CN107869245A CN201711237628.3A CN201711237628A CN107869245A CN 107869245 A CN107869245 A CN 107869245A CN 201711237628 A CN201711237628 A CN 201711237628A CN 107869245 A CN107869245 A CN 107869245A
Authority
CN
China
Prior art keywords
connecting piece
wall
threaded rod
turnover type
type wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711237628.3A
Other languages
Chinese (zh)
Inventor
欧宁
杨杰
潘宏亮
傅珂
李清茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201711237628.3A priority Critical patent/CN107869245A/en
Publication of CN107869245A publication Critical patent/CN107869245A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to the realm of building construction, specifically a kind of turnover type wall-connecting piece and its application method;It is characterized in:Including fastener, threaded rod, pad and nut;Wherein, one end full weld fastener of threaded rod, pad have two panels and are through in threaded rod, and nut also has two and is equally through in threaded rod.This turnover type wall-connecting piece only need in the pre-buried pvc pipe in the corresponding position of agent structure, after beam side is removed, installation can turnover type wall-connecting piece, be directly attached using steel pipe, installation rate is fast, and next procedure is not impacted, can be used in turn, and saves material.

Description

Turnover type wall-connecting piece and its application method
Technical field
The present invention relates to the realm of building construction, specifically a kind of turnover type wall-connecting piece and its application method.
Background technology
The attached wall connection effect of scaffold wall connecting piece, the resistance to overturning for strengthening scaffold, improve its stable carrying energy Power and avoid the occurrence of the major accident tool such as topple over or cave in and play a very important role.
In work progress, embedded steel tube is often carried out before casting concrete, be attached with scaffold to be formed it is whole Body, in scaffold wall-connecting piece be usually three steps two across or two steps three step into row embedded steel tube and set, so as to cause embedded steel tube Wastage it is larger.
During masonry construction, scaffold is removed after the completion of masonry construction, and the position of pre-buried wall-connecting piece, often Influence masonry construction, can only reserved opening, secondary repairing could be carried out to hole after scaffold dismounting, work consuming take.
Embedded steel tube can only be used as first use, after removing scaffold, must carry out cutting operation, cut off the steel of exposed parts Pipe, excision and pre-buried secondary can not use, and cause the waste of material.
The content of the invention
It is an object of the present invention to overcome drawbacks described above, there is provided a kind of to be used in turn and the wall-connecting piece of convenient disassembly.
In order to achieve the above object, the present invention is realized in:
A kind of turnover type wall-connecting piece, including fastener, threaded rod, pad and nut;Wherein, one end full weld button of threaded rod Part, pad have two panels and are through in threaded rod, and nut also has two and is equally through in threaded rod.
The application method of the turnover type wall-connecting piece, including
Step 1, by design drawing carry out template construction;
After the completion of step 2, template construction, template is drilled and pre-buried run through by the position that wall-connecting piece is laid in design drawing The pvc pipe section of whole wall;
Step 3, casting concrete;
After the completion of step 4, concreting operation, form removal;
Step 5, the threaded rod in wall-connecting piece is penetrated in pvc pipe and screwed pipe is anchored at by concrete by pad and nut In wall;
Step 6, the turnover type wall-connecting piece by having anchored fastener by scaffold and wall drawknot.
The waste of steel can be reduced by the use of this turnover type wall-connecting piece;Meanwhile using this wall-connecting piece not under the influence of The construction of procedure simultaneously reduces the process that subsequent artefacts cut off steel pipe.
Brief description of the drawings
Fig. 1 is the use state diagram of this wall-connecting piece.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in figure 1, a kind of turnover type wall-connecting piece, including fastener 1, threaded rod 2, pad and nut 3;Wherein, screw thread One end full weld fastener 1 of connecting rod 2, pad have two panels and are through in threaded rod 2, and nut 3 also has two and is equally through screw thread On connecting rod 1.
The application method of the turnover type wall-connecting piece, including
Step 1, by design drawing carry out template construction;
After the completion of step 2, template construction, template is drilled and pre-buried run through by the position that wall-connecting piece is laid in design drawing The pvc pipe section of whole wall;
Step 3, casting concrete;
After the completion of step 4, concreting operation, form removal;
Step 5, the threaded rod in wall-connecting piece is penetrated in pvc pipe screwed pipe is anchored at by concrete walls by pad and nut In vivo;
Step 6, the turnover type wall-connecting piece by having anchored fastener by scaffold and wall drawknot.
This turnover type wall-connecting piece only need to be in the pre-buried pvc pipe in the corresponding position of agent structure, and after beam side is removed, installation can week Rotatable wall-connecting piece is simultaneously directly attached using steel pipe and fastener, and installation rate is fast, and next procedure is not impacted, can be had enough to meet the need Use, save material.

Claims (2)

1. a kind of turnover type wall-connecting piece, it is characterized in that:Including fastener, threaded rod, pad and nut;Wherein, threaded rod One end full weld fastener, pad have two panels and are through in threaded rod, and nut also has two and is equally through in threaded rod.
2. the application method of turnover type wall-connecting piece according to claim 1, it is characterized in that:Including
Step 1, by design drawing carry out template construction;
After the completion of step 2, template construction, template is drilled and pre-buried run through by the position that wall-connecting piece is laid in design drawing The pvc pipe section of whole wall;
Step 3, casting concrete;
After the completion of step 4, concreting operation, form removal;
Step 5, the threaded rod in wall-connecting piece is penetrated in pvc pipe and screwed pipe is anchored at by concrete by pad and nut In wall;
Step 6, the turnover type wall-connecting piece by having anchored fastener by scaffold and wall drawknot.
CN201711237628.3A 2017-11-30 2017-11-30 Turnover type wall-connecting piece and its application method Pending CN107869245A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711237628.3A CN107869245A (en) 2017-11-30 2017-11-30 Turnover type wall-connecting piece and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711237628.3A CN107869245A (en) 2017-11-30 2017-11-30 Turnover type wall-connecting piece and its application method

Publications (1)

Publication Number Publication Date
CN107869245A true CN107869245A (en) 2018-04-03

Family

ID=61755084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711237628.3A Pending CN107869245A (en) 2017-11-30 2017-11-30 Turnover type wall-connecting piece and its application method

Country Status (1)

Country Link
CN (1) CN107869245A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605677A (en) * 2021-09-02 2021-11-05 重庆万力新材料有限公司 Wall connecting piece for building construction and use method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080179477A1 (en) * 2007-01-31 2008-07-31 Regency Innovations, Llc Scaffolding securement system
CN202644967U (en) * 2012-07-11 2013-01-02 陕西建工集团第十建筑工程有限公司 Scaffold tool type wall connecting piece
CN203097263U (en) * 2013-03-18 2013-07-31 平煤神马建工集团有限公司土建处 Standardized revolving scaffolding connecting tube
CN203891449U (en) * 2014-06-13 2014-10-22 中建四局第一建筑工程有限公司 Wall connecting piece for wall connection of scaffold
CN206245709U (en) * 2016-03-04 2017-06-13 中建三局第三建设工程有限责任公司 A kind of outrigger wall-connecting piece

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080179477A1 (en) * 2007-01-31 2008-07-31 Regency Innovations, Llc Scaffolding securement system
CN202644967U (en) * 2012-07-11 2013-01-02 陕西建工集团第十建筑工程有限公司 Scaffold tool type wall connecting piece
CN203097263U (en) * 2013-03-18 2013-07-31 平煤神马建工集团有限公司土建处 Standardized revolving scaffolding connecting tube
CN203891449U (en) * 2014-06-13 2014-10-22 中建四局第一建筑工程有限公司 Wall connecting piece for wall connection of scaffold
CN206245709U (en) * 2016-03-04 2017-06-13 中建三局第三建设工程有限责任公司 A kind of outrigger wall-connecting piece

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605677A (en) * 2021-09-02 2021-11-05 重庆万力新材料有限公司 Wall connecting piece for building construction and use method thereof

Similar Documents

Publication Publication Date Title
CN203701562U (en) Tool scaffold wall connecting piece
CN103122696B (en) Cast-in-place concrete floor gage controller and method thereof
CN203441100U (en) Formwork structure of constructional column
CN202627475U (en) Scaffold wall connecting member
CN107762139A (en) Cast-in-place concrete haunch wall aluminium alloy chamfering formwork supporting adn fixing device and method
CN111236647A (en) Constructional column oblique split bolt and construction method of fixed template thereof
CN206289945U (en) A kind of assembled Portable safety crosshead
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN106223597A (en) Detachable tapered cup nut wall-connecting piece and construction method thereof
CN107869245A (en) Turnover type wall-connecting piece and its application method
US20140345589A1 (en) Peeling device
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN109958281A (en) Reinforcing device for building construction and application
CN107447975A (en) Exterior wall scaffold tapered cup nut wall-connecting piece
CN207999071U (en) A kind of wall column root concrete capping tools
CN207569004U (en) A kind of hanger fixing device of a Preembedded
CN205990753U (en) Exterior wall scaffold tapered cup nut wall-connecting piece
CN201714093U (en) Turn-around tie bolt used in construction of concrete wall form
CN201103240Y (en) Expansion type drawknot screw
CN212002299U (en) Oblique split bolt for constructional column
CN204728475U (en) A kind of secondary structure steel tie bar embedded part device
CN203891449U (en) Wall connecting piece for wall connection of scaffold
CN105735630A (en) Fixing method for steel beam
CN206928668U (en) A kind of sleeve pipe erector
CN206616851U (en) A kind of wall attaching parts of steel pipe scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination