CN212002357U - Construction is with platform of unloading - Google Patents
Construction is with platform of unloading Download PDFInfo
- Publication number
- CN212002357U CN212002357U CN202020368107.2U CN202020368107U CN212002357U CN 212002357 U CN212002357 U CN 212002357U CN 202020368107 U CN202020368107 U CN 202020368107U CN 212002357 U CN212002357 U CN 212002357U
- Authority
- CN
- China
- Prior art keywords
- platform
- discharging
- plate
- fixedly connected
- unloading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a construction is with platform of unloading, including the mounting panel, the mounting panel lower extreme is equipped with a plurality of evenly distributed's universal wheel, and the mounting panel upper end is equipped with connecting axle one, connecting axle one top and disc fixed connection, be equipped with sliding connection's storage case with it in the disc. When the device is used, a worker can finally unload the materials above the material collecting plate at any position of the working platform, so that the unified management of the materials is facilitated; through the hydraulic cylinder, the platform lifting limiting plate and the platform lifting rod, a worker can conveniently adjust the height of the working platform, the lifting rod and the clamping plate can prevent the connecting shaft from deflecting when descending, and the stability of the device is improved; through speed reduction piece, second spring, material collecting plate, third spring, can make the storage case decline in-process slow down, prevent to damage device or material, improve the device security.
Description
Technical Field
The utility model relates to a construction field specifically is a construction is with platform of unloading.
Background
In the building construction process, need transport building material, just need use the turnover platform to have enough to meet the need this moment, this turnover platform is the platform of unloading again. The height of the existing discharging platform is not convenient to adjust, the discharging platform can conveniently and quickly reach the discharging position, and in the discharging process, a worker can discharge materials only by reaching a specified position, so that time is delayed. Therefore, the utility model provides a construction is with platform of unloading to solve the above-mentioned problem of proposing.
Disclosure of Invention
An object of the utility model is to provide a construction is with platform of unloading to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a discharging platform for building construction comprises a mounting plate, wherein a plurality of universal wheels which are uniformly distributed are arranged at the lower end of the mounting plate, a first connecting shaft is arranged at the upper end of the mounting plate, the top end of the first connecting shaft is fixedly connected with a disc, a storage box which is connected with the disc in a sliding mode is arranged in the disc, a limiting block is fixedly connected with the first connecting shaft, a limiting hole is formed in the limiting block, a limiting rod is clamped in the limiting hole and fixedly connected with an arc-shaped block through a connecting rod, the arc-shaped block is rotatably connected with the limiting block through a rotating shaft, the rotating shaft is fixedly connected with a motor, the first connecting shaft and;
the mounting panel upper end is equipped with the pneumatic cylinder, and the pneumatic cylinder is terminal and work platform fixed connection, and work platform be located storage case lower extreme and with storage case sliding connection, be equipped with a plurality of unloading hole in the work platform, the unloading hole lower extreme be equipped with a plurality of evenly distributed's lower flitch one, lower flitch two, lower flitch one with lower flitch two-way first spring coupling, lower flitch two lower parts are equipped with the material collecting plate, the second outside of lower flitch is equipped with the discharge gate.
As a further scheme of the utility model, two lower extremes of connecting axle are equipped with a plurality of lifter, and the mounting panel upper end is equipped with a plurality of pinch-off blades, the lifter card go into in the pinch-off blades and with pinch-off blades inner wall sliding connection.
As a further scheme of the utility model, a flitch bottom is equipped with the unloading fixed plate down, two sliding connection of unloading fixed plate and unloading board.
As a further scheme of the utility model, the unloading hole size slightly is greater than the storage case, down flitch one all is equipped with a plurality of speed reduction piece with two inner walls of flitch down, and speed reduction piece sets up to the arc.
As the utility model discloses further scheme, the speed reduction piece blocks into down flitch one respectively, down two inner walls of flitch and rather than inner wall sliding connection, speed reduction piece and second spring fixed connection.
As the utility model discloses further scheme, the board outside parcel that gathers materials has the cushion, and the board lower extreme that gathers materials is equipped with a plurality of third spring, and the third spring passes through the support column to be connected with the mounting panel.
As a further scheme of the utility model, the work platform lower extreme is equipped with a plurality of fixed connection's platform lifter with it, and the platform lifter card is gone into in the platform lift limiting plate and rather than inner wall sliding connection.
Compared with the prior art, the beneficial effects of the utility model are that:
when the device is used, a worker can finally unload the materials above the material collecting plate at any position of the working platform, so that the unified management of the materials is facilitated; through the hydraulic cylinder, the platform lifting limiting plate and the platform lifting rod, a worker can conveniently adjust the height of the working platform, the lifting rod and the clamping plate can prevent the connecting shaft from deflecting when descending, and the stability of the device is improved; through speed reduction piece, second spring, material collecting plate, third spring, can make the storage case decline in-process slow down, prevent to damage device or material, improve the device security.
Drawings
Fig. 1 is a schematic structural view of a discharging platform for building construction.
FIG. 2 is a schematic structural diagram of a first connecting shaft in the unloading platform for building construction.
Fig. 3 is a connection diagram of a limiting block and a limiting rod in the discharging platform for building construction.
Fig. 4 is a schematic structural view of an arc-shaped block in the discharging platform for building construction.
Fig. 5 is a schematic structural view of a discharging platform for building construction at a position A in fig. 1.
In the figure: 1. mounting a plate; 2. a universal wheel; 3. a first connecting shaft; 4. a disc; 5. a material storage box; 6. a limiting block; 7. a limiting hole; 8. a limiting rod; 9. a connecting rod; 10. an arc-shaped block; 11. a rotating shaft; 12. a fixing plate; 13. a second connecting shaft; 14. A lifting rod; 15. a clamping plate; 16. a working platform; 17. a blanking hole; 18. a first blanking plate; 19. a first spring; 20. blanking fixing plates; 21. a deceleration block; 22. a second spring; 23. a hydraulic cylinder; 24. a platform lifting limit plate; 25. a platform lifting rod; 26. a material collecting plate; 27. a support pillar; 28. a third spring; 29. a discharge port; 30. a motor; 31. and a second blanking plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, in the embodiment of the present invention, an unloading platform for building construction comprises a mounting plate 1, a plurality of universal wheels 2 uniformly distributed are disposed at the lower end of the mounting plate 1, a first connecting shaft 3 is disposed at the upper end of the mounting plate 1, the top end of the first connecting shaft 3 is fixedly connected to a disc 4, a storage box 5 slidably connected to the disc 4 is disposed in the disc 4, a first connecting shaft 3 is fixedly connected to a first stopper 6, a stopper hole 7 is disposed in the stopper 6, a stopper rod 8 is inserted into the stopper hole 7, the stopper rod 8 is fixedly connected to an arc block 10 through a connecting rod 9, the arc block 10 is rotatably connected to the stopper 6 through a rotating shaft 11, the rotating shaft 11 is fixedly connected to a motor 30, the first connecting shaft 3 is rotatably connected to a second connecting shaft 13 through a bearing, the second connecting shaft 13 is fixedly connected to the motor, the upper end of the mounting plate 1 is provided with a plurality of clamping plates 15, and the lifting rod 14 is clamped in the clamping plates 15 and is in sliding connection with the inner walls of the clamping plates 15;
the upper end of the mounting plate 1 is provided with a hydraulic cylinder 23, the tail end of the hydraulic cylinder 23 is fixedly connected with a working platform 16, the working platform 16 is positioned at the lower end of the storage box 5 and is in sliding connection with the storage box 5, the working platform 16 is internally provided with a plurality of blanking holes 17, the size of the blanking holes 17 is slightly larger than that of the storage box 5, the lower end of the blanking holes 17 is provided with a plurality of first blanking plates 18 and second blanking plates 31 which are uniformly distributed, the first blanking plates 18 and the second blanking plates 31 are connected through first springs 19, the bottom end of the first blanking plates 18 is provided with a blanking fixing plate 20, the blanking fixing plate 20 is in sliding connection with the second blanking plates 31, the inner walls of the first blanking plates 18 and the second blanking plates 31 are respectively provided with a plurality of speed reducing blocks 21, the speed reducing blocks 21 are arranged into arc shapes, the speed reducing blocks 21 are respectively clamped into the inner walls of the first blanking plates 18 and, the outer side of the material collecting plate 26 is wrapped with a cushion, the lower end of the material collecting plate 26 is provided with a plurality of third springs 28, the third springs 28 are connected with the mounting plate 1 through supporting columns 27, and the outer side of the second blanking plate 31 is provided with a discharge hole 29;
the lower end of the working platform 16 is provided with a plurality of platform lifting rods 25 fixedly connected with the working platform, and the platform lifting rods 25 are clamped in the platform lifting limit plates 24 and are in sliding connection with the inner walls of the platform lifting limit plates.
The utility model discloses a theory of operation is:
when the utility model is used, a worker loads materials into the material storage box 5 at the upper end of the working platform 16, the starting motor 30 drives the limiting rod 8 to rotate through the arc block 10, the limiting rod 8 drives the limiting block 6 to rotate, the limiting block 6 drives the material storage box 5 in the disc 4 to rotate through the connecting shaft I3, the material storage box 5 falls into the upper end of the material collecting plate 26 through the material discharging hole 17, and the worker can finally discharge the materials into the upper part of the material collecting plate 26 at any position of the working platform 16, thereby facilitating the unified management of the materials; through the hydraulic cylinder 23, the platform lifting limit plate 24 and the platform lifting rod 25, a worker can conveniently adjust the height of the working platform 16, the lifting rod 14 and the clamping plate 15 can prevent the connecting shaft I3 from deflecting when descending, and the stability of the device is improved; through the speed reduction block 21, the second spring 22, the material collection plate 26 and the third spring 28, the speed of the material storage box 5 can be reduced in the descending process, the device or the material is prevented from being damaged, and the safety of the device is improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. A discharging platform for building construction comprises a mounting plate (1) and is characterized in that a plurality of universal wheels (2) which are uniformly distributed are arranged at the lower end of the mounting plate (1), a first connecting shaft (3) is arranged at the upper end of the mounting plate (1), the top end of the first connecting shaft (3) is fixedly connected with a disc (4), a storage box (5) which is connected with the disc (4) in a sliding manner is arranged in the disc (4), a limiting block (6) is fixedly connected with the first connecting shaft (3), a limiting hole (7) is arranged in the limiting block (6), a limiting rod (8) is clamped in the limiting hole (7), the limiting rod (8) is fixedly connected with an arc-shaped block (10) through a connecting rod (9), the arc-shaped block (10) is rotatably connected with the limiting block (6) through a rotating shaft (11), the rotating shaft (11) is fixedly connected with a motor (30), the, the second connecting shaft (13) is fixedly connected with the motor (30) through a fixing plate (12);
mounting panel (1) upper end is equipped with pneumatic cylinder (23), pneumatic cylinder (23) end and work platform (16) fixed connection, work platform (16) are located storage case (5) lower extreme and with storage case (5) sliding connection, be equipped with a plurality of unloading hole (17) in work platform (16), unloading hole (17) lower extreme is equipped with a plurality of evenly distributed's unloading board one (18), unloading board two (31), unloading board one (18) are connected through first spring (19) with unloading board two (31), unloading board two (31) lower part is equipped with album flitch (26), unloading board two (31) outside is equipped with discharge gate (29).
2. The discharging platform for building construction according to claim 1, wherein a plurality of lifting rods (14) are arranged at the lower end of the second connecting shaft (13), a plurality of clamping plates (15) are arranged at the upper end of the mounting plate (1), and the lifting rods (14) are clamped in the clamping plates (15) and are slidably connected with the inner walls of the clamping plates (15).
3. The discharging platform for building construction as claimed in claim 1, wherein a discharging fixing plate (20) is arranged at the bottom end of the first discharging plate (18), and the discharging fixing plate (20) is slidably connected with the second discharging plate (31).
4. The discharging platform for building construction as claimed in claim 1, wherein the size of the discharging hole (17) is slightly larger than that of the storage box (5), the inner walls of the first discharging plate (18) and the second discharging plate (31) are provided with a plurality of speed reducing blocks (21), and the speed reducing blocks (21) are arranged in an arc shape.
5. The discharging platform for building construction as claimed in claim 4, wherein the speed reducing block (21) is respectively clamped into the inner walls of the first discharging plate (18) and the second discharging plate (31) and is connected with the inner walls in a sliding manner, and the speed reducing block (21) is fixedly connected with the second spring (22).
6. The discharging platform for building construction as claimed in claim 1, wherein the material collecting plate (26) is wrapped with soft mats, the lower end of the material collecting plate (26) is provided with a plurality of third springs (28), and the third springs (28) are connected with the mounting plate (1) through supporting columns (27).
7. The discharging platform for building construction according to claim 1, wherein the lower end of the working platform (16) is provided with a plurality of platform lifting rods (25) fixedly connected with the working platform, and the platform lifting rods (25) are clamped in the platform lifting limit plates (24) and are in sliding connection with the inner wall of the platform lifting limit plates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020368107.2U CN212002357U (en) | 2020-03-20 | 2020-03-20 | Construction is with platform of unloading |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020368107.2U CN212002357U (en) | 2020-03-20 | 2020-03-20 | Construction is with platform of unloading |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212002357U true CN212002357U (en) | 2020-11-24 |
Family
ID=73429922
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020368107.2U Expired - Fee Related CN212002357U (en) | 2020-03-20 | 2020-03-20 | Construction is with platform of unloading |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212002357U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482546A (en) * | 2022-02-10 | 2022-05-13 | 大连职业技术学院 | Controlling means for construction |
-
2020
- 2020-03-20 CN CN202020368107.2U patent/CN212002357U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482546A (en) * | 2022-02-10 | 2022-05-13 | 大连职业技术学院 | Controlling means for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201817112U (en) | Automobile hydraulic fast unloader | |
CN205555985U (en) | Multi -functional fork truck equipment and fork truck | |
CN212002357U (en) | Construction is with platform of unloading | |
CN201751078U (en) | Automatic feeder of car body top cover | |
CN214138761U (en) | Cargo transportation robot | |
CN205971310U (en) | Hydraulic side -tipping tramcar | |
CN206156413U (en) | Accessible formula aggregate hole liquid accuse grid platform | |
CN214028791U (en) | Transfer trolley convenient for unloading | |
CN212245912U (en) | Container overturning lifting appliance | |
CN210709757U (en) | Movable side dumping platform | |
CN215245141U (en) | Van-type semitrailer with side electric lifting expansion function | |
CN2325355Y (en) | Roller-way platform for transferring goods | |
CN207226916U (en) | A kind of automatic unloading mechanism with lifting platform | |
CN209700740U (en) | A kind of storehouse management handling device | |
CN209758170U (en) | Electric four-wheel side-hung bucket cleaning and transporting vehicle | |
CN220078467U (en) | Automobile chassis battery lifting machine | |
CN219545915U (en) | Conveying device for storage of aerated blocks | |
CN220220889U (en) | Anti-drop's transportation engineering handling equipment | |
CN217734908U (en) | Construction is with platform of unloading | |
CN218618428U (en) | Four-wheel synchronous rail-changing welding material transfer trolley | |
CN215625351U (en) | Material stacking device for steel structure construction | |
CN110901501B (en) | Flat-bed transport vehicle with hydraulic lifting system | |
CN210793240U (en) | Lead-acid storage battery storage device | |
CN221214077U (en) | Building material transportation handling equipment | |
CN221070869U (en) | A loading transfer device for plastic drum |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201124 |