CN218437464U - A prefabricated integral concrete house for scenic spot civilian is lodged - Google Patents

A prefabricated integral concrete house for scenic spot civilian is lodged Download PDF

Info

Publication number
CN218437464U
CN218437464U CN202221368117.1U CN202221368117U CN218437464U CN 218437464 U CN218437464 U CN 218437464U CN 202221368117 U CN202221368117 U CN 202221368117U CN 218437464 U CN218437464 U CN 218437464U
Authority
CN
China
Prior art keywords
wall
board
room body
plate
scenic spot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221368117.1U
Other languages
Chinese (zh)
Inventor
袁城
孟存芬
马珂
孔明明
高小欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Xinye Construction Integrated Technology Co ltd
Original Assignee
Xinjiang Xinye Construction Integrated Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Xinye Construction Integrated Technology Co ltd filed Critical Xinjiang Xinye Construction Integrated Technology Co ltd
Priority to CN202221368117.1U priority Critical patent/CN218437464U/en
Application granted granted Critical
Publication of CN218437464U publication Critical patent/CN218437464U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of houses, a prefabricated integral concrete house for scenic spot people's residence is disclosed, including the room body, two sets of tray seats and two flexible arms, every group the upper surface of tray seat all contacts with the bottom surface of the room body, the surface of each flexible arm all contacts with the inner wall of the room body, the both sides face of each flexible arm all installs and props up the board, the surface of each propping board all contacts with the inner wall of the room body, two crossbeam boards have been placed in the outside of the room body, the bottom surface of each crossbeam board and the bottom surface of flexible arm all install the connecting plate jointly, the inner wall of each connecting plate all has two sets of crew cut bolts in threaded connection, the surface of each group crew cut bolt all with the inner wall of flexible arm and the inner wall threaded connection of crossbeam board; the utility model discloses a be provided with backup pad and layer board seat, can play the effect of connecting the crossbeam board and supporting room body corner to the realization makes the room body can receive the purpose of even bearing when hoist and mount.

Description

A prefabricated integral concrete house for scenic spot civilian is lodged
Technical Field
The utility model relates to a house technical field specifically is a prefabricated integral concrete house for scenic spot people's host.
Background
The house is a building formed by reinforced concrete for people or articles, the scenic spot house is developed by developers by using superior natural conditions and geographical positions of a tourism development area, a tourist scenic spot and a leisure and vacation area, the prefabricated integral concrete house is an integral shape of the house built in an industrialized mode, and generally an integral pouring mode is used, so that the prefabricated integral concrete house can be directly used, and the installation time is saved.
When the existing prefabricated integral concrete house is used, the existing prefabricated integral concrete house needs to be lifted, tools used by lifting need to be arranged on the concrete house, so that the concrete house can be damaged when being installed, and the existing prefabricated integral concrete house is inconvenient to lift due to the fact that the size of the concrete house is large.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a prefabricated integral concrete house for scenic spot people's room possesses the convenience and hoists the concrete house to be difficult to damage the advantage in concrete house.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prefabricated integral concrete house for scenic spot civilian is lodged, includes the room body, two sets of layer board seats and two flexible arms, every group the upper surface of layer board seat all contacts with the bottom surface of the room body, every the surface of flexible arm all contacts with the inner wall of the room body, every the both sides face of flexible arm is all installed and is propped the board, every prop the surface of holding the board and all contact with the inner wall of the room body, two crossbeam boards have been placed in the outside of the room body, every the connecting plate is all installed jointly to the bottom surface of crossbeam board and the bottom surface of flexible arm, every the equal threaded connection of inner wall of connecting plate has two sets of flat head bolts, every group the surface of flat head bolt all with the inner wall of flexible arm and the inner wall threaded connection of crossbeam board, every the inner wall of connecting plate all contacts with the surface of the room body, every the backup pad is all installed to the both sides face of crossbeam board, every the bottom surface of backup pad all is connected with the upper surface fixed of layer board seat, every one side that the room body was kept away from to the crossbeam board and one side of keeping away from the room body are all installed and hang the dress board.
Preferably, a clamping plate is mounted on the upper surface of each supporting plate, and the bottom surface of each clamping plate is in contact with the upper surface of the house body.
Preferably, the inner wall of each clamp plate is provided with a fixing column, and the outer surface of each fixing column is fixedly connected with the inner wall of the beam plate.
Preferably, two clamping grooves are formed in one side face, close to each other, of each clamping hoop plate, and two clamping plates are placed above the house body.
Preferably, the outer surface of each clamping plate is clamped with the inner wall of each clamping groove, and the inner wall of each supporting plate is in threaded connection with a plurality of identical connecting bolts.
Preferably, the outer surface of each connecting bolt is in threaded connection with the inner wall of the supporting plate seat, and a steel plate is mounted on one side face, far away from the cross beam plate, of the supporting plate.
Preferably, two sets of fastening pins are all installed to every the inner wall of steel sheet, every group the surface of fastening pin all with the inner wall fixed connection of the inner wall of backup pad and crossbeam board.
Preferably, the inner wall of each hoisting plate is in threaded connection with a fixing bolt, and the outer surface of each fixing bolt is in threaded connection with the inner wall of the support plate and the inner wall of the beam plate.
(III) advantageous effects
Compared with the prior art, the utility model provides a prefabricated integral concrete building for scenic spot civilian is equipped with following beneficial effect:
1. this a prefabricated integral concrete house for scenic spot civilian is stayed through being provided with flexible arm and propping the board, can prop the internal portion of room and hold to need not fix the problem on the room body with utensil for hoist and mount, rethread crossbeam board, connecting plate and flat head bolt can hoist thereby the room body conveniently and hoist under the condition that does not damage the room body after the connecting plate is connected crossbeam board and flexible arm, realize carrying out the purpose of bearing when hoist the room body.
2. This a prefabricated integral concrete house for scenic spot civilian is stayed, through being provided with backup pad and layer board seat, can play the effect of connecting the crossbeam board and supporting room body corner, thereby realize making the room body can receive the purpose of even bearing when hoist and mount, in order to can produce the problem that slopes or rock when the room body handling, through the hoist and mount board, can be easy to assemble carry out instrument for hoist and mount to the room body, the hoist and mount board is evenly installed at the front and back of the room body, stability when being favorable to increasing the hoist and mount of the room body.
Drawings
FIG. 1 is a schematic view of a three-dimensional structure of a room body of the present invention;
FIG. 2 is a schematic three-dimensional structure of the clamp plate of the present invention;
fig. 3 is a schematic three-dimensional structure view of the telescopic arm of the present invention;
fig. 4 is a schematic structural diagram of the three-dimensional structure of the pallet base of the present invention.
In the figure: 1. a house body; 2. a clamp plate; 3. clamping a plate; 4. fixing a column; 5. hoisting the plate; 6. a pallet base; 7. a beam plate; 8. a steel plate; 9. a fastening pin; 10. a connecting bolt; 11. a support plate; 12. a supporting plate; 13. a telescopic arm; 14. a card slot; 15. a flat head bolt; 16. a connecting plate; 17. and fixing the bolt.
Detailed Description
In order to better understand the purpose, structure and function of the utility model, the following figures are combined, which is right for the utility model relates to a further detailed description is done to a prefabricated integral concrete house for scenic spot civilian.
Referring to fig. 1-4, the present invention: the utility model provides a prefabricated integral concrete house for scenic spot people's residence, including the room body 1, two sets of support plate seats 6 and two flexible arms 13, the upper surface of every group support plate seat 6 all contacts with the bottom surface of the room body 1, the surface of every flexible arm 13 all contacts with the inner wall of the room body 1, through flexible arm 13, can hold board 12 to propping and extend, thereby will prop and hold board 12 and press in the room body 1, two draw-in grooves 14 have all been seted up to a side that two clamp plate 2 are close to each other, two cardboard 3 have been placed to the top of the room body 1, through draw-in groove 14 and cardboard 3, can connect clamp plate 2, thereby conveniently hoist and mount 1 top of the room body.
The both sides face of every flexible arm 13 all is installed and is propped board 12, and every props the surface that props board 12 and all contacts with the inner wall of the room body 1, and the surface of every cardboard 3 all blocks with the inner wall of draw-in groove 14 mutually, and the equal threaded connection of inner wall of every backup pad 11 has the same connecting bolt 10 of a plurality of, through connecting bolt 10, is connected backup pad 11 and layer board seat 6, increases the joint strength of backup pad 11 and layer board seat 6.
Two crossbeam boards 7 have been placed in the outside of the room body 1, and connecting plate 16 is all installed jointly to the bottom surface of every crossbeam board 7 and the bottom surface of flexible arm 13, through crossbeam board 7 and connecting plate 16, can be connected with flexible arm 13 to carry out the centre gripping to the inside and outside both sides of the room body 1, every connecting bolt 10's surface all with the inner wall threaded connection of layer board seat 6, steel sheet 8 is all installed to the side that crossbeam board 7 was kept away from to every backup pad 11.
The inner wall of each connecting plate 16 is in threaded connection with two groups of flat-head bolts 15, the outer surface of each group of flat-head bolts 15 is in threaded connection with the inner wall of the telescopic arm 13 and the inner wall of the cross beam plate 7, the inner wall of each connecting plate 16 is in contact with the outer surface of the house body 1, and the connecting plates 16 are fixed on the telescopic arm 13 and the cross beam plate 7 through the flat-head bolts 15, so that the connecting plates 16 play a role in connecting the telescopic arm 13 and the cross beam plate 7.
Backup pad 11 is all installed to the both sides face of every crossbeam board 7, hoop board 2 is all installed to the upper surface of every backup pad 11, two sets of holding pin 9 are all installed to the inner wall of every steel sheet 8, through holding pin 9, fix steel sheet 8, and connect backup pad 11 and crossbeam board 7, the surface of every group holding pin 9 all with the inner wall of backup pad 11 and the inner wall fixed connection of crossbeam board 7, through hoop board 2, carry out the joint to 1 top of the room body, can conveniently hoist and mount 1 top of the room body.
The bottom surface of every clamp plate 2 all contacts with the upper surface of the room body 1, and the equal threaded connection of inner wall of every hoist and mount board 5 has fixing bolt 17, and every fixing bolt 17's surface all with the inner wall of backup pad 11 and the inner wall threaded connection of crossbeam board 7, through fixing bolt 17, is connected backup pad 11 and crossbeam board 7, realizes the purpose fixed to backup pad 11 and crossbeam board 7.
The bottom surface of every backup pad 11 all is connected with the last fixed surface of layer board seat 6, and fixed column 4 is all installed to the inner wall of every clamp plate 2, and the surface of every fixed column 4 all with the inner wall fixed connection of crossbeam board 7, through fixed column 4, fixes clamp plate 2 on crossbeam board 7 for clamp plate 2 can the atress.
Every backup pad 11 is kept away from a side of room body 1 and a side that room body 1 was kept away from to crossbeam board 7 all installs hoisting plate 5, and through hoisting plate 5, hoisting plate 5 is used for installing and hangs the application instrument to can carry out the handling to room body 1 through hoisting plate 5.
The utility model discloses a theory of operation is: firstly, when needing to carry out the handling installation to the room body 1, install layer board seat 6 in room body 1 below, make four angles of room body 1 can the atress even, connect backup pad 11 and crossbeam board 7 again, can use steel sheet 8 and fastening pin 9 during the connection, backup pad 11 is connected the back with crossbeam board 7, install backup pad 11 on layer board seat 6 with connecting bolt 10, install flexible arm 13 inside room body 1, connect flexible arm 13 and crossbeam board 7 with connecting plate 16, fix connecting plate 16 on flexible arm 13 and crossbeam board 7 with flat head bolt 15, flexible arm 13 is good installed back, expand flexible arm 13, make supporting board 12 support room body 1 inside, then, carry out the installation of clamp plate 2, clamp plate 2 needs to be connected with crossbeam board 7, install cardboard 3 in the clamp plate 2, when room body 1 hoists, can carry out hoist and mount roof body 1 top through clamp plate 2 and cardboard 3, when flexible arm 13, crossbeam board 7 and fixed seat 6 need to hoist and mount rope seat, thereby the hoist and mount tools such as the line and mount in room body 1, thereby the hoist and mount the line and mount.
It is to be understood that the present invention has been described with reference to certain embodiments, and that various changes or equivalents may be substituted for elements thereof by those skilled in the art without departing from the spirit and scope of the invention. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the invention without departing from the essential scope thereof. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of the present application are intended to be covered by the present invention.

Claims (8)

1. The utility model provides a prefabricated integral concrete building for scenic spot civilian is lodged, includes the room body (1), two sets of tray seat (6) and two flexible arms (13), its characterized in that: every group the upper surface of layer board seat (6) all contacts with the bottom surface of the room body (1), every the surface of telescopic arm (13) all contacts with the inner wall of the room body (1), every the both sides face of telescopic arm (13) is all installed and is propped board (12), every prop the surface of propping board (12) and all contact with the inner wall of the room body (1), two crossbeam boards (7) have been placed in the outside of the room body (1), every connecting plate (16) are all installed jointly to the bottom surface of crossbeam board (7) and the bottom surface of telescopic arm (13), every the inner wall of connecting plate (16) all threaded connection has two sets of flat head bolts (15), every group the surface of flat head bolt (15) all with the inner wall of telescopic arm (13) and the inner wall threaded connection of crossbeam board (7), every the inner wall of connecting plate (16) all contacts with the surface of the room body (1), every both sides face of crossbeam board (7) all installs backup pad (11), every the bottom surface of backup pad (11) all with the fixed layer board seat (6), every side face of layer board (5) is kept away from the roof body and all install the hanging board (1) and hang a roof board (5).
2. The prefabricated integral concrete house for scenic spot residences and lodging according to claim 1, wherein: and each hoop plate (2) is installed on the upper surface of each supporting plate (11), and the bottom surface of each hoop plate (2) is in contact with the upper surface of the house body (1).
3. The prefabricated integral concrete house for scenic spot residences and lodging according to claim 2, wherein: fixed columns (4) are installed on the inner wall of each clamp plate (2), and the outer surface of each fixed column (4) is fixedly connected with the inner wall of each beam plate (7).
4. The prefabricated integral concrete house for scenic spot residences and lodging according to claim 2, wherein: two clamping grooves (14) are formed in one side face, close to each other, of each clamping hoop plate (2), and two clamping plates (3) are placed above the room body (1).
5. The prefabricated integrated concrete housing for scenic spot civilian accommodation of claim 4, wherein: the outer surface of each clamping plate (3) is clamped with the inner wall of each clamping groove (14), and the inner wall of each supporting plate (11) is in threaded connection with a plurality of same connecting bolts (10).
6. The prefabricated integrated concrete housing for scenic spot civilian accommodation of claim 5, wherein: every the surface of connecting bolt (10) all with the inner wall threaded connection of layer board seat (6), every steel sheet (8) are all installed to one side that crossbeam board (7) were kept away from in backup pad (11).
7. The prefabricated integrated concrete housing for scenic spot civilian accommodation of claim 6, wherein: every two sets of holding pin (9) are all installed to the inner wall of steel sheet (8), every group the surface of holding pin (9) all with the inner wall of backup pad (11) and the inner wall fixed connection of crossbeam board (7).
8. The prefabricated integrated concrete housing for scenic spot civilian accommodation of claim 1, wherein: the inner wall of each hoisting plate (5) is in threaded connection with a fixing bolt (17), and the outer surface of each fixing bolt (17) is in threaded connection with the inner wall of the supporting plate (11) and the inner wall of the cross beam plate (7).
CN202221368117.1U 2022-06-01 2022-06-01 A prefabricated integral concrete house for scenic spot civilian is lodged Active CN218437464U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221368117.1U CN218437464U (en) 2022-06-01 2022-06-01 A prefabricated integral concrete house for scenic spot civilian is lodged

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221368117.1U CN218437464U (en) 2022-06-01 2022-06-01 A prefabricated integral concrete house for scenic spot civilian is lodged

Publications (1)

Publication Number Publication Date
CN218437464U true CN218437464U (en) 2023-02-03

Family

ID=85077631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221368117.1U Active CN218437464U (en) 2022-06-01 2022-06-01 A prefabricated integral concrete house for scenic spot civilian is lodged

Country Status (1)

Country Link
CN (1) CN218437464U (en)

Similar Documents

Publication Publication Date Title
CN218437464U (en) A prefabricated integral concrete house for scenic spot civilian is lodged
CN106284264B (en) A kind of detachable truss leg
CN112376698A (en) Corridor construction method
CN218438659U (en) Iron art railing assembled enclosure and lifting device thereof
CN106121259A (en) The hanging apparatus of embedded integrated outer wall plate and hanging method thereof
CN216482529U (en) Simple rocket erecting device
CN209618648U (en) A kind of lifting lift hanger
CN208202294U (en) Furred ceiling conversion layer structure
CN211198323U (en) Module hoisting tool for installation platform of MARK3 type L NG ship containment system
CN205935718U (en) Hoist device of embedded integral side fascia
CN201261681Y (en) Sling for mounting RH furnace circulating pipe
CN213243487U (en) Novel engineering cable support
CN211851035U (en) Temporary roof supporting device for construction based on constructional engineering
CN219685380U (en) Auxiliary installation device of water pump unit
CN221219590U (en) Socket-type disc buckle type scaffold
JPH09235817A (en) Roof panel and loading structure thereof
CN212222218U (en) Single-point hoisting pile erecting system
CN217048991U (en) Marine hoist and mount formula scaffold frame
CN215368877U (en) Uninstallation strutting arrangement
CN218376710U (en) Through-flow unit runner chamber suspension tool
CN215402564U (en) Gallows structure for engineering construction
CN218344972U (en) Balanced hoisting accessory of slidingtype superimposed sheet
CN219408863U (en) Hoisting tool for prefabricated inspection well
CN219156274U (en) Tool for transferring ultra-long metal roof contour plates
CN212561899U (en) Steel frame structure for building quickly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant