CN111980052A - Electric power construction pile foundation structure - Google Patents

Electric power construction pile foundation structure Download PDF

Info

Publication number
CN111980052A
CN111980052A CN202010977866.3A CN202010977866A CN111980052A CN 111980052 A CN111980052 A CN 111980052A CN 202010977866 A CN202010977866 A CN 202010977866A CN 111980052 A CN111980052 A CN 111980052A
Authority
CN
China
Prior art keywords
main
pile foundation
solid fixed
vertical
fixed cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010977866.3A
Other languages
Chinese (zh)
Other versions
CN111980052B (en
Inventor
陈大宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Installation Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010977866.3A priority Critical patent/CN111980052B/en
Publication of CN111980052A publication Critical patent/CN111980052A/en
Application granted granted Critical
Publication of CN111980052B publication Critical patent/CN111980052B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a power construction pile foundation structure, relates to the technical field of power equipment, and solves the problems that the existing pile foundation cannot be disassembled and has poor adaptability; a fixed clamping plate is movably embedded and mounted on the inner side of the main fixed cylinder; the bottom of the vertical rod fixing seat is fixedly connected with a supporting vertical rod. Need use when this device fixed wire pole, assemble this device earlier, it is inboard with the one end of big screw rod to screw into the main solid fixed cylinder earlier during the equipment, and make this one end contact solid fixed splint of big screw rod and promote solid fixed splint and slide left in the inboard of main solid fixed cylinder, it can stop to be close with the wire pole diameter to the interval of solid fixed splint and main solid fixed cylinder one side inner wall, can adapt to the wire pole of various different diameters like this, adaptability strengthens greatly, support frame can grab and hold in three direction after fixing, the plectane and the riser that support the montant outside simultaneously can prevent the pile foundation from upwards moving about and inclining, further improve the stability of device.

Description

Electric power construction pile foundation structure
Technical Field
The invention relates to the technical field of power equipment, in particular to a power construction pile foundation structure.
Background
In the process of erecting power equipment, the wire pole is one of the indispensable power equipment for support wire, gold utensil etc. can bear the side direction wind-force, and the wire pole mostly is steel and reinforced concrete and makes, all need use the pile foundation to fix it when fixing these wire pole bottoms.
For example, patent application No. 201720794986.3 discloses a pile foundation structure of a telegraph pole, and solves the technical problems that the telegraph pole is not firmly buried and is easily blown down by strong wind in the prior art; the key points of the technical scheme are as follows: the pile foundation structure of the telegraph pole comprises two clamping parts which are used for clamping the telegraph pole and are arranged in a mirror image mode, wherein the outer side surface of each clamping part is fixedly connected with a plurality of supporting legs which are distributed in a tree root shape, and the supporting legs are downwards inclined from one end connected with the clamping parts to the other end; the utility model discloses a set up the supporting legs that is root form and distribute in the side of clamping part, improve the wire pole and to the power of grabbing of ground, make the wire pole be difficult for taking place to topple because of factors such as strong wind, improve the security of wire pole.
Based on the above, the existing telegraph pole pile foundations are of fixed structures, and because the whole coverage range is large and the telegraph pole pile foundations cannot be detached, a large part of space needs to be occupied during transportation, small frame bodies at the edge parts are easy to damage and deform due to collision, the using effect is affected, the diameters of the telegraph poles, which can be fixed by the pile foundations, are corresponding, the telegraph poles with different diameters can only use the pile foundations of different models when being installed, and the adaptability is poor; therefore, the existing requirements are not met, and the electric power construction pile foundation structure is provided for the existing requirements.
Disclosure of Invention
The invention aims to provide an electric power construction pile foundation structure, which solves the problems that the existing telegraph pole pile foundations in the background technology are all fixed structures, a large part of space is required to be occupied during transportation because the whole coverage area is large and the telegraph pole pile foundations cannot be disassembled, the small frame bodies at the edge parts are easy to damage and deform due to collision, the use effect is influenced, the diameters of the telegraph poles which can be fixed by the pile foundations are all corresponding, and the telegraph poles with different diameters can only use pile foundations of different models when being installed, so that the adaptability is poor.
In order to achieve the purpose, the invention provides the following technical scheme: a power construction pile foundation structure comprises a main fixed cylinder; a fixed clamping plate is movably embedded and mounted on the inner side of the main fixed cylinder; one side of the main fixed cylinder is fixedly and symmetrically embedded with four big screw rods through threads; six pressurizing baffle plates are fixedly and symmetrically arranged on one side of the fixed clamping plate; the outer side of the main fixed cylinder is fixedly and symmetrically provided with eight cross rod fixed seats; a supporting cross rod is fixedly embedded and installed on one side of each cross rod fixing seat, and a cross rod fixing insertion rod is embedded and installed at the position where the cross rod fixing seat is embedded and installed with the supporting cross rod; three support frames are embedded in the support cross rod at equal intervals, and a support frame fixing inserted rod is embedded in the embedding position of the support cross rod and the support frame; a vertical rod fixing seat is fixedly arranged between every two adjacent transverse rod fixing seats; the bottom of the vertical rod fixing seat is fixedly connected with a supporting vertical rod.
Preferably, the front and back side of main solid fixed cylinder all sets up the inside and outside bar groove that runs through of twice, and the solid fixed splint both sides all are provided with two T shape sliders, and the T shape slider imbeds respectively in the bar groove of main solid fixed cylinder front and back side and can the horizontal slip, and it is inboard to screw into main solid fixed cylinder with the one end of big screw rod during the use, can promote solid fixed splint when this one end contact solid fixed splint of big screw rod and slide left in the inboard of main solid fixed cylinder.
Preferably, two vertical and symmetrical semicircular column strips are fixedly arranged on one side of the inside of the main fixing cylinder and one side of the fixing clamp plate, and the pressurizing baffle plate on one side of the fixing clamp plate is of an arc-shaped plate structure.
Preferably, every face in four faces in the main fixed cylinder outside all is provided with two horizontal pole fixing bases, and all is provided with the bar arch one in the middle of adjacent horizontal pole fixing base one side, also all is provided with the bar groove of one correspondence on two looks adjacent faces of montant fixing base, and the bar groove of montant fixing base installation back outside can with the protruding looks gomphosis of bar in the horizontal pole fixing base outside.
Preferably, the one end outside of supporting the horizontal pole all is provided with a platelike structure, and supports the horizontal pole and pass through the fixed inserted bar of horizontal pole fixed back, and the platelike structure that supports the horizontal pole outside can leak the vertical face in the outside with the montant fixing base and closely laminate.
Preferably, the support horizontal pole one end inboard all is provided with a cross-shaped groove, and the main part of support frame also is the cruciform structure that corresponds, during the support frame installation directly installs the middle part embedding in the cross-shaped groove of support horizontal pole inboard, and the impartial distance in cross-shaped groove position on the support horizontal pole is provided with three inclined hole in addition, and the middle part of support frame also all is provided with an inclined hole that inclination is the same, and the fixed inserted bar of support frame passes the inclined hole on the support horizontal pole and the inclined hole on the support frame during the installation fixes the support frame.
Preferably, the two sides of the top of the horizontal plate and the two sides of the top of the vertical plate of the support frame are both fixedly provided with small-sized square plates, and the square plates are respectively integrally vertical to the horizontal plate and the vertical plate.
Preferably, the outer sides of the supporting vertical rods are all fixedly and equidistantly provided with three horizontal circular plate-shaped structures, a group of two vertical square plates are fixedly and symmetrically arranged between every two adjacent circular plates, and the vertical square plates on the outer sides of the four supporting vertical rods can be annularly arranged in four different directions.
Preferably, the vertical rod fixing seat, the supporting vertical rods, the supporting cross rods and the supporting frame are all of detachable structures, and the main fixing cylinder can be detached from the outer side of the main fixing cylinder and placed independently during transportation.
Compared with the prior art, the invention has the beneficial effects that:
first, when needing to use the fixed wire pole of this device, assemble this device earlier, it is inboard with the one end of big screw rod to twist into the main solid fixed cylinder during the equipment, and make this one end contact solid fixed splint of big screw rod and promote solid fixed splint to slide left in the inboard of main solid fixed cylinder, it can stop to be close with the wire pole diameter to the interval of solid fixed splint and main solid fixed cylinder one side inner wall, can adapt to the wire pole of various different diameters like this, adaptability strengthens greatly, fixed back support frame can be held and hold in three direction, the plectane and the riser that support the montant outside simultaneously can prevent the pile foundation from upwards moving and slope, further improve the stability of device.
The second, the montant fixing base, support the montant, it is dismantlement formula structure to support horizontal pole and support frame, the homoenergetic is dismantled from the main solid fixed cylinder outside and is placed alone during the transportation, this device is in the inboard of main solid fixed cylinder with solid fixed splint fixed mounting and at solid fixed splint both sides welding T shape slider during manufacturing, gu fixed splint alright slide in the inboard side of main solid fixed cylinder about like this, all the other parts are all made alone, when needing to transport this device, the part all can place the transportation alone, occupation space still less during the transportation, and also difficult production collision, avoid the part to cause damage and deformation.
Drawings
FIG. 1 is a schematic view of the assembled bent axis side structure of the present invention;
FIG. 2 is a schematic view of the assembled bottom side structure of the present invention;
FIG. 3 is a schematic view of a top-down shaft side structure of the main stationary cylinder of the present invention;
FIG. 4 is a schematic top view of the primary stationary barrel of the present invention;
FIG. 5 is a top view of the present invention in a partially assembled configuration;
FIG. 6 is a schematic top side view of the support rail and support frame assembly of the present invention;
FIG. 7 is a schematic bottom view of the cross bar and the stand assembly of the present invention;
FIG. 8 is an enlarged partial view of FIG. 2 at point A;
in the figure: 1. a main fixed cylinder; 2. fixing the clamping plate; 3. a large screw; 4. a pressure boost baffle; 5. a cross bar fixing seat; 6. the inserted rod is fixed by the cross rod; 7. a vertical rod fixing seat; 8. supporting the vertical rod; 9. a support rail; 10. a support frame; 11. the support frame fixes the inserted link.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1 to 8, an embodiment of the present invention includes: a power construction pile foundation structure comprises a main fixed cylinder 1; a fixed splint 2 is movably embedded and installed on the inner side of the main fixed cylinder 1; each surface of four surfaces of the outer side of the main fixed cylinder 1 is provided with two transverse rod fixing seats 5, the middle of one side of each adjacent transverse rod fixing seat 5 is provided with a strip-shaped bulge, two adjacent surfaces of the vertical rod fixing seats 7 are provided with corresponding strip-shaped grooves, and the strip-shaped groove at the outer side of the vertical rod fixing seat 7 is embedded with the strip-shaped bulge at the outer side of the transverse rod fixing seat 5 after the vertical rod fixing seat 7 is installed, when in installation, four vertical rod fixing seats 7 are installed between four groups of adjacent transverse rod fixing seats 5, then eight supporting transverse rods 9 are respectively embedded and installed in the transverse rod fixing seats 5 and the transverse rod fixing inserted rods 6 are inserted, when in installation, the plate-shaped structure at the outer side of the supporting transverse rods 9 faces the vertical rod fixing seats 7, the vertical rod fixing seats 7 are pushed inwards by the plate-shaped structures on the outer sides of the supporting cross rods 9 after installation, and the vertical rod fixing seats 7 can be effectively prevented from falling off by the aid of the protrusions on the cross rod fixing seats 5; the front side and the rear side of the main fixing cylinder 1 are respectively provided with two strip-shaped grooves which are internally and externally penetrated, two sides of the fixing splint 2 are respectively provided with two T-shaped sliding blocks, the T-shaped sliding blocks are respectively embedded into the strip-shaped grooves on the front side and the rear side of the main fixing cylinder 1 and can slide left and right, one end of the large screw 3 is screwed into the inner side of the main fixing cylinder 1 when in use, and the end of the large screw 3 is contacted with the fixing splint 2 and can push the fixing splint 2 to slide left on the inner side of the main fixing cylinder 1; one side of the main fixed cylinder 1 is fixedly and symmetrically embedded with four big screw rods 3 through threads; six pressurizing baffle plates 4 are symmetrically and fixedly arranged on one side of the fixed splint 2; the outer side of the main fixed cylinder 1 is fixedly and symmetrically provided with eight cross bar fixed seats 5; a supporting cross rod 9 is fixedly embedded and installed on one side of the cross rod fixing seat 5, and a cross rod fixing inserted rod 6 is embedded and installed at the position where the cross rod fixing seat 5 is embedded and installed with the supporting cross rod 9; three support frames 10 are embedded in the support cross rod 9 at equal intervals, and a support frame fixing inserted rod 11 is embedded in the embedded position of the support cross rod 9 and the support frame 10; the two sides of the top of the horizontal plate and the two sides of the top of the vertical plate of the support frame 10 are respectively fixedly provided with a small-sized square plate, the square plates are respectively integrally vertical to the horizontal plate and the vertical plate, and the support frame 10 of the device can grip the upper part of the device in three directions after concrete is solidified, so that the stability is improved; a vertical rod fixing seat 7 is fixedly arranged between every two adjacent transverse rod fixing seats 5; the bottom of each vertical rod fixing seat 7 is fixedly connected with a supporting vertical rod 8; the equal fixed equidistance in the support montant 8 outside is provided with the circular platelike structure of three horizontally, and equal fixed symmetry is provided with two vertical square boards of a set of between two adjacent plectanes, and four vertical square boards that support montant 8 in its outside after the installation can be the annular and arrange the direction towards four differences respectively, and the plectane and the riser that support the montant 8 outside after the fixing can prevent the pile foundation activity and slope that make progress.
Further, inside one side of a main fixed cylinder 1 and one side of solid fixed splint 2 are all fixed and are provided with the vertical and symmetrical semi-circular column strip of twice, and the pressure boost plate washer 4 of solid fixed splint 2 one side is arc platelike structure, and the outside can block between the semi-circular column strip of inside one side of a main fixed cylinder 1 and solid fixed splint 2 one side during the wire pole installation, consequently can be spacing with the wire pole.
Further, the one end outside of supporting horizontal pole 9 all is provided with a platelike structure, and support horizontal pole 9 and pass through the fixed back of the fixed inserted bar 6 of horizontal pole, the platelike structure in the support horizontal pole 9 outside can leak the vertical face in the outside with montant fixing base 7 and closely laminate, install four montant fixing bases 7 between four adjacent horizontal pole fixing bases 5 of group during the installation, again with eight support horizontal poles 9 embedding respectively install in horizontal pole fixing base 5 and insert the fixed inserted bar 6 of horizontal pole, the platelike structure that makes the support horizontal pole 9 outside during the installation moves towards montant fixing base 7, the platelike structure in the support horizontal pole 9 outside after the installation can be tight with montant fixing base 7 inside top, in addition the arch on horizontal pole fixing base 5 can effectively prevent montant fixing base 7 from dro.
Further, support horizontal pole 9 one end inboard all to be provided with a cross-shaped groove, and the main part of support frame 10 is the cruciform structure that corresponds also, support frame 10 directly installs middle part embedding in the cross-shaped groove of supporting horizontal pole 9 inboard during the installation, and the equal equidistance in cross-shaped groove position on the support horizontal pole 9 is provided with three inclined hole, the middle part of support frame 10 also all is provided with the inclined hole that an inclination is the same, the fixed inserted bar 11 of support frame passes the inclined hole on supporting horizontal pole 9 and the inclined hole on the support frame 10 fixes support frame 10 during the installation, it is very convenient during the installation, and it is also very stable after the installation.
Further, montant fixing base 7, support montant 8, support horizontal pole 9 and support frame 10 and be the dismantlement formula structure, homoenergetic is dismantled from the main solid fixed cylinder 1 outside and is placed alone during the transportation, this device is in the time of the manufacturing with solid fixed splint 2 fixed mounting in the inboard of main solid fixed cylinder 1 and at solid fixed splint 2 both sides welding T shape slider, gu fixed splint 2 alright slide in the main solid fixed cylinder 1 inboard side about like this, all the other parts are all made alone, when needing to transport this device, the transportation all can be placed alone to the part, occupation space still less during the transportation, and also difficult collision, avoid the part to cause damage and deformation.
The working principle is as follows: when the device is manufactured, the fixed splint 2 is fixedly arranged on the inner side of the main fixed cylinder 1, the T-shaped sliding blocks are welded on the two sides of the fixed splint 2, so that the fixed splint 2 can slide left and right on the inner side of the main fixed cylinder 1, other parts are manufactured independently, when the device needs to be transported, the parts can be placed and transported independently, the occupied space during transportation is less, the collision is not easy to generate, and the parts are prevented from being damaged and deformed, when a telegraph pole needs to be fixed by using the device, firstly, a pit is dug at the position needing to be fixed, then, the device is assembled, one end of the large screw 3 is screwed into the inner side of the main fixed cylinder 1 during assembly, the end of the large screw 3 is contacted with the fixed splint 2 and pushes the fixed splint 2 to slide leftwards on the inner side of the main fixed cylinder 1 until the distance between the fixed splint 2 and, thus, the utility model can be adapted to telegraph poles with different diameters, four vertical rod fixing seats 7 are arranged between four groups of adjacent horizontal rod fixing seats 5, eight supporting horizontal rods 9 are respectively embedded and arranged in the horizontal rod fixing seats 5 and the horizontal rod fixing insertion rods 6 are inserted, the plate-shaped structure outside the supporting horizontal rods 9 faces the vertical rod fixing seats 7 during installation, the plate-shaped structure outside the supporting horizontal rods 9 can tightly push the vertical rod fixing seats 7 inwards after installation, the vertical rod fixing seats 7 can be effectively prevented from falling off by the bulges on the horizontal rod fixing seats 5, the middle parts of the supporting frames 10 are embedded and arranged in the cross-shaped grooves inside the supporting horizontal rods 9 and are fixed through the supporting frame fixing insertion rods 11, the device is assembled after all installation, then the supporting vertical rods 8 of the device are placed downwards in the dug pits, and the telegraph poles are inserted into the empty grooves on one side of the fixing clamping plates 2, the outside can block between the semicircle pillar strip of 1 inside one side of main fixed cylinder and 2 one sides of solid fixed splint during wire pole installation, consequently can be spacing with the wire pole, continue to hang the wire pole tightly to pouring concrete in the hole, the support frame 10 of this device can be held to three direction in device top part after the concrete sets, the plectane and the riser that support the 8 outsides of montant simultaneously can prevent the pile foundation from upwards moving about and slope, 4 contact concrete of pressure boost plate washer can prevent solid fixed splint 2 activities again, further improve the stability of device.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (9)

1. The utility model provides an electric power construction pile foundation structure which characterized in that: comprises a main fixed cylinder (1); a fixed clamping plate (2) is movably embedded and mounted on the inner side of the main fixed cylinder (1); one side of the main fixed cylinder (1) is fixedly and symmetrically embedded with four big screw rods (3) through threads; six pressurizing baffle plates (4) are fixedly and symmetrically arranged on one side of the fixed splint (2); the outer side of the main fixed cylinder (1) is fixedly and symmetrically provided with eight cross bar fixed seats (5); a supporting cross rod (9) is fixedly embedded into one side of each cross rod fixing seat (5), and a cross rod fixing inserted rod (6) is embedded into the position where each cross rod fixing seat (5) is embedded into the corresponding supporting cross rod (9); three support frames (10) are embedded and mounted on the support cross rod (9) at equal intervals, and a support frame fixing inserted rod (11) is embedded and mounted at the embedding position of the support cross rod (9) and the support frame (10); a vertical rod fixing seat (7) is fixedly arranged between every two adjacent transverse rod fixing seats (5); the bottom of the vertical rod fixing seat (7) is fixedly connected with a supporting vertical rod (8).
2. An electric power construction pile foundation structure according to claim 1, characterized in that: the side all sets up the bar groove that runs through inside and outside the twice around the main solid fixed cylinder (1), solid fixed splint (2) both sides all are provided with two T shape sliders, and the T shape slider inlays respectively in the bar groove of main solid fixed cylinder (1) front and back side and can the horizontal slip, and it is inboard to screw into main solid fixed cylinder (1) with the one end of big screw rod (3) during the use, can promote solid fixed splint (2) and slide left in the inboard of main solid fixed cylinder (1) when this one end contact solid fixed splint (2) of big screw rod (3).
3. An electric power construction pile foundation structure according to claim 1, characterized in that: two vertical and symmetrical semi-cylindrical strips are fixedly arranged on one side of the inner portion of the main fixing barrel (1) and one side of the fixing clamp plate (2), and the pressurizing baffle plate (4) on one side of the fixing clamp plate (2) is of an arc-shaped plate structure.
4. An electric power construction pile foundation structure according to claim 1, characterized in that: every face in four faces in the main fixed cylinder (1) outside all is provided with two horizontal pole fixing bases (5), and all is provided with one bar arch in the middle of adjacent horizontal pole fixing base (5) one side, also all is provided with the bar groove that corresponds one on two looks facies of montant fixing base (7), and the bar groove of montant fixing base (7) installation back outside can with the protruding looks gomphosis of bar in the horizontal pole fixing base (5) outside.
5. An electric power construction pile foundation structure according to claim 1, characterized in that: the one end outside of supporting horizontal pole (9) all is provided with a platelike structure, and supports horizontal pole (9) and fixes the back through fixed inserted bar (6) of horizontal pole, and the platelike structure that supports the horizontal pole (9) outside can leak the vertical face in the outside with montant fixing base (7) and closely laminate.
6. An electric power construction pile foundation structure according to claim 1, characterized in that: support horizontal pole (9) one end inboard all is provided with a cross-shaped groove, and the main part of support frame (10) is the cruciform structure that corresponds also, directly install the middle part embedding in the cross-shaped groove that supports horizontal pole (9) inboard during support frame (10) installation, and the equal equidistance of cross-shaped groove position on the support horizontal pole (9) is provided with three inclined hole, the middle part of support frame (10) also all is provided with the inclined hole that an inclination is the same, the inclined hole that support frame fixed inserted bar (11) passed on support horizontal pole (9) and support frame (10) during the installation is fixed support frame (10).
7. An electric power construction pile foundation structure according to claim 1, characterized in that: the two sides of the top of the horizontal plate and the two sides of the top of the vertical plate of the support frame (10) are respectively fixedly provided with a small-sized square plate, and the square plates are respectively integrally vertical to the horizontal plate and the vertical plate.
8. An electric power construction pile foundation structure according to claim 1, characterized in that: the supporting vertical rods (8) are fixed at equal intervals outside and are provided with three horizontal circular plate-shaped structures, a group of two vertical square plates are fixed between every two adjacent circular plates, and the vertical square plates outside the supporting vertical rods (8) can be arranged in an annular mode and face four different directions respectively after being installed.
9. An electric power construction pile foundation structure according to claim 1, characterized in that: the vertical rod fixing seat (7), the supporting vertical rod (8), the supporting cross rod (9) and the supporting frame (10) are all of detachable structures, and can be detached from the outer side of the main fixing cylinder (1) and placed independently during transportation.
CN202010977866.3A 2020-09-17 2020-09-17 Electric power construction pile foundation structure Active CN111980052B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010977866.3A CN111980052B (en) 2020-09-17 2020-09-17 Electric power construction pile foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010977866.3A CN111980052B (en) 2020-09-17 2020-09-17 Electric power construction pile foundation structure

Publications (2)

Publication Number Publication Date
CN111980052A true CN111980052A (en) 2020-11-24
CN111980052B CN111980052B (en) 2022-05-06

Family

ID=73450784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010977866.3A Active CN111980052B (en) 2020-09-17 2020-09-17 Electric power construction pile foundation structure

Country Status (1)

Country Link
CN (1) CN111980052B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113774952A (en) * 2021-09-17 2021-12-10 田丰 Pile foundation structure for electric power construction

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1270649A (en) * 1997-09-18 2000-10-18 钢铁基础技术有限公司 Screw pile anchor
CN2725367Y (en) * 2004-06-03 2005-09-14 田俊如 Power rod tower pipe pile foundation
CN207228145U (en) * 2017-07-03 2018-04-13 深圳市孺子牛建设工程有限公司 A kind of piling strtucture of electric pole
CN207406096U (en) * 2017-07-13 2018-05-25 深圳市新旭龙通信实业有限公司 A kind of reinforcement type monitoring bar
US10526758B1 (en) * 2018-09-05 2020-01-07 Gregory Enterprises, Inc. Helical pile foundation system
CN210263029U (en) * 2019-05-13 2020-04-07 浙江紫微建筑工程有限公司 Combined pile for constructional engineering
CN211113713U (en) * 2019-11-21 2020-07-28 毕新连 Pile foundation device for building engineering

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1270649A (en) * 1997-09-18 2000-10-18 钢铁基础技术有限公司 Screw pile anchor
CN2725367Y (en) * 2004-06-03 2005-09-14 田俊如 Power rod tower pipe pile foundation
CN207228145U (en) * 2017-07-03 2018-04-13 深圳市孺子牛建设工程有限公司 A kind of piling strtucture of electric pole
CN207406096U (en) * 2017-07-13 2018-05-25 深圳市新旭龙通信实业有限公司 A kind of reinforcement type monitoring bar
US10526758B1 (en) * 2018-09-05 2020-01-07 Gregory Enterprises, Inc. Helical pile foundation system
CN210263029U (en) * 2019-05-13 2020-04-07 浙江紫微建筑工程有限公司 Combined pile for constructional engineering
CN211113713U (en) * 2019-11-21 2020-07-28 毕新连 Pile foundation device for building engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113774952A (en) * 2021-09-17 2021-12-10 田丰 Pile foundation structure for electric power construction

Also Published As

Publication number Publication date
CN111980052B (en) 2022-05-06

Similar Documents

Publication Publication Date Title
CN111980052B (en) Electric power construction pile foundation structure
CN202651150U (en) Hanging rope fixing device of photovoltaic module
CN219491789U (en) Safety protection channel
CN216713539U (en) Roof rack bearing structure that slides
CN210685097U (en) Assembled aeolian bells door head
CN104818995A (en) Method for assembling confined concrete arch frames
CN201474702U (en) Heating pipeline-fixing force transfer support of heating shield tunnel
CN210768144U (en) Civil engineering encloses fender connecting device
CN202370543U (en) Steel pipe bent frame supporting device
CN219528094U (en) Novel assembled stone material curtain fossil fragments installation node
CN215405772U (en) Guardrail convenient to carry out local maintenance
CN214626280U (en) Hanging bracket
CN205840001U (en) A kind of light steel house connecting structure
CN217557574U (en) Historical site protection construction table
CN221422654U (en) Socket-type disc-buckle scaffold node structure
CN218648754U (en) Mountain region photovoltaic flexible support limit anchor structure
CN220874449U (en) Prefabricated base for flexible photovoltaic support, flexible photovoltaic support and photovoltaic system
CN220007784U (en) Bionic centipede rack
CN219564838U (en) Assembled rigid contact net conversion support
CN219584800U (en) Tunnel stock dish rack
CN217232812U (en) Lattice stand column mounting and positioning device
CN220252807U (en) Large outdoor advertisement showing net rack
CN221878733U (en) Assembled building frame
CN216075598U (en) Building construction steel construction fixing device
CN220451092U (en) Modular combined supporting steel member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220420

Address after: 730000, No.2, Wujiayuan West Street, Lanzhou City, Gansu Province

Applicant after: Gansu installation Construction Group Co.,Ltd.

Address before: 402472 No. 173, group 5, Xinmin village, Guchang Town, Rongchang District, Chongqing

Applicant before: Chen Dakuan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant