CN206245709U - A kind of outrigger wall-connecting piece - Google Patents

A kind of outrigger wall-connecting piece Download PDF

Info

Publication number
CN206245709U
CN206245709U CN201620164667.XU CN201620164667U CN206245709U CN 206245709 U CN206245709 U CN 206245709U CN 201620164667 U CN201620164667 U CN 201620164667U CN 206245709 U CN206245709 U CN 206245709U
Authority
CN
China
Prior art keywords
plate washer
steel plate
circular hole
stud
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620164667.XU
Other languages
Chinese (zh)
Inventor
苏龙辉
梅志超
陈先明
王传英
胡浩
曾火平
牛帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
Third Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Third Engineering Division filed Critical Third Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201620164667.XU priority Critical patent/CN206245709U/en
Application granted granted Critical
Publication of CN206245709U publication Critical patent/CN206245709U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to a kind of outrigger wall-connecting piece, including is embedded in the pvc pipe through walls in wall, the interior steel plate washer with the first circular hole, outer steel plate washer and stud with the second circular hole;One end of stud is fixed through the first circular hole that interior steel plate washer is then passed through after pvc pipe through walls finally by the first nut;The other end of stud through outer steel plate washer the second circular hole after fixed by the second nut;The outer steel plate washer is welded with one end of steel pipe, and the other end of steel pipe is connected with the vertical rod fastener of scaffold, and outer steel plate washer constitutes wall connecting rod part with steel-pipe welding;The center line of stud and the centerline parallel of steel pipe.It is the utility model simple structure, easy to operate, can reuse, reduce construction cost.

Description

A kind of outrigger wall-connecting piece
Technical field
The utility model belongs to the realm of building construction, and in particular to a kind of outrigger wall-connecting piece.
Background technology
External scaffolding system refers to the scaffold set up in architecture enclosing, is mainly used in reinforced concrete construction, outer Wall is built by laying bricks or stones, alien invasion is fitted up.Wall-connecting piece is the important guarantee of scaffold stability, and JGJ130-2011 has accordingly to wall-connecting piece Regulation, but not specify wall-connecting piece concrete structure.
Existing outer scaffold wall connector has following three kinds of methods to be made:(1) pre-buried steel tube method:Before concreting, use One vertical short steel pipes are embedded in about 20cm in beam, expose beam and break an agreement 20cm, and concreting is complete, with level steel pipe long, vertical rod and Vertical short steel pipes fastener connection.(2) embedded iron parts method:Before main body beam column concrete construction, in the pre- buried strap anchor pin in relevant position Iron plate, after form removable, welded with steel pipe and the iron plate for exposing beam side or post side, the opposite side of steel pipe and the vertical rod of scaffold Connected with fastener.(3) method is anchored afterwards:In beam sides drilling, expansion anchor or chemical anchor bolts are installed, then with being welded into steel pipe in advance The anchor slab connection of one.
However, there are problems in existing outer scaffold wall connector, it is specific as follows:(1) pre-buried steel tube method:Pre-buried Steel pipe and part fastener cannot be recycled, and construction cost is high, while dismantling trouble, need to block hole, there is serious infiltration hidden danger, Gas cutting often is used during dismounting, is unfavorable for fire prevention, and reconcile limited up and down, influence retaining design construction.(2) embedded iron parts method:Steel plate And anchor pin cannot be reused, steel using amount is big, and construction cost is high, and construction procedure is complicated, to be welded during installation, will gas during dismounting Cut, it is cumbersome and have disaster hidden-trouble.(3) method is anchored afterwards:Construction trouble, only with 1 expansion anchor, bearing capacity is not high, easily Loosen, low cycle repetitive load can not be born, after the completion of construction, crab-bolt is scrapped, it is impossible to reused, and causes construction cost high.
Therefore, we can reuse in the urgent need to a kind of simple structure, easy to operate, reduce the outrigger of construction cost Wall-connecting piece.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of simple structure, easy to operate, can reuse, energy Reduce the outrigger wall-connecting piece of construction cost.
The technical scheme that the utility model is used is:A kind of outrigger wall-connecting piece, including it is embedded in the PVC through walls in wall Pipe, the interior steel plate washer with the first circular hole, outer steel plate washer and stud with the second circular hole;One end of stud passes through through walls The first circular hole of interior steel plate washer is then passed through after pvc pipe, is fixed finally by the first nut;The other end of stud passes through outer steel Fixed by the second nut after second circular hole of pad;One end of the outer steel plate washer and steel pipe is welded, the other end of steel pipe with The vertical rod fastener connection of scaffold, outer steel plate washer constitutes wall connecting rod part with steel-pipe welding;
The center line of the stud and the centerline parallel of steel pipe.
Construction procedure is:
The first circular hole (the first screwed hole) is first rushed in advance at the center of interior steel plate washer, is rushed second in advance on the top of outer steel plate washer and is justified Hole (the second screwed hole), one end of steel pipe is welded in the bottom of outer steel plate washer;
Before main column wall beam board member concrete construction, pvc pipe through walls is set in relevant position;
After the dismounting of concrete component vertical formwork, one end of stud is then passed through interior steel pad after passing through pvc pipe through walls First circular hole (the first screwed hole) of piece, fastens finally by the first nut;The other end of stud passes through outer steel plate washer Second circular hole (the second screwed hole) is fastened by the second nut afterwards;The other end of steel pipe is connected with the vertical rod fastener of scaffold;
After outer-wall building, alien invasion finishing are finished, by steel pipe, vertical rod fastener, interior steel plate washer, outer steel plate washer, the first spiral shell Mother, the second nut, stud are reclaimed totally, in case next time uses (turnover), have saved construction cost, economic ring again Protect;After cutting PVC sleeve pipes through walls, wall is repaired using cement mortar smooth, it is to avoid leak.Whole construction safety, efficiently, It is convenient.
Compared with prior art, the utility model has the advantage of:
After stud is passed through into pvc pipe through walls, its two ends is fastened by nut and steel plate washer, is welded on outer steel plate washer With the steel pipe of stud centerline parallel, structure is very simple, and during construction, only need to tighten nut can be installed, without Gas welding, electric welding, install very convenient, and only need to unclamp nut can just be dismantled, and dismounting is very convenient, time saving and energy saving;Make steel pipe Center line and double threaded screw centerline parallel, enhance the intensity of whole outrigger wall-connecting piece, improve resistance to overturning, bearing capacity Height, is integrally difficult to loosen;
After outer-wall building, alien invasion finishing are finished, can be by steel pipe, vertical rod fastener, interior steel plate washer, outer steel plate washer, first Nut, the second nut, stud are reclaimed totally, realize the recycling of device, have saved construction cost, economical and environmentally friendly;
Each steel pipe correspondence a piece stud and a pvc pipe through walls, stud two pieces of steel plate washers of correspondence With 2 nuts, structure is very simple, installs and dismantles and be also very convenient;A piece steel pipe piece pvc pipe through walls of correspondence, both subtracted Lack construction materials, saved construction cost, reduced the engineering time, also ensure that the intensity of wall;
The device for being used is conventional device, easy to make;
When embodiment is constructed, live fire operation is prevented effectively from, reduces fire safety evaluating hidden danger;Preformed hole is smaller, construction After the completion of only need to block pvc pipe, reduce hidden leakage defect;Construction is convenient, and workman's efficiency of construction is significantly improved.
Brief description of the drawings
Fig. 1 is the structural representation of interior steel plate washer;
Fig. 2 is the structural representation of outer steel plate washer;
Fig. 3 is the overall structure diagram of the utility model outrigger wall-connecting piece;
Fig. 4 uses schematic diagram for the utility model.
In figure:1-1, interior steel plate washer, 1-2, outer steel plate washer, 2-1, the first circular hole, 2-2, the second circular hole, 3, steel pipe, 4, double Hook bolt, 5-1, the first nut, 5-2, the second nut, 6, pvc pipe through walls, 7, wall, 8, scaffold.
Specific embodiment
Embodiment of the present utility model is further illustrated below in conjunction with the accompanying drawings.
Referring to Fig. 1-Fig. 4, a kind of outrigger wall-connecting piece, including the pvc pipe through walls 6, band for being embedded in diameter 25mm in wall 7 The size of the first circular hole 2-1 is the interior steel plate washer 1-1 of 100mm × 5mm, size with the second circular hole 2-2 is 100mm × 5mm's The stud 4 of outer steel plate washer 1-2 and diameter 20mm;One end of stud 4 is then passed through interior steel pad after passing through pvc pipe through walls 6 The first circular hole 2-1 of piece 1-1, fixes finally by the first nut 5-1;The other end of stud 4 is through outer steel plate washer 1-2's Fixed by the second nut 5-2 after second circular hole 2-2;One end welding of the steel pipe 3 of outer steel plate washer 1-2 and 48 × 3.0mm of diameter, The other end of steel pipe 3 is connected with the vertical rod fastener of scaffold 8, and outer steel plate washer 1-2 is welded to form wall connecting rod part with steel pipe 3;In order to Ensure resistance to overturning, the center line of stud 4 and the centerline parallel of steel pipe 3.
Construction procedure is:
The first circular hole 2-1 (the first screwed hole) of diameter 22mm is first rushed in advance at the center of interior steel plate washer 1-1, in outer steel plate washer The top of 1-2 rushes the second circular hole 2-2 (the second screwed hole) of diameter 22mm in advance, and one end of steel pipe 3 is welded in outer steel plate washer 1-2 Bottom;
Before main column wall beam board member concrete construction, pvc pipe 6 through walls is set in relevant position;
After the dismounting of concrete component vertical formwork, one end of stud 4 is then passed through interior steel after passing through pvc pipe through walls 6 The first circular hole 2-1 (the first screwed hole) of pad 1-1, fastens finally by the first nut 5-1;The other end of stud 4 is worn The the second circular hole 2-2 (the second screwed hole) for crossing outer steel plate washer 1-2 is fastened by the second nut 5-2 afterwards;By the other end of steel pipe 3 with The vertical rod fastener connection of scaffold 8;
When outer-wall building, alien invasion finishing finish after, by steel pipe 3, vertical rod fastener, interior steel plate washer 1-1, outer steel plate washer 1-2, First nut 5-1, the second nut 5-2, stud 4 are reclaimed totally, in case next time uses (turnover), have been saved and have been constructed into This, it is economical and environmentally friendly;After cutting PVC sleeve pipes 6 through walls, wall is repaired using cement mortar smooth, it is to avoid leak.Entirely apply Work is safe efficient, convenient.
On the premise of outrigger resistance to overturning is ensured, peace tears convenient open to the present apparatus, reduces fire and infiltration hidden danger, and can Turnover, reduces spillage of material, economic and environment-friendly.

Claims (1)

1. a kind of outrigger wall-connecting piece, it is characterised in that:Including the pvc pipe through walls, the interior steel with the first circular hole that are embedded in wall Pad, outer steel plate washer and stud with the second circular hole;One end of stud is then passed through interior steel pad after passing through pvc pipe through walls First circular hole of piece, fixes finally by the first nut;The other end of stud through outer steel plate washer the second circular hole after lead to The second nut is crossed to fix;The outer steel plate washer is welded with one end of steel pipe, and the other end of steel pipe connects with the vertical rod fastener of scaffold Connect;
The center line of the stud and the centerline parallel of steel pipe;
First circular hole is located at the center of interior steel plate washer, and the second circular hole is located at the top of outer steel plate washer;
The size of the interior steel plate washer is 100mm × 5mm;The size of outer steel plate washer is 100mm × 5mm;The diameter of the first circular hole It is 22mm;A diameter of 22mm of the second circular hole.
CN201620164667.XU 2016-03-04 2016-03-04 A kind of outrigger wall-connecting piece Active CN206245709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620164667.XU CN206245709U (en) 2016-03-04 2016-03-04 A kind of outrigger wall-connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620164667.XU CN206245709U (en) 2016-03-04 2016-03-04 A kind of outrigger wall-connecting piece

Publications (1)

Publication Number Publication Date
CN206245709U true CN206245709U (en) 2017-06-13

Family

ID=58997364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620164667.XU Active CN206245709U (en) 2016-03-04 2016-03-04 A kind of outrigger wall-connecting piece

Country Status (1)

Country Link
CN (1) CN206245709U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869245A (en) * 2017-11-30 2018-04-03 上海宝冶集团有限公司 Turnover type wall-connecting piece and its application method
CN113550562A (en) * 2021-06-02 2021-10-26 中国五冶集团有限公司 Large-span large-storey high-wall-connecting piece setting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869245A (en) * 2017-11-30 2018-04-03 上海宝冶集团有限公司 Turnover type wall-connecting piece and its application method
CN113550562A (en) * 2021-06-02 2021-10-26 中国五冶集团有限公司 Large-span large-storey high-wall-connecting piece setting method

Similar Documents

Publication Publication Date Title
CN203462583U (en) Super high-rise exposed column foot
CN206245709U (en) A kind of outrigger wall-connecting piece
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN110863644A (en) Novel turnover tool type beam side connecting wall piece fixing device and method
CN203363529U (en) Concrete pipe repairing device of water supply prestress steel cylinder
CN109763571A (en) It is a kind of semicircle bolt snap ring assemblies and with its fix overhanging I-steel construction method
CN203795825U (en) Scaffold and wall connector and scaffold and wall connecting structure
CN212224604U (en) Wall connecting assembly for connecting outer wall scaffold and wall structure
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN201704954U (en) Formwork opposite-pulling device for pouring waterproof walls
CN204174937U (en) The construction equipment of recyclable wire rope draw ring
CN204299162U (en) To encorbelment steel I-beam anchor structure
CN206800981U (en) A kind of detachable builder's jack retainer ring
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN212745338U (en) Vertical pump pipe fixer
CN205840298U (en) Scaffold exterior wall connector
CN210067407U (en) Scaffold wall connecting piece
CN204386140U (en) A kind of recoverable suspension scaffold shaped steel anchor device
CN211286573U (en) Scaffold foot supporting component capable of being recycled
CN209723400U (en) Using a kind of prefabricated integral frame bean column node that sleeve quickly connects
CN219298791U (en) Multifunctional aluminum die inclined support
CN204282802U (en) A kind of adjustable scaffold wall-connecting piece of zero loss
CN204456449U (en) A kind of simple and easy callable pre-buried wall-connecting piece
CN211714556U (en) Building scaffold wall connecting device
CN214575462U (en) Device for drawknot of double-row protection frame outside underground chamber of constructional engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant