CN106639354A - Method for reinforcing concrete beam shear-bearing capacity of steel plate and pre-stressed carbon fiber cloth - Google Patents

Method for reinforcing concrete beam shear-bearing capacity of steel plate and pre-stressed carbon fiber cloth Download PDF

Info

Publication number
CN106639354A
CN106639354A CN201710016571.8A CN201710016571A CN106639354A CN 106639354 A CN106639354 A CN 106639354A CN 201710016571 A CN201710016571 A CN 201710016571A CN 106639354 A CN106639354 A CN 106639354A
Authority
CN
China
Prior art keywords
steel plate
plate
concrete
beams
carbon cloth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710016571.8A
Other languages
Chinese (zh)
Other versions
CN106639354B (en
Inventor
康俊涛
张亚州
李豪
邱奕龙
马雷
谷倩
秦世强
邵光强
曹鸿猷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Technology WUT
Original Assignee
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT filed Critical Wuhan University of Technology WUT
Priority to CN201710016571.8A priority Critical patent/CN106639354B/en
Publication of CN106639354A publication Critical patent/CN106639354A/en
Application granted granted Critical
Publication of CN106639354B publication Critical patent/CN106639354B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0244Increasing or restoring the load-bearing capacity of building construction elements of beams at places of holes, e.g. drilled in them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G2023/0251Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements

Abstract

The invention discloses a method for reinforcing a concrete beam shear-bearing capacity of a steel plate and pre-stressed carbon fiber cloth. The method comprises the following steps: step 1: treating a concrete beam; step 2: blanking the steel plate and cutting the carbon fiber cloth; step 3: sticking the steel plate; step 4: mounting and fixing a wave-shaped tooth plate and a counter force block; and step 5: tensioning and anchoring the carbon fiber cloth. The method disclosed by the invention is not a single fixation manner any more, but is the effective combination of a steel plate reinforcing method and a pre-stressed carbon fiber cloth reinforcing method; the shear-bearing capacity can be provided after the structure is reinforced due to the application of pre-stress, and the pre-stress can reduce the width of cracks, even close the cracks; and meanwhile, a carbon fiber cloth material and the steel plate are stuck and the sticking effect is remarkably better than the effect of sticking the carbon fiber cloth material on concrete. Furthermore, equipment for stretching the carbon fiber cloth is simple and is easy to realize, and the stretching can be finished through only one jack; and the method is simple and convenient and is efficient and economical.

Description

The method of steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity
Technical field
The present invention relates to a kind of method of concrete beam strengthening, and in particular to steel plate and prestressed carbon cloth reinforced coagulation The method of native beam shear-carrying capacity, is mainly used in Technology Bridge Strengthening field.
Background technology
At present most of bridges have that downwarp is excessive, and Lack of support problem, particularly some active times are longer, bear The larger bridge of the volume of traffic.The bridge of these Lack of support is carried out removing rebuilding and was both blocked traffic, but it is uneconomical, therefore and It is inadvisable.
Existing solution is that consolidation process is carried out to bridge, improves the bearing capacity and stiffness of bridge, enables to reach The load requirement of certain grade, continues to be on active service.Common method is to use steel plate, carbon cloth, prestressed carbon cloth etc. several Plant material to reinforce old bridge.Steel plate reinforcement the bearing capacity and stiffness of lift structure is played the role of it is larger, while steel plate Beam concrete can be protected, the concrete in crack is particularly had occurred and that, on the one hand the setting of steel plate delays the carbonization of concrete, On the other hand, internal reinforcing bar is also protected not corroded by external environment condition.But one apparent shortcoming of steel plate reinforcement is that it is received Power mode, steel plate reinforcement is the mode of secondary loading, and steel plate just understands stress only in beam bearing load again, could provide and hold Carry power.This is relatively light for damaging, and amount of deflection is not that very big structure is more effective, but the beams of concrete more serious for damage, Effect is not then obvious.
It is a kind of mode of active force to carry out reinforcing using prestressed carbon cloth, and structure is opened after completing to reinforce Begin to provide bearing capacity, but carry out reinforcing using carbon cloth and there is also some disadvantages, such as the anchoring of prestressed carbon cloth Problem, due to prestressed setting, needs the waveform tooth plate for clamping carbon cloth to be securely fixed on beams of concrete, and this Any is that old bridge institute is difficult provides, because concrete carbonization can have a strong impact on the fixed effect of waveform tooth plate.
Shear Strengthening is needed in vertical tension prestressing force sheet material, the larger space of heavy tensioning equipment needs, and coagulation Native beam shear-carrying capacity is reinforced often does not possess such condition, therefore less using the situation of prestressing force shear-carrying capacity reinforcing.
The content of the invention
An object of the present invention be provide a kind of steel plate and prestressed carbon cloth composite reinforcement, while being also anti- The method for reinforcing concrete beam of reinforcement is cut, what the present invention was realized in:
Steel plate and the method for prestressed carbon cloth reinforced beams of concrete shear-carrying capacity, comprise the steps:
Step 1:Beams of concrete process
Beams of concrete is surface-treated, and according to the size and position of steel plate and fixing end waveform tooth plate on beams of concrete Setting-out, drills according to setting-out position, and drilling runs through beams of concrete, and drilling is respectively used to fixation steel plate and fixing end waveform tooth plate; The dust of beams of concrete is cleared up after the completion of setting-out, drilling;
Step 2:The blanking of steel plate and the cutting of carbon cloth
Blanking process is carried out to steel plate, steel plate carries out wharf's pavement quality with beams of concrete contact surface;
Cutting is carried out to carbon cloth, according to the width cutting of waveform tooth plate, and ensures carbon cloth flush edge non-notch;
Step 3:The stickup of steel plate
Epoxy glue is smeared according to steel plate setting-out position on beams of concrete, before epoxy adhesive curing steel plate was pasted, pasted Steel plate is fixed into the rear fixation steel plate bolt using through beams of concrete;
Step 4:The installation of waveform tooth plate and counter-force block is fixed
According to the bore position for anchoring fixing end waveform tooth plate of step 1, using run through bolt, one end anchoring fixing end ripple Shape tooth plate, the other end fixes anchor block, so as to fixing end waveform tooth plate and anchor block are fixed on beams of concrete, in concrete Beam is provided with the side of anchor block, is provided with stretching end waveform tooth plate, and the side of stretching end waveform tooth plate is provided with screw rod, screw rod Anchor block and counter-force block are sequentially passed through, on the screw rod between anchor block and counter-force block, nut is provided with;
Step 5:The stretch-draw anchor of carbon cloth
One end of carbon cloth is placed between the base plate of fixing end waveform tooth version and cover plate, is fixed using high-strength bolt, Then carbon cloth is coordinated into steel plate direction arrangement, and by the other end of carbon cloth be placed in stretching end waveform tooth plate base plate and Between cover plate, also it is fixed using high-strength bolt, because stretching end waveform tooth plate is not affixed on beams of concrete, now will Jack is placed between anchor block and counter-force block the tensioning work that carbon cloth is completed by applying power;Anchor is tightened after the completion of tensioning Gu the nut behind block is completed to reinforce and installed.
Further scheme is:In step 1, beams of concrete is surface-treated, including:Beams of concrete surface is entered The smooth process of row, by the serious concrete chisel removal that is carbonized, and is repaired using cement mortar, and the region more serious to hollow makes Carried out with cement mortar floating, it is ensured that process completes the maximum hollow depth on back rest surface within 3mm.
Further scheme is:In step 2, blanking process is carried out to steel plate, completed in factory, protected after the completion of blanking Card steel plate does not have seaming, burr phenomena.
Further scheme is:In step 2, wharf's pavement quality, the plucking direction of steel plate is oblique beams of concrete inner side 45 Degree.
Further scheme is:In step 3, steel sticking need to ensure that epoxy glue is full of space between steel plate and beam body, And emptying bubble.
Further scheme is:Described fixing end waveform tooth plate and stretching end waveform tooth plate includes base plate, cover plate And the high-strength bolt between base plate and cover plate.
Further scheme is:Deflecting plate is set in the corner of steel plate outer surface, deflecting plate material is polytetrafluoroethyl-ne Alkene, deflecting plate is located in the middle of carbon cloth and steel plate, and the width of deflecting plate is not less than the width of carbon cloth.
Further scheme is:The process that described stretching end waveform tooth plate is widened, makes cover plate be located at base plate Within.
The present invention is no longer single reinforcing mode, but by steel plate reinforcement and prestressed carbon cloth reinforced two methods Effectively combined, prestressed applying makes structure that shear-carrying capacity can be provided after reinforcing is completed, and in advance should Power can reduce the width in crack, or even sealed fracture, meanwhile, solve the bonding of prestressed carbon cloth material and beams of concrete Problem, carbon cloth material and steel plate are bondd, and bond effect is substantially better than and is bonded on concrete.In addition tensioning carbon fiber Cloth equipment is simple, it is easy to accomplish, compared to the tensioning equipment of conventional cumbersome, only need a jack to complete tensioning, simply It is convenient, high-efficiency and economic.
Structural strengthening at present is mostly anti-bending bearing capacity reinforcing, and due to tensioning equipment spacial influence, and steering arranges tired Difficulty, carries out shear-carrying capacity reinforcing and applies less in engineering using prestressing force, but what structure was failed due to shear-carrying capacity Accident is much, structure setting and method that the present invention passes through the above, and component shear-carrying capacity can be carried out effectively to add Gu.
Description of the drawings
Fig. 1 is the cross-sectional view of shear-carrying capacity composite reinforcement method;
Fig. 2 is the side view of shear-carrying capacity composite reinforcement method;
Fig. 3 is carbon cloth anchored end waveform tooth plate figure;
Fig. 4 is carbon cloth stretching end waveform tooth plate figure;
Fig. 5 is waveform tooth plate side view;
Fig. 6 is stretching end installation drawing;
Wherein:1st, concrete beam body to be reinforced, 2, steel plate, 3, carbon cloth, 4, fixing end waveform tooth plate, 5, stretching end waveform Tooth plate, 6, anchor block, 7, counter-force block, 8, screw rod, 9, run through bolt, 10, fixation steel plate bolt, 11, deflecting plate, 12, base plate, 13rd, cover plate, 14, high-strength bolt, 15, nut.
Specific embodiment
Steel plate and the method for prestressed carbon cloth reinforced beams of concrete shear-carrying capacity, are realized by following steps:
Step 1:
The process of beams of concrete 1, by the surface of beams of concrete 1 to be reinforced smooth process is carried out, by the serious concrete chisel that is carbonized Remove, and repaired using mortar, the region more serious to hollow is carried out floating using cement mortar, it is ensured that process completes the back rest The maximum hollow depth on surface is within 3mm.Then put according to the size and position of steel plate and fixing end waveform tooth plate 4 Sample.And drilled according to the position of setting-out, drilling should run through beams of concrete 1, and drilling is respectively used to fixation steel plate 2 and fixing end Waveform tooth plate 4.Setting-out, drilling should be processed beams of concrete 1 again after completing, and mainly clear up dust.
Step 2:
The blanking of steel plate 2 is operated in factory and completes, and the quality of steel plate is should ensure that after the completion of blanking, it is impossible to have the phenomenons such as seaming, burr, To prevent prestressed carbon cloth 3 from being broken.Steel plate 2 carries out wharf's pavement quality, the plucking side of steel plate with the contact surface of beams of concrete 1 To for 45 degree on the inside of oblique beams of concrete.Cutting is carried out to carbon cloth 3 according to the width of fixing end waveform tooth version 4, cutting should Ensure the flush edge non-notch of carbon cloth 3.
Step 3:
The stickup of steel plate 2.Epoxy glue is smeared according to setting-out position on beams of concrete after the completion of the blanking of steel plate 2, and in epoxy glue Steel plate 2 is pasted between solidification, affixing steel plate 2 should ensure that epoxy glue is full of space between steel plate and beam body, and want emptying gas Bubble.Steel plate 2 is fixed after positioning using the fixation steel plate bolt 10 through beams of concrete 1.
Step 4:
According to the bore position for anchoring fixing end waveform tooth plate 4 of step 1, using run through bolt 9, one end anchoring fixing end Waveform tooth plate, the other end fixes anchor block 6, so as to fixing end waveform tooth plate and anchor block are fixed on beams of concrete, mixed Solidifying Tu Liang is provided with the side of anchor block, is provided with stretching end waveform tooth plate 5, and the side of stretching end waveform tooth plate is provided with screw rod 8, screw rod sequentially passes through anchor block 6 and counter-force block 7, on the screw rod 8 between anchor block and counter-force block, is provided with nut 15.
Step 5:
The tensioning of carbon cloth 3.Do not fix in the waveform tooth plate 5 of stretching end, screw rod 8, screw rod are welded with behind waveform tooth plate 5 8 pass sequentially through anchor block 6 and counter-force block 7.Jack is placed between anchor block 6 and counter-force block 7 by applying power and completes carbon fibre The tensioning work of dimension cloth 3.The nut 15 after anchor block 6 is tightened after the completion of tensioning.
One end of carbon cloth 3 is placed between the base plate 12 of fixing end waveform tooth version and cover plate 13, using high-strength bolt 15 are fixed, and then carbon cloth are coordinated into steel plate direction arrangement, and the other end of carbon cloth is placed in into stretching end waveform Between the base plate 12 and cover plate 13 of tooth plate, also it is fixed using high-strength bolt 14.
Deflecting plate 11 is set in the corner of steel plate outer surface, deflecting plate material is polytetrafluoroethylene (PTFE), and deflecting plate is located at carbon In the middle of fiber cloth and steel plate, and the width of deflecting plate is not less than the width of carbon cloth.
Because stretching end waveform tooth plate is not affixed on beams of concrete, now jack is placed in into anchor block 6 and counter-force Applying power can complete the tensioning work of carbon cloth between block 7;The nut 15 tightened after the completion of tensioning behind anchor block is i.e. complete Install into reinforcing.

Claims (8)

1. the method for steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity, it is characterised in that including following step Suddenly:
Step 1:Beams of concrete process
Beams of concrete is surface-treated, and according to the size and position of steel plate and fixing end waveform tooth plate on beams of concrete Setting-out, drills according to setting-out position, and drilling runs through beams of concrete, and drilling is respectively used to fixation steel plate and fixing end waveform tooth plate; The dust of beams of concrete is cleared up after the completion of setting-out, drilling;
Step 2:The blanking of steel plate and the cutting of carbon cloth
Blanking process is carried out to steel plate, steel plate carries out wharf's pavement quality with beams of concrete contact surface;
Cutting is carried out to carbon cloth, according to the width cutting of fixing end waveform tooth plate, and ensure carbon cloth flush edge without Breach;
Step 3:The stickup of steel plate
Epoxy glue is smeared according to steel plate setting-out position on beams of concrete, and steel plate was pasted before epoxy adhesive curing, pasted After the completion of using being fixed to steel plate through the fixation steel plate bolt of beams of concrete;
Step 4:The installation of waveform tooth plate and counter-force block is fixed
According to the bore position for anchoring fixing end waveform tooth plate of step 1, using run through bolt, one end anchoring fixing end ripple Shape tooth plate, the other end fixes anchor block, so as to fixing end waveform tooth plate and anchor block are fixed on beams of concrete;In concrete Beam is provided with the side of anchor block, installs stretching end waveform tooth plate, and the side of stretching end waveform tooth plate is provided with screw rod, screw rod according to It is secondary through anchor block and counter-force block, on the screw rod between anchor block and counter-force block, be provided with nut;
Step 5:The stretch-draw anchor of carbon cloth
One end of carbon cloth is placed between the base plate of fixing end waveform tooth version and cover plate, is fixed using high-strength bolt, Then carbon cloth is coordinated into steel plate direction arrangement, and by the other end of carbon cloth be placed in stretching end waveform tooth plate base plate and Between cover plate, also it is fixed using high-strength bolt, because stretching end waveform tooth plate is not affixed on beams of concrete, now will Jack is placed between anchor block and counter-force block the tensioning work that carbon cloth is completed by applying power;Anchor is tightened after the completion of tensioning Gu the nut behind block is completed to reinforce and installed.
2. the method for steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity according to claim 1, it is special Levy and be:
In step 1, beams of concrete is surface-treated, including:Smooth process is carried out to beams of concrete surface, carbonization is serious Concrete chisel removal, and repaired using cement mortar, the region more serious to hollow is carried out floating using cement mortar, is protected Card process completes the maximum hollow depth on back rest surface within 3mm.
3. the method for steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity according to claim 1, it is special Levy and be:
In step 2, blanking process is carried out to steel plate, completed in factory, ensure that steel plate does not have seaming, burr existing after the completion of blanking As.
4. according to claim 1 or 3 steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity method, its It is characterised by:
In step 2, wharf's pavement quality, the plucking direction of steel plate is 45 degree of oblique beams of concrete inner side.
5. the method for steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity according to claim 1, it is special Levy and be:
In step 3, steel sticking need to ensure that epoxy glue is full of space between steel plate and beam body, and emptying bubble.
6. the method for steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity according to claim 1, it is special Levy and be:
Described fixing end waveform tooth plate and stretching end waveform tooth plate include base plate, cover plate and installed in base plate and cover plate it Between high-strength bolt.
7. the method for steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity according to claim 1, it is special Levy and be:Deflecting plate is set in the corner of steel plate outer surface, deflecting plate material is polytetrafluoroethylene (PTFE), and deflecting plate is located at carbon fiber In the middle of cloth and steel plate, and the width of deflecting plate is not less than the width of carbon cloth.
8. the method for steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity according to claim 1, it is special Levy and be:The process that described stretching end and anchored end waveform tooth plate is widened, makes cover plate be located within base plate.
CN201710016571.8A 2017-01-10 2017-01-10 The method of steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity Active CN106639354B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710016571.8A CN106639354B (en) 2017-01-10 2017-01-10 The method of steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710016571.8A CN106639354B (en) 2017-01-10 2017-01-10 The method of steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity

Publications (2)

Publication Number Publication Date
CN106639354A true CN106639354A (en) 2017-05-10
CN106639354B CN106639354B (en) 2018-12-18

Family

ID=58843490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710016571.8A Active CN106639354B (en) 2017-01-10 2017-01-10 The method of steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity

Country Status (1)

Country Link
CN (1) CN106639354B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550617A (en) * 2020-04-26 2021-10-26 山西同新复材技术有限公司 Reinforcing structure, reinforcing rod and reinforcing method thereof
CN117432101A (en) * 2023-12-21 2024-01-23 西南石油大学 Assembled CFRP-slotted steel plate shear wall structure and assembling method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328561A (en) * 2002-05-14 2003-11-19 Dps Bridge Works Co Ltd Reinforcing method for concrete member and tensioning device for tendon used therein
US20060272246A1 (en) * 2003-09-09 2006-12-07 Hans-Peter Andra Anchoring for strip-shaped traction elements on supporting structures
CN101245668A (en) * 2008-03-11 2008-08-20 李唐宁 Construction method for two-side reinforcing engineering structure
CN103912132A (en) * 2014-03-19 2014-07-09 华北水利水电大学 Frame beam composite reinforcing method by transversely tensioning prestress carbon fiber cloth and steel
CN105625197A (en) * 2016-01-04 2016-06-01 武汉理工大学 Concrete beam bending reinforcing method based on steel plate-prestressed carbon fiber plate
CN105887702A (en) * 2016-04-20 2016-08-24 武汉理工大学 Method for reinforcing concrete beam by prestressed carbon fiber plate and steel-concrete

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328561A (en) * 2002-05-14 2003-11-19 Dps Bridge Works Co Ltd Reinforcing method for concrete member and tensioning device for tendon used therein
US20060272246A1 (en) * 2003-09-09 2006-12-07 Hans-Peter Andra Anchoring for strip-shaped traction elements on supporting structures
CN101245668A (en) * 2008-03-11 2008-08-20 李唐宁 Construction method for two-side reinforcing engineering structure
CN103912132A (en) * 2014-03-19 2014-07-09 华北水利水电大学 Frame beam composite reinforcing method by transversely tensioning prestress carbon fiber cloth and steel
CN105625197A (en) * 2016-01-04 2016-06-01 武汉理工大学 Concrete beam bending reinforcing method based on steel plate-prestressed carbon fiber plate
CN105887702A (en) * 2016-04-20 2016-08-24 武汉理工大学 Method for reinforcing concrete beam by prestressed carbon fiber plate and steel-concrete

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550617A (en) * 2020-04-26 2021-10-26 山西同新复材技术有限公司 Reinforcing structure, reinforcing rod and reinforcing method thereof
CN117432101A (en) * 2023-12-21 2024-01-23 西南石油大学 Assembled CFRP-slotted steel plate shear wall structure and assembling method thereof
CN117432101B (en) * 2023-12-21 2024-03-05 西南石油大学 Assembled CFRP-slotted steel plate shear wall structure and assembling method thereof

Also Published As

Publication number Publication date
CN106639354B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CA2918395C (en) Pre-stressed steel structure and method for pre-stressing a steel structure
CN102704698B (en) A kind of full prestressing composite integrated reinforced steel concrete structure
CN101713252B (en) Method for reinforcing concrete structure by using prestressed fiber cloth
CN105625197A (en) Concrete beam bending reinforcing method based on steel plate-prestressed carbon fiber plate
CN102900242A (en) Steel bar concrete beam reinforcing structure with partially restrained steel truss
KR100265697B1 (en) Anchoring method and apparatus for improving end bearing structure in external prestress reinforcement
CN102704491A (en) Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
JP2016160690A (en) Road bridge protection fence and its installation method
CN204357147U (en) The composite reinforcing structure of prestressed reinforced concrete construction flexural member
JP2007327255A (en) Fatigue-resistant steel floor slab
CN104481165B (en) Reinforced beam affixing steel plate pressurization fixing device and reinforcement means
JP7118880B2 (en) Shear reinforcement method for PC box girder bridge
CN106639354A (en) Method for reinforcing concrete beam shear-bearing capacity of steel plate and pre-stressed carbon fiber cloth
CN106481089B (en) The maintenance and reinforcement tectosome construction method of outmoded structure
JP4003211B2 (en) Reinforcing structure of concrete structure and method for reinforcing concrete structure
JP5026830B2 (en) Reinforced concrete block wall
JPH04285247A (en) Member for introducing prestress and method of introducing prestress
JP2007321419A (en) Reinforcing method for overhang floor slab by use of fiber reinforced reinforcing material
CN202645035U (en) Full pre-stressing compound integrated strengthened reinforced concrete structure
JP2016017358A (en) Reinforcement method and reinforcement structure for hinge part of existing girder bridge
CN106836021A (en) A kind of pre-stress FRP sheet material Shear Strengthening beams of concrete experimental provision
CN207999071U (en) A kind of wall column root concrete capping tools
JP2018204356A (en) Steel girder reinforcement method
JP3627931B2 (en) Concrete surface repair structure and concrete surface repair method
KR100435099B1 (en) The panel reinforcement method of construction in negative moment section of bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant