CN114319862A - Fixed template structure of pouring frame for construction engineering construction - Google Patents

Fixed template structure of pouring frame for construction engineering construction Download PDF

Info

Publication number
CN114319862A
CN114319862A CN202210041882.0A CN202210041882A CN114319862A CN 114319862 A CN114319862 A CN 114319862A CN 202210041882 A CN202210041882 A CN 202210041882A CN 114319862 A CN114319862 A CN 114319862A
Authority
CN
China
Prior art keywords
plate
fixed
pouring frame
engineering construction
connecting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210041882.0A
Other languages
Chinese (zh)
Inventor
邱朝立
许王生
周少敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Xinji Construction Group Co ltd
Original Assignee
Fujian Xinji Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Xinji Construction Group Co ltd filed Critical Fujian Xinji Construction Group Co ltd
Priority to CN202210041882.0A priority Critical patent/CN114319862A/en
Publication of CN114319862A publication Critical patent/CN114319862A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a fixed template structure of a pouring frame for construction engineering construction, and relates to the technical field of building template structures. This building engineering construction is with pouring frame fixed template structure, including connecting plate, corner board, picture peg, bounding wall and adjusting plate, the fixed surface of adjusting plate is connected with the connecting block, the connecting block is the rectangular array and distributes, it has the protective sheath to peg graft on the surface of connecting block, it has the hydraulic stem to peg graft on the surface of protective sheath, the side fixedly connected with cutting of cooperation groove is kept away from to the connecting plate. According to the invention, the adjusting plate is attached to the frame, the hydraulic rod is inserted into the connecting block, the fixing ring and the movable ring are clamped on the scaffold, the matching plate is fixed through the matching of the bolts, the nuts and the through holes, the hydraulic rod is further fixed on the scaffold, the adjusting plate is pressurized through the hydraulic rod, when concrete is poured, the frame is not easy to generate gaps under the gravity of the concrete, and the pressurizing place is easy to adjust.

Description

Fixed template structure of pouring frame for construction engineering construction
Technical Field
The invention relates to the technical field of building template structures, in particular to a fixed template structure of a pouring frame for construction engineering construction.
Background
Concrete pouring (concrete placement) the mixed concrete material is poured into a bin, the bin is leveled, and the concrete material is tamped and compacted. The construction template is a temporary supporting structure, is manufactured according to design requirements, enables a concrete structure and a member to be formed according to specified positions and geometric dimensions, keeps the correct position, bears the self weight of the construction template and external loads acting on the construction template, and performs template engineering, so that the quality and the construction safety of concrete engineering are ensured, the construction progress is accelerated, and the engineering cost is reduced.
Building engineering construction on the existing market is with pouring frame fixed template structure, fixes into the frame through panel, consolidates the frame through steel nail, screw and panel, and reinforced structure restricts panel when pouring, does not let it take place deformation, but easily produces the gap between the panel, consolidates the place fixed, uses not nimble enough.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a fixed template structure of a pouring frame for construction engineering construction, which solves the problems that gaps are easy to generate between plates and the use is not flexible enough.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: building engineering construction is with pouring frame fixed template structure, including connecting plate, corner board, picture peg, bounding wall and adjusting plate, the fixed surface of adjusting plate is connected with the connecting block, the connecting block is the rectangular array and distributes, the surface of connecting block is pegged graft and is had the protective sheath, the surface of protective sheath is pegged graft and is had the hydraulic stem.
Preferably, a matching groove is formed in the side face of the connecting plate, the side face, far away from the matching groove, of the connecting plate is fixedly connected with the inserting strip, and the matching groove is matched with the inserting strip in shape.
Preferably, the surface of the corner plate is provided with a connecting groove, the surface of the corner plate is fixedly connected with a matching strip, and the connecting groove is matched with the matching strip in shape.
Preferably, the side face of the inserting plate is fixedly connected with two protrusions, and the two protrusions are symmetrically distributed.
Preferably, the surface of the coaming is provided with two slots, and the two slots are symmetrically distributed.
Preferably, the inner wall fixedly connected with blotter of slot, the material of blotter is rubber.
Preferably, the output of hydraulic stem can be dismantled and be connected with the retainer plate, the surface of retainer plate articulates there is the movable ring, the equal fixedly connected with cooperation board in surface of retainer plate and movable ring, the through-hole has been seted up on the surface of cooperation board.
Preferably, the surfaces of the fixed ring and the movable ring are coated with wear-resistant coatings, and the surface of the output end of the hydraulic rod is electroplated with a wear-resistant coating.
(III) advantageous effects
The invention provides a fixed template structure of a pouring frame for construction engineering construction. The method has the following beneficial effects:
1. this building engineering construction is with pouring frame fixed template structure, adjusting plate and frame laminating, insert the hydraulic stem again on the connecting block, reuse retainer plate and movable ring card to the scaffold frame on, rethread bolt, nut and through-hole cooperation fixed coordination board, and then fix the hydraulic stem on the scaffold frame, pressurize the adjusting plate through the hydraulic stem, when concreting, the frame is difficult for producing the gap under the gravity of concrete, the easy adjustment in pressurization place.
2. This building engineering construction is with pouring frame fixed template structure, through being provided with connecting plate, turning board, picture peg and bounding wall cooperation use, the mutual concatenation of connecting plate is prolonged, and the turning point is connected to the turning board, and picture peg and bounding wall cooperation enclose into hollow main part, use more in a flexible way.
3. This building engineering construction is with pouring frame fixed template structure, when pressurizeing for picture peg and bounding wall, can compress the blotter, and then make picture peg and bounding wall more laminate, be difficult for producing the gap.
Drawings
FIG. 1 is a schematic structural diagram of a connecting plate of a fixed formwork structure of a pouring frame for construction of constructional engineering, according to the present invention;
FIG. 2 is a schematic structural view of a corner plate of a fixed formwork structure of a pouring frame for construction engineering according to the present invention;
FIG. 3 is a schematic illustration of a plate inserting structure of a fixed formwork structure of a pouring frame for construction engineering according to the present invention;
FIG. 4 is a schematic structural diagram of a coaming of a fixed template structure of a pouring frame for construction of building engineering according to the present invention;
FIG. 5 is a schematic structural view of an adjusting plate of a fixed formwork structure of a pouring frame for construction of building engineering according to the present invention;
FIG. 6 is a cross-sectional view of a connecting block of a fixed formwork structure of a pouring frame for construction of constructional engineering according to the present invention;
fig. 7 is a schematic structural view of a fixing ring of a fixed formwork structure of a pouring frame for construction engineering according to the present invention.
Wherein, 1, connecting plate; 2. a mating groove; 3. cutting; 4. a corner plate; 5. connecting grooves; 6. a mating strip; 7. inserting plates; 8. a protrusion; 9. enclosing plates; 10. a slot; 11. an adjustment plate; 12. connecting blocks; 13. a protective sleeve; 14. a hydraulic lever; 15. a stationary ring; 16. a movable ring; 17. a mating plate; 18. a through hole; 19. a cushion pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example (b):
as shown in fig. 1-7, an embodiment of the present invention provides a fixed formwork structure of a pouring frame for construction engineering, including a connecting plate 1, a corner plate 4, an inserting plate 7, a surrounding plate 9 and an adjusting plate 11, wherein a connecting block 12 is fixedly connected to a surface of the adjusting plate 11, the connecting block 12 is distributed in a rectangular array, a protective sleeve 13 is inserted into a surface of the connecting block 12, a hydraulic rod 14 is inserted into a surface of the protective sleeve 13, a fixing ring 15 is detachably connected to an output end of the hydraulic rod 14, a movable ring 16 is hinged to a surface of the fixing ring 15, a matching plate 17 is fixedly connected to surfaces of the fixing ring 15 and the movable ring 16, a through hole 18 is formed in a surface of the matching plate 17, the hydraulic rod 14 is inserted into the connecting block 12, then the fixing ring 15 and the movable ring 16 are clamped onto a scaffold, and then the matching plate 17 is fixed by matching bolts, nuts and the through holes 18, so as to fix the hydraulic rod 14 onto the scaffold, the adjustment plate 11 is pressurized by a hydraulic rod 14;
the surfaces of the fixed ring 15 and the movable ring 16 are coated with wear-resistant coatings, and the surface of the output end of the hydraulic rod 14 is electroplated with a wear-resistant coating.
The side surface of a connecting plate 1 is provided with a matching groove 2, the side surface of the connecting plate 1, which is far away from the matching groove 2, is fixedly connected with an inserting strip 3, the shape of the matching groove 2 is matched with the inserting strip 3, the surface of a corner plate 4 is provided with a connecting groove 5, the surface of the corner plate 4 is fixedly connected with a matching strip 6, the shape of the connecting groove 5 is matched with the matching strip 6, the connecting plate 1 is matched with the inserting strip 3 through the matching groove 2 for extension, the connecting plate 1 is supported through obliquely placing a supporting plate through steel nails or bolts (the supporting plate is a common wood plate in the prior art), corners are matched with the inserting strip 3 through the connecting groove 5, the matching strip 6 is matched with the matching groove 2, the corner plate 4 is connected, and the corner plate 4 is reinforced in the same way;
the side face of the inserting plate 7 is fixedly connected with two bulges 8, the number of the bulges 8 is two, the two bulges 8 are symmetrically distributed, the surface of the enclosing plate 9 is provided with two slots 10, the number of the slots 10 is two, the two slots 10 are symmetrically distributed, when a column body is poured, the bulges 8 are inserted into the slots 10, and further the inserting plate 7 and the enclosing plate 9 are enclosed into a hollow column shape;
the inner wall fixedly connected with blotter 19 of slot 10, blotter 19's material is rubber, for picture peg 7 and bounding wall 9 when pressurizeing, can compress blotter 19, and then makes picture peg 7 and bounding wall 9 more be the laminating, is difficult for producing the gap.
The working principle is as follows: when a plane is poured, the connecting plates 1 are matched with the inserting strips 3 through the matching grooves 2 to be lengthened, the connecting plates 1 are supported by obliquely placing supporting plates through steel nails or bolts (the supporting plates are wood plates commonly used in the prior art), corner plates 4 are connected through the matching of the connecting grooves 5 and the inserting strips 3 and the matching strips 6 and the matching grooves 2, the corner plates 4 are reinforced in the same way, then the adjusting plate 11 is jointed with the connecting plate 1 or the corner plate 4, the hydraulic rod 14 is inserted into the connecting block 12, the fixing ring 15 and the movable ring 16 are clamped on the scaffold, the matching plate 17 is fixed by matching bolts, nuts and through holes 18, the hydraulic rod 14 is further fixed on the scaffold, the adjusting plate 11 is pressurized through the hydraulic rod 14, and when concrete is poured, gaps are not prone to being generated between the connecting plate 1 and the corner plate 4 under the gravity of the concrete;
when the column is poured, the protrusions 8 are inserted into the slots 10, the inserting plate 7 and the enclosing plate 9 are further enclosed into a hollow column shape, the adjusting plate 11 is attached to the inserting plate 7 and the enclosing plate 9 respectively, the hydraulic rod 14 is inserted into the connecting block 12, the fixing ring 15 and the movable ring 16 are clamped on a scaffold, the hydraulic rod 14 is fixed on the scaffold through the bolt, the nut and the through hole 18 which are matched with the fixing matching plate 17, the adjusting plate 11 is pressurized through the hydraulic rod 14, and when concrete is poured, gaps are not prone to being generated between the inserting plate 7 and the enclosing plate 9.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. Building engineering construction is with pouring frame fixed template structure, including connecting plate (1), turning board (4), picture peg (7), bounding wall (9) and adjusting plate (11), its characterized in that: the surface of adjusting plate (11) is fixedly connected with connecting block (12), connecting block (12) are rectangular array and distribute, protective sheath (13) is pegged graft on the surface of connecting block (12), hydraulic stem (14) is pegged graft on the surface of protective sheath (13).
2. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: cooperation groove (2) have been seted up to connecting plate (1) side, side fixedly connected with cutting (3) of cooperation groove (2) are kept away from in connecting plate (1), the shape and the cutting (3) adaptation of cooperation groove (2).
3. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: connecting groove (5) have been seted up on the surface of turning board (4), the fixed surface of turning board (4) is connected with cooperation strip (6), the shape and the cooperation strip (6) adaptation of connecting groove (5).
4. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: the side fixedly connected with of picture peg (7) is protruding (8), the quantity of protruding (8) has two, two protruding (8) symmetric distribution.
5. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: slots (10) are formed in the surface of the enclosing plate (9), the number of the slots (10) is two, and the two slots (10) are symmetrically distributed.
6. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 5, wherein: the inner wall of the slot (10) is fixedly connected with a cushion pad (19), and the cushion pad (19) is made of rubber.
7. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: the output of hydraulic stem (14) can be dismantled and be connected with retainer plate (15), the surface of retainer plate (15) articulates there is movable circle (16), the equal fixedly connected with cooperation board (17) in surface of retainer plate (15) and movable circle (16), through-hole (18) have been seted up on the surface of cooperation board (17).
8. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 7, wherein: the surfaces of the fixed ring (15) and the movable ring (16) are coated with wear-resistant coatings, and the surface of the output end of the hydraulic rod (14) is plated with a wear-resistant coating.
CN202210041882.0A 2022-01-14 2022-01-14 Fixed template structure of pouring frame for construction engineering construction Pending CN114319862A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210041882.0A CN114319862A (en) 2022-01-14 2022-01-14 Fixed template structure of pouring frame for construction engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210041882.0A CN114319862A (en) 2022-01-14 2022-01-14 Fixed template structure of pouring frame for construction engineering construction

Publications (1)

Publication Number Publication Date
CN114319862A true CN114319862A (en) 2022-04-12

Family

ID=81027479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210041882.0A Pending CN114319862A (en) 2022-01-14 2022-01-14 Fixed template structure of pouring frame for construction engineering construction

Country Status (1)

Country Link
CN (1) CN114319862A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05156806A (en) * 1991-12-04 1993-06-22 Masahiro Murakami Formwork device
CN106065710A (en) * 2016-08-19 2016-11-02 中国十七冶集团有限公司 A kind of wall-connecting piece utilizing formwork fastener to do overhanging type steel pipe exterior wall scaffold
CN207761278U (en) * 2018-01-17 2018-08-24 沭阳宇天木业有限公司 A kind of mortar leakage prevention building template assembly
CN212336706U (en) * 2020-03-23 2021-01-12 魏金志 Assembled building template
CN213710397U (en) * 2020-10-15 2021-07-16 刘红伟 Building templates strutting arrangement
CN113216707A (en) * 2021-04-28 2021-08-06 烟建集团有限公司 Construction method of pool wall of towing pool
CN113266143A (en) * 2021-05-18 2021-08-17 甘肃路桥宏盛房屋建筑安装工程有限公司 Fixed template structure of pouring frame for construction engineering construction
CN214034734U (en) * 2020-10-13 2021-08-24 安徽瑞云建设有限公司 Building engineering construction is with pouring template
CN214739819U (en) * 2020-11-23 2021-11-16 广东方纳建设有限公司 Scaffold for building links wall device
CN215055236U (en) * 2021-04-09 2021-12-07 梁鸿雁 Concrete building template for civil engineering
CN113914607A (en) * 2021-10-21 2022-01-11 五冶集团上海有限公司 Method for horizontally supporting shear wall template through disc buckle frame body

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05156806A (en) * 1991-12-04 1993-06-22 Masahiro Murakami Formwork device
CN106065710A (en) * 2016-08-19 2016-11-02 中国十七冶集团有限公司 A kind of wall-connecting piece utilizing formwork fastener to do overhanging type steel pipe exterior wall scaffold
CN207761278U (en) * 2018-01-17 2018-08-24 沭阳宇天木业有限公司 A kind of mortar leakage prevention building template assembly
CN212336706U (en) * 2020-03-23 2021-01-12 魏金志 Assembled building template
CN214034734U (en) * 2020-10-13 2021-08-24 安徽瑞云建设有限公司 Building engineering construction is with pouring template
CN213710397U (en) * 2020-10-15 2021-07-16 刘红伟 Building templates strutting arrangement
CN214739819U (en) * 2020-11-23 2021-11-16 广东方纳建设有限公司 Scaffold for building links wall device
CN215055236U (en) * 2021-04-09 2021-12-07 梁鸿雁 Concrete building template for civil engineering
CN113216707A (en) * 2021-04-28 2021-08-06 烟建集团有限公司 Construction method of pool wall of towing pool
CN113266143A (en) * 2021-05-18 2021-08-17 甘肃路桥宏盛房屋建筑安装工程有限公司 Fixed template structure of pouring frame for construction engineering construction
CN113914607A (en) * 2021-10-21 2022-01-11 五冶集团上海有限公司 Method for horizontally supporting shear wall template through disc buckle frame body

Similar Documents

Publication Publication Date Title
CN106320691B (en) Aluminum wood template construction method
CN109049296A (en) A kind of template poured vertically for prefabricated panel, mold method and construction technology
CN110541565A (en) Aluminum-wood combined structure for root of non-standard layer wall column and construction method
CN205676785U (en) Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam
CN111962860B (en) Design and construction method of shear key assembly type formwork of hollow sandwich plate
CN105587097A (en) Ground aerial structure capable of being leveled
CN110397268B (en) Integrated design and construction method for post-cast ring beam template and plate support of fabricated shear wall
CN114319862A (en) Fixed template structure of pouring frame for construction engineering construction
CN215907514U (en) Assembled heavy support frame
CN211058291U (en) Aluminum alloy template variable cross-section structure
CN213868903U (en) Supporting and reinforcing device for axillary angle template
CN210999274U (en) Adjustable laminated plate die
CN211873802U (en) Pouring template
CN112482636A (en) Underground assembly type station cast-in-place beam formwork-free structure and construction method thereof
CN216787811U (en) Novel wall surface mold for building template system
CN110714395A (en) Concrete side formwork convenient to adjust and using method thereof
CN217680504U (en) Bathroom balcony subsides template
CN211597368U (en) Temporary reinforcing beam for wallboard
CN217268827U (en) External wall formwork for caisson of toilet
CN220184646U (en) Wood form splicing structure
CN216196542U (en) Novel concrete form installation for construction device
CN211597711U (en) Aluminum template early-dismantling head connecting piece and aluminum template early-dismantling head supporting piece
CN217027758U (en) Adjustable reserves supplementary installation device of muscle
CN214575631U (en) Bracing mechanism for aluminum alloy template
CN219100709U (en) Cast-in-place slab band aluminum mould strutting arrangement of superimposed sheet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination