Publication Publication Date Title
CN107217839A (en) Cast-in-situ concrete beam plate form bracing system and its construction method
CN206942131U (en) Cast-in-situ concrete beam plate form bracing system
CN109736449A (en) Stiffness structure bean column node and construction method
CN104695336B (en) The double-deck first up and then down stand construction method of Cast-in-situ Beam
CN112609980A (en) Construction method of post-cast strip back-jacking aluminum alloy single-column
CN107989447A (en) A kind of large-scale earthing concrete tank dome steel support structure and installation method
CN105275203B (en) Extensible canopy and the adjustable die system and the construction method of the mould bases using its making
CN101858055A (en) Setting steel pipe bracket support system of cover beam and construction method thereof
CN212771953U (en) No. 0 piece construction bracket braced system of continuous beam
CN211472143U (en) Pier steel form
CN105780922A (en) Construction method for segmental formwork hoisting system of large-span steel reinforced concrete transfer truss
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN211775609U (en) Integrated form scaffold of independent post roof beam outer frame high-rise building
CN113445739A (en) Adjustable unilateral template supporting device
CN210216478U (en) Open caisson construction work platform
CN110878522A (en) Main tower lower cross beam construction system and construction method
CN108930406A (en) Construction method for large-formwork narrow-space wall based on integral assembly
CN211201150U (en) Shear wall template structure
CN212388363U (en) A auxiliary device for construction of hollow mound cross slab of bridge
CN107816132B (en) High-level tower crane single-row frame attachment structure without floor slab and construction method thereof
CN209779457U (en) Supporting device for box girder side template
CN115075613A (en) Fabricated building supporting system and construction method thereof
CN207363256U (en) A kind of type quick detaching beam bottom mother plate supporting rack
CN111962850A (en) Construction method of overhanging scaffold
CN205476466U (en) Formwork system is hoisted in segmentation of large -span shaped steel concrete conversion truss

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170929