CN204266572U CN201420751944.8U CN201420751944U CN204266572U CN 204266572 U CN204266572 U CN 204266572U CN 201420751944 U CN201420751944 U CN 201420751944U CN 204266572 U CN204266572 U CN 204266572U
Authority
CN
China
Prior art keywords
threaded screw
wall
screw rod
square
shaped fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420751944.8U
Other languages
Chinese (zh)
Inventor
陈霞
陈敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN201420751944.8U priority Critical patent/CN204266572U/en
Application granted granted Critical
Publication of CN204266572U publication Critical patent/CN204266572U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型涉及一种脚手架连墙件。本实用新型它包括L形固定板、金属管、螺纹丝杆、PVC套管、两个锁紧螺母以及两块方形垫片;所述PVC套管套设于螺纹丝杆上,方形垫片上开设有通孔,两块方形垫片分别通过通孔穿设于螺纹丝杆的两端;L形固定板的纵向板上开设有钻孔,L形固定板通过钻孔固定于螺纹丝杆的一端部且位于方形垫片外侧,所述L形固定板的横向板与金属管的一端相固定连接;两个锁紧螺母分别用于将螺纹丝杆两端的方形垫片及L形固定板固定在螺纹丝杆上,本实用新型的优点在于:1)结构简单、拆装方便;2)安全性能良好、质量有保证;3)可多次周转使用;4)减少墙体修补工作量与工作难度。

The utility model relates to a scaffold connecting wall piece. The utility model includes an L-shaped fixing plate, a metal pipe, a threaded screw rod, a PVC sleeve, two lock nuts and two square gaskets; the PVC sleeve is sleeved on the threaded screw rod and the square gasket There are through holes, and two square gaskets are respectively pierced on both ends of the threaded screw through the through holes; the longitudinal plate of the L-shaped fixing plate is drilled, and the L-shaped fixing plate is fixed on the threaded screw through the holes. One end is located outside the square washer, the transverse plate of the L-shaped fixing plate is fixedly connected with one end of the metal pipe; two lock nuts are respectively used to fix the square washer and the L-shaped fixing plate at both ends of the threaded screw rod On the threaded screw, the utility model has the following advantages: 1) simple structure, convenient disassembly and assembly; 2) good safety performance, guaranteed quality; 3) can be used repeatedly; 4) reduce the workload and work of wall repair difficulty.

Description

脚手架连墙件Scaffolding wall parts

技术领域technical field

本实用新型涉及一种脚手架连墙件。The utility model relates to a scaffold connecting wall piece.

背景技术Background technique

传统的脚手架连墙件包括预埋钢管法、后锚固法、预埋铁板法以及预埋钢筋法,但是经实际分析表明这些常用的脚手架连墙件的缺点大于优点,如预埋钢管法,它不仅成本高、拆卸麻烦、封堵洞口有严重的渗水隐患,而且它在拆除时常用气割,这不利于防火;此外,后锚固法、预埋铁板法以及预埋钢筋法也存在诸如成本高,周转使用率低,并且有安全与质量隐患的缺点。因此,随着建筑技术的不断革新,绿色施工的着力推动,需要开发一种不仅安拆方便、安全、质量有保证,而且又可多次周转使用的工具式连墙件。Traditional scaffolding wall parts include pre-embedded steel pipe method, post-anchoring method, pre-embedded iron plate method and pre-embedded steel bar method, but actual analysis shows that the disadvantages of these commonly used scaffolding wall parts outweigh the advantages, such as pre-embedded steel pipe method, Not only is it costly, it is troublesome to dismantle, and there is a serious hidden danger of water seepage when the hole is blocked, but also gas cutting is often used during demolition, which is not conducive to fire protection; High, low turnover utilization rate, and has the disadvantages of safety and quality hidden dangers. Therefore, with the continuous innovation of building technology and the vigorous promotion of green construction, it is necessary to develop a tool-type wall connecting piece that is not only convenient to install and disassemble, safe, and guaranteed in quality, but also can be used repeatedly.

发明内容Contents of the invention

本实用新型的目的在于提供一种拆装方便、安全、质量有保证,而且又可多次周转使用的工具式脚手架连墙件。The purpose of the utility model is to provide a tool-type scaffolding wall part which is convenient for disassembly and assembly, safe and guaranteed in quality, and can be used repeatedly.

本实用新型的目的通过如下技术方案实现:一种脚手架连墙件,其特征在于:它包括L形固定板、金属管、螺纹丝杆、PVC套管、两个锁紧螺母以及两块方形垫片;The purpose of this utility model is achieved through the following technical solutions: a scaffold wall piece, characterized in that it includes an L-shaped fixing plate, a metal pipe, a threaded screw, a PVC sleeve, two lock nuts and two square pads piece;

所述PVC套管套设于螺纹丝杆上,方形垫片上开设有通孔,两块方形垫片分别通过通孔穿设于螺纹丝杆的两端;L形固定板的纵向板上开设有钻孔,L形固定板通过钻孔固定于螺纹丝杆的一端部且位于方形垫片外侧,所述L形固定板的横向板与金属管的一端相固定连接;两个锁紧螺母分别用于将螺纹丝杆两端的方形垫片及L形固定板固定在螺纹丝杆上。The PVC sleeve is sleeved on the threaded screw rod, and a through hole is opened on the square gasket, and two square gaskets are respectively pierced through the through holes at both ends of the threaded screw rod; the longitudinal plate of the L-shaped fixing plate is provided with There is a drilling hole, and the L-shaped fixing plate is fixed on one end of the threaded screw rod through the drilling hole and is located outside the square gasket. The transverse plate of the L-shaped fixing plate is fixedly connected with one end of the metal pipe; two lock nuts are respectively It is used to fix the square gaskets and L-shaped fixing plates at both ends of the threaded screw on the threaded screw.

较之现有技术而言,本实用新型的优点在于:1)本实用新型结构简单、拆装方便;2)本实用新型安全性能良好、质量有保证;3)本实用新型可多次周转使用,体现了环保节能的优点;4)本实用新型对于不同类型的钢筋混凝土建筑物外墙脚手架搭设,连墙件系统适应性强,根据建筑物结构类型的不同形式,实现简单灵活地布置,可最大限度地减小连墙件的布置对工程施工的影响,也可减少墙体修补工作量与工作难度;5)本实用新型除后可以回收和反复周转使用,不产生废料,连墙件在使用完成后拆卸方便,连墙件对墙体结构造成的影响有很大降低,占用面积仅为垫片的面积,即100×100mm2,面积很小,对后序装饰施工影响小。Compared with the prior art, the utility model has the following advantages: 1) the utility model is simple in structure and convenient to disassemble; 2) the utility model has good safety performance and guaranteed quality; 3) the utility model can be used repeatedly , which embodies the advantages of environmental protection and energy saving; 4) The utility model has strong adaptability to the erection of scaffolding on the outer wall of different types of reinforced concrete buildings, and the wall connecting system can be easily and flexibly arranged according to different types of building structures. Minimize the impact of the layout of the wall-connecting parts on the engineering construction, and also reduce the workload and difficulty of wall repair; 5) The utility model can be recycled and used repeatedly after removal, without generating waste, and the wall-connecting parts It is easy to disassemble after use, and the impact of the wall parts on the wall structure is greatly reduced. The occupied area is only the area of the gasket, that is, 100×100mm 2 , which is very small and has little impact on the subsequent decoration construction.

附图说明Description of drawings

图1是本实用新型一种实施例的结构示意图。Fig. 1 is a schematic structural view of an embodiment of the utility model.

图2是本实用新型一种实施例的使用状态示意图。Fig. 2 is a schematic diagram of the use state of an embodiment of the utility model.

图3是本实用新型一种实施例受力计算简图。Fig. 3 is a schematic diagram of force calculation of an embodiment of the utility model.

图4是本实用新型一种实施例受力计算结果简图。Fig. 4 is a schematic diagram of force calculation results of an embodiment of the present invention.

图5是本实用新型与脚手架配合使用的一种实施例结构示意图。Fig. 5 is a structural schematic diagram of an embodiment of the utility model used in conjunction with scaffolding.

标号说明:1金属管、2L形固定板、3螺纹丝杆、4方形垫片、5PVC套管、6内主杆、7外主杆、8抛撑、9扣件、10待施工钢筋混凝土板、11现浇混凝土块、12锁紧螺母。Description of labels: 1 metal pipe, 2 L-shaped fixed plate, 3 threaded screw rod, 4 square gasket, 5 PVC casing, 6 inner main rod, 7 outer main rod, 8 throwing brace, 9 fastener, 10 reinforced concrete plate to be constructed , 11 cast-in-place concrete blocks, 12 lock nuts.

具体实施方式Detailed ways

下面结合说明书附图和实施例对本实用新型内容进行详细说明:Below in conjunction with description accompanying drawing and embodiment the utility model content is described in detail:

如图1所示:一种脚手架连墙件,它包括L形固定板2、金属管1、螺纹丝杆3、PVC套管5、两个锁紧螺母12以及两块方形垫片4;As shown in Figure 1: a scaffolding wall piece, which includes an L-shaped fixing plate 2, a metal pipe 1, a threaded screw 3, a PVC casing 5, two lock nuts 12 and two square gaskets 4;

所述PVC套管5套设于螺纹丝杆3上,方形垫片4上开设有通孔,两块方形垫片4分别通过通孔穿设于螺纹丝杆3的两端;L形固定板2的纵向板上开设有钻孔,L形固定板2通过钻孔固定于螺纹丝杆3的一端部且位于方形垫片4外侧,所述L形固定板2的横向板与金属管1的一端相固定连接;两个锁紧螺母12分别用于将螺纹丝杆3两端的方形垫片4及L形固定板2固定在螺纹丝杆3上。The PVC casing 5 is sleeved on the threaded screw rod 3, and a through hole is provided on the square gasket 4, and two square gaskets 4 are respectively set on the two ends of the threaded screw rod 3 through the through holes; the L-shaped fixing plate 2 is provided with a drill hole on the longitudinal plate, and the L-shaped fixed plate 2 is fixed on one end of the threaded screw rod 3 through the drill hole and is located outside the square gasket 4. The transverse plate of the L-shaped fixed plate 2 and the metal pipe 1 One end is fixedly connected; two locking nuts 12 are respectively used to fix the square gasket 4 and the L-shaped fixing plate 2 at both ends of the threaded screw 3 on the threaded screw 3 .

所述L形固定板2为等边角钢。The L-shaped fixing plate 2 is an equilateral angle steel.

所述PVC套管5做预留孔用,该脚手架连墙件在安装时,先在墙体或钢筋混凝土板中预埋PVC套管5,然后将螺纹丝3杆穿过PVC套管5.The PVC casing 5 is used as a reserved hole. When the scaffolding wall is installed, the PVC casing 5 is pre-embedded in the wall or the reinforced concrete slab, and then the threaded wire 3 is passed through the PVC casing 5.

本实用新型与扣件9配合使用,采用扣件9将连墙件与脚手架内、外主杆件连接,构成脚手架与建筑物钢筋混凝土墙体(梁、柱等)水平连接的刚性连墙件系统。The utility model is used in conjunction with the fastener 9, and the fastener 9 is used to connect the wall part with the inner and outer main rods of the scaffold to form a rigid wall part for the horizontal connection between the scaffold and the reinforced concrete wall (beam, column, etc.) of the building. system.

实施例1Example 1

1)螺纹丝杆1:选择Q235钢材,直径20mm,长50cm,该螺纹丝杆1采用梯形螺纹,该螺纹丝杆1可降低磨损程度,同时可循环使用,经济成本较低。1) Threaded screw 1: choose Q235 steel material, diameter 20mm, length 50cm, the threaded screw 1 adopts trapezoidal thread, the threaded screw 1 can reduce the degree of wear, and can be recycled at the same time, the economic cost is low.

2)方形垫片:尺寸为100mm×100mm,厚度为8mm,中心开有圆孔,孔径22mm,起到增加受压面积的作用,减少墙体的损坏。2) Square gasket: the size is 100mm×100mm, the thickness is 8mm, there is a round hole in the center, the hole diameter is 22mm, which can increase the compression area and reduce the damage of the wall.

3)锁紧螺母12:与螺纹丝杆锚固件配套使用分别置于内外墙面加固螺纹丝杆。3) Lock nut 12: it is used together with threaded screw anchors and is respectively placed on the inner and outer walls to reinforce the threaded screw.

4)连墙杆件:连墙杆件采用L形固定板(2)即等边角钢与金属管1焊接组成,焊缝饱满,并按三级焊缝验收标准进行了检查验收,根据试验测试确定所用的等边角钢采用Q 235钢,等边角钢型号L63×63×5,板厚不小于5mm,钻孔孔径d=22mm,金属管1与等边角钢的钢板焊接处焊缝应饱满,焊缝厚度不小于3.5mm,即能满足单个扣件9的抗拔力需要。钢管采用48.3×3.6,标准长度为1.5m,为兼顾小横杆,其质量符合GB/T700《碳素结构钢》的规定,等边角钢质量符合GB/T9787-1988的规定。5PVC套管:做预留孔用,锯末,填实PVC管。4) Connecting wall rods: The connecting wall rods are composed of L-shaped fixed plates (2), that is, equilateral angle steel and metal pipe 1. Make sure that the equilateral angle steel used is Q 235 steel, the type of equilateral angle steel is L63×63×5, the thickness of the plate is not less than 5mm, the diameter of the drilling hole is d=22mm, and the welding seam of the metal pipe 1 and the steel plate of the equilateral angle steel should be full. The thickness of the weld seam is not less than 3.5 mm, which can meet the pullout resistance requirement of a single fastener 9 . The steel pipe adopts 48.3×3.6, and the standard length is 1.5m. In order to take into account the small horizontal bar, its quality conforms to the provisions of GB/T700 "Carbon Structural Steel", and the quality of equilateral angle steel conforms to the provisions of GB/T9787-1988. 5PVC casing: used for reserved holes, sawdust, and filled PVC pipes.

本实用新型在制作过程中,每个部件都按设计尺寸进行制作,以本系统标准连墙杆为例,风荷载通过内、外立杆由扣件9传递至连墙件,并假设扣件9均达到其抗滑承载设计值,即8kN,该荷载传递至连墙杆形成的偏心弯矩值为0.44kN·m;连墙杆系统由螺栓的拉剪作用及等边角钢的橇力作用形成连墙杆与建筑物可靠构件连接节点的刚性,并保守考虑扣件9节点为铰接点,其受力计算简图如图3所示。采用力学方法可解得各节点荷载(见图4)。In the production process of the utility model, each part is manufactured according to the design size. Taking the standard connecting wall rod of this system as an example, the wind load is transmitted to the connecting wall part by the fastener 9 through the inner and outer vertical rods, and the fastener is assumed 9 have reached the design value of its anti-sliding load, that is, 8kN, and the eccentric bending moment formed by the load transferred to the connecting wall rod is 0.44kN m; Form the rigidity of the connection node between the wall rod and the reliable component of the building, and conservatively consider the joint 9 of the fastener as the hinge point. The schematic diagram of its force calculation is shown in Figure 3. The mechanical method can be used to solve the load of each node (see Figure 4).

由图4所示,Φ16mm螺纹丝杆受到轴力为16k N、剪力为0.636kN的拉(压)剪作用,显然满足承载能力要求;Φ48mm×3.6mm金属管连墙杆件受到的轴力最大值发生在b~c段,为16kN,并受到最大弯矩值为0.17kN·m的作用,为压弯构件;B节点为等边角钢与金属管的焊接节点,焊缝受到的压力为16kN,受到的弯矩0.00465kN·m。As shown in Figure 4, the Φ16mm threaded screw is subjected to the tensile (compressive) shear action with an axial force of 16k N and a shear force of 0.636kN, which obviously meets the load-bearing capacity requirements; The maximum value occurs in the b~c section, which is 16kN, and is subjected to the action of the maximum bending moment value of 0.17kN m, which is a compression bending member; the B node is the welding node between the equilateral angle steel and the metal pipe, and the pressure on the weld is 16kN, the bending moment received is 0.00465kN·m.

1)对于连墙杆件金属管:1) For the metal pipe of the wall member:

λ=1000×1.5/15.8=95,Φ=0.626,λ=1000×1.5/15.8=95, Φ=0.626,

对于连墙杆件金属管与等边角钢焊缝节点:For wall member metal pipe and equilateral angle steel weld joints:

&sigma;&sigma; == NN AA ++ Mm WW == 1600016000 330330 ++ 0.004650.00465 &times;&times; 1010 66 39803980 == 5050 NN // mmmm 22 << 160160 NN // mmmm 22 ..

以上验算表明,本组合工具式连墙件系统具有良好的承载性能。The above calculations show that the combined tool type wall connecting system has good bearing performance.

2)连墙件所受的轴向力:2) Axial force on the wall parts:

连墙件的轴向力计算值按照公式计算:Nl=Nlw+NoThe calculation value of the axial force of the connecting wall is calculated according to the formula: Nl=Nlw+No

其中:Nlw——风荷载产生的连墙件轴向力设计值(kN),应按照下式计算:Where: Nlw——the design value of the axial force of the connecting wall part (kN) generated by the wind load, which shall be calculated according to the following formula:

Nlw=1.4×wk×AwNlw=1.4×wk×Aw

wk——风荷载标准值,wk=0.351kN/m2;wk——wind load standard value, wk=0.351kN/m2;

Aw——每个连墙件的覆盖面积内脚手架外侧的迎风面积,Aw=3.0×4.5=13.5m2;Aw——the windward area outside the scaffolding within the coverage area of each wall piece, Aw=3.0×4.5=13.5m2;

No——连墙件约束脚手架平面外变形所产生的轴向力(kN);No=5.00No——the axial force (kN) generated by the out-of-plane deformation of the scaffold constrained by the wall; No=5.00

经计算得到Nlw=6.63kN,连墙件轴向力计算值Nl=11.63kN<16KN,故可以满足承载力要求。After calculation, Nlw=6.63kN, and the calculated value of the axial force of the wall part Nl=11.63kN<16KN, so it can meet the bearing capacity requirements.

3)连墙杆件安全性验算:3) Safety check of connecting wall members:

采用Φ48×3.6钢管时,连墙杆件采用两只直角扣件9锁住脚手架内外两立杆,When Φ48×3.6 steel pipes are used, two right-angle fasteners 9 are used to lock the two vertical poles inside and outside the scaffold for the connecting wall rods.

根据连墙件杆件强度要求,轴向力设计值Nf1=0.85AC[f]According to the strength requirements of the connecting wall members, the design value of axial force Nf1=0.85AC[f]

根据连墙件杆件稳定性要求,轴向力设计值Nf2=0.85ФA[f]According to the stability requirements of the connecting wall member, the design value of the axial force Nf2=0.85ФA[f]

其中Ф——轴心受压的立杆的稳定系数,由长细比:λ=L/i=30/1.59=85,查表,稳定系数Φ=0.95;净截面积AC=5.06cm2,毛截面积A=26.10cm2,[f]=205N/mm。Among them Ф - the stability coefficient of the vertical rod under axial compression, from the slenderness ratio: λ = L/i = 30/1.59 = 85, look up the table, the stability coefficient Φ = 0.95; the net cross-sectional area AC = 5.06cm2, the gross Cross-sectional area A = 26.10cm2, [f] = 205N/mm.

经计算得Nf1=88.17KN>N1,连墙件的设计满足强度设计要求,It is calculated that Nf1=88.17KN>N1, the design of the wall parts meets the strength design requirements,

经计算得Nf2=432KN>N1,连墙件的设计满足稳定性设计要求,It is calculated that Nf2=432KN>N1, the design of the wall parts meets the stability design requirements,

即连墙杆采用Φ48×3.6钢管时,其稳定性承载力足够。That is to say, when the connecting wall rod adopts Φ48×3.6 steel pipe, its stability and bearing capacity are sufficient.

4)扣件9安全性验算:4) Check the safety of the fastener 9:

该连墙件采用2只扣件锁住脚手架内外两立杆,而且连墙件偏离主节点的距离不应大于300mm,大于该值时可增加斜杆作支撑,从《脚手架规范》中查得,每个扣件9的承载力为8kN,那么扣件9的可承受能力:2×8=16kN>N1=11.63kN,该扣件9安全。The wall-connecting parts use 2 fasteners to lock the two vertical poles inside and outside the scaffold, and the distance between the wall-connecting parts and the main node should not be greater than 300mm. If it is greater than this value, the inclined rods can be added for support. Check it from the "Scaffold Specifications" , the bearing capacity of each fastener 9 is 8kN, then the bearing capacity of the fastener 9 is: 2×8=16kN>N1=11.63kN, the fastener 9 is safe.

5)等边角钢安全性验算5) Safety checking calculation of equilateral angle steel

热轧等边角钢63×63×5的钻孔的孔径d=22mm,The hole diameter of the hot-rolled equilateral angle steel 63×63×5 is d=22mm,

有效抗拉截面:(63-22)×5=205mm2Effective tensile section: (63-22)×5=205mm2

该等边角钢的抗拉强度设计值为:205×205=42.03kN>N1=11.63kN,满足安全要求。The design value of the tensile strength of the equilateral angle steel is: 205×205=42.03kN>N1=11.63kN, which meets the safety requirements.

6)焊缝安全性验算6) Weld safety check calculation

该等边角钢与钢管采用搭接的焊接方法,采用E43型焊条,手工电弧焊hf=5mm,已知焊条的容许抗拉、抗剪、抗压强度[ftw]=160Mpa,该连墙件所受拉力N1=11.63kN。ftw=N1/(0.7×hf×ΣLw)=11.63×103/(0.7×5×63×2)=26.37Mpa<[ftw]=160MpaThe equilateral angle steel and the steel pipe adopt lap joint welding method, use E43 type electrode, manual arc welding hf=5mm, and the allowable tensile, shear and compressive strength [ftw] of the electrode is known to be 160Mpa. Tensile force N1 = 11.63kN. ftw=N1/(0.7×hf×ΣLw)=11.63×103/(0.7×5×63×2)=26.37Mpa<[ftw]=160Mpa

实施效果:通过以上的验算,该连墙件构造体系符合建筑物外墙脚手架的安全要求,受力清晰,性能可靠。因为本实用新型在制作过程中,经承载力计算、轴向力计算可知,本实用新型具有良好的承载性能。Implementation effect: Through the above calculations, the structural system of the wall parts meets the safety requirements of the scaffolding on the exterior wall of the building, with clear force and reliable performance. Because the utility model has good load-bearing performance through bearing capacity calculation and axial force calculation in the manufacturing process.

本实用新型的安装:Installation of the utility model:

1、若建筑物外墙墙体为钢筋混凝土结构,在钢筋混凝土外墙(梁、柱等)施工时,该脚手架连墙件安装利用剪力墙、梁柱模板安装时预埋直径Ф25的PVC套管,待混凝土达到一定强度后,将该连墙件的螺纹丝杆穿过PVC套管,内侧伸出剪力墙不小于10cm,然后用方型垫片和锁紧螺母固定紧,外侧金属管贴紧混凝土剪力墙外墙壁,用锁紧螺母将螺纹丝杆与连墙件的等边角钢固定紧,采用扣件9将连墙件与脚手架内主杆6、外主杆7件连接,构成脚手架与建筑物钢筋混凝土墙体(梁、柱等)水平连接的刚性连墙件系统。1. If the exterior wall of the building is a reinforced concrete structure, when the reinforced concrete exterior wall (beams, columns, etc.) Sleeve, after the concrete reaches a certain strength, pass the threaded screw rod of the wall part through the PVC sleeve, and the inner side protrudes from the shear wall for no less than 10cm, and then fix it tightly with square gaskets and lock nuts, and the outer metal The pipe is tightly attached to the outer wall of the concrete shear wall, and the threaded screw rod and the equilateral angle steel of the connecting wall piece are fixed tightly with lock nuts, and the connecting wall piece is connected with the inner main rod 6 and the outer main rod 7 of the scaffold with fasteners 9 , to form a rigid wall-connecting system for the horizontal connection between scaffolding and reinforced concrete walls (beams, columns, etc.) of buildings.

2、若建筑物外墙墙体为砌筑结构,当连墙件设置部位无钢筋混凝土构造柱或圈梁(如图2所示)时,墙体内设置长度与宽度均≥200mm的现浇混凝土块11,在该现浇混凝土块11内预埋直径Ф25的PVC套管,而后设穿墙螺纹丝杆,当连墙件设置部位存在钢筋混凝土构造柱或圈梁时,直接在构造柱或圈梁内预埋直径Ф25的PVC套管,而后设穿墙螺纹丝杆,待上述混凝土达到一定强度后,将穿墙螺纹丝杆与连墙件角钢端采用螺纹丝杆连接,采用扣件9将连墙件与脚手架内主杆6、外主杆7件连接,构成脚手架与建筑物墙体水平连接的刚性连墙件系统。2. If the exterior wall of the building is a masonry structure, when there is no reinforced concrete structural column or ring beam (as shown in Figure 2) in the installation part of the connecting wall, the cast-in-place with a length and width of ≥200mm should be installed in the wall. Concrete block 11, pre-embed a PVC casing with a diameter of Ф25 in the cast-in-place concrete block 11, and then set a threaded screw rod through the wall. A PVC casing with a diameter of Ф25 is pre-buried in the ring beam, and then a threaded screw rod is installed through the wall. After the above-mentioned concrete reaches a certain strength, the threaded screw rod through the wall is connected with the angle steel end of the wall fitting with a threaded screw rod, and a fastener 9 is used. The wall connecting parts are connected with 6 inner main rods and 7 outer main rods of the scaffold to form a rigid wall connecting part system for the horizontal connection between the scaffold and the building wall.

3、建筑物楼层钢筋混凝土板结构施工时,在现浇混凝土板内预埋直径Ф25的PVC套管,而后设穿板螺纹丝杆,待上述混凝土达到一定强度后,将穿板螺纹丝杆与连墙件角钢端采用螺纹丝杆连接,采用扣件9将连墙件与脚手架内主杆6、外主杆7件连接,构成脚手架与建筑物结构板水平连接的刚性连墙件系统。3. During the construction of the reinforced concrete slab structure on the building floor, a PVC casing with a diameter of Ф25 is pre-buried in the cast-in-situ concrete slab, and then the threaded screw rod is installed. After the above-mentioned concrete reaches a certain strength, the threaded screw rod and the The angle steel ends of the wall parts are connected by threaded screw rods, and the wall parts are connected with the inner main rod 6 and the outer main rod 7 of the scaffold by fasteners 9 to form a rigid wall part system for the horizontal connection between the scaffold and the structural plate of the building.

4、初始搭设脚手架时,如在悬挑支架上初始搭设脚手架,或建筑物的层高较高、跨度较大时,或者对于整体提升脚手架提升后最上一层超高的架段,水平刚性连墙件系统无法布置,此时在建筑物楼层钢筋混凝土板结构施工时,在现待施工钢筋混凝土板10内预埋直径Ф25的PVC套管,而后设穿板螺纹丝杆,待上述混凝土达到一定强度后,将穿板螺纹丝杆与连墙件角钢端采用锁紧螺母连接,采用钢管与扣件9将连墙件与脚手架内主杆6、外主杆7件斜向连接,构成脚手架与建筑物结构板刚性抛撑8系统或斜向刚性连墙件系统如图3所示,该刚性抛撑8系统或斜向刚性连墙件系统可随结构或二次结构的施工进展,按先增后换的原则,转换为与建筑物外墙结构水平连接的刚性连墙件系统。4. When initially erecting scaffolding, such as initially erecting scaffolding on cantilevered supports, or when the building has a high floor height and a large span, or for the superhigh section of the uppermost floor after the overall lifting of the scaffolding, the horizontal rigid connection The wall system cannot be arranged. At this time, when the reinforced concrete slab structure is being constructed on the building floor, a PVC casing with a diameter of Ф25 is embedded in the reinforced concrete slab 10 to be constructed, and then a threaded screw rod is installed through the plate. After the strength is achieved, connect the threaded screw rod through the plate and the angle steel end of the wall fitting with a lock nut, and connect the wall fitting with the inner main rod 6 and the outer main rod 7 of the scaffold obliquely by using a steel pipe and a fastener 9 to form a scaffold and The rigid throwing brace 8 system or the oblique rigid wall connecting system of the building structural plate is shown in Fig. The principle of replacement after addition is transformed into a rigid wall connection system that is horizontally connected to the exterior wall structure of the building.

本实用新型的拆除:The removal of the utility model:

在外墙装饰完毕后的扣件9式钢管外脚手架拆除作业中,连墙件的拆除申请人也很重视,连墙件随脚手架逐层、同步进行拆除,严禁先将连墙件整层拆除后再拆脚手架,按照规定,在脚手架分段拆除时,其拆除高差不大于2步。During the removal of the fastener 9-type steel pipe exterior scaffolding after the exterior wall decoration is completed, the applicant also attaches great importance to the removal of the wall parts. The wall parts are removed layer by layer and synchronously with the scaffolding. It is strictly forbidden to remove the entire layer of the wall parts first. Then remove the scaffolding, according to regulations, when the scaffolding is dismantled in sections, the removal height difference shall not be greater than 2 steps.

1)脚手架连墙件体系拆除时,先拆除与立杆连接的扣件9;1) When the scaffolding wall system is removed, first remove the fastener 9 connected to the pole;

2)拆除等边角钢锚板上的锁紧螺母、垫片、螺纹丝杆、连墙杆件;2) Remove the lock nuts, gaskets, threaded screws, and connecting wall rods on the equilateral angle steel anchor plate;

3)连墙杆件、扣件9和螺纹丝杆等拆除后进行清理、保养集中储放,以备下次使用。3) Clean up, maintain and store centrally after the connecting wall rods, fasteners 9 and threaded screw rods are removed for next use.

4)连墙体系拆除干净后,凿除PVC套管,采用水泥砂浆将墙体修补平整。4) After the connecting wall system is removed, the PVC sleeve is chiseled off, and the wall is repaired and leveled with cement mortar.

实施效果:该组合工具式脚手架连墙件体系拆除后可以回收和反复周转使用,不产生废料,连墙件在使用完成后拆卸方便,连墙件对墙体结构造成的影响有很大降低,占用面积仅为垫片的面积,即100×100mm2,面积很小,对后序装饰施工影响小。Implementation effect: The combined tool-type scaffolding wall system can be recycled and used repeatedly after dismantling, without generating waste. The wall parts are easy to disassemble after use, and the impact of the wall parts on the wall structure is greatly reduced. The occupied area is only the area of the gasket, that is, 100×100mm 2 , which is very small and has little impact on subsequent decoration construction.

Claims (1)

1. a scaffold wall connecting piece, is characterized in that: it comprises L shape fixed head (2), metal tube (1), threaded screw rod (3), PVC sleeve pipe (5), two locking nuts (12) and two pieces of square washers (4);
Described PVC sleeve pipe (5) is sheathed on threaded screw rod (3), and (4) offer through hole to square washer, and two pieces of square washers (4) are arranged in the two ends of threaded screw rod (3) respectively by through hole; Longitudinal plate of L shape fixed head (2) offers boring, L shape fixed head (2) is fixed on an end of threaded screw rod (3) by boring and is positioned at square washer (4) outside, and the transverse plate of described L shape fixed head (2) and one end of metal tube (1) are fixedly connected; Two locking nuts (12) are respectively used to the square washer (4) at threaded screw rod (3) two ends and L shape fixed head (2) to be fixed on threaded screw rod (3).
CN201420751944.8U 2014-12-03 2014-12-03 Scaffold wall connecting piece Expired - Lifetime CN204266572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420751944.8U CN204266572U (en) 2014-12-03 2014-12-03 Scaffold wall connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420751944.8U CN204266572U (en) 2014-12-03 2014-12-03 Scaffold wall connecting piece

Publications (1)

Publication Number Publication Date
CN204266572U true CN204266572U (en) 2015-04-15

Family

ID=52801444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420751944.8U Expired - Lifetime CN204266572U (en) 2014-12-03 2014-12-03 Scaffold wall connecting piece

Country Status (1)

Country Link
CN (1) CN204266572U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986286A (en) * 2015-02-09 2016-10-05 李树宝 Novel electrolytic cell anode cassette fixture and special high temperature resistant greases thereof
CN108612097A (en) * 2018-05-04 2018-10-02 中建海峡建设发展有限公司 A kind of stake position centering technique of position centralising device and this of application position centralising device
CN115749244A (en) * 2022-10-28 2023-03-07 中建安装集团有限公司 Wall connecting piece for super-span large-storey-height building and construction process thereof
CN115749020A (en) * 2022-12-01 2023-03-07 广东世城精装建设股份有限公司 Building external wall heat-insulation anti-drop structure and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986286A (en) * 2015-02-09 2016-10-05 李树宝 Novel electrolytic cell anode cassette fixture and special high temperature resistant greases thereof
CN105986286B (en) * 2015-02-09 2018-03-16 李树宝 Novel electrolytic bath anode small box fastener and its special high temperature resistant lubricating grease
CN108612097A (en) * 2018-05-04 2018-10-02 中建海峡建设发展有限公司 A kind of stake position centering technique of position centralising device and this of application position centralising device
CN108612097B (en) * 2018-05-04 2020-05-22 中建海峡建设发展有限公司 Pile position centering device and pile position centering process applying same
CN115749244A (en) * 2022-10-28 2023-03-07 中建安装集团有限公司 Wall connecting piece for super-span large-storey-height building and construction process thereof
CN115749020A (en) * 2022-12-01 2023-03-07 广东世城精装建设股份有限公司 Building external wall heat-insulation anti-drop structure and construction method thereof
CN115749020B (en) * 2022-12-01 2023-09-08 广东世城精装建设股份有限公司 Building outer wall heat insulation anti-drop structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN110593419B (en) Node structure of assembled type through bolt unequal-altitude beam-square steel tube concrete column and manufacturing method
CN101949213B (en) Special support system of building structure deformed seam template
CN101886466B (en) Construction method for support structure of coal tower template for tamping type coke oven
CN101538939B (en) Construction Method of Preset Nut Type Steel Concrete Composite Column Formwork Fixing Device
CN106677336A (en) Connecting joint structure of square concrete filled steel tubular column and I-shaped section steel beam
CN205777424U (en) A kind of pull-up builder&#39;s jack support means being anchored in outside structure
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN211873350U (en) Assembled type through bolt unequal-height beam-square steel tube concrete column joint structure
CN204266572U (en) Scaffold wall connecting piece
CN106930531A (en) A kind of pull-up manomelia is encorbelmented the construction method of heavy frame
CN111962948A (en) A kind of concrete-filled steel tubular column-H-shaped steel beam-steel support-π-shaped connecting piece combined side column bottom node and method
CN111962952A (en) A kind of concrete-filled steel tubular column-H-shaped steel beam-steel support-π-shaped connecting piece combined middle column bottom node and method
CN110725525A (en) A kind of supporting device of prefabricated cantilever scaffold and its construction method
CN104295109B (en) Do not register one&#39;s residence balcony rapid reinforcement structure and construction method thereof in old community
CN210086553U (en) Dry-type connected precast concrete wall and foundation connection node
CN111851987B (en) A construction method for an attached short-limb I-beam flower basket tie-bar tie-type cantilever frame
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN210105298U (en) A formwork support system for walls at deformation joints
CN203654710U (en) Instrumental connecting tube for external wall scaffold shearing wall portion
CN211647306U (en) Floor carrier plate bearing structure with adjustable steel construction large-span
CN206245709U (en) A kind of outrigger wall-connecting piece
CN218990875U (en) Assembled triangular truss cantilever support frame system
CN103195235A (en) Design and calculation for detachable steel plate type steel fixture
CN206554483U (en) A kind of full fabricated scaffold is encorbelmented component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150415