CN2142500Y - Mine air purifier - Google Patents

Mine air purifier Download PDF

Info

Publication number
CN2142500Y
CN2142500Y CN 92216537 CN92216537U CN2142500Y CN 2142500 Y CN2142500 Y CN 2142500Y CN 92216537 CN92216537 CN 92216537 CN 92216537 U CN92216537 U CN 92216537U CN 2142500 Y CN2142500 Y CN 2142500Y
Authority
CN
China
Prior art keywords
dust
settling compartment
dust removing
removing chamber
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 92216537
Other languages
Chinese (zh)
Inventor
高飞龙
李国增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HONGHUAGOU GOLD ORE CHIFENG CITY
Original Assignee
HONGHUAGOU GOLD ORE CHIFENG CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HONGHUAGOU GOLD ORE CHIFENG CITY filed Critical HONGHUAGOU GOLD ORE CHIFENG CITY
Priority to CN 92216537 priority Critical patent/CN2142500Y/en
Application granted granted Critical
Publication of CN2142500Y publication Critical patent/CN2142500Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a mine air purifier for blasting environment, such as well and tunnel excavating environment, etc. The mine air purifier comprises a motor, a draught fan and a dust removing chamber which are arranged on a machine base, wherein, the inlet end of the dust removing chamber is provided with an electric heating disinfection chamber, the middle part of the dust removing chamber is uniformly distributed with sprayers capable of forming water curtains, and the outlet end of the dust removing chamber is communicated with the discharge pipe of the purifier through the draught fan. The utility model has the advantages of compact structure, small size, convenient movement, low consumption, energy saving and high purifying efficiency and can replace the existing ventilating equipment.

Description

Mine air purifier
The utility model relates to a kind of mining air clarifier that is used for bursting work environment such as roadway digging.
At present, in the mining mining operations, comparatively abominable with the condition of labor in bursting work places such as roadway digging.Improve abominable condition of labor and become people's question of common concern.Existing cleaning equipment all adopts ventilation system, and the harmful cigarette after the explosion, dirt are discharged.This is the very big special-purpose dust removal by ventilation equipment of required power not only, and power consumption is big, and the activity duration is long, influences mining work efficient.Particularly in the excavation operation of down-hole dead face, because of dust-producing amount is big, drain time is longer, and the operating environment official is abominable, seriously jeopardizes health of operators.For this reason, the improvement of roadway digging operation condition has become the long-awaited urgency of a people difficult problem to be solved.
The purpose of this utility model provides a kind of mining air clarifier, its compact conformation, and volume is little, and conveniently moving can replace existing ventilation equipment, has low consumption, energy-conservation, advantage that purification efficiency is high.
The purpose of this utility model is achieved in that this device comprises motor, air-introduced machine, the dust-settling compartment that is assembled on the support, wherein be provided with the electric heating sterilizing room at the dust-settling compartment arrival end, the dust-settling compartment middle part is evenly equipped with the sprayer that can form water curtain, and the dust-settling compartment port of export communicates with the clarifier delivery pipe by air-introduced machine.
Owing to be provided with electric heating sterilizing room and water curtain in the utility model dust-settling compartment, after so the flue gas of construction operation face is inhaled into dust-settling compartment, pernicious gases such as carbon monoxide in the flue gas and hydrogen sulfide, oxidized or decomposition under hot conditions, flue gas is cleaned through the water curtain depositing dust again, become nontoxic, tasteless and moistening gas, discharge, blow to the scope of operation by the purified gas delivery pipe.And the flue gas of the scope of operation constantly is cleaned discharge, adopts the existing special-purpose used time of dust removal by ventilation equipment thereby shortened, and has improved the construction operation condition, has accelerated construction speed, has improved operating efficiency and purification efficiency.Adopt this device also can replace existing special-purpose dust removal by ventilation equipment in addition, make the down-hole reduce obstacle, the tunnel official adds spacious clean and tidy; Save equipment investment and cut down the consumption of energy, help of the present utility model applying.
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is a kind of concrete structure schematic diagram of the utility model.
Fig. 2 is the vertical view of Fig. 1.
Describe concrete structure of the present utility model in detail according to Fig. 1-2.This device comprises support 5, is assembled in motor 7, air-introduced machine 6, cable box 8, water pump 10, dust-settling compartment 3 and filter 12 etc. on the support 5.Wherein be conveniently moving, can be packed in support 5 and have on movable wheel 11 and the locomotive 9.Dust-settling compartment 3 arrival ends are provided with electric heating sterilizing room 2, this indoor electric heater that is evenly equipped with temperature controller control, but its temperature rising tune to 400 ℃ high temperature.Dust-settling compartment 3 middle parts are evenly equipped with the sprayer 4 that can form water curtain, and the bottom hydroecium is provided with filter 12, and the water of filter residue enters sprayer 4 again through water pump 10, recycles.Filter residue is that laying dust is discharged through slag-drip opening 13.The through hole of dust-settling compartment 3 ports of export communicates with emission abatement pipe 1 by air-introduced machine 6.In dust-settling compartment 3 entrance, be provided with the air jet pipe that communicates with delivery pipe 1 all around, can so that the flue gas of Jing Huaing does not progress into dust-settling compartment 3 inlets, reduce the existence of residual flue gas along the inlet periphery to scope of operation direction spray purified gas.
After scope of operation explosion, the utility model slowly can be pushed, starter motor 7 and water pump 10, air-introduced machine 6 and sprayer 4 are started working, and adjust the temperature controller of electric heating toxin expelling chamber 2, make it temperature and rise to 300-400 ℃.Flue gas is inhaled into this chamber from dust-settling compartment 3 arrival ends, when electric heater, carbon monoxide in the flue gas produces oxidation reaction and generates carbon dioxide under hot conditions, hydrogen sulfide produces decomposition reaction under hot conditions, flue gas enters dust-settling compartment 3 middle parts behind the high temperature toxin expelling, the water curtain that high-temperature flue gas forms by sprayer 4, the smell that is contained in the flue gas continues to be excluded under the effect of water vapour, is mixed in dust in flue gas and is landed by water curtain.The flue gas that is cleaned becomes nontoxic, dustless, tasteless humid gas, is discharged by purified gas delivery pipe 1 by dust-settling compartment 3 outlets.Meanwhile, purified gas is the air jet pipe ejection around dust-settling compartment 3 inlets also, forces the flue gas of the roadway scope of operation to enter dust-settling compartment 3 inlets, also increases oxygen content in the flue gas.Purify for the flue gas that quickens roadway scope of operation depths enters this device as early as possible, also purified gas delivery pipe 1 lengthening can be stretched into the lane head, residual flue gas is blown out.End-of-job to be clean is closed sprayer, opens the sprinkler pipe that communicates with water pump, and after scope of operation watering, operating personnel can enter site work.The locomotive 9 of this device can manually also can be motor-driven.Handle for the gas cleaning that pernicious gas is more, this device also can be set up the high temperature reaction catalyst adding apparatus at the arrival end of dust-settling compartment 3, to accelerate toxin expelling speed.As adopt catalyzer such as calcium hypochlorite or oxygen.Also can adopt the detection alarm control system of gas sensor composition at the utility model,, further save energy and improve the purification operating efficiency so that this device is realized automatic control operation.

Claims (4)

1, a kind of mining empty institute clarifier, comprise the motor, air-introduced machine, the dust-settling compartment that are assembled on the support, it is characterized in that being provided with the electric heating sterilizing room at the dust-settling compartment arrival end, the dust-settling compartment middle part is evenly equipped with the sprayer that can form water curtain, and the dust-settling compartment port of export communicates with the clarifier delivery pipe by air-introduced machine.
2, clarifier according to claim 1 is characterized in that being evenly equipped with in the electric heating sterilizing room electric heater that temperature controller is controlled.
3, clarifier according to claim 1 is characterized in that being provided with air jet pipe around the dust-settling compartment inlet.
4, clarifier according to claim 1, Qi Techu are that support is packed on the locomotive.
CN 92216537 1992-07-22 1992-07-22 Mine air purifier Expired - Fee Related CN2142500Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92216537 CN2142500Y (en) 1992-07-22 1992-07-22 Mine air purifier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92216537 CN2142500Y (en) 1992-07-22 1992-07-22 Mine air purifier

Publications (1)

Publication Number Publication Date
CN2142500Y true CN2142500Y (en) 1993-09-22

Family

ID=33764639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92216537 Expired - Fee Related CN2142500Y (en) 1992-07-22 1992-07-22 Mine air purifier

Country Status (1)

Country Link
CN (1) CN2142500Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437821A (en) * 2016-11-30 2017-02-22 贵州大学 System for purifying air in tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437821A (en) * 2016-11-30 2017-02-22 贵州大学 System for purifying air in tunnel

Similar Documents

Publication Publication Date Title
CN101581228B (en) Large tunnel dust removal plant and dust removal method thereof
CN103143471B (en) A kind of integral movable type environment-friendlyplasma plasma spraying equipment and paint mist purification method
CN200984583Y (en) Soot dust gas processing and purifying machine for electric welding
CN108815967B (en) Environment-friendly chemical equipment waste gas treatment device and operation method thereof
CN2142500Y (en) Mine air purifier
CN113368631B (en) Industrial waste gas treatment equipment and treatment method thereof
CN220415442U (en) On-spot dust collector that ventilates of using under mine
CN210356491U (en) Workshop waste gas cooling and purifying equipment for industrial environmental protection
CN2242336Y (en) Device for purifying air in mine tunnel
CN217092602U (en) Boiler harmful gas optimizes dust removal discharging equipment
CN115138153A (en) Conveniently-detachable smoke dust purification device and method for chemical industry
CN213995332U (en) Industrial waste gas treatment device
CN212942073U (en) Kiln flue gas processing apparatus
CN208927937U (en) A kind of taste removal dust-extraction unit for rubber production
CN216498099U (en) Tunnel construction air purification device
CN214221234U (en) Underground is movable ventilation unit for well
CN2341032Y (en) Water curtain smoke and dust eliminating device
CN111013366A (en) Waste gas purification spray column of environmental protection
CN218759790U (en) Tunnel blast hole cleaning device
CN219231276U (en) Electric smoke-blocking vertical wall
CN213807743U (en) A high-efficient dust device for gold mine exploitation
CN217616698U (en) Laboratory constant temperature fume chamber
CN2211315Y (en) Air purifying apparatus for underground construction engineering
CN217028992U (en) Fast clear type colliery tunnelling tunnel dust removal integrative device
CN218348806U (en) Air purifier with humidification function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee