CN213391144U - Internal top and external climbing type formwork construction platform for construction of super high-rise building - Google Patents

Internal top and external climbing type formwork construction platform for construction of super high-rise building Download PDF

Info

Publication number
CN213391144U
CN213391144U CN202022022305.6U CN202022022305U CN213391144U CN 213391144 U CN213391144 U CN 213391144U CN 202022022305 U CN202022022305 U CN 202022022305U CN 213391144 U CN213391144 U CN 213391144U
Authority
CN
China
Prior art keywords
lifting mechanism
wall body
platform
block
super high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022022305.6U
Other languages
Chinese (zh)
Inventor
朱新民
户俊
柳朝辉
田显东
何理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaoqida Group Co ltd
Original Assignee
Gaoqida Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gaoqida Group Co ltd filed Critical Gaoqida Group Co ltd
Priority to CN202022022305.6U priority Critical patent/CN213391144U/en
Application granted granted Critical
Publication of CN213391144U publication Critical patent/CN213391144U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses an inside top climbing formwork construction platform for super high-rise building construction, which comprises a first wall body and a second wall body, wherein a plurality of embedded parts are fixedly arranged on the first wall body and the second wall body, a first lifting mechanism is arranged on the left side surface of the first wall body, a second lifting mechanism is arranged on the right side surface of the first wall body, and a third lifting mechanism is arranged on the left side surface of the second wall body; two second operation platforms are arranged between the second lifting mechanism and the third lifting mechanism, and the second lifting mechanism is connected with the third lifting mechanism through the two second operation platforms. Through set up first work platform on first elevating system, set up second work platform on second elevating system, third elevating system, make two kinds of work platforms function simultaneously, replace traditional whole jacking formula construction platform, alleviateed construction platform's whole weight greatly, lightened the burden of pneumatic cylinder, it is more nimble, also accelerated construction speed.

Description

Internal top and external climbing type formwork construction platform for construction of super high-rise building
Technical Field
The utility model relates to a super high-rise building construction field especially relates to an interior top climbing formula die carrier construction platform outward for super high-rise building construction.
Background
The super high-rise building refers to a building with the height of more than 100 meters. The Chinese general rule for civil building design GB 50352-2005 stipulates: when the building height exceeds 100m, the residential buildings and the public buildings are all super high-rise buildings; in the reinforced concrete construction of the wall body, the core barrel, the chimney, the water tower and other buildings of the super high-rise building, an integral lifting steel platform scaffold system is mostly adopted, the system takes a bearing upright post (lattice post) inserted in the wall as a support, takes a plate lifting machine as power, and adopts large-section H-shaped steel, a lower hanging template and a scaffold system as a main beam. And a closed operating platform with certain bearing capacity is formed above the operating surface of the core barrel.
However, the integral lifting cylinder platform scaffold system has the following defects: firstly, the steel platform is integrally and fixedly connected, so that the platform must be cut when the steel platform meets a structural outrigger truss and a connecting beam, the construction difficulty is increased, and otherwise, a related horizontal structure cannot be constructed; secondly, the latticed column must be buried in the structure and cannot be recycled, so that material waste is caused and the construction of a horizontal structure is influenced; thirdly, the construction method generally adopted by the super high-rise core tube construction is as follows: vertical structure first, horizontal structure lags behind vertical wall more than 10 layers, leads to vertical and horizontal structure fall too big, faces serious fire control potential safety hazard problem and structure atress problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an interior top climbing formula die carrier construction platform outward for super high-rise building construction to solve above-mentioned technical problem.
The utility model discloses a solve above-mentioned technical problem, adopt following technical scheme to realize:
an inside-ceiling and outside-climbing formwork construction platform for super high-rise building construction comprises a first wall body and a second wall body, wherein the first wall body is positioned on the left side of the second wall body, a plurality of embedded parts are fixedly arranged on the first wall body and the second wall body, a first lifting mechanism is arranged on the left side surface of the first wall body, a second lifting mechanism is arranged on the right side surface of the first wall body, a third lifting mechanism is arranged on the left side surface of the second wall body, the first lifting mechanism and the second lifting mechanism are respectively connected with the left side surface and the right side surface of the first wall body through the embedded parts, and the third lifting mechanism is connected with the left side surface of the second wall body through the embedded parts; two second operation platforms are arranged between the second lifting mechanism and the third lifting mechanism, and the second lifting mechanism is connected with the third lifting mechanism through the two second operation platforms; the first lifting mechanism, the second lifting mechanism and the third lifting mechanism are identical in structure.
Preferably, the first lifting mechanism comprises two hanger rails, the two hanger rails are fixedly connected with the left side surface of the first wall body through embedded parts, the two hanger rails are parallel to the first wall body, the hanger rails are connected with a first slide block and a second slide block in a sliding manner, the second slide block is positioned above the first slide block, a first connecting block is fixedly arranged at the top of one side surface of the first slide block, which is positioned outside the hanger rails, a second connecting block is fixedly arranged at the bottom of one side surface of the second slide block, which is positioned outside the hanger rails, a hydraulic cylinder is fixedly arranged at the top surface of the first connecting block, the extending end of the hydraulic cylinder is fixedly connected with the bottom surface of the second connecting block, a plurality of movable blocks are hinged in the hanger rails, L-shaped support blocks are arranged below the movable blocks, the plurality of L-shaped support blocks are fixedly connected with the inner walls of the hanger rails, springs are fixedly connected on the L-shaped support blocks, and the other ends of the, the L-shaped supporting block is in contact with the movable block, a plurality of fixed blocks are fixedly arranged on one side face, located in the hanger rail, of the first sliding block and the second sliding block at equal intervals, and the fixed blocks are in contact with the movable block.
Preferably, the first sliding block and the second sliding block are both in an I shape.
Preferably, first elevating system left side is provided with first operation platform, first operation platform and two first slider left surface fixed connection of first elevating system, first operation platform's top surface has set firmly first protection railing, first protection railing below is provided with the fender foot board, the top surface fixed connection of fender foot board and first operation platform, two support down tube of first operation platform's bottom surface fixedly connected with, two support down tube other ends support the down tube respectively with two first slider fixed connection of first elevating system.
Preferably, a plurality of hanging rings are fixedly arranged on the first protective barrier, a hook is hung on each hanging ring, a connecting rope is fixedly connected to each hook, and a safety belt is fixedly connected to the other end of each connecting rope.
Preferably, two the left end that second work platform connects and two first slider right flank fixed connection of second elevating system, two the right-hand member that second work platform connects and two first slider left flanks fixed connection of third elevating system, two all set firmly right side second in the second work platform connection and prevent guardrail bar, two be provided with a plurality of bridging between the second work platform connection, it is a plurality of the bridging connects two second work platforms.
The utility model has the advantages that:
1. the utility model drives the second slider to move upwards by starting the hydraulic cylinder, so that the fixed block moves upwards, the movable block is pushed by the upwards moving fixed block and strides over the movable block to be above the movable block, and the first slider is driven by the hydraulic cylinder to move upwards by controlling the contraction of the extending end of the hydraulic cylinder, so that the device moves upwards; through set up first work platform on first elevating system, set up second work platform on second elevating system, third elevating system, make two kinds of work platforms function simultaneously, replace traditional whole jacking formula construction platform, alleviateed construction platform's whole weight greatly, lightened the burden of pneumatic cylinder, it is more nimble, also accelerated construction speed.
2. The utility model discloses a set up link, couple, connection rope, safety belt, when the construction, make things convenient for the staff to wear the safety belt, can be many-sided protection high altitude staff's safety.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of part A of FIG. 1 according to the present invention;
FIG. 3 is an enlarged view of a portion B of FIG. 1 according to the present invention;
fig. 4 is a top view of the first slider according to the present invention.
Reference numerals: 1. a first wall; 2. a second wall; 3. embedding parts; 4. hoisting a rail; 5. a first slider; 6. a second slider; 7. a first connection block; 8. a second connecting block; 9. a hydraulic cylinder; 10. an L-shaped support block; 11. a movable block; 12. a fixed block; 13. a first work platform; 14. supporting the diagonal rods; 15. a first guard rail; 16. a foot blocking plate; 17. hanging a ring; 18. hooking; 19. connecting ropes; 20. a seat belt; 21. a spring; 22. a second work platform; 23. a scissor support; 24. a second guard rail.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the present invention will be further explained below with reference to the following embodiments and the accompanying drawings, but the following embodiments are only the preferred embodiments of the present invention, and not all embodiments are included. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative work belong to the protection scope of the present invention.
Specific embodiments of the present invention will be described below with reference to the accompanying drawings.
Examples
As shown in fig. 1-4, an inside-ceiling and outside-climbing formwork construction platform for super high-rise building construction comprises a first wall 1 and a second wall 2, wherein the first wall 1 is positioned on the left side of the second wall 2, a plurality of embedded parts 3 are fixedly arranged on the first wall 1 and the second wall 2, a first lifting mechanism is arranged on the left side surface of the first wall 1, a second lifting mechanism is arranged on the right side surface of the first wall 1, a third lifting mechanism is arranged on the left side surface of the second wall 2, the first lifting mechanism and the second lifting mechanism are respectively connected with the left side surface and the right side surface of the first wall 1 through the embedded parts 3, and the third lifting mechanism is connected with the left side surface of the second wall 2 through the embedded parts 3; two second operation platforms 22 are arranged between the second lifting mechanism and the third lifting mechanism, and the second lifting mechanism is connected with the third lifting mechanism through the two second operation platforms 22; the first lifting mechanism, the second lifting mechanism and the third lifting mechanism are identical in structure, the first lifting mechanism comprises two hanger rails 4, the two hanger rails 4 are fixedly connected with the left side surface of the first wall body 1 through embedded parts 3, the two hanger rails 4 are parallel to the first wall body 1, the hanger rails 4 are connected with a first sliding block 5 and a second sliding block 6 in a sliding manner, the second sliding block 6 is positioned above the first sliding block 5, a first connecting block 7 is fixedly arranged at the top of one side surface of the first sliding block 5 positioned outside the hanger rails 4, a second connecting block 8 is fixedly arranged at the bottom of one side surface of the second sliding block 6 positioned outside the hanger rails 4, a hydraulic cylinder 9 is fixedly arranged at the top surface of the first connecting block 7, the extending end of the hydraulic cylinder 9 is fixedly connected with the bottom surface of the second connecting block 8, a plurality of movable blocks 11 are hinged in the hanger rails 4, an L-shaped supporting block 10 is arranged below the movable block 11, and the plurality of L-shaped supporting blocks 10 are fixedly connected, the L-shaped supporting block 10 is fixedly connected with a spring 21, the other end of the spring 21 is fixedly connected with the bottom surface of the movable block 11, the L-shaped supporting block 10 is contacted with the movable block 11, a plurality of fixed blocks 12 are fixedly arranged on one side surface of each of the first sliding block 5 and the second sliding block 6, which is positioned in the hanger rail 4, at equal intervals, the fixed blocks 12 are contacted with the movable block 11, each of the first sliding block 5 and the second sliding block 6 is I-shaped, the left side of the first lifting mechanism is provided with a first operation platform 13, the first operation platform 13 is fixedly connected with the left side surfaces of the two first sliding blocks 5 of the first lifting mechanism, the top surface of the first operation platform 13 is fixedly provided with a first guard rail 15, a foot baffle plate 16 is arranged below the first guard rail 15, the foot baffle plate 16 is fixedly connected with the top surface of the first operation platform 13, the bottom surface of the first operation platform 13 is fixedly connected with two supporting inclined rods 14, the other ends of the two supporting inclined rods, a plurality of links 17 have set firmly on first protection railing 15, it is equipped with couple 18 to hang on link 17, fixedly connected with connects rope 19 on the couple 18, connect rope 19's other end fixedly connected with safety belt 20, two second operation platform connect 22 the left end and two first slider 5 right sides fixed connection of second elevating system, two second operation platform connect 22 the right-hand member and two first slider 5 left sides fixed connection of third elevating system, all set firmly right second protection railing 24 on two second operation platform connect 22, be provided with a plurality of bridging 23 between two second operation platform connect 22, a plurality of bridging 23 are connected two second operation platform 22.
The working principle is as follows: when the device needs to move upwards, the extending end of the hydraulic cylinder 9 drives the second connecting block 8 and the second sliding block 6 to move upwards by starting the hydraulic cylinder 9, and further drive the fixed block 12 on the second slide block 6 to move upwards, the fixed block 12 moving upwards pushes the movable block 11 upwards, so that the movable block 11 moves upwards and stretches the spring 21, and as the fixed block 12 continues to move upwards, the spring crosses over the movable block 11, and comes above the movable block 11, at which time the movable block 11 is moved downward by the elastic force of the spring 21, and contacts with the L-shaped supporting block 10, so that the L-shaped supporting block 10 supports the movable block 11, and then the extending end of the hydraulic cylinder 9 is controlled to contract, because the movable block 11 limits the fixed block 12 to be incapable of moving downwards, when the extension end of the hydraulic cylinder 9 contracts, the bottom of the hydraulic cylinder 9 drives the first sliding block 5 to move upwards; thereby make first elevating system, second elevating system, third elevating system rebound to drive first work platform 13, the rebound of second work platform 22, make first work platform 13, the second work platform 22 can function simultaneously, replace traditional whole jacking formula construction platform, alleviateed construction platform's whole weight greatly, lightened pneumatic cylinder 9's burden, it is more nimble, also accelerated the construction speed.
Through setting up link 17, couple 18, connecting rope 19, baseboard 16, safety belt 20, when the construction, make things convenient for the staff to wear safety belt 20, can the multifaceted safety of having protected high altitude staff.
Wherein, through setting up first guardrail bar 15, second guardrail bar 24, supporting down tube 14, bridging 23, can make work platform more stable firm, protected the operation personnel.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides an interior top climbing formula die carrier construction platform outward for super high-rise building construction, includes first wall body (1), second wall body (2), its characterized in that: the first wall body (1) is located on the left side of the second wall body (2), a plurality of embedded parts (3) are fixedly arranged on the first wall body (1) and the second wall body (2), a first lifting mechanism is arranged on the left side face of the first wall body (1), a second lifting mechanism is arranged on the right side face of the first wall body (1), a third lifting mechanism is arranged on the left side face of the second wall body (2), the first lifting mechanism and the second lifting mechanism are respectively connected with the left side face and the right side face of the first wall body (1) through the embedded parts (3), and the third lifting mechanism is connected with the left side face of the second wall body (2) through the embedded parts (3); two second operation platforms (22) are arranged between the second lifting mechanism and the third lifting mechanism, and the second lifting mechanism and the third lifting mechanism are connected through the two second operation platforms (22); the first lifting mechanism, the second lifting mechanism and the third lifting mechanism are identical in structure.
2. The inside-roof outside-climbing formwork construction platform for super high-rise building construction according to claim 1, wherein: the first lifting mechanism comprises two hanger rails (4), the two hanger rails (4) are fixedly connected with the left side face of a first wall body (1) through embedded parts (3), the two hanger rails (4) are parallel to the first wall body (1), the hanger rails (4) are connected with a first sliding block (5) and a second sliding block (6) in a sliding manner, the second sliding block (6) is positioned above the first sliding block (5), a first connecting block (7) is fixedly arranged at the top of one side face of the first sliding block (5) positioned outside the hanger rails (4), a second connecting block (8) is fixedly arranged at the bottom of one side face of the second sliding block (6) positioned outside the hanger rails (4), a hydraulic cylinder (9) is fixedly arranged on the top face of the first connecting block (7), the extending end of the hydraulic cylinder (9) is fixedly connected with the bottom face of the second connecting block (8), and a plurality of movable blocks (11) are hinged in the hanger rails (4), the movable block (11) below is provided with L shape supporting shoe (10), and is a plurality of L shape supporting shoe (10) all with hanger rail (4) inner wall fixed connection, fixedly connected with spring (21) on L shape supporting shoe (10), the other end and the movable block (11) bottom surface fixed connection of spring (21), L shape supporting shoe (10) and movable block (11) contact, first slider (5), second slider (6) are located all the equidistance on the side of hanger rail (4) and have set firmly a plurality of fixed blocks (12), fixed block (12) and movable block (11) contact.
3. The inside-roof outside-climbing formwork construction platform for super high-rise building construction according to claim 2, wherein: the first sliding block (5) and the second sliding block (6) are both in an I shape.
4. The inside-roof outside-climbing formwork construction platform for super high-rise building construction according to claim 1, wherein: first elevating system left side is provided with first operation platform (13), first operation platform (13) and two first slider (5) left surface fixed connection of first elevating system, the top surface of first operation platform (13) has set firmly first guardrail bar (15), first guardrail bar (15) below is provided with fender foot board (16), the top surface fixed connection of fender foot board (16) and first operation platform (13), two bottom surface fixedly connected with of first operation platform (13) support down tube (14), two the other end that supports down tube (14) respectively with two first slider (5) fixed connection of first elevating system.
5. The inside-roof outside-climbing formwork construction platform for super high-rise building construction according to claim 4, wherein: a plurality of hanging rings (17) are fixedly arranged on the first protective barrier (15), a hook (18) is hung on each hanging ring (17), a connecting rope (19) is fixedly connected to each hook (18), and a safety belt (20) is fixedly connected to the other end of each connecting rope (19).
6. The inside-roof outside-climbing formwork construction platform for super high-rise building construction according to claim 1, wherein: two the left end that second work platform connected (22) and two first slider (5) right flank fixed connection of second elevating system, two the right-hand member that second work platform connected (22) and two first slider (5) left flank fixed connection of third elevating system, two all set firmly right second guard rail (24), two on the second work platform connection (22) be provided with a plurality of bridging (23), a plurality of between second work platform connection (22) bridging (23) are with two second work platform (22) connection.
CN202022022305.6U 2020-09-16 2020-09-16 Internal top and external climbing type formwork construction platform for construction of super high-rise building Expired - Fee Related CN213391144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022022305.6U CN213391144U (en) 2020-09-16 2020-09-16 Internal top and external climbing type formwork construction platform for construction of super high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022022305.6U CN213391144U (en) 2020-09-16 2020-09-16 Internal top and external climbing type formwork construction platform for construction of super high-rise building

Publications (1)

Publication Number Publication Date
CN213391144U true CN213391144U (en) 2021-06-08

Family

ID=76178854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022022305.6U Expired - Fee Related CN213391144U (en) 2020-09-16 2020-09-16 Internal top and external climbing type formwork construction platform for construction of super high-rise building

Country Status (1)

Country Link
CN (1) CN213391144U (en)

Similar Documents

Publication Publication Date Title
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN110004834B (en) Automatic climbing platform for hanging cable construction
CN102080357A (en) Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN205296803U (en) Elevator automatic lifting operation panel
CN213391144U (en) Internal top and external climbing type formwork construction platform for construction of super high-rise building
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN202926333U (en) Hanging system of whole-circle integral upside down hanging formwork
CN108675116B (en) Construction method of PC (polycarbonate) component
CN208996441U (en) Building hoistway form frame system with material distributing machine
CN111851982A (en) Scaffold frame liftable prevents weighing down safety device
CN113443535B (en) Down extending type lifting equipment for well construction and mounting method thereof
CN207727440U (en) Whole self-crawling type integrated platform for bridge tower construction
CN216662305U (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform
CN210366717U (en) Be applied to console mode and from climbing formula whole construction work platform
CN211447761U (en) Electric creeping formwork device for building construction
CN206220484U (en) A kind of template suspension centre spandrel girder of steel platform
CN214989866U (en) Safe type tower crane standard festival
CN220336411U (en) Protection platform lifting point truss for building construction
CN212249335U (en) Sizing steel ladder for people to get on and off
CN216474526U (en) A remove work platform for being under construction in bridge railing outside
CN205777485U (en) Self-elevating type elevator hoistway shear wall creeping formwork operating platform
CN219100720U (en) Cantilever formwork steel platform of cornice structure
CN216190897U (en) Building carrying frame with protection function
CN218667170U (en) Support bracket for bridge construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210608

CF01 Termination of patent right due to non-payment of annual fee