CN219408863U - A hoisting tool for prefabricated inspection well - Google Patents
A hoisting tool for prefabricated inspection well Download PDFInfo
- Publication number
- CN219408863U CN219408863U CN202320096035.4U CN202320096035U CN219408863U CN 219408863 U CN219408863 U CN 219408863U CN 202320096035 U CN202320096035 U CN 202320096035U CN 219408863 U CN219408863 U CN 219408863U
- Authority
- CN
- China
- Prior art keywords
- hook
- fixedly connected
- prefabricated
- hole
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 21
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 9
- 238000004804 winding Methods 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 abstract 1
- 239000000725 suspension Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及检查井的吊装工具技术领域,具体为一种用于预制检查井的吊装工具。The utility model relates to the technical field of hoisting tools for inspection wells, in particular to a hoisting tool for prefabricated inspection wells.
背景技术Background technique
市政工程中,混凝土检查井多采用预制形式。但预制检查井的安装步骤较为繁琐,需要在工厂加工时预留吊装孔。In municipal engineering, concrete inspection wells are mostly prefabricated. However, the installation steps of prefabricated inspection wells are relatively cumbersome, and hoisting holes need to be reserved during factory processing.
如中国专利申请号为202221809761.8当前解决了待预制检查井吊装完成后,吊装孔需要进行封堵,这存在封堵不严出现泄漏的问题,不利于保证检查井的施工质量的问题。现有的预制检查井的吊装工具,在使用过程中,不能很好的进行吊装稳定性不佳,导致在进行吊装时容易造成脱落以及位置滑动的情况,存在一定的危险性,在进行吊装时,绳索处于分散开来,不能很好的进行限位距离。For example, the Chinese patent application number 202221809761.8 currently solves the problem that after the hoisting of the prefabricated inspection well is completed, the hoisting hole needs to be sealed. The existing hoisting tools for prefabricated inspection wells cannot be hoisted well during use, and the stability is not good, resulting in easy falling off and position slippage during hoisting, which has certain dangers. During hoisting, the ropes are scattered and cannot be well limited.
所以,如何设计一种用于预制检查井的吊装工具,成为我们当前需要解决的问题。Therefore, how to design a hoisting tool for prefabricated inspection wells has become a problem that we need to solve at present.
实用新型内容Utility model content
针对现有技术的不足,本实用新型提供了一种用于预制检查井的吊装工具,解决了吊装和稳固的问题。Aiming at the deficiencies of the prior art, the utility model provides a hoisting tool for a prefabricated inspection well, which solves the problems of hoisting and stability.
为实现上述目的,本实用新型提供如下技术方案:一种用于预制检查井的吊装工具,包括预制井、通孔和第一挂钩,所述预制井的表面贯穿连接有通孔,所述通孔的一侧嵌入连接有第一挂钩,所述通孔的另一侧嵌入连接有第二挂钩,所述第二挂钩的一端固定连接有端头,所述第二挂钩的内部固定连接有凸起头,所述第二挂钩的顶部固定连接有圆环,所述凸起头的中间部位固定连接有卡槽,所述凸起头的表面固定连接有防滑纹路,所述圆环的内部缠绕连接有绳索,所述绳索的顶部捆绑连接有连接盘,所述连接盘的内部固定连接有支撑杆,所述支撑杆的顶部固定连接有铁环,所述支撑杆的一侧固定连接有捆绑区。In order to achieve the above object, the utility model provides the following technical solution: a hoisting tool for a prefabricated inspection well, including a prefabricated well, a through hole and a first hook. A through hole is connected through the surface of the prefabricated well. One side of the through hole is embedded and connected with a first hook, and the other side of the through hole is embedded and connected with a second hook. One end of the second hook is fixedly connected with a terminal. The card slot, the surface of the protruding head is fixedly connected with anti-slip lines, the inside of the ring is wound and connected with a rope, the top of the rope is bound and connected with a connection plate, the inside of the connection plate is fixedly connected with a support rod, the top of the support rod is fixedly connected with an iron ring, and one side of the support rod is fixedly connected with a binding area.
优选的,所述第一挂钩和第二挂钩的结构相同,凸起头呈圆弧结构,吻合通孔的圆弧端面,卡槽的大小宽度吻合预制井的厚度。Preferably, the structure of the first hook and the second hook is the same, the protruding head has a circular arc structure, which fits the circular end face of the through hole, and the size and width of the clamping groove match the thickness of the prefabricated well.
优选的,所述绳索捆绑圆环和连接盘,支撑杆交叉固定在连接盘的内侧,将捆绑区分为四块,铁环用于起重器的吊接。Preferably, the rope binds the ring and the connection plate, the support rods are cross-fixed on the inner side of the connection plate, and the binding area is divided into four pieces, and the iron ring is used for hoisting of the jack.
有益效果Beneficial effect
本实用新型提供了一种用于预制检查井的吊装工具,具备以下有益效果:The utility model provides a hoisting tool for a prefabricated inspection well, which has the following beneficial effects:
(1)、本实用新型通过设置悬挂装置,第一挂钩和第二挂钩的结构相同,将第一挂钩和第二挂钩分别悬挂固定在预制井两侧的通孔处,凸起头呈圆弧结构,吻合通孔的圆弧端面,以便于在进行悬挂时,挂钩能够很好的贴合在通孔的圆弧端面处,卡槽的大小宽度吻合预制井的厚度,在进行吊装预制井时,结合卡槽能够很好的进行限位固定预制井防止掉落,位置移动的问题,由圆环连接绳索进行吊装。(1) The utility model is provided with a suspension device, the first hook and the second hook have the same structure, and the first hook and the second hook are respectively suspended and fixed at the through holes on both sides of the prefabricated well. To prevent the problem of falling and position movement, it is hoisted by connecting ropes with rings.
(2)、本实用新型通过设置辅助装置,防滑纹路在进行吊装时,可加大凸起头端面的摩擦力,加强稳定性,绳索捆绑圆环和连接盘,绳索捆绑连接盘的表面来对绳索进行位置限制,防止绳索的搬动,便于进行稳固吊装,支撑杆交叉固定在连接盘的内侧,将捆绑区分为四块,在预制井具有两个通孔的情况,可采用四个挂钩进行同时吊装,以方便在进行吊装时,能够受力,铁环用于起重器的吊接。(2) In the utility model, by setting the auxiliary device, the anti-skid lines can increase the friction force of the end surface of the raised head and enhance the stability. The rope is bound to the ring and the connection plate, and the rope is bound to the surface of the connection plate to limit the position of the rope, prevent the movement of the rope, and facilitate stable hoisting. The support rod is cross-fixed on the inner side of the connection plate to divide the binding area into four pieces. , it can be stressed, and the iron ring is used for the hoisting of the jack.
附图说明Description of drawings
图1为本实用新型的整体结构示意图;Fig. 1 is the overall structural representation of the utility model;
图2为本实用新型的预制井结构示意图;Fig. 2 is the structural representation of the prefabricated well of the present utility model;
图3为本实用新型的挂钩结构示意图;Fig. 3 is the structural schematic diagram of the hook of the present utility model;
图4为本实用新型的A处放大图。Fig. 4 is the enlarged view of A place of the present utility model.
图中:1、预制井;2、通孔;3、第一挂钩;4、第二挂钩;5、端头;6、凸起头;7、圆环;8、卡槽;9、防滑纹路;10、绳索;11、连接盘;12、支撑杆;13、铁环;14、捆绑区。In the figure: 1. Prefabricated well; 2. Through hole; 3. First hook; 4. Second hook; 5. End; 6. Protruding head; 7. Ring;
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例,基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all of them. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work all belong to the scope of protection of the present invention.
在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present utility model, it should be understood that the orientations or positional relationships indicated by the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise" etc. are based on the orientation or positional relationship shown in the drawings, and are only for convenience of description The present invention and simplified description do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the present invention.
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量,由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征,在本实用新型的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be understood as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Therefore, the features limited to "first" and "second" may explicitly or implicitly include one or more such features. In the description of the present utility model, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
请参阅图1-4,本实用新型提供技术方案:一种用于预制检查井的吊装工具,包括预制井1、通孔2和第一挂钩3,预制井1的表面贯穿连接有通孔2,通孔2的一侧嵌入连接有第一挂钩3,通孔2的另一侧嵌入连接有第二挂钩4,第二挂钩4的一端固定连接有端头5,第二挂钩4的内部固定连接有凸起头6,第二挂钩4的顶部固定连接有圆环7,凸起头6的中间部位固定连接有卡槽8,凸起头6的表面固定连接有防滑纹路9,圆环7的内部缠绕连接有绳索10,绳索10的顶部捆绑连接有连接盘11,连接盘11的内部固定连接有支撑杆12,支撑杆12的顶部固定连接有铁环13,支撑杆12的一侧固定连接有捆绑区14。Please refer to Figures 1-4, the utility model provides a technical solution: a hoisting tool for a prefabricated inspection well, including a prefabricated well 1, a through hole 2 and a first hook 3, the surface of the prefabricated well 1 is connected with a through hole 2, one side of the through hole 2 is embedded and connected with the first hook 3, the other side of the through hole 2 is embedded and connected with the second hook 4, one end of the second hook 4 is fixedly connected with the end 5, the inside of the second hook 4 is fixedly connected with the raised head 6, and the top of the second hook 4 is fixedly connected with the ring 7, the convex The middle part of the starting head 6 is fixedly connected with a card slot 8, the surface of the protruding head 6 is fixedly connected with an anti-skid pattern 9, the inner winding of the ring 7 is connected with a rope 10, and the top of the rope 10 is bound and connected with a connection plate 11, the inside of the connection plate 11 is fixedly connected with a support rod 12, the top of the support rod 12 is fixedly connected with an iron ring 13, and one side of the support rod 12 is fixedly connected with a binding area 14.
优选的,第一挂钩3和第二挂钩4的结构相同,凸起头6呈圆弧结构,吻合通孔2的圆弧端面,卡槽8的大小宽度吻合预制井1的厚度,由预制井1、通孔2、第一挂钩3、第二挂钩4、端头5、凸起头6、圆环7和卡槽8共同组成悬挂装置,现有的预制检查井的吊装工具,在使用过程中,不能很好的进行吊装稳定性不佳,导致在进行吊装时容易造成脱落以及位置滑动的情况,存在一定的危险性,通过设置悬挂装置,第一挂钩3和第二挂钩4的结构相同,将第一挂钩3和第二挂钩4分别悬挂固定在预制井1两侧的通孔2处,凸起头6呈圆弧结构,吻合通孔2的圆弧端面,以便于在进行悬挂时,挂钩能够很好的贴合在通孔2的圆弧端面处,卡槽8的大小宽度吻合预制井1的厚度,在进行吊装预制井1时,结合卡槽8能够很好的进行限位固定预制井1防止掉落,位置移动的问题,由圆环7连接绳索10进行吊装。Preferably, the structure of the first hook 3 and the second hook 4 is the same, the protruding head 6 has an arc structure, which fits the arc end face of the through hole 2, and the size and width of the groove 8 match the thickness of the prefabricated well 1, and the suspension device is composed of the prefabricated well 1, the through hole 2, the first hook 3, the second hook 4, the end 5, the protruding head 6, the ring 7 and the groove 8. When hoisting, it is easy to cause falling off and position slippage, which has certain dangers. By setting the suspension device, the first hook 3 and the second hook 4 have the same structure, and the first hook 3 and the second hook 4 are hung and fixed on the through holes 2 on both sides of the prefabricated well 1 respectively. When hoisting the prefabricated well 1, combined with the card slot 8, the prefabricated well 1 can be well limited and fixed to prevent the problem of falling and position movement, and the hoisting is carried out by connecting the rope 10 with the ring 7.
优选的,绳索10捆绑圆环7和连接盘11,支撑杆12交叉固定在连接盘11的内侧,将捆绑区14分为四块,铁环13用于起重器的吊接,由防滑纹路9、绳索10、连接盘11、支撑杆12、铁环13和捆绑区14共同组成辅助装置,在进行吊装时,绳索处于分散开来,不能很好的进行限位距离,通过设置辅助装置,防滑纹路9在进行吊装时,可加大凸起头6端面的摩擦力,加强稳定性,绳索10捆绑圆环7和连接盘11,绳索10捆绑连接盘11的表面来对绳索10进行位置限制,防止绳索10的搬动,便于进行稳固吊装,支撑杆12交叉固定在连接盘11的内侧,将捆绑区14分为四块,在预制井1具有两个通孔2的情况,可采用四个挂钩进行同时吊装,以方便在进行吊装时,能够受力,铁环13用于起重器的吊接。Preferably, the rope 10 binds the ring 7 and the connecting plate 11, and the support rod 12 is cross-fixed on the inner side of the connecting plate 11, and the binding area 14 is divided into four pieces, and the iron ring 13 is used for hoisting of the jack. 9. During hoisting, the frictional force on the end surface of the raised head 6 can be increased to enhance stability. The rope 10 is bound to the ring 7 and the connection plate 11, and the rope 10 is bound to the surface of the connection plate 11 to limit the position of the rope 10 to prevent the movement of the rope 10 and facilitate stable hoisting. The support rod 12 is cross-fixed on the inner side of the connection plate 11, and the binding area 14 is divided into four pieces. It is convenient to be able to bear force when hoisting, and the iron ring 13 is used for hoisting of the jack.
综上可得,本实用新型的工作流程:第一挂钩3和第二挂钩4的结构相同,将第一挂钩3和第二挂钩4分别悬挂固定在预制井1两侧的通孔2处,凸起头6呈圆弧结构,吻合通孔2的圆弧端面,以便于在进行悬挂时,挂钩能够很好的贴合在通孔2的圆弧端面处,卡槽8的大小宽度吻合预制井1的厚度,在进行吊装预制井1时,结合卡槽8能够很好的进行限位固定预制井1防止掉落,位置移动的问题,由圆环7连接绳索10进行吊装,防滑纹路9在进行吊装时,可加大凸起头6端面的摩擦力,加强稳定性,绳索10捆绑圆环7和连接盘11,绳索10捆绑连接盘11的表面来对绳索10进行位置限制,防止绳索10的搬动,便于进行稳固吊装,支撑杆12交叉固定在连接盘11的内侧,将捆绑区14分为四块,在预制井1具有两个通孔2的情况,可采用四个挂钩进行同时吊装,以方便在进行吊装时,能够受力,铁环13用于起重器的吊接。In summary, the working process of the present utility model: the first hook 3 and the second hook 4 have the same structure, and the first hook 3 and the second hook 4 are suspended and fixed on the through holes 2 on both sides of the prefabricated well 1 respectively. The card slot 8 can well limit and fix the prefabricated well 1 to prevent falling and position movement. The ring 7 is connected to the rope 10 for lifting. The inner side of the disc 11 divides the binding area 14 into four parts. In the case that the prefabricated well 1 has two through holes 2, four hooks can be used for simultaneous hoisting so as to facilitate the hoisting. The iron ring 13 is used for hoisting of the jack.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, replacements and modifications can be made to these embodiments without departing from the principle and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320096035.4U CN219408863U (en) | 2023-02-01 | 2023-02-01 | A hoisting tool for prefabricated inspection well |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320096035.4U CN219408863U (en) | 2023-02-01 | 2023-02-01 | A hoisting tool for prefabricated inspection well |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN219408863U true CN219408863U (en) | 2023-07-25 |
Family
ID=87203910
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320096035.4U Expired - Fee Related CN219408863U (en) | 2023-02-01 | 2023-02-01 | A hoisting tool for prefabricated inspection well |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN219408863U (en) |
-
2023
- 2023-02-01 CN CN202320096035.4U patent/CN219408863U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN219408863U (en) | A hoisting tool for prefabricated inspection well | |
| CN108726358A (en) | A kind of towering concrete structure main reinforcement batch hanging apparatus and method | |
| CN205778885U (en) | A kind of shield machine reaction frame | |
| CN204873453U (en) | A lifting lug for large tonnage hoisting | |
| CN206720552U (en) | A kind of adjustable lifting appliance for being used to lift steel plate | |
| CN205973449U (en) | Jack -up handling rigging of buffering pulley | |
| CN205061368U (en) | Adjustable quick steel plate lifting clamp | |
| CN205932940U (en) | Hang various steel sheet tripod | |
| CN210029711U (en) | Brake drum special spreader | |
| CN212315299U (en) | Anti-swing device of hoisting equipment | |
| CN210133812U (en) | Steel bar hoisting and clamping device for construction site | |
| CN210636659U (en) | Plane steel bar truss building carrier plate based on rapid Assembly formula | |
| CN206927467U (en) | A kind of lifting pipeline instrument | |
| CN221720290U (en) | An auxiliary tool suitable for hoisting wooden truss structure of antique building | |
| CN107986154A (en) | A spreader for hoisting large steel pipes | |
| CN209161307U (en) | A kind of inverted T shaped hoisting connecting piece of prefabricated part hanging | |
| CN209337940U (en) | A kind of snap component of crawler telescopic arm hoisting machine suspender | |
| CN219296965U (en) | H-shaped steel lifting hook | |
| CN221662413U (en) | A tripod for rapid lifting and sinking of ring beams | |
| CN219429459U (en) | Lifting appliance convenient to disassemble and assemble | |
| CN209740482U (en) | Heavy pipeline hoisting device and hoisting system | |
| CN217578013U (en) | Special lifting appliance for large steel plate | |
| CN204224077U (en) | A kind of steel construction piece mounting hanger | |
| CN217323036U (en) | Tubular pile crane with buffer device | |
| CN211619744U (en) | Clamp for hoisting plate |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230725 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |