CN114319862A - Fixed template structure of pouring frame for construction engineering construction - Google Patents
Fixed template structure of pouring frame for construction engineering construction Download PDFInfo
- Publication number
- CN114319862A CN114319862A CN202210041882.0A CN202210041882A CN114319862A CN 114319862 A CN114319862 A CN 114319862A CN 202210041882 A CN202210041882 A CN 202210041882A CN 114319862 A CN114319862 A CN 114319862A
- Authority
- CN
- China
- Prior art keywords
- plate
- fixed
- pouring frame
- engineering construction
- connecting block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention provides a fixed template structure of a pouring frame for construction engineering construction, and relates to the technical field of building template structures. This building engineering construction is with pouring frame fixed template structure, including connecting plate, corner board, picture peg, bounding wall and adjusting plate, the fixed surface of adjusting plate is connected with the connecting block, the connecting block is the rectangular array and distributes, it has the protective sheath to peg graft on the surface of connecting block, it has the hydraulic stem to peg graft on the surface of protective sheath, the side fixedly connected with cutting of cooperation groove is kept away from to the connecting plate. According to the invention, the adjusting plate is attached to the frame, the hydraulic rod is inserted into the connecting block, the fixing ring and the movable ring are clamped on the scaffold, the matching plate is fixed through the matching of the bolts, the nuts and the through holes, the hydraulic rod is further fixed on the scaffold, the adjusting plate is pressurized through the hydraulic rod, when concrete is poured, the frame is not easy to generate gaps under the gravity of the concrete, and the pressurizing place is easy to adjust.
Description
Technical Field
The invention relates to the technical field of building template structures, in particular to a fixed template structure of a pouring frame for construction engineering construction.
Background
Concrete pouring (concrete placement) the mixed concrete material is poured into a bin, the bin is leveled, and the concrete material is tamped and compacted. The construction template is a temporary supporting structure, is manufactured according to design requirements, enables a concrete structure and a member to be formed according to specified positions and geometric dimensions, keeps the correct position, bears the self weight of the construction template and external loads acting on the construction template, and performs template engineering, so that the quality and the construction safety of concrete engineering are ensured, the construction progress is accelerated, and the engineering cost is reduced.
Building engineering construction on the existing market is with pouring frame fixed template structure, fixes into the frame through panel, consolidates the frame through steel nail, screw and panel, and reinforced structure restricts panel when pouring, does not let it take place deformation, but easily produces the gap between the panel, consolidates the place fixed, uses not nimble enough.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a fixed template structure of a pouring frame for construction engineering construction, which solves the problems that gaps are easy to generate between plates and the use is not flexible enough.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: building engineering construction is with pouring frame fixed template structure, including connecting plate, corner board, picture peg, bounding wall and adjusting plate, the fixed surface of adjusting plate is connected with the connecting block, the connecting block is the rectangular array and distributes, the surface of connecting block is pegged graft and is had the protective sheath, the surface of protective sheath is pegged graft and is had the hydraulic stem.
Preferably, a matching groove is formed in the side face of the connecting plate, the side face, far away from the matching groove, of the connecting plate is fixedly connected with the inserting strip, and the matching groove is matched with the inserting strip in shape.
Preferably, the surface of the corner plate is provided with a connecting groove, the surface of the corner plate is fixedly connected with a matching strip, and the connecting groove is matched with the matching strip in shape.
Preferably, the side face of the inserting plate is fixedly connected with two protrusions, and the two protrusions are symmetrically distributed.
Preferably, the surface of the coaming is provided with two slots, and the two slots are symmetrically distributed.
Preferably, the inner wall fixedly connected with blotter of slot, the material of blotter is rubber.
Preferably, the output of hydraulic stem can be dismantled and be connected with the retainer plate, the surface of retainer plate articulates there is the movable ring, the equal fixedly connected with cooperation board in surface of retainer plate and movable ring, the through-hole has been seted up on the surface of cooperation board.
Preferably, the surfaces of the fixed ring and the movable ring are coated with wear-resistant coatings, and the surface of the output end of the hydraulic rod is electroplated with a wear-resistant coating.
(III) advantageous effects
The invention provides a fixed template structure of a pouring frame for construction engineering construction. The method has the following beneficial effects:
1. this building engineering construction is with pouring frame fixed template structure, adjusting plate and frame laminating, insert the hydraulic stem again on the connecting block, reuse retainer plate and movable ring card to the scaffold frame on, rethread bolt, nut and through-hole cooperation fixed coordination board, and then fix the hydraulic stem on the scaffold frame, pressurize the adjusting plate through the hydraulic stem, when concreting, the frame is difficult for producing the gap under the gravity of concrete, the easy adjustment in pressurization place.
2. This building engineering construction is with pouring frame fixed template structure, through being provided with connecting plate, turning board, picture peg and bounding wall cooperation use, the mutual concatenation of connecting plate is prolonged, and the turning point is connected to the turning board, and picture peg and bounding wall cooperation enclose into hollow main part, use more in a flexible way.
3. This building engineering construction is with pouring frame fixed template structure, when pressurizeing for picture peg and bounding wall, can compress the blotter, and then make picture peg and bounding wall more laminate, be difficult for producing the gap.
Drawings
FIG. 1 is a schematic structural diagram of a connecting plate of a fixed formwork structure of a pouring frame for construction of constructional engineering, according to the present invention;
FIG. 2 is a schematic structural view of a corner plate of a fixed formwork structure of a pouring frame for construction engineering according to the present invention;
FIG. 3 is a schematic illustration of a plate inserting structure of a fixed formwork structure of a pouring frame for construction engineering according to the present invention;
FIG. 4 is a schematic structural diagram of a coaming of a fixed template structure of a pouring frame for construction of building engineering according to the present invention;
FIG. 5 is a schematic structural view of an adjusting plate of a fixed formwork structure of a pouring frame for construction of building engineering according to the present invention;
FIG. 6 is a cross-sectional view of a connecting block of a fixed formwork structure of a pouring frame for construction of constructional engineering according to the present invention;
fig. 7 is a schematic structural view of a fixing ring of a fixed formwork structure of a pouring frame for construction engineering according to the present invention.
Wherein, 1, connecting plate; 2. a mating groove; 3. cutting; 4. a corner plate; 5. connecting grooves; 6. a mating strip; 7. inserting plates; 8. a protrusion; 9. enclosing plates; 10. a slot; 11. an adjustment plate; 12. connecting blocks; 13. a protective sleeve; 14. a hydraulic lever; 15. a stationary ring; 16. a movable ring; 17. a mating plate; 18. a through hole; 19. a cushion pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example (b):
as shown in fig. 1-7, an embodiment of the present invention provides a fixed formwork structure of a pouring frame for construction engineering, including a connecting plate 1, a corner plate 4, an inserting plate 7, a surrounding plate 9 and an adjusting plate 11, wherein a connecting block 12 is fixedly connected to a surface of the adjusting plate 11, the connecting block 12 is distributed in a rectangular array, a protective sleeve 13 is inserted into a surface of the connecting block 12, a hydraulic rod 14 is inserted into a surface of the protective sleeve 13, a fixing ring 15 is detachably connected to an output end of the hydraulic rod 14, a movable ring 16 is hinged to a surface of the fixing ring 15, a matching plate 17 is fixedly connected to surfaces of the fixing ring 15 and the movable ring 16, a through hole 18 is formed in a surface of the matching plate 17, the hydraulic rod 14 is inserted into the connecting block 12, then the fixing ring 15 and the movable ring 16 are clamped onto a scaffold, and then the matching plate 17 is fixed by matching bolts, nuts and the through holes 18, so as to fix the hydraulic rod 14 onto the scaffold, the adjustment plate 11 is pressurized by a hydraulic rod 14;
the surfaces of the fixed ring 15 and the movable ring 16 are coated with wear-resistant coatings, and the surface of the output end of the hydraulic rod 14 is electroplated with a wear-resistant coating.
The side surface of a connecting plate 1 is provided with a matching groove 2, the side surface of the connecting plate 1, which is far away from the matching groove 2, is fixedly connected with an inserting strip 3, the shape of the matching groove 2 is matched with the inserting strip 3, the surface of a corner plate 4 is provided with a connecting groove 5, the surface of the corner plate 4 is fixedly connected with a matching strip 6, the shape of the connecting groove 5 is matched with the matching strip 6, the connecting plate 1 is matched with the inserting strip 3 through the matching groove 2 for extension, the connecting plate 1 is supported through obliquely placing a supporting plate through steel nails or bolts (the supporting plate is a common wood plate in the prior art), corners are matched with the inserting strip 3 through the connecting groove 5, the matching strip 6 is matched with the matching groove 2, the corner plate 4 is connected, and the corner plate 4 is reinforced in the same way;
the side face of the inserting plate 7 is fixedly connected with two bulges 8, the number of the bulges 8 is two, the two bulges 8 are symmetrically distributed, the surface of the enclosing plate 9 is provided with two slots 10, the number of the slots 10 is two, the two slots 10 are symmetrically distributed, when a column body is poured, the bulges 8 are inserted into the slots 10, and further the inserting plate 7 and the enclosing plate 9 are enclosed into a hollow column shape;
the inner wall fixedly connected with blotter 19 of slot 10, blotter 19's material is rubber, for picture peg 7 and bounding wall 9 when pressurizeing, can compress blotter 19, and then makes picture peg 7 and bounding wall 9 more be the laminating, is difficult for producing the gap.
The working principle is as follows: when a plane is poured, the connecting plates 1 are matched with the inserting strips 3 through the matching grooves 2 to be lengthened, the connecting plates 1 are supported by obliquely placing supporting plates through steel nails or bolts (the supporting plates are wood plates commonly used in the prior art), corner plates 4 are connected through the matching of the connecting grooves 5 and the inserting strips 3 and the matching strips 6 and the matching grooves 2, the corner plates 4 are reinforced in the same way, then the adjusting plate 11 is jointed with the connecting plate 1 or the corner plate 4, the hydraulic rod 14 is inserted into the connecting block 12, the fixing ring 15 and the movable ring 16 are clamped on the scaffold, the matching plate 17 is fixed by matching bolts, nuts and through holes 18, the hydraulic rod 14 is further fixed on the scaffold, the adjusting plate 11 is pressurized through the hydraulic rod 14, and when concrete is poured, gaps are not prone to being generated between the connecting plate 1 and the corner plate 4 under the gravity of the concrete;
when the column is poured, the protrusions 8 are inserted into the slots 10, the inserting plate 7 and the enclosing plate 9 are further enclosed into a hollow column shape, the adjusting plate 11 is attached to the inserting plate 7 and the enclosing plate 9 respectively, the hydraulic rod 14 is inserted into the connecting block 12, the fixing ring 15 and the movable ring 16 are clamped on a scaffold, the hydraulic rod 14 is fixed on the scaffold through the bolt, the nut and the through hole 18 which are matched with the fixing matching plate 17, the adjusting plate 11 is pressurized through the hydraulic rod 14, and when concrete is poured, gaps are not prone to being generated between the inserting plate 7 and the enclosing plate 9.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. Building engineering construction is with pouring frame fixed template structure, including connecting plate (1), turning board (4), picture peg (7), bounding wall (9) and adjusting plate (11), its characterized in that: the surface of adjusting plate (11) is fixedly connected with connecting block (12), connecting block (12) are rectangular array and distribute, protective sheath (13) is pegged graft on the surface of connecting block (12), hydraulic stem (14) is pegged graft on the surface of protective sheath (13).
2. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: cooperation groove (2) have been seted up to connecting plate (1) side, side fixedly connected with cutting (3) of cooperation groove (2) are kept away from in connecting plate (1), the shape and the cutting (3) adaptation of cooperation groove (2).
3. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: connecting groove (5) have been seted up on the surface of turning board (4), the fixed surface of turning board (4) is connected with cooperation strip (6), the shape and the cooperation strip (6) adaptation of connecting groove (5).
4. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: the side fixedly connected with of picture peg (7) is protruding (8), the quantity of protruding (8) has two, two protruding (8) symmetric distribution.
5. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: slots (10) are formed in the surface of the enclosing plate (9), the number of the slots (10) is two, and the two slots (10) are symmetrically distributed.
6. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 5, wherein: the inner wall of the slot (10) is fixedly connected with a cushion pad (19), and the cushion pad (19) is made of rubber.
7. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 1, wherein: the output of hydraulic stem (14) can be dismantled and be connected with retainer plate (15), the surface of retainer plate (15) articulates there is movable circle (16), the equal fixedly connected with cooperation board (17) in surface of retainer plate (15) and movable circle (16), through-hole (18) have been seted up on the surface of cooperation board (17).
8. The fixed formwork structure of the pouring frame for construction engineering construction according to claim 7, wherein: the surfaces of the fixed ring (15) and the movable ring (16) are coated with wear-resistant coatings, and the surface of the output end of the hydraulic rod (14) is plated with a wear-resistant coating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210041882.0A CN114319862A (en) | 2022-01-14 | 2022-01-14 | Fixed template structure of pouring frame for construction engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210041882.0A CN114319862A (en) | 2022-01-14 | 2022-01-14 | Fixed template structure of pouring frame for construction engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114319862A true CN114319862A (en) | 2022-04-12 |
Family
ID=81027479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210041882.0A Pending CN114319862A (en) | 2022-01-14 | 2022-01-14 | Fixed template structure of pouring frame for construction engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114319862A (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05156806A (en) * | 1991-12-04 | 1993-06-22 | Masahiro Murakami | Formwork device |
CN106065710A (en) * | 2016-08-19 | 2016-11-02 | 中国十七冶集团有限公司 | A kind of wall-connecting piece utilizing formwork fastener to do overhanging type steel pipe exterior wall scaffold |
CN207761278U (en) * | 2018-01-17 | 2018-08-24 | 沭阳宇天木业有限公司 | A kind of mortar leakage prevention building template assembly |
CN212336706U (en) * | 2020-03-23 | 2021-01-12 | 魏金志 | Assembled building template |
CN213710397U (en) * | 2020-10-15 | 2021-07-16 | 刘红伟 | Building templates strutting arrangement |
CN113216707A (en) * | 2021-04-28 | 2021-08-06 | 烟建集团有限公司 | Construction method of pool wall of towing pool |
CN113266143A (en) * | 2021-05-18 | 2021-08-17 | 甘肃路桥宏盛房屋建筑安装工程有限公司 | Fixed template structure of pouring frame for construction engineering construction |
CN214034734U (en) * | 2020-10-13 | 2021-08-24 | 安徽瑞云建设有限公司 | Building engineering construction is with pouring template |
CN214739819U (en) * | 2020-11-23 | 2021-11-16 | 广东方纳建设有限公司 | Scaffold for building links wall device |
CN215055236U (en) * | 2021-04-09 | 2021-12-07 | 梁鸿雁 | Concrete building template for civil engineering |
CN113914607A (en) * | 2021-10-21 | 2022-01-11 | 五冶集团上海有限公司 | Method for horizontally supporting shear wall template through disc buckle frame body |
-
2022
- 2022-01-14 CN CN202210041882.0A patent/CN114319862A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05156806A (en) * | 1991-12-04 | 1993-06-22 | Masahiro Murakami | Formwork device |
CN106065710A (en) * | 2016-08-19 | 2016-11-02 | 中国十七冶集团有限公司 | A kind of wall-connecting piece utilizing formwork fastener to do overhanging type steel pipe exterior wall scaffold |
CN207761278U (en) * | 2018-01-17 | 2018-08-24 | 沭阳宇天木业有限公司 | A kind of mortar leakage prevention building template assembly |
CN212336706U (en) * | 2020-03-23 | 2021-01-12 | 魏金志 | Assembled building template |
CN214034734U (en) * | 2020-10-13 | 2021-08-24 | 安徽瑞云建设有限公司 | Building engineering construction is with pouring template |
CN213710397U (en) * | 2020-10-15 | 2021-07-16 | 刘红伟 | Building templates strutting arrangement |
CN214739819U (en) * | 2020-11-23 | 2021-11-16 | 广东方纳建设有限公司 | Scaffold for building links wall device |
CN215055236U (en) * | 2021-04-09 | 2021-12-07 | 梁鸿雁 | Concrete building template for civil engineering |
CN113216707A (en) * | 2021-04-28 | 2021-08-06 | 烟建集团有限公司 | Construction method of pool wall of towing pool |
CN113266143A (en) * | 2021-05-18 | 2021-08-17 | 甘肃路桥宏盛房屋建筑安装工程有限公司 | Fixed template structure of pouring frame for construction engineering construction |
CN113914607A (en) * | 2021-10-21 | 2022-01-11 | 五冶集团上海有限公司 | Method for horizontally supporting shear wall template through disc buckle frame body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106320691B (en) | Aluminum wood template construction method | |
CN109049296A (en) | A kind of template poured vertically for prefabricated panel, mold method and construction technology | |
CN110541565A (en) | Aluminum-wood combined structure for root of non-standard layer wall column and construction method | |
CN205676785U (en) | Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam | |
CN111962860B (en) | Design and construction method of shear key assembly type formwork of hollow sandwich plate | |
CN105587097A (en) | Ground aerial structure capable of being leveled | |
CN110397268B (en) | Integrated design and construction method for post-cast ring beam template and plate support of fabricated shear wall | |
CN114319862A (en) | Fixed template structure of pouring frame for construction engineering construction | |
CN215907514U (en) | Assembled heavy support frame | |
CN211058291U (en) | Aluminum alloy template variable cross-section structure | |
CN213868903U (en) | Supporting and reinforcing device for axillary angle template | |
CN210999274U (en) | Adjustable laminated plate die | |
CN211873802U (en) | Pouring template | |
CN112482636A (en) | Underground assembly type station cast-in-place beam formwork-free structure and construction method thereof | |
CN216787811U (en) | Novel wall surface mold for building template system | |
CN110714395A (en) | Concrete side formwork convenient to adjust and using method thereof | |
CN217680504U (en) | Bathroom balcony subsides template | |
CN211597368U (en) | Temporary reinforcing beam for wallboard | |
CN217268827U (en) | External wall formwork for caisson of toilet | |
CN220184646U (en) | Wood form splicing structure | |
CN216196542U (en) | Novel concrete form installation for construction device | |
CN211597711U (en) | Aluminum template early-dismantling head connecting piece and aluminum template early-dismantling head supporting piece | |
CN217027758U (en) | Adjustable reserves supplementary installation device of muscle | |
CN214575631U (en) | Bracing mechanism for aluminum alloy template | |
CN219100709U (en) | Cast-in-place slab band aluminum mould strutting arrangement of superimposed sheet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |