SUMMERY OF THE UTILITY MODEL
The embodiment of the utility model provides a technical problem that will solve lies in, to adopting artifical transport work piece, not only inefficiency, but also the problem of extravagant manpower, has provided a double-deck heavy load circulation board chain line.
In order to solve the technical problem, the embodiment of the utility model provides a double-deck heavy load circulation board chain line is provided, this double-deck heavy load circulation board chain line includes: the body mount and set gradually the frock on the body mount and switch the platform, the left side lift, middle upper strata doubly defeated chain line, middle lower floor doubly defeated chain line and the right lift, two-layer about left side lift and the right lift all have, and the symmetry sets up, middle upper strata doubly defeated chain line sets up between the left side lift and the right lift with middle lower floor doubly defeated chain line, and the correspondence sets up from top to bottom, middle upper strata doubly defeated both ends of chain line are connected with the upper strata of the left side lift and the right lift respectively, middle lower floor doubly the both ends of defeated chain line be connected with the lower floor of the left side lift and the right lift respectively, the frock switches the platform and is connected with the lower floor of the left side lift.
Wherein, both sides on the body mount that the frock switches the bench and corresponds all are provided with guide bar and spring ejector die ware, and the frock switches one of bench and is close to left side lift and serves and install stop device.
Wherein, the upper double chain transmission line and the middle lower double chain transmission line all are provided with the work position that three interval set up on the line, first mould ware and the second mould ware of lifting are installed respectively to both sides on the body mount that corresponds on every work position, the both ends inboard of first mould ware of lifting is provided with first locating pin and first inductor respectively, the both ends inboard of second mould ware is provided with second inductor and second locating pin respectively, first inductor and second inductor, first locating pin and the equal diagonal setting of second locating pin.
Wherein, first mould ware and the second mould ware of lifting all are connected with the solenoid valve, through solenoid valve control jack-up and decline, first locating pin and second locating pin pass through the connector of floating and connect on the cylinder, and the cylinder passes through base fixed mounting on the body mount.
Wherein, install the stopper on the body mount between first mould ware and the second mould ware of lifting, stopper and first inductor and second inductor electric connection.
Wherein, install electric integral type quick connector on the body mount, electric integral type quick connector is including the female of setting up side by side inserting and public inserting, and the public of integral type quick connector is inserted and is connected with the cylinder, and public outside of inserting and female inserting all is provided with the gas port.
Implement the embodiment of the utility model provides a, following beneficial effect has: this double-deck heavy load circulation board chain line combines to accomplish to fix a position fast and accurately with mould lifting device and locating pin, and automatic switch can be done to electricity, has realized that the frock can remove, quick work, and the layer separately independent design about the conveying can not influence the precision of upper and lower two-layer work position.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, fig. 1 is a schematic structural view of a double-layer heavy-duty circulating plate chain line provided by the present invention; fig. 2 is a schematic side view of the double-layer heavy-duty circulating plate chain line provided by the present invention; FIG. 3 is an enlarged schematic view of the working position; fig. 4 is a schematic view of an installation structure of the electrical integrated quick connector. This double-deck heavy load circulation board chain line includes: the device comprises a body fixing frame 10, a tool switching table 11, a left lifter 12, a middle upper layer chain conveying line 13, a middle lower layer chain conveying line 14 and a right lifter 15.
This double-deck heavy load circulation board chain line includes: the device comprises a body fixing frame 10, and a tool switching table 11, a left lifter 12, a middle upper layer chain conveying line 13, a middle lower layer chain conveying line 14 and a right lifter 15 which are sequentially arranged on the body fixing frame 10.
Left side lift 12 and right lift 15 all have about two-layerly, and the symmetry sets up, middle upper strata doubly loses chain line 13 and middle lower floor doubly loses chain line 14 and sets up between left side lift 12 and right lift 15, and correspond the setting from top to bottom, middle upper strata doubly loses the both ends of chain line 13 and is connected with the upper strata of left side lift 12 and right lift 15 respectively, middle lower floor doubly loses the both ends of chain line 14 and is connected with the lower floor of left side lift 12 and right lift 15 respectively, frock switching station 11 is connected with the lower floor of left side lift 12.
Both sides on the corresponding body mount 10 on the frock switching platform 11 all are provided with guide bar 16 and spring ejector 17, and one end that frock switching platform 11 is close to left side lift 12 is last to install stop device 18.
All be provided with the work position 19 that three interval set up on the doubly chain line of failing 13 of upper strata and the doubly chain line of failing 14 of middle lower floor, first mould ware 20 and the second mould ware 21 of lifting are installed respectively to the both sides on the body mount 10 that corresponds on every work position 19, the both ends inboard of first mould ware 20 is provided with first locating pin 22 and first inductor 23 respectively, the both ends inboard of second mould ware 21 is provided with second inductor 24 and second locating pin 25 respectively, first inductor 23 and second inductor 24, first locating pin 22 and the equal diagonal setting of second locating pin 25. First mould ware 20 and the second mould ware 21 of lifting are all connected with the solenoid valve, through solenoid valve control jack-up and decline, and first locating pin 22 and second locating pin 25 are connected on cylinder 26 through the connector that floats, and cylinder 26 passes through base fixed mounting on body mount 10. A stopper 27 is mounted on the body fixing frame 10 between the first die lifter 20 and the second die lifter 21, and the stopper 27 is electrically connected with the first sensor 23 and the second sensor 24.
Install electric integral type quick connector 28 on body mount 10, electric integral type quick connector 28 is including female 29 and public 30 of inserting that set up side by side, and the public 30 of inserting of integral type quick connector 28 is connected with cylinder 26, and public outside of inserting 29 and female 30 all is provided with air-receiving port 31.
The utility model discloses a through electric fast switch-over, lift the mould ware jacking, motor back and forth movement can ensure: the electrical quick switching can lead each tool 40 to be quickly inflated to the next station and receive the corresponding program of the station, so that the tool automatically works; the die lifter can quickly jack up the tool 40, and is beneficial to accurate insertion of the lower positioning pin into the positioning hole on the tool; the tooling is very heavy and fast to jack up and fast to descend, (the die lifter is made of balls, the tooling reduces friction on the tooling and can move on the tooling, when the tooling works in place, the tooling does not accurately reach the position of the positioning pin, and the tooling can be smoothly and accurately positioned by combining the chamfer in front of the pin and the balls on the die lifter with two types of matching).
This double-deck heavy load circulation board chain line, the lift and the interlude work position at both ends, five frocks altogether. The motor drives a speed multiplication chain transmission tool, the heavy-load stopper stops the tool when the transmission is in place, the die lifter jacks up the tool after the tool is in place, the lower cylinder drives the positioning pin to position the positioning hole in the tool, and the working position works for one minute and is conveyed to the lower station. The frock transmission goes to the lift on the right, and through the drive decline of slide rail and cylinder and rise, descends to lower floor's frock work and conveys the left side through the motor times chain transmission, and the lift on the left side rises to above, conveys the frock position.
The double-layer heavy-load circulating plate chain line is provided with 5 sets of tools in a transmission and conveying mode, 4 working positions are formed, and the tools are switched. The upper layer of double-transmission chains 1,2 and 3 are carried and moved for 1.8 meters at the same time, the stopper is opened in the motion process, and the sensor sensing tool is installed on the double-layer heavy-load circulating plate chain line to sense where the stopper is opened and closed. The mould ware just jacks up after the frock targets in place, and layer heavy load circulation board chain line above locating pin carries out accurate location, and electric quick insertion lets the action requirement of this station of frock installation carry out work.
Implement the embodiment of the utility model provides a, following beneficial effect has: this double-deck heavy load circulation board chain line combines to accomplish to fix a position fast and accurately with mould lifting device and locating pin, and automatic switch can be done to electricity, has realized that the frock can remove, quick work, and the layer separately independent design about the conveying can not influence the precision of upper and lower two-layer work position.
Details not described in this specification are within the skill of the art that are well known to those skilled in the art. The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.