- CN213683485U CN213683485U CN202021699577.3U CN202021699577U CN213683485U CN 213683485 U CN213683485 U CN 213683485U CN 202021699577 U CN202021699577 U CN 202021699577U CN 213683485 U CN213683485 U CN 213683485U
- Authority
- CN
- China
- Prior art keywords
- groove
- movable
- movable block
- fixedly connected
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 34
- 230000037431 insertion Effects 0.000 claims description 12
- 238000003780 insertion Methods 0.000 claims description 12
- 238000009434 installation Methods 0.000 abstract description 7
- 239000002131 composite material Substances 0.000 abstract description 4
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Images
Landscapes
- Fencing (AREA)
Abstract
The utility model discloses a building engineering construction rail, two mounts and the rail main part of setting between two mounts including vertical setting, the mount is close to the fixed block that one side fixedly connected with symmetry of rail main part set up, two connection inserts of the equal fixedly connected with in both sides of rail main part are equipped with the inserting groove on the fixed block, and connect the inserting block activity and peg graft in the inserting groove, the right side of mount is equipped with the activity groove, and activity inslot movable mounting has the movable block, and the right-hand member of movable block extends to the outside in activity groove, the bottom right side fixedly connected with reference column of movable block. The utility model discloses can make things convenient for the quick composite mounting between realization rail main part and the mount, and operate very simply, improve composite mounting's efficiency greatly to can fix the quick installation of whole rail subaerial, simple structure, the installation rate is fast, and the people of being convenient for install fixedly.
Description
Technical Field
The utility model relates to a building engineering technical field especially relates to a building engineering construction rail.
Background
The construction building fences are common on construction sites, are fence series which are set by taking earth pits excavated according to the basic altitude and the basic plane size as reference, are mainly used for foundation engineering, a plurality of constructors know the foundation pit construction building fences, the construction building fences are common on construction sites and have yellow-black phases and red-white phases, and striking yellow, red or white is helpful for reminding the constructors of safety, so that the construction building fences are indispensable building construction fences on various construction sites.
The construction fence net has the specification of 1.2 x 2m, the height of the column is 1.2 m, warning words and warning lines are coated on the surface of the handrail 1.2 x 2m (which can be defined according to drawing requirements), the construction image of a construction site is improved, and the construction fence, the edge-facing fence, the construction elevator protection door, the elevator wellhead protection door, the foundation pit edge-facing fence, the tower crane fence, the edge-facing guardrail, the distribution box protection frame, the stair standardized handrail, the edge-facing guardrail and the like are all necessary protection facilities for the prevention safety of the construction site.
However, in the existing construction fence for building engineering, the fence main body and the fixing frame are inconvenient for people to assemble and install, the assembly operation is troublesome, and the efficiency is low; the whole fence is not convenient for people to install and fix on the ground, and the use requirements of people cannot be met; therefore, the utility model provides a building engineering construction rail is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a construction fence for building engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a construction fence for building engineering comprises two vertically arranged fixing frames and a fence main body arranged between the two fixing frames, one side of the fixing frame close to the fence main body is fixedly connected with symmetrically arranged fixing blocks, two connecting inserting blocks are fixedly connected with both sides of the fence main body, inserting grooves are arranged on the fixing blocks, the connecting plug block is movably inserted in the inserting groove, the right side of the fixed frame is provided with a movable groove, a movable block is movably arranged in the movable groove, the right end of the movable block extends to the outside of the movable groove, the right side of the bottom of the movable block is fixedly connected with a positioning column, the top of the connecting insert block is provided with a positioning groove, the bottom of the positioning column movably penetrates into the inserting groove and is positioned and clamped in the positioning groove, the right side of the top of the movable block is also fixedly connected with a pull ring, and a clamp spring is fixedly connected between the movable block and the inner wall of the top of the movable groove; the bottom fixedly connected with ring flange of mount, and pass through expansion bolts between ring flange and the ground and install fixedly.
Preferably, still fixed warning sign that is provided with in the rail main part, and mark on the warning sign "being under construction, forbid strictly crossing".
Preferably, the movable groove is internally and fixedly connected with a fixing rod which is vertically arranged, and the clamp spring and the movable block are movably sleeved on the fixing rod.
Preferably, the movable block in the movable groove is provided with a movable hole, and the movable block is movably sleeved on the fixed rod through the movable hole.
Preferably, a sliding groove is formed in the inner wall of the left side of the movable groove, a sliding block is arranged at the left end of the movable block, and the sliding block is connected with the sliding groove in a sliding mode.
Preferably, a through hole is formed in the inner wall of the top of the inserting groove, and the positioning column movably penetrates through the through hole.
Compared with the prior art, the beneficial effects of the utility model are that:
in the utility model, the movable block is pulled upwards through the pull ring, the positioning column is moved out from the insertion groove when the movable block moves upwards, the clamp spring is extruded when the movable block moves upwards, then the connecting insertion block on the fence main body is inserted into the insertion groove, and finally the pull ring is loosened, the clamp spring resets, and under the elastic reaction of the clamp spring, the movable block and the positioning column can move downwards, and the bottom of the positioning column is clamped in the positioning groove, so that the combined installation between the fence main body and the fixing frame can be realized conveniently and quickly; in addition, the flange plate at the bottom of the fixing frame is fixedly connected with the ground through the expansion bolts, so that people can conveniently and quickly install and fix the whole fence on the ground, and the fixing frame is simple in structure and convenient for people to install and fix.
To sum up, the utility model discloses can make things convenient for the quick built-up mounting between realization rail main part and the mount, and operate very simply, improve the efficiency of built-up mounting greatly to can fix the quick installation of whole rail subaerial, simple structure, the installation rate is fast, and the people of being convenient for install fixedly.
Drawings
Fig. 1 is a schematic structural view of a construction fence for construction engineering provided by the present invention;
FIG. 2 is a schematic view of the present invention showing a part of the details thereof enlarged;
fig. 3 is an enlarged schematic structural view of a portion a in fig. 2 according to the present invention.
In the figure: the fence comprises a fence main body 1, a fixing frame 2, a flange plate 3, an expansion bolt 4, a ground 5, a warning board 6, a fixing block 7, a plug-in groove 70, a pull ring 71, a movable block 72, a positioning column 73, a positioning groove 74, a snap spring 75, a fixed rod 76, a movable groove 77, a sliding block 78 and a connecting plug 8.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a construction fence for building engineering comprises two vertically arranged fixed frames 2 and a fence main body 1 arranged between the two fixed frames 2, wherein one side of the fixed frame 2 close to the fence main body 1 is fixedly connected with symmetrically arranged fixed blocks 7, two sides of the fence main body 1 are fixedly connected with two connecting insertion blocks 8, the fixed blocks 7 are provided with insertion grooves 70, the connecting insertion blocks 8 are movably inserted in the insertion grooves 70, the right side of the fixed frame 2 is provided with a movable groove 77, a movable block 72 is movably arranged in the movable groove 77, the right end of the movable block 72 extends to the outside of the movable groove 77, the right side of the bottom of the movable block 72 is fixedly connected with a positioning column 73, the top of the connecting insertion block 8 is provided with a positioning groove 74, the bottom of the positioning column 73 movably penetrates into the insertion groove 70 and is positioned and clamped in the positioning groove 74, the right side of the top of the movable block 72 is also, a clamp spring 75 is fixedly connected between the movable block 72 and the inner wall of the top of the movable groove 77; the bottom fixedly connected with ring flange 3 of mount 2, and install fixedly through expansion bolts 4 between ring flange 3 and the ground 5. The utility model provides a building engineering construction rail, the composite mounting between realization rail main part 1 that can make things convenient for quick and mount 2, and the operation is very simple, has improved composite mounting's efficiency greatly to can fix the quick installation of whole rail on ground 5, simple structure, the installation rate is fast, and the people of being convenient for install fixedly.
Further, still be fixed on the rail main part 1 and be provided with warning sign 6, and mark on the warning sign 6 and be under construction, forbid the warning denoter of strideing across strictly.
Further, a fixed rod 76 vertically arranged is fixedly connected in the movable groove 77, and the clamp spring 75 and the movable block 72 are movably sleeved on the fixed rod 76.
Further, a movable hole is provided on the movable block 72 located in the movable groove 77, and the movable block 72 is movably sleeved on the fixed rod 76 through the movable hole.
Further, a sliding groove is formed in the inner wall of the left side of the movable groove 77, a sliding block 78 is arranged at the left end of the movable block 72, and the sliding block 78 is connected with the sliding groove in a sliding mode.
Furthermore, a through hole is formed in the inner wall of the top of the inserting groove 70, and the positioning column 73 movably penetrates through the through hole.
The utility model provides a building engineering construction rail, when carrying out aggregate erection to rail main part and mount 2, stimulate movable block 72 upwards through pull ring 71 earlier, make reference column 73 remove from inserting groove 70 again when movable block 72 shifts up, still extrude jump ring 75 when movable block 72 shifts up simultaneously, then insert connection inserted block 8 on rail main part 1 into inserting groove 70, at last loosen the pull ring again, jump ring 75 resets, under the elastic reaction of jump ring 75, can make movable block 72 and reference column 73 move down, and make the bottom of reference column 73 clamp in positioning groove 70 can, thereby can make things convenient for quick realization rail main part 1 and mount 2 between aggregate erection; thus, through the positioning matching of the positioning column 73 and the positioning groove 74, the connection insertion block 8 on the fence main body 1 and the fixed block 7 on the fixed frame 2 can be firmly combined and connected; in addition, the flange 3 at the bottom of the fixing frame 2 is fixedly connected with the ground 5 through the expansion bolts 4, so that people can conveniently and quickly install and fix the whole fence on the ground 5, and the rail fixing device is simple in structure and convenient for people to install and fix.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The building engineering construction fence comprises two vertically arranged fixed frames (2) and a fence main body (1) arranged between the two fixed frames (2), and is characterized in that one side of each fixed frame (2) close to the fence main body (1) is fixedly connected with symmetrically arranged fixed blocks (7), two sides of the fence main body (1) are fixedly connected with two connecting plug blocks (8), the fixed blocks (7) are provided with plug-in grooves (70), the connecting plug blocks (8) are movably plugged in the plug-in grooves (70), the right side of each fixed frame (2) is provided with a movable groove (77), a movable block (72) is movably arranged in each movable groove (77), the right end of each movable block (72) extends to the outside of the corresponding movable groove (77), the right side of the bottom of each movable block (72) is fixedly connected with a positioning column (73), and the top of each connecting plug block (8) is provided with a positioning groove (74), the bottom of the positioning column (73) movably penetrates into the insertion groove (70) and is positioned and clamped in the positioning groove (74), the right side of the top of the movable block (72) is also fixedly connected with a pull ring (71), and a clamp spring (75) is fixedly connected between the movable block (72) and the inner wall of the top of the movable groove (77); the bottom fixedly connected with ring flange (3) of mount (2), and pass through expansion bolts (4) between ring flange (3) and ground (5) and install fixedly.
2. The construction fence of building engineering according to claim 1, characterized in that a warning board (6) is further fixedly arranged on the fence body (1).
3. The construction fence of the building engineering as claimed in claim 1, wherein a vertically arranged fixing rod (76) is fixedly connected in the movable groove (77), and the clamp spring (75) and the movable block (72) are movably sleeved on the fixing rod (76).
4. The construction fence of building engineering according to claim 1 or 3, characterized in that the movable block (72) in the movable groove (77) is provided with a movable hole, and the movable block (72) is movably sleeved on the fixed rod (76) through the movable hole.
5. The construction fence of building engineering according to claim 1, characterized in that a sliding groove is arranged on the inner wall of the left side of the movable groove (77), a sliding block (78) is arranged at the left end of the movable block (72), and the sliding block (78) is connected with the sliding groove in a sliding manner.
6. The construction fence of building engineering as claimed in claim 1, wherein the inner wall of the top of the insertion groove (70) is provided with a through hole, and the positioning column (73) is movably penetrated through the through hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021699577.3U CN213683485U (en) | 2020-08-15 | 2020-08-15 | Building engineering construction rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021699577.3U CN213683485U (en) | 2020-08-15 | 2020-08-15 | Building engineering construction rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213683485U true CN213683485U (en) | 2021-07-13 |
Family
ID=76744060
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021699577.3U Expired - Fee Related CN213683485U (en) | 2020-08-15 | 2020-08-15 | Building engineering construction rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213683485U (en) |
-
2020
- 2020-08-15 CN CN202021699577.3U patent/CN213683485U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207160629U (en) | Spliced type constructor walking system | |
CN210507456U (en) | Standardized lower pedestrian crossing of hanging down of deep basal pit can have enough to meet need | |
CN213683485U (en) | Building engineering construction rail | |
CN212835882U (en) | Y-shaped steel structure upright column dome with two layers of galleries | |
CN208345549U (en) | A kind of additional elevator shaft structure of assembled being adapted to jack-up construction | |
CN111456346A (en) | Novel beam type stair are assembled in prefabrication of board structure of marking time | |
CN218406385U (en) | Detachable dewatering well platform | |
CN216662305U (en) | Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform | |
CN213597400U (en) | Elevator shaft | |
CN104499724B (en) | Edge protection fence | |
CN210563283U (en) | Rectangular column construction operation platform | |
CN204326565U (en) | Face frontier defense guardrail | |
CN216665096U (en) | Socket type shaping protective railing | |
CN216197121U (en) | Boundary guardrail connecting device for pedestrian passageway inside and outside subway engineering pit | |
CN218090879U (en) | Suspension type plate buckle berm | |
CN217811596U (en) | H-shaped steel combined base for light house | |
CN215443451U (en) | Assembled decoration integrated enclosure wall unit | |
CN217920935U (en) | Passage switching device for assembly type construction elevator | |
CN213063218U (en) | Metal net protective fence | |
CN214299163U (en) | Lifting type lifting frame for micro pipe jacking operation | |
CN218175683U (en) | Anti-collision isolation pier and anti-collision isolation flower box | |
CN213538657U (en) | Assembled municipal pedestrian bridge | |
CN211396523U (en) | Assembled supports construction platform | |
CN219795129U (en) | Combined type building site gate capable of being turned over | |
CN217998886U (en) | Narrow space climbing platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210713 |
|
CF01 | Termination of patent right due to non-payment of annual fee |