CN212247898U - Jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars - Google Patents

Jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars Download PDF

Info

Publication number
CN212247898U
CN212247898U CN202021486314.4U CN202021486314U CN212247898U CN 212247898 U CN212247898 U CN 212247898U CN 202021486314 U CN202021486314 U CN 202021486314U CN 212247898 U CN212247898 U CN 212247898U
Authority
CN
China
Prior art keywords
main frame
steel
bars
hoisting
pier shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021486314.4U
Other languages
Chinese (zh)
Inventor
周志鸿
吴伟豪
罗军
黄建富
杨超
王铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Poly Changda Engineering Co Ltd
Original Assignee
Poly Changda Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Poly Changda Engineering Co Ltd filed Critical Poly Changda Engineering Co Ltd
Priority to CN202021486314.4U priority Critical patent/CN212247898U/en
Application granted granted Critical
Publication of CN212247898U publication Critical patent/CN212247898U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a jig frame for integral prefabrication and hoisting of large pier shaft reinforcing steel bars, which comprises a main frame consisting of square steel, wherein the front side surface, the back side surface, the left side surface and the right side surface of the main frame are respectively provided with a cross bar and a plurality of reinforcing bars, the cross bars are arranged in the middle of the front side surface, the back side surface, the left side surface and the right side surface of the main frame, and the reinforcing bars are arranged between the main frame and the cross bars and form a rhombus; the top and the bottom of the main frame are respectively provided with a plurality of steel clamping pieces, and a plurality of clamping grooves for clamping steel bars are uniformly arranged on each steel clamping piece at intervals. The utility model discloses a large-scale pier shaft reinforcing bar construction is standardized, prefabricated for the turnover speed of pier shaft platform support and template reduces the input cost, has reduced the construction degree of difficulty, and has ensured reinforcing bar installation accuracy, and bed-jig simple structure easily makes moreover, and reuse rate is high.

Description

Jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars
Technical Field
The utility model relates to a pier shaft reinforcing bar integrally-prefabricated hoist and mount construction technical field in the bridge construction specifically is a bed-jig of large-scale pier shaft reinforcing bar integrally-prefabricated hoist and mount.
Background
The traditional pier body steel bar construction is in a split type, and operators install main bars, stirrups and lacing wires on a construction platform support one by one and gradually. This traditional construction method has the following disadvantages: 1. the method is not suitable for the current requirements of standardized and prefabricated bridge construction. 2. The construction period of a single pier body is long, and the turnover speed of the pier body platform support and the template is low. 3. The vertical butt joint degree of difficulty of owner muscle is great, and is difficult to guarantee the muffjoint department installation quality. The thickness of the concrete protective layer is difficult to ensure. 4. The process of the scattered assembly belongs to high-altitude operation, and the safety risk is high.
In addition, pier shaft reinforcing bar adopts the prefabricated hoist and mount of branch face, subsection in the current bridge work progress, mainly has following several: 1. and a small positioning clamping groove is manufactured, and the single-side main reinforcement prefabrication hoisting is realized. 2. And manufacturing a small jig frame, and realizing segmental prefabrication and hoisting of stirrups. But the integral prefabrication and hoisting of the large pier body reinforcing steel bars cannot be realized.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a bed-jig structure of whole prefabricated hoist and mount of large-scale pier shaft reinforcing bar has realized the whole prefabricated hoist and mount of large-scale pier shaft reinforcing bar to make the whole prefabricated hoist and mount more high-efficient, more swift, more convenient.
The utility model provides an adopted technical scheme of its technical problem does: a jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars comprises a main frame consisting of square steel, wherein cross bars and a plurality of reinforcing bars are arranged on the front side surface, the rear side surface, the left side surface and the right side surface of the main frame respectively, the cross bars are arranged in the middle of the front side surface, the rear side surface, the left side surface and the right side surface of the main frame, and the reinforcing bars are arranged between the main frame and the cross bars and form a rhombus; the top and the bottom of the main frame are respectively provided with a plurality of steel clamping pieces, and a plurality of clamping grooves for clamping steel bars are uniformly arranged on each steel clamping piece at intervals.
Furthermore, a cross-shaped connecting rod is arranged in the middle of the top of the main frame, and a lifting hook is arranged in the center of the connecting rod.
The utility model also discloses a pier shaft reinforcing bar construction method utilizes the bed-jig of foretell whole prefabricated hoist and mount of large-scale pier shaft reinforcing bar, transversely places the main frame earlier, then is in with the semi-manufactured goods of pier shaft reinforcing bar fixed on the steel clip, the ligature shaping adopts the crane to lift again and hangs messenger's bed-jig and stick up, and the crane hoists pier shaft reinforcing bar and fixes a position the installation to the mounted position, sets up the cable wind rope after the installation finishes and guarantees that pier shaft reinforcing bar is firm, do not empty.
The utility model has the advantages that:
1. realizes the standardization and prefabrication of the large pier body steel bar construction.
2. Pier shaft reinforcement can construct with the cushion cap synchronization, shortens single pier construction cycle for the turnover speed of pier shaft platform support and template reduces the input cost.
3. Convert high altitude construction into ground operation, reduced the safety risk.
4. The construction difficulty is reduced, and the installation precision of the steel bars is guaranteed.
5. The jig frame is simple in structure, easy to manufacture and high in repeated utilization rate.
Drawings
Fig. 1 is a schematic front structural view of the present invention;
fig. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic view of the bottom structure of the present invention
Fig. 4 is a schematic top view of the present invention.
Detailed Description
The present invention will be further described with reference to the accompanying drawings.
As shown in fig. 1 to 4, a jig frame for integral prefabrication and hoisting of large pier body steel bars comprises a main frame 1 composed of square steel (the model is 20 × 20cm, and the wall thickness is 2cm), wherein a cross bar 2 (adopting 12# channel steel) and a plurality of reinforcing bars 3 (adopting 12# channel steel) are respectively arranged on the front side, the rear side, the left side and the right side of the main frame, the cross bar 2 is arranged in the middle of the front side, the rear side, the left side and the right side of the main frame 1, the lower half parts of the front side and the rear side of the main frame 1 are quadrilateral, the upper half parts of the front side and the rear side of the main frame 1 are trapezoidal, and the reinforcing bars 3 are arranged between the main frame 1 and the; the top and the bottom of main frame 1 are equipped with a plurality of steel clamping pieces 4 respectively, each even interval arrangement has a plurality of draw-in grooves 41 that are used for cliping the reinforcing bar on the steel clamping piece 4, the middle part at the top of main frame 1 is equipped with the connecting rod 11 of "ten" shape, the central part of connecting rod 11 is equipped with lifting hook 12.
The utility model also discloses a pier shaft reinforcing bar construction method utilizes foretell one kind of whole prefabricated bed-jig of hoist and mount of large-scale pier shaft reinforcing bar, transversely places the main frame earlier, then is in with the semi-manufactured goods of pier shaft reinforcing bar fixed on the steel clip, the ligature shaping sets up 4 hoisting points (top, bottom each 2) on the bed-jig, adopts 1 130T (top) and 1 50T (bottom) crane to lift and hangs and make the bed-jig erect, then 50T crane unhook, hoists pier shaft reinforcing bar by 130T crane and fixes a position the installation to the mounted position, sets up the cable wind rope after the installation finishes and guarantees that the pier shaft reinforcing bar is firm, do not topple over.
The above mentioned embodiments are only preferred embodiments of the present invention, and the scope of the present invention should not be limited thereby, and all the simple equivalent changes and modifications made according to the claims and the description of the present invention are still included in the scope covered by the present invention.

Claims (3)

1. The jig frame for integrally prefabricating and hoisting the large pier body steel bars is characterized by comprising a main frame, wherein a cross bar and a plurality of reinforcing bars are respectively arranged on the front side surface, the rear side surface, the left side surface and the right side surface of the main frame, the cross bar is arranged in the middle of the front side surface, the rear side surface, the left side surface and the right side surface of the main frame, and the reinforcing bars are arranged between the main frame and the cross bar and form a rhombus; the top and the bottom of the main frame are respectively provided with a plurality of steel clamping pieces, and a plurality of clamping grooves for clamping steel bars are uniformly arranged on each steel clamping piece at intervals.
2. The jig frame for integral prefabrication and hoisting of large pier shaft steel bars according to claim 1, wherein the main frame is composed of square steel.
3. The jig frame for integral prefabrication and hoisting of the large pier shaft steel bars according to claim 1, wherein a cross-shaped connecting rod is arranged in the middle of the top of the main frame, and a lifting hook is arranged in the center of the connecting rod.
CN202021486314.4U 2020-07-24 2020-07-24 Jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars Active CN212247898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021486314.4U CN212247898U (en) 2020-07-24 2020-07-24 Jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021486314.4U CN212247898U (en) 2020-07-24 2020-07-24 Jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars

Publications (1)

Publication Number Publication Date
CN212247898U true CN212247898U (en) 2020-12-29

Family

ID=73980906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021486314.4U Active CN212247898U (en) 2020-07-24 2020-07-24 Jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars

Country Status (1)

Country Link
CN (1) CN212247898U (en)

Similar Documents

Publication Publication Date Title
CN201172574Y (en) Precast beam reinforced bar hoisting rack
CN105088970A (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN201080597Y (en) Multifunctional cast-in-situ cantilever plate construction bracket
CN212247898U (en) Jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars
CN201473221U (en) Light cable crane for suspension bridge
CN208197158U (en) A kind of reinforcing bar tire suspender of precast segment box beam
CN207330116U (en) Pre-install stair connection structure
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN211769762U (en) Concrete box girder steel reinforcement cage integral hoisting device
CN102398849A (en) Method for moving whole crawler crane down to dock
CN201722621U (en) Integral hoisting frame of pre-fabricated box beam
CN214656451U (en) Front supporting point composite hanging basket
CN214059608U (en) PC superimposed sheet transportation frame hoist
CN111877170A (en) Jig frame for integral prefabrication and hoisting of large pier body reinforcing steel bars and pier body reinforcing steel bar construction method
CN209890066U (en) Box girder bottom web reinforcing bar lifting device
CN212129882U (en) Prefabricated construction outrigger drawknot structure
CN218434470U (en) Device for quickly hoisting bridge deck by cable crane
CN215702616U (en) Pin hoisting ring device
CN211547373U (en) Supervision is with cable-stay bridge cable-stayed tower bottom end rail assembled supporting structure
CN219239012U (en) Shoulder pole for hoisting beam slab reinforcement cage
CN214885625U (en) Multi-point prefabricated part mounting platform
CN214944429U (en) Unilateral moving die carrier for quickly constructing cable trough of ditch
CN213202065U (en) Prefabricated T roof beam framework of reinforcement hoist and mount gallows
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN215439465U (en) Lifting device for combined aluminum alloy template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant