CN214034734U - Building engineering construction is with pouring template - Google Patents

Building engineering construction is with pouring template Download PDF

Info

Publication number
CN214034734U
CN214034734U CN202022262443.1U CN202022262443U CN214034734U CN 214034734 U CN214034734 U CN 214034734U CN 202022262443 U CN202022262443 U CN 202022262443U CN 214034734 U CN214034734 U CN 214034734U
Authority
CN
China
Prior art keywords
panel
fixed
template
plate
fixing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022262443.1U
Other languages
Chinese (zh)
Inventor
罗君君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Ruiyun Construction Co ltd
Original Assignee
Anhui Ruiyun Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Ruiyun Construction Co ltd filed Critical Anhui Ruiyun Construction Co ltd
Priority to CN202022262443.1U priority Critical patent/CN214034734U/en
Application granted granted Critical
Publication of CN214034734U publication Critical patent/CN214034734U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building engineering construction is with pouring template, including the pull rod, go up straining device and left fixed plate, tight pulley right-hand member and lead screw fixed connection, and the lead screw right-hand member passes fixed frame and pass through the bearing and support a fixed connection, support a right-hand member simultaneously and be provided with first panel, first panel downside is provided with installs the second panel, and the third panel is installed on second panel right side to third panel tip and fourth panel concatenation are in the same place, fixedly connected with limiting plate on the fixed plate of a left side, and the limiting plate right side installs the steel pipe, and the steel pipe is installed on the sleeper, sleeper tip and first panel fixed connection simultaneously to right fixed plate is installed to the fixed plate right side of a left side. This building engineering construction is with pouring template, two taut protections are used in the template body simultaneously, carry out guard work to the template body, avoid when being in milk, the template body is because the condition of the emergence of intensity is out of order to explode thick liquid inadequately.

Description

Building engineering construction is with pouring template
Technical Field
The utility model relates to a pour the template field, specifically be a building engineering construction is with pouring template.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirement, then the concrete structure and the components are shaped according to the specified position and geometric dimension, the correct position is kept, the building template structure for cast-in-place concrete structure engineering construction mainly comprises three parts, namely a panel, a supporting structure and a connecting piece, wherein the panel is a bearing plate which is directly contacted with newly poured concrete, and the supporting structure is a temporary structure for supporting the panel, the concrete and construction load, and is used for stabilizing the panel and enhancing the stability of the panel, thereby guarantee that building templates structure makes up firmly, does not warp, does not destroy, and the connecting piece is the accessory that connects into whole with bearing structure with the panel.
When the building template is used in the existing engineering construction, firstly, the wooden template is spliced according to the required shape and size, then the fastening strip is installed on the wooden template, then the supporting plate is installed and fixed, when grouting is carried out, slurry can leak out from the template frequently, and when the overall strength of the template is insufficient, the condition of mold explosion is easy to occur when grouting is carried out; the stability of the whole template is not high, and certain potential safety hazards exist in the building construction; therefore, a pouring template for construction engineering construction is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering construction is with pouring template to the building templates who mentions in solving above-mentioned background art takes place easily to leak the defect of thick liquid and exploding the thick liquid in work.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering construction is with pouring template, includes tight pulley, pull rod, goes up straining device and left fixed plate, tight pulley right-hand member and lead screw fixed connection, and the lead screw right-hand member passes fixed frame and pass through the bearing and support a fixed connection, support a right-hand member simultaneously and be provided with first panel, and first panel downside is provided with installs the second panel, and the third panel is installed on second panel right side to third panel tip and fourth panel concatenation are in the same place, fixedly connected with limiting plate on the fixed plate of a left side, and the limiting plate right side installs the steel pipe, and the steel pipe is installed on the sleeper, sleeper tip and first panel fixed connection simultaneously to right fixed plate is installed to the fixed plate right side of a left side.
Preferably, four circumferential positions of the fixed outer frame are uniformly provided with four groups of fixed wheels, the surface of a screw rod on each fixed wheel is screwed with two groups of fixed nuts, and the screw rod is screwed in a screwed hole formed in the fixed outer frame.
Preferably, the supporting blocks are of a circular structure made of metal materials, and the supporting blocks are arranged into 16 groups and evenly abutted against the surface of the template body.
Preferably, the first panel, the second panel, the third panel and the fourth panel are combined together to form a template body, and a mold cavity is formed in the template body.
Preferably, the right end of the pull rod sequentially penetrates through the right fixing plate, the template body, the left fixing plate and the nut to be fixedly connected, the right fixing plate and the left fixing plate are of rectangular structures made of metal materials, and four groups of mounting holes are formed in the right fixing plate and the left fixing plate.
Preferably, equal fixedly connected with limiting plate on right side fixed plate and the left fixed plate, and the limiting plate is the arc structure of being made by the metal material, and the limiting plate joint is on the steel pipe, and the steel pipe joint is on the sleeper.
Preferably, the upper tensioning device and the lower tensioning device are arranged in parallel, and the upper tensioning device and the lower tensioning device are respectively composed of a left fixing plate, a right fixing plate and a pull rod.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the fixed wheel is arranged on the outer side of the fixed outer frame, the fixed wheel rotates to enable the abutting block to move transversely, the abutting block is tightly fastened on the outer side of the template body, the two tensioning protections simultaneously act on the template body, the template body is protected, and the condition that slurry explosion occurs to the template body due to insufficient strength in grouting is avoided;
2. the whole body of template body is consolidated through the steel pipe, uses right fixed plate and left fixed plate to fix the steel pipe on the template body immediately, accomplishes the reinforcement work to the template body, improves the bulk strength of template body.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a top view of the structure of FIG. 1;
FIG. 3 is a schematic view of the tension device of the present invention;
fig. 4 is a schematic view of the right fixing plate of the structure of the present invention.
Reference numbers in the figures: 1. a fixed wheel; 2. fixing a nut; 3. fixing the outer frame; 4. a screw rod; 5. A resisting block; 6. a first panel; 7. a pull rod; 8. a second panel; 9. a third panel; 10. a right fixing plate; 11. an upper tensioning device; 12. a template body; 13. a lower tensioning device; 14. a mold cavity; 15. crossties; 16. a steel pipe; 17. a limiting plate; 18. a left fixing plate; 19. a fourth panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a pouring template for construction engineering construction comprises a fixed wheel 1, a pull rod 7, an upper tensioning device 11 and a left fixed plate 18, wherein the right end of the fixed wheel 1 is fixedly connected with a screw rod 4, the right end of the screw rod 4 penetrates through a fixed outer frame 3 and is fixedly connected with a supporting block 5 through a bearing, a first panel 6 is arranged at the right end of the supporting block 5, a second panel 8 is arranged at the lower side of the first panel 6, a third panel 9 is arranged at the right side of the second panel 8, the end part of the third panel 9 is spliced with a fourth panel 19, the first panel 6, the second panel 8, the third panel 9 and the fourth panel 19 are combined together to form a template body 12, and a mold cavity 14 is formed in the template body 12; four circumferential positions of the fixed outer frame 3 are uniformly provided with four groups of fixed wheels 1, the surface of a screw rod 4 on each fixed wheel 1 is in threaded connection with two groups of fixed nuts 2, and the screw rod 4 is in threaded connection with a threaded hole formed in the fixed outer frame 3; a limiting plate 17 is fixedly connected to the left fixing plate 18, a steel pipe 16 is installed on the right side of the limiting plate 17, the steel pipe 16 is installed on the sleeper 15, meanwhile, the end portion of the sleeper 15 is fixedly connected with the first panel 6, a right fixing plate 10 is installed on the right side of the left fixing plate 18, the resisting blocks 5 are of a circular structure made of metal materials, and 16 groups of the resisting blocks 5 are arranged to be evenly abutted against the surface of the template body 12; the right end of the pull rod 7 sequentially penetrates through the right fixing plate 10, the template body 12 and the left fixing plate 18 to be fixedly connected with a nut, the right fixing plate 10 and the left fixing plate 18 are both rectangular structures made of metal materials, and four groups of mounting holes are formed in the right fixing plate 10 and the left fixing plate 18; the right fixing plate 10 and the left fixing plate 18 are both fixedly connected with a limiting plate 17, the limiting plate 17 is of an arc-shaped structure made of metal materials, the limiting plate 17 is clamped on a steel pipe 16, and the steel pipe 16 is clamped on a sleeper 15; the upper tensioning device 11 and the lower tensioning device 13 are arranged in parallel, and the upper tensioning device 11 and the lower tensioning device 13 are composed of a left fixing plate 18, a right fixing plate 10 and a pull rod 7.
As shown in fig. 1-2: the upper tensioning device 11 and the lower tensioning device 13 are consistent in composition mode, the upper tensioning device 11 and the lower tensioning device 13 are consistent in composition structure, the whole body of the formwork body 12 is reinforced through the steel pipe 16, the right fixing plate 10 and the left fixing plate 18 are used for fixing the steel pipe 16 on the formwork body 12, and the reinforcing work of the formwork body 12 is completed.
As shown in fig. 2-4: the tensioning device forms the first tensioning work to template body 12, supports 5 and forms the tensioning work to the second way of template body 12, and fixed frame 3 cup joints in the outside of template body 12, and fixed wheel 1 is installed in the fixed frame 3 outside, and fixed wheel 1 rotates for support 5 carries out lateral shifting, makes support 5 pass tightly in the outside of template body 12, avoids template body 12 when carrying out grout, and the condition of taking place to leak thick liquid or even explode thick liquid takes place.
The working principle is as follows: when the pouring template for building engineering construction is used, a first panel 6, a second panel 8, a third panel 9 and a fourth panel 19 are spliced together, a steel pipe 16 is clamped on a sleeper 15, a limiting plate 17 on a right fixing plate 10 is clamped on the steel pipe 16 at the moment, a left fixing plate 18 is clamped on the steel pipe 16 through the limiting plate 17 on the left fixing plate, an upper tensioning device 11 and a lower tensioning device 13 tension four surfaces of a template body 12, the first tensioning protection device is used, a fixing nut 2 is loosened on a screw rod 4 at the same time, a fixing wheel 1 is rotated to enable a supporting block 5 to move rightwards, the supporting block 5 is tightly supported on the first panel 6, the other three groups of panels are tightly supported with the supporting block 5, the second tensioning protection device is used, the second tensioning protection device is simultaneously used on the template body 12, the template body 12 is protected, and grouting is avoided, the template body 12 is in a condition of slurry explosion due to insufficient strength; the whole process of the pouring template for construction engineering is the whole process.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a building engineering construction is with pouring template, includes tight pulley (1), pull rod (7), goes up overspeed device tensioner (11) and left fixed plate (18), its characterized in that: fixed pulley (1) right-hand member and lead screw (4) fixed connection, and lead screw (4) right-hand member pass fixed frame (3) through the bearing with support piece (5) fixed connection, support piece (5) right-hand member simultaneously and be provided with first panel (6), first panel (6) downside is provided with installs second panel (8), third panel (9) are installed on second panel (8) right side, and third panel (9) tip and fourth panel (19) splice together, fixedly connected with limiting plate (17) on left side fixed plate (18), and limiting plate (17) right side installs steel pipe (16), and steel pipe (16) are installed on sleeper (15), and sleeper (15) tip and first panel (6) fixed connection simultaneously to right fixed plate (10) are installed on left side fixed plate (18) right side.
2. The pouring template for construction engineering construction according to claim 1, wherein: four circumferential positions of the fixed outer frame (3) are uniformly provided with four groups of fixed wheels (1), the surface of a screw rod (4) on each fixed wheel (1) is in threaded connection with two groups of fixed nuts (2), and the screw rod (4) is in threaded connection with a threaded hole formed in the fixed outer frame (3).
3. The pouring template for construction engineering construction according to claim 1, wherein: the supporting blocks (5) are of a circular structure made of metal materials, and the supporting blocks (5) are arranged into 16 groups and evenly abutted against the surface of the template body (12).
4. The pouring template for construction engineering construction according to claim 1, wherein: the first panel (6), the second panel (8), the third panel (9) and the fourth panel (19) are combined together to form a template body (12), and a mold cavity (14) is formed in the template body (12).
5. The pouring template for construction engineering construction according to claim 1, wherein: the right end of the pull rod (7) sequentially penetrates through the right fixing plate (10), the template body (12) and the left fixing plate (18) to be fixedly connected with the nut, the right fixing plate (10) and the left fixing plate (18) are all of rectangular structures made of metal materials, and four groups of mounting holes are formed in the right fixing plate (10) and the left fixing plate (18).
6. The pouring template for construction engineering construction according to claim 1, wherein: equal fixedly connected with limiting plate (17) on right side fixed plate (10) and left fixed plate (18), and limiting plate (17) are the arc structure of being made by the metal material, and limiting plate (17) joint is on steel pipe (16), and steel pipe (16) joint is on sleeper (15).
7. The pouring template for construction engineering construction according to claim 1, wherein: the upper tensioning device (11) and the lower tensioning device (13) are arranged in parallel, and the upper tensioning device (11) and the lower tensioning device (13) are composed of a left fixing plate (18), a right fixing plate (10) and a pull rod (7).
CN202022262443.1U 2020-10-13 2020-10-13 Building engineering construction is with pouring template Active CN214034734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022262443.1U CN214034734U (en) 2020-10-13 2020-10-13 Building engineering construction is with pouring template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022262443.1U CN214034734U (en) 2020-10-13 2020-10-13 Building engineering construction is with pouring template

Publications (1)

Publication Number Publication Date
CN214034734U true CN214034734U (en) 2021-08-24

Family

ID=77352349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022262443.1U Active CN214034734U (en) 2020-10-13 2020-10-13 Building engineering construction is with pouring template

Country Status (1)

Country Link
CN (1) CN214034734U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319862A (en) * 2022-01-14 2022-04-12 福建新纪建设集团有限公司 Fixed template structure of pouring frame for construction engineering construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319862A (en) * 2022-01-14 2022-04-12 福建新纪建设集团有限公司 Fixed template structure of pouring frame for construction engineering construction

Similar Documents

Publication Publication Date Title
CN103061505A (en) Multifunctional split bolt and application thereof
CN214034734U (en) Building engineering construction is with pouring template
CN203007824U (en) Reinforcement device for underwater pier column
CN106917517B (en) Construction method of prestress high-strength fiber cloth reinforced column member
JP2001280089A (en) Reinforcing method when placing concrete in high- strength buried form and repairing method for tunnel wall
CN203487639U (en) Device for precisely pre-burying and fixing steelwork column anchor bolts
CN211735098U (en) Wide construction equipment is transversely pieced together to built-up connection formula concrete T roof beam
CN106758663A (en) Buried rubber fastening band installs positioning construction method in one kind
CN204299162U (en) To encorbelment steel I-beam anchor structure
CN205502576U (en) A sealed reinforcing apparatus that is used for concrete side column seam position template
CN205024733U (en) Fixing device of leading waterstop
CN206245709U (en) A kind of outrigger wall-connecting piece
CN211547638U (en) Grouting plugging device easy to assemble and disassemble
CN201202276Y (en) Beam side panels fixture
CN201381517Y (en) Elastic concrete plinth for supporting large-scale steam turbine generator
CN210315587U (en) Foundation pit supporting structure
JPS6110634A (en) Method of preventing corrosion and reinforcing steel pipe pile
CN210530311U (en) Concrete supporting template for construction engineering construction
CN212454465U (en) Bury formula waterstop mounting fixture in short side wall of tunnel invert
CN208717762U (en) A kind of assembling type steel corrugated plating Combined concrete arch culvert
CN106639354A (en) Method for reinforcing concrete beam shear-bearing capacity of steel plate and pre-stressed carbon fiber cloth
CN203846836U (en) Cast-in-place concrete pool wall rubber water stop band reinforcing device
CN111379277A (en) Fixing device for box culvert connected bin pouring rubber waterstop and foam board and using method of fixing device
CN103670451A (en) Mounting tool of embedded longitudinal rubber waterstop in tunnel and using method thereof
CN214879753U (en) H-shaped steel hoop attachment structure for tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant