CN213243487U - Novel engineering cable support - Google Patents

Novel engineering cable support Download PDF

Info

Publication number
CN213243487U
CN213243487U CN202021856456.5U CN202021856456U CN213243487U CN 213243487 U CN213243487 U CN 213243487U CN 202021856456 U CN202021856456 U CN 202021856456U CN 213243487 U CN213243487 U CN 213243487U
Authority
CN
China
Prior art keywords
cable
bracket
support
stand
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021856456.5U
Other languages
Chinese (zh)
Inventor
周元成
时于帅
李北燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heze Urban Construction Engineering Development Group Co ltd
Original Assignee
Heze Urban Construction Engineering Development Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heze Urban Construction Engineering Development Group Co ltd filed Critical Heze Urban Construction Engineering Development Group Co ltd
Priority to CN202021856456.5U priority Critical patent/CN213243487U/en
Application granted granted Critical
Publication of CN213243487U publication Critical patent/CN213243487U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a novel engineering cable support, including the piping lane, piping lane left and right sides wall symmetry is equipped with the support, the support includes the stand, the stand uses expansion bolts to fix at the piping lane lateral wall, a plurality of brackets are connected from bottom to top to the stand, the bracket is the right angle triangle-shaped form, the long right angle limit of bracket up, the bracket uses expansion bolts to fix on the stand, the bracket upper surface is connected with a plurality of cable clamp, cable clamp includes the base, base fixed connection is on the bracket, a base top articulated upper cover, form cable tray hole between base and the upper cover. The utility model discloses having set up cable clamp, can preventing that the cable from landing from the support, cable clamp is easy to be dismantled and easily closes, improves the efficiency of construction, and stand, bracket, cable clamp's material is the SMC combined material, can effectively increase the life of support.

Description

Novel engineering cable support
Technical Field
The utility model relates to a cable support technical field, in particular to novel engineering cable support.
Background
Cable holders are commonly used for the erection of cables in cable trenches. The cable support among the prior art, unable dismantlement of cable support, the cable of placing moreover slips off from the support easily to cause the cable to damage, or cause staff's bodily injury easily is formed through welding or fastener antithetical couplet concatenation dress usually.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model provides a novel engineering cable support, includes the piping lane, piping lane left and right sides wall symmetry is equipped with the support, the support includes the stand, the stand uses expansion bolts to fix at the piping lane lateral wall, a plurality of brackets are connected from bottom to top to the stand, the bracket is the triangle-shaped shape in right angle, the long right angle limit of bracket up, the bracket uses expansion bolts to fix on the stand, the bracket upper surface is connected with a plurality of cable clamp, cable clamp includes the base, base fixed connection is on the bracket, the articulated upper cover in base top, form the cable support hole between base and the upper cover, on cover and be equipped with hangers one, be equipped with the lug on the hangers one, be equipped with hangers two on the base, be equipped with the recess on the hangers two, the lug card is gone into in the recess.
Preferably, the upright post, the bracket and the cable clamp are made of SMC composite materials.
Preferably, the first hanging lug is longer than the second hanging lug.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses having set up cable clamp, can preventing that the cable from landing from the support, cable clamp is easy to be dismantled and easily closes, improves the efficiency of construction, and stand, bracket, cable clamp's material is the SMC combined material, can effectively increase the life of support.
Drawings
The invention is described in further detail below with reference to the following figures and embodiments:
fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic structural view of the cable clamp of the present invention;
FIG. 3 is a schematic view of the connection structure of the first and second hangers of the present invention;
fig. 4 is a schematic structural view of the suspension loop of the present invention;
fig. 5 is a schematic structural view of a second hanging lug of the present invention.
Detailed Description
The invention will be described in further detail with reference to the following detailed description and accompanying drawings:
a novel engineering cable support comprises a pipe gallery 1, wherein supports 2 are symmetrically arranged on the left side wall and the right side wall of the pipe gallery 1, each support 2 comprises a stand column 3, the stand columns 3 are fixed on the side wall of the pipe gallery 1 through expansion bolts, the stand columns 3 are connected with a plurality of brackets 4 from bottom to top, the brackets 4 are in right-angled triangle shapes, the long right-angled edges of the brackets 4 face upwards, the brackets 4 are fixed on the stand columns 3 through the expansion bolts, the upper surface of each bracket 4 is connected with a plurality of cable clamps 5, each cable clamp 5 comprises a base 501, the base 501 is fixedly connected onto the corresponding bracket 4, an upper cover 502 is hinged above the base 501, a cable support hole 503 is formed between the base 501 and the upper cover 502, a first lug 504 is arranged on the upper cover 502, a lug 505 is arranged on the first lug 504, a second lug 506 is arranged on the base 501, a groove 507 is arranged on, the projection 505 snaps into the groove 507.
Furthermore, the upright post 3, the bracket 4 and the cable clamp 5 are made of SMC composite materials, and the service life of the support 2 can be effectively prolonged by the SMC composite materials.
Further, the first hanging lug 504 is longer than the second hanging lug 506, so that the upper cover 502 can be lifted conveniently.
The utility model is used for the erection of cable in the cable pit, during the construction, arrange the cable in cable support hole 503 in, be equipped with lug 505 card income recess 507 on the back with hangers 504 in, with cable position fixing, prevent that it from droing.
The above detailed description of the embodiments of the present invention is only used as an example, and the present invention is not limited to the above described embodiments, and the modifications of the present invention are also within the scope of the present invention.

Claims (3)

1. The novel engineering cable support is characterized by comprising a pipe gallery (1), wherein supports (2) are symmetrically arranged on the left side wall and the right side wall of the pipe gallery (1), each support (2) comprises a stand column (3), each stand column (3) is fixed on the side wall of the pipe gallery (1) through an expansion bolt, the stand columns (3) are connected with a plurality of brackets (4) from bottom to top, each bracket (4) is in a right-angled triangular shape, the long right-angled edges of the brackets (4) face upwards, the brackets (4) are fixed on the stand columns (3) through the expansion bolts, the upper surfaces of the brackets (4) are connected with a plurality of cable clamps (5), each cable clamp (5) comprises a base (501), the bases (501) are fixedly connected onto the brackets (4), an upper cover (502) is hinged above the bases (501), and cable support holes (503) are formed between the bases (501) and the upper cover (502), be equipped with hangers one (504) on upper cover (502), be equipped with lug (505) on hangers one (504), be equipped with hangers two (506) on base (501), be equipped with recess (507) on hangers two (506), lug (505) card is gone into in recess (507).
2. The novel engineering cable support according to claim 1, characterized in that the upright (3), the bracket (4) and the cable clamp (5) are made of SMC composite material.
3. The new engineered cable holder of claim 1, wherein the first hanger (504) is longer than the second hanger (506).
CN202021856456.5U 2020-08-31 2020-08-31 Novel engineering cable support Expired - Fee Related CN213243487U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021856456.5U CN213243487U (en) 2020-08-31 2020-08-31 Novel engineering cable support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021856456.5U CN213243487U (en) 2020-08-31 2020-08-31 Novel engineering cable support

Publications (1)

Publication Number Publication Date
CN213243487U true CN213243487U (en) 2021-05-18

Family

ID=75903250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021856456.5U Expired - Fee Related CN213243487U (en) 2020-08-31 2020-08-31 Novel engineering cable support

Country Status (1)

Country Link
CN (1) CN213243487U (en)

Similar Documents

Publication Publication Date Title
CN213243487U (en) Novel engineering cable support
CN205295960U (en) Bridge construction support bracket
CN212559093U (en) Panel lifting frame for construction
CN106012861A (en) Mounting positioning device and construction method of corrugated steel web
CN214615447U (en) Fixing support for building engineering template
CN207048368U (en) A kind of adjustable anchor ear device
CN206108705U (en) Gallows of frame isolated footing
CN209179519U (en) Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top
CN212078772U (en) Cutting unloading device for building steel structure engineering
CN111980052A (en) Electric power construction pile foundation structure
CN215803424U (en) Prevent interim fixed knot of column bottom steel construction structure of inclining and construct
CN214495334U (en) Construction elevator auxiliary stay device
CN205741935U (en) The mounting and positioning device of Wavelike steel webplate
CN210783784U (en) Flower showing stand with large bearing capacity
CN219791457U (en) Floor fixing structure of hanging rail
CN221662413U (en) Tripod for quick lifting and ring beam sinking construction
CN215666641U (en) Turnover supporting seat for hoisting dome structure steel truss
CN218437464U (en) A prefabricated integral concrete house for scenic spot civilian is lodged
CN220790719U (en) A dish knot formula steel pipe template support for concrete placement
CN213683066U (en) Surrounding type glass modeling design structure
CN215154613U (en) Novel overhead corridor floor
CN219818511U (en) Telescopic fire receiving hopper device
CN216233482U (en) Prefabricated plate combination formula stacks frame
CN213837428U (en) Horizontal ladder for positioning building industrialization project conversion layer
CN221855941U (en) Adjustable decoration furred ceiling structure in bathroom

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210518

Termination date: 20210831

CF01 Termination of patent right due to non-payment of annual fee