CN211849265U - Flood storage type ecological embankment - Google Patents

Flood storage type ecological embankment Download PDF

Info

Publication number
CN211849265U
CN211849265U CN202020453197.5U CN202020453197U CN211849265U CN 211849265 U CN211849265 U CN 211849265U CN 202020453197 U CN202020453197 U CN 202020453197U CN 211849265 U CN211849265 U CN 211849265U
Authority
CN
China
Prior art keywords
water storage
ecological
flood
embankment
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020453197.5U
Other languages
Chinese (zh)
Inventor
韩雪
石爱廷
王小林
张琳娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020453197.5U priority Critical patent/CN211849265U/en
Application granted granted Critical
Publication of CN211849265U publication Critical patent/CN211849265U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses an ecological dyke of flood storage formula, including burying underground in the subaerial pile body, the top of pile body is equipped with dyke body, be equipped with a plurality of water storage canals that are echelonment top-down on the dyke body, the equidistance is equipped with horizontal pole in the water storage canal, the both ends of horizontal pole all with dyke body fixed connection, be equipped with the arresting net on the horizontal pole, be equipped with the permeable formation between the water storage canal, the bottom of water storage canal is located to the permeable formation, be equipped with ecological aquatic floating bed in the water storage canal. The utility model has the advantages that: has flood control function, can store water and delay flood, and makes the dike more beautiful.

Description

Flood storage type ecological embankment
Technical Field
The utility model relates to a water conservancy dyke system technical field specifically indicates a flood storage formula ecological dyke.
Background
In the traditional urban river embankment construction, people focus on various economic requirements of water supply, flood control and shipping, the pursuit is basically economic benefit and social benefit, the consideration is less to give play to the ecological functions of the river such as natural ecology, rest and entertainment, landscape and the like, the embankment construction is only non-ecological engineering such as embankment reinforcement, bending value taking, spur dike building and the like, but human beings can adjust the urban river flow and the traditional bank protection of the river channel to form discontinuity and obstruction on the river structure, change the water and material exchange between the river channel and the bank, after the bank is hardened, the original river bank surface is closed, so that the river channel is isolated from the river bank, the relation between soil and water is isolated, the contact of organisms and microorganisms in the river channel with the ground is isolated, the filtration and purification effects of the river ecological corridor are lost, the water quality is reduced, and the overall balance of the river ecological system is damaged.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome the above difficulties, and provide a flood storage type ecological embankment which has the flood control function, can store water, delay flood and make the embankment more beautiful.
In order to solve the technical problem, the utility model provides a technical scheme does: a flood storage type ecological embankment comprises a pile body buried under the ground, wherein an embankment body is arranged at the top of the pile body, a plurality of water storage channels are arranged on the embankment body in a step shape from top to bottom, horizontal cross rods are arranged in the water storage channels at equal intervals, two ends of each horizontal cross rod are fixedly connected with the embankment body, blocking nets are arranged on the horizontal cross rods, permeable layers are arranged among the water storage channels and are arranged at the bottoms of the water storage channels, and ecological water floating beds are arranged in the water storage channels.
As an improvement, a street is arranged between the water storage channels.
As an improvement, one side of the packway close to the river is provided with a railing.
Compared with the prior art, the utility model the advantage lie in: the ecological function of the dike is improved, the ecological development is protected beneficially, the ecological balance is maintained, the dike has the flood discharge function, the functions of flood storage, flood detention and flood compensation can be realized, and the ecological aquatic floating bed can make the dike more attractive.
Drawings
Fig. 1 is a schematic view of the sectional structure of a flood storage type ecological embankment of the present invention.
As shown in the figure: 1. pile body, 2, dyke body, 3, water storage channel, 4, horizontal cross bar, 5, arresting net, 6, permeable formation, 7, ecological water floating bed, 8, berm, 9 and railing.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
With reference to fig. 1, the flood storage type ecological embankment comprises a pile body 1 buried under the ground, wherein an embankment body 2 is arranged at the top of the pile body 1, a plurality of water storage channels 3 in a step shape from top to bottom are arranged on the embankment body 2, horizontal cross rods 4 are equidistantly arranged in the water storage channels 3, two ends of each horizontal cross rod 4 are fixedly connected with the embankment body 2, blocking nets 5 are arranged on the horizontal cross rods 4, permeable layers 6 are arranged between the water storage channels 3, the permeable layers 6 are arranged at the bottoms of the water storage channels 3, and ecological water floating beds 7 are arranged in the water storage channels 3.
And a horse way 8 is arranged between the water storage channels 3. And a railing 9 is arranged on one side of the packway 8 close to the river channel.
Pile body 1 can make the dyke more firm, horizontal pole 4 can make the more firm of water storage channel 3, arresting net 5 can prevent that ecological aquatic floating bed 7 from being washed away by the flood, and ecological aquatic floating bed 5 can be along with the automatic rising of the water level height in the water storage channel 3, railing 9 can prevent that people from falling into the water storage channel 3 when playing on the packway in a careless way, and permeable formation 6 locates between the water storage channel 3, can adjust the water level in the water storage channel 3.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (3)

1. A flood storage type ecological embankment is characterized in that: the ecological floating water storage pile is characterized by comprising a pile body (1) buried underground, wherein the top of the pile body (1) is provided with an embankment body (2), a plurality of water storage channels (3) are arranged on the embankment body (2) in a step shape from top to bottom, horizontal cross rods (4) are arranged in the water storage channels (3) at equal intervals, two ends of each horizontal cross rod (4) are fixedly connected with the embankment body (2), blocking nets (5) are arranged on the horizontal cross rods (4), permeable layers (6) are arranged between the water storage channels (3), the bottoms of the water storage channels (3) are arranged with the permeable layers (6), and ecological water floating beds (7) are arranged in the water storage channels (3).
2. A flood-storing ecological embankment according to claim 1, wherein: and a road (8) is arranged between the water storage channels (3).
3. A flood-storing ecological embankment according to claim 2, wherein: and one side of the packway (8) close to the river is provided with a railing (9).
CN202020453197.5U 2020-04-01 2020-04-01 Flood storage type ecological embankment Expired - Fee Related CN211849265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020453197.5U CN211849265U (en) 2020-04-01 2020-04-01 Flood storage type ecological embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020453197.5U CN211849265U (en) 2020-04-01 2020-04-01 Flood storage type ecological embankment

Publications (1)

Publication Number Publication Date
CN211849265U true CN211849265U (en) 2020-11-03

Family

ID=73144278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020453197.5U Expired - Fee Related CN211849265U (en) 2020-04-01 2020-04-01 Flood storage type ecological embankment

Country Status (1)

Country Link
CN (1) CN211849265U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142382A (en) * 2022-07-29 2022-10-04 重庆交通大学 Landscape water supplementing system and method applied to source-head type river channel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142382A (en) * 2022-07-29 2022-10-04 重庆交通大学 Landscape water supplementing system and method applied to source-head type river channel
CN115142382B (en) * 2022-07-29 2024-05-07 重庆交通大学 Landscape water supplementing system and method applied to source type river

Similar Documents

Publication Publication Date Title
CN104790346A (en) Reservoir hydro-fluctuation belt bank slope protection pine pile-gabion box combined plant-growing retaining wall
CN106120651A (en) A kind of colonnade formula stacked arrangement ecological revetment and construction method thereof
CN112391997B (en) Ecological river bank structure for sponge city construction
CN109601444B (en) Improve bionical attitude pond of laying viscidity ovum fish breed
CN105507208A (en) Locking-type stacked ecological building block
CN112211157A (en) Ecological restoration method for micro-topography of abandoned sand pit of riparian zone in high-altitude area
CN211849265U (en) Flood storage type ecological embankment
CN207619930U (en) A kind of high stable state ecoscape protective slope structure
CN206015604U (en) A kind of colonnade formula stacked arrangement ecological revetment
CN205276213U (en) A ecological block for cascaded ecological barricade
CN207998829U (en) A kind of drop type revetment structure
CN207498892U (en) A kind of cavernous body ecological revetment
CN110761241A (en) City river course ecology defense
CN110552318A (en) Plank road type ecological revetment
CN109385976B (en) Ecological landscape combined revetment inserting plate pile
CN209873714U (en) River bank protection structure for urban mountain area
CN204569552U (en) A kind of unpowered downstream riverbank artificial wet land water quality purification system
CN105297676A (en) River ecological bank protection system formed by triangular pyramidal wood pile stone cage frames and construction method
CN110258449B (en) Gentle slope water retaining structure for urban water environment landscape
CN205276215U (en) Ecological block that kayser formula is piled up
CN210887100U (en) City water environment view is with gentle slope manger plate structure
CN107653837A (en) The native compound dike of stone framework
CN211621506U (en) Combined ecological drainage channel structure
CN210177445U (en) Regulation and waterlogging prevention system for increasing water storage capacity of urban river
CN210049185U (en) Natural water body layered landscape revetment with ecological protection and restoration functions

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201103

Termination date: 20210401