CN211689927U - An operating platform device for construction in bridge towers - Google Patents
An operating platform device for construction in bridge towers Download PDFInfo
- Publication number
- CN211689927U CN211689927U CN201922200600.3U CN201922200600U CN211689927U CN 211689927 U CN211689927 U CN 211689927U CN 201922200600 U CN201922200600 U CN 201922200600U CN 211689927 U CN211689927 U CN 211689927U
- Authority
- CN
- China
- Prior art keywords
- embedded
- tower
- fixed
- beams
- tower column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种用于桥塔塔内施工的操作平台装置,包括分别预埋在塔柱左右两侧的预埋件,在塔柱每侧分别前后间隔预埋有四个预埋件,塔柱左侧的四个预埋件与塔柱右侧的四个预埋件彼此左右一一对应设置;在每一个所述的支撑牛腿上沿水平方向开有一个连接通孔,两根钢筋的前后两端分别穿过与同一个埋件板连接的两个支撑牛腿上的连接通孔且与支撑牛腿焊接固定置;四根横梁的左右两端分别支撑设置在彼此左右对应设置的左侧钢筋和右侧钢筋上并且与相应侧的钢筋焊接固定,多根分配梁焊接固定在横梁上,在分配梁上固定有桥面板。本操作平台拆除速度快,可在塔内不同节段周转使用。
The utility model discloses an operation platform device used for construction in a bridge tower, which comprises pre-embedded parts respectively pre-embedded on the left and right sides of a tower column, and four pre-embedded parts are pre-embedded on each side of the tower column at the front and rear intervals respectively. , the four embedded parts on the left side of the tower column and the four embedded parts on the right side of the tower column are arranged in a one-to-one correspondence with each other; a connecting through hole is opened along the horizontal direction on each of the supporting corbels, and the two The front and rear ends of the steel bar respectively pass through the connecting through holes on the two supporting corbels connected to the same embedded plate and are welded and fixed with the supporting corbels; the left and right ends of the four beams are respectively supported and arranged in the left and right corresponding to each other. The left reinforcing bars and the right reinforcing bars are arranged and fixed by welding with the reinforcing bars on the corresponding sides, a plurality of distribution beams are welded and fixed on the cross beams, and a bridge deck is fixed on the distribution beams. The operation platform has a fast dismantling speed and can be used in different segments in the tower.
Description
技术领域technical field
本实用新型涉及操作平台装置,特别涉及一种用于桥塔塔内施工的操作平台装置。The utility model relates to an operating platform device, in particular to an operating platform device used for construction in a bridge tower.
背景技术Background technique
斜拉桥由于其优美的造型,被广泛应用作跨海大桥的通航孔桥。海域斜拉桥施工区天气复杂多变,灾害性天气类型多,雨、大风、雷暴、热带气旋等灾害天气发生频繁,极大风速大于40m/s,海域最大潮差达3.90m,平均最大流速2.5m/s。随着桥塔结构物施工进度,塔柱越来越高,海上施工安全风险越来越高。桥塔塔柱外部普遍采用液压爬模施工,而对于塔柱狭小内腔施工,爬架体系搭设安装不方便,且施工复杂成本高,不便于拆除周转。Cable-stayed bridges are widely used as navigation bridges of sea-crossing bridges due to their beautiful shapes. The weather in the construction area of the cable-stayed bridge in the sea is complex and changeable, and there are many types of disastrous weather. Rain, strong wind, thunderstorm, tropical cyclone and other disastrous weather occur frequently. The maximum wind speed is greater than 40m/s. 2.5m/s. With the construction progress of the bridge tower structure, the tower column is getting higher and higher, and the safety risk of offshore construction is getting higher and higher. Hydraulic climbing formwork is generally used for the construction of the exterior of the tower column. For the construction of the narrow inner cavity of the tower column, the erection and installation of the climbing frame system is inconvenient, and the construction is complicated and costly, and it is not convenient for dismantling and turnover.
发明内容SUMMARY OF THE INVENTION
本实用新型的目的在于克服已有技术的缺点,提供一种拆除速度快,可在塔内不同节段周转使用的用于桥塔塔内施工的操作平台装置。The purpose of the utility model is to overcome the shortcomings of the prior art, and to provide an operation platform device for the construction in the bridge tower tower, which is fast in dismantling and can be used in different segments in the tower.
为解决上述技术问题所采用的技术方案:The technical solutions adopted to solve the above technical problems:
一种用于桥塔塔内施工的操作平台装置,包括分别预埋在塔柱左右两侧的预埋件,在塔柱每侧分别前后间隔预埋有四个预埋件,塔柱左侧的四个预埋件与塔柱右侧的四个预埋件彼此左右一一对应设置;每一个所述的预埋件包括埋设在塔柱相应侧外壁面上的埋件板,所述的埋件板通过螺杆与爬锥固定相连,所述的螺杆与爬锥浇筑在塔柱内,在每一个埋件板上固定有两个前后平行间隔设置的支撑牛腿,支撑牛腿均由钢板制成;An operation platform device used for construction in a bridge tower tower includes pre-embedded parts respectively pre-embedded on the left and right sides of the tower column; The four embedded parts of the pylon and the four embedded parts on the right side of the tower column are arranged in a one-to-one correspondence with each other; each of the embedded parts includes an embedded part board embedded on the outer wall surface of the corresponding side of the tower column. The embedded plate is fixedly connected with the climbing cone through the screw, the screw and the climbing cone are poured in the tower column, and two supporting corbels arranged in parallel at the front and rear are fixed on each embedded plate, and the supporting corbels are all made of steel plates. production;
在每一个所述的支撑牛腿上沿水平方向开有一个连接通孔,两根钢筋的前后两端分别穿过与同一个埋件板连接的两个支撑牛腿上的连接通孔且与支撑牛腿焊接固定,所述的两根钢筋沿水平方向设置;A connecting through hole is opened on each of the supporting corbels in the horizontal direction, and the front and rear ends of the two steel bars respectively pass through the connecting through holes on the two supporting corbels connected to the same embedded plate and are connected with the same embedded plate. The support corbel is welded and fixed, and the two steel bars are arranged in the horizontal direction;
四根前后平行间隔设置的横梁的左右两端分别支撑设置在彼此左右对应设置的左侧钢筋和右侧钢筋上并且与相应侧的钢筋焊接固定,多根左右平行间隔设置的分配梁焊接固定在横梁上,在所述的分配梁上固定有桥面板,在所述的桥面板的前后两侧分别固定有防护栏杆。The left and right ends of the four transverse beams arranged at parallel intervals in the front and rear are respectively supported and arranged on the left and right steel bars corresponding to each other and are welded and fixed with the steel bars on the corresponding sides. On the cross beam, a bridge deck is fixed on the distribution beam, and protective railings are respectively fixed on the front and rear sides of the bridge deck.
本实用新型的有益效果是:本装置充分考虑了塔内腔空间狭小,设计合理,结构简单,提高了施工质量,节省了外海桥塔施工成本。桥面板及防护栏杆的设置改善了工人操作环境,提高了平台整体安全性及平稳性。本操作平台拆除速度快,可在塔内不同节段周转使用。The beneficial effects of the utility model are as follows: the device fully considers the narrow space of the inner cavity of the tower, the design is reasonable, the structure is simple, the construction quality is improved, and the construction cost of the offshore bridge tower is saved. The setting of the bridge deck and protective railing improves the operating environment of workers and improves the overall safety and stability of the platform. The operation platform has a fast dismantling speed and can be used in different segments in the tower.
附图说明Description of drawings
图1为本实用新型一种用于桥塔塔内施工的操作平台装置平面示意图;Fig. 1 is a kind of plane schematic diagram of the operation platform device used for construction in bridge tower tower of the present invention;
图2为本实用新型一种用于桥塔塔内施工的操作平台装置立面示意图;Figure 2 is a schematic elevation view of an operation platform device used for construction in a bridge tower tower of the present invention;
图3为图2所示的作业平台装置中的支撑牛腿结构示意图;Fig. 3 is the structural schematic diagram of the support corbel in the work platform device shown in Fig. 2;
图4为图3所示的支撑牛腿结构的A-A剖面图。FIG. 4 is an A-A sectional view of the supporting corbel structure shown in FIG. 3 .
具体实施方式Detailed ways
下面结合附图和具体实施例对本专利作以详细描述。The present patent will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
如附图所示的本实用新型的用于桥塔塔内施工的操作平台装置,包括分别预埋在塔柱1左右侧的预埋件5,在塔柱1每侧分别前后间隔预埋有四个预埋件5,塔柱1左侧的四个预埋件5与塔柱1右侧的四个预埋件5彼此左右一一对应设置;As shown in the accompanying drawings, the operation platform device of the present invention for construction in a bridge tower includes
每一个所述的预埋件5包括埋设在塔柱1相应侧外壁面上的埋件板,所述的埋件板通过螺杆与爬锥固定相连,所述的螺杆与爬锥浇筑在塔柱内,在每一个埋件板上固定有两个前后平行间隔设置的支撑牛腿6,支撑牛腿6均由钢板制成。Each of the
在每一个所述的支撑牛腿6上沿水平方向开有一个连接通孔,两根钢筋7的前后两端分别穿过同一个埋件板上的两个支撑牛腿6上的连接通孔且与支撑牛腿6焊接固定。所述的两根钢筋7沿水平方向设置。A connecting through hole is opened on each of the supporting
所述预埋件5浇筑在塔柱混凝土内部,由埋件板、螺杆及爬锥连接组成,能使预埋件具有很好的抗拉效果。爬锥可精确定位埋件板和螺杆,在砼浇筑前通过普通螺栓固定在模板上。The embedded
四根前后平行间隔设置的横梁2的左右两端分别支撑设置在彼此左右对应设置的左侧钢筋7和右侧钢筋上并且与相应侧的钢筋焊接固定,多根左右平行间隔设置的分配梁3焊接固定在横梁2上。在所述的分配梁3上固定有桥面板4,在所述的桥面板4的前后两侧分别固定有防护栏杆8,保证工人钢筋安装,模板拼装,混凝土浇筑施工安全。The left and right ends of the four horizontally spaced front and
所述横梁2与分配梁3可以采用工字钢。The
本装置用作桥塔塔内钢筋安装、模板拼装、混凝土浇筑的工作平台,有效保证工人的施工安全。The device is used as a working platform for steel reinforcement installation, formwork assembly, and concrete pouring in the bridge tower to effectively ensure the construction safety of workers.
本结构的施工步骤如下:The construction steps of this structure are as follows:
(1)上节混凝土浇筑前,将埋件板、高强螺杆及爬锥组合成预埋件5,通过普通螺栓将爬锥固定于模板上,然后浇筑混凝土埋置预埋件。(1) Before the concrete pouring of the upper section, the embedded plate, the high-strength screw rod and the climbing cone are combined to form the embedded
(2)起吊支撑牛腿6,与预埋件5对齐,采用高强螺栓固定。(2) Lift the supporting
(3)支撑牛腿6安装完成后,在同一预埋件5的两个支撑牛腿上焊接两根钢筋7。(3) After the installation of the supporting
(4)将四根工字钢构成的横梁2放置于钢筋7上,并焊接固定,焊缝需满足要求。分配梁3均匀布置于横梁2,采用同样标准焊接固定。(4) The
(5)横梁2与分配梁3固定完成后,继续吊装桥面板4于分配梁3上,紧密固定。(5) After the fixing of the
(6)吊装防护栏杆8,防护栏杆8与桥面板4焊接固定,保证工人钢筋安装,模板拼装,混凝土浇筑施工安全。(6) The
以上所述仅为本发明创造的较佳实例而已,并不用以限制本发明创造,凡在本发明创造的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明创造的保护范围之内。The above is only a preferred example of the present invention, and is not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the present invention. within the scope of protection of inventions.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922200600.3U CN211689927U (en) | 2019-12-10 | 2019-12-10 | An operating platform device for construction in bridge towers |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922200600.3U CN211689927U (en) | 2019-12-10 | 2019-12-10 | An operating platform device for construction in bridge towers |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211689927U true CN211689927U (en) | 2020-10-16 |
Family
ID=72790393
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922200600.3U Expired - Fee Related CN211689927U (en) | 2019-12-10 | 2019-12-10 | An operating platform device for construction in bridge towers |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211689927U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115162165A (en) * | 2022-08-04 | 2022-10-11 | 中铁四局集团有限公司 | Construction method for closing middle tower column of highway-railway dual-purpose river-crossing A-type cable-stayed bridge |
-
2019
- 2019-12-10 CN CN201922200600.3U patent/CN211689927U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115162165A (en) * | 2022-08-04 | 2022-10-11 | 中铁四局集团有限公司 | Construction method for closing middle tower column of highway-railway dual-purpose river-crossing A-type cable-stayed bridge |
| CN115162165B (en) * | 2022-08-04 | 2023-03-28 | 中铁四局集团有限公司 | Construction method for closing middle tower column of highway-railway dual-purpose river-crossing A-type cable-stayed bridge |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101781879B (en) | Construction method of single-pylon cable-stayed bridge without dorsal cables | |
| CN101781878B (en) | Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof | |
| CN108360380B (en) | A kind of bridge pier column construction work platform and construction method thereof | |
| CN110878522B (en) | Construction system and construction method of beam under main tower | |
| CN104695337A (en) | Self-lifting sliding and turnover construction system and construction method | |
| CN215052006U (en) | Double-limb thin-wall pier assembled bracket structure | |
| CN113293694B (en) | Turnover formwork frame structure for efficient pier body construction and construction process | |
| CN111749142A (en) | A BIM-based 0# block prefabricated bracket design and construction method | |
| CN111455837B (en) | Thin-wall hollow pier pouring connection structure and construction method thereof | |
| CN109869153A (en) | The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method | |
| CN207714108U (en) | A kind of support system of the more arcading arched aqueducts of large span or bridge | |
| CN209194354U (en) | High-altitude long-span binder base-supporting shellfish thunder support construction | |
| CN101298796A (en) | Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof | |
| CN202000265U (en) | Concrete construction formwork for high pier of bridge | |
| CN104727446A (en) | Construction method of large aluminum alloy formwork at settlement joint | |
| CN211473320U (en) | Tool type external hanging rack for corridor | |
| CN209568359U (en) | A kind of falsework for the construction of outer-enwraped type Guard fence base | |
| CN211368420U (en) | Main tower lower beam diagonal bracing system | |
| CN108797350B (en) | Tower column inner and outer stiff skeleton device and construction method thereof | |
| CN116025170B (en) | A device for tying and positioning steel bars of a horizontal beam on water in a wharf project and a construction method thereof | |
| CN207332305U (en) | Climbing frame in a kind of king-post construction | |
| CN116145560A (en) | A slab type pier cover beam operating platform and steel bar construction method | |
| CN106049283A (en) | Bridge rectangular pier hanging die construction method | |
| CN201588172U (en) | Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template | |
| CN216892017U (en) | Tie beam integral casting template in template connecting piece and lower stand |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201016 |