CN211415605U - Fast-floating shear wall mold - Google Patents

Fast-floating shear wall mold Download PDF

Info

Publication number
CN211415605U
CN211415605U CN201922289532.2U CN201922289532U CN211415605U CN 211415605 U CN211415605 U CN 211415605U CN 201922289532 U CN201922289532 U CN 201922289532U CN 211415605 U CN211415605 U CN 211415605U
Authority
CN
China
Prior art keywords
plate
trowelling
wall
groove
length direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922289532.2U
Other languages
Chinese (zh)
Inventor
黄金鑫
任国俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Huiya Building Materials Technology Co ltd
Original Assignee
Nantong Huiya Building Materials Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Huiya Building Materials Technology Co ltd filed Critical Nantong Huiya Building Materials Technology Co ltd
Priority to CN201922289532.2U priority Critical patent/CN211415605U/en
Application granted granted Critical
Publication of CN211415605U publication Critical patent/CN211415605U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a fast-floating shear wall mold, which relates to the technical field of shear wall manufacturing, and has the technical scheme that two side vertical plates are both provided with a first sliding groove in an inverted T shape, the length direction of the first sliding groove is arranged along the length direction of the side vertical plates, a sliding block is arranged in the first sliding groove in a sliding manner, and the outer side wall of the sliding block is mutually attached to the inner side wall of the first sliding groove; the two sliding blocks are connected with a trowelling plate, the length direction of the trowelling plate is arranged along the length direction of the transverse vertical plate, the lower surface of the trowelling plate is mutually attached to the upper surface of the side vertical plate, a group of enclosing plates are symmetrically arranged on the side wall of the trowelling plate, pull ropes are fixedly connected to the side walls of the two sliding blocks, and a recovery device is arranged at one end, away from the forming groove, of the transverse vertical plate; the advantages of quickly screeding the upper surface of the concrete and improving the working efficiency are achieved.

Description

Fast-floating shear wall mold
Technical Field
The utility model relates to a technical field is made to the shear force wall, and more specifically says, it relates to a quick floating shear force wall mould.
Background
Shear walls, also known as wind-resistant walls, earthquake-resistant walls or structural walls, are walls in houses or structures that mainly bear horizontal loads caused by wind loads or earthquakes and vertical loads caused by gravity, and prevent the structures from being damaged by shear forces.
The existing chinese patent with the publication number of CN209261213U provides a shear wall mold, which includes a bottom plate, two side vertical plates and two transverse vertical plates, wherein the two side vertical plates and the two transverse vertical plates are connected to the bottom plate to form a frame body of the shear wall, so as to limit the shape and size of the shear wall; and pouring concrete into the frame body, and obtaining the shear wall after the concrete is formed.
However, after the concrete is poured into the frame body, in order to ensure that the upper surface of the concrete is flush, a shovel needs to be manually used for shoveling redundant concrete, and the manual shoveling speed is slow, so that the efficiency is low, and therefore improvement is needed.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a quick floating shear force wall mould, it has fast floating the concrete upper surface, improves work efficiency's advantage.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a shear wall die capable of being quickly leveled comprises a bottom plate, two side vertical plates and two transverse vertical plates, wherein the two transverse vertical plates are connected between the two side vertical plates, and the two side vertical plates and the two transverse vertical plates are connected on the bottom plate to form a forming groove for forming concrete; the method is characterized in that: the two side vertical plates are respectively provided with an inverted T-shaped first sliding groove, the length direction of the first sliding grooves is arranged along the length direction of the side vertical plates, sliding blocks are arranged in the first sliding grooves in a sliding manner, and the outer side walls of the sliding blocks are mutually attached to the inner side walls of the first sliding grooves; the two sliding blocks are connected with a trowelling plate, the length direction of the trowelling plate is arranged along the length direction of the transverse vertical plate, the lower surface of the trowelling plate is mutually attached to the upper surface of the side vertical plate, a group of coamings are symmetrically arranged on the side wall of the trowelling plate, and pull ropes are symmetrically connected to the outer side wall of the trowelling plate; and a recovery device is arranged at one end of the transverse vertical plate, which is far away from the forming groove.
Through adopting above-mentioned technical scheme, through pulling the stay cord, order about the first inslot that slides of sliding block and slide, the top of shaping inslot concrete can be screeded to the floating plate, and unnecessary concrete gathers between two bounding walls simultaneously, finally pushes off unnecessary concrete and falls to recovery unit in, realizes troweling fast to shaping inslot concrete top, has improved work efficiency, collects the concrete that shovels simultaneously fast, has effectively reduced the waste, has reached energy-concerving and environment-protective advantage.
Further, the length direction of the coaming is perpendicular to that of the trowelling plate, a second sliding groove for the coaming to be inserted and slide is formed in the side vertical plate, and the inner side wall of the second sliding groove is attached to the outer side wall of the coaming.
Through adopting above-mentioned technical scheme, the bounding wall is inserted and is established in the second groove that slides, has improved the leakproofness between bounding wall and the side riser, and the concrete of eradicateing is difficult for spilling from the gap between bounding wall and the side riser, has improved the gathering effect of bounding wall to the concrete.
Furthermore, the top of the troweling plate is provided with a limiting plate which inclines towards the direction far away from the forming groove.
Through adopting above-mentioned technical scheme, the limiting plate avoids the concrete pile between the bounding wall too high, and the concrete that will strike off effectively gathers between two bounding walls.
Further, the two pull ropes are the same in length and are connected with pull rings together.
Through adopting above-mentioned technical scheme, the pulling pull ring drives two sliding blocks simultaneously, has improved the convenience of operation.
Further, a rubber sleeve is sleeved on the pull ring.
By adopting the technical scheme, the comfort degree of hand holding is increased, and the pull ring is convenient for a worker to pull.
Furthermore, the first sliding groove and the second sliding groove are both through grooves, and the opening directions of the first sliding groove and the second sliding groove are arranged towards the end wall direction of the side vertical plate.
Through adopting above-mentioned technical scheme, making at the board that does not need practical trowels, can dismantle sliding block and bounding wall respectively with first sliding groove and second sliding groove, realize the dismantlement to trowels, the staff of being convenient for simultaneously carries out cleaning work to first sliding groove and second sliding groove, guarantees that sliding block and bounding wall have good sliding effect in first sliding groove and second sliding groove.
Furthermore, the recycling device comprises a recycling box and an installation block which is integrally formed on the side wall of the recycling box, the installation block is located at the top of the outer side wall of the recycling box, the length direction of the recycling box is arranged along the length direction of the transverse vertical plate, and an installation groove for the installation block to be inserted and abutted is formed in the side wall of the transverse vertical plate.
By adopting the technical scheme, the shoveled concrete is collected by utilizing the recovery box, so that waste and pollution are effectively reduced; through the mounting groove mutually supporting with the installation piece, realize quick dismantlement and the installation to the collection box, improved the convenience of operation.
Further, the inner side wall of the recovery box and the top wall of the recovery box are provided with arc-shaped guide surfaces.
Through adopting above-mentioned technical scheme, when the concrete dropped from horizontal riser, the concrete landing on the spigot surface avoided having more concrete to pile up at recovery box top wall, has improved recovery unit's recovery efficiency.
To sum up, the utility model discloses following beneficial effect has:
1. the pull ring is pulled to drive the sliding block to slide in the first sliding groove, and the troweling plate quickly trowels the top end of concrete in the forming groove, so that the working efficiency is improved;
2. the enclosing plates slide in the second sliding grooves, the limiting plates at the top ends of the troweling plates gather the shoveled concrete between the two enclosing plates, and the concrete is collected by the recovery box, so that the waste is effectively reduced, and the advantages of energy conservation and environmental protection are achieved;
3. through the mounting groove mutually supporting with the installation piece, realize quick dismantlement and the installation to the collection box, improved the convenience of operation.
Drawings
FIG. 1 is a schematic structural diagram of a shear wall mold for rapid leveling according to an embodiment;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is a sectional view showing the connection between the recovery apparatus and the cross-sectional plate according to the embodiment.
In the figure: 1. a base plate; 11. a side vertical plate; 12. a transverse vertical plate; 13. forming a groove; 2. a first sliding groove; 21. a sliding block; 3. smearing the plate; 31. enclosing plates; 311. a second sliding groove; 32. a limiting plate; 4. a recovery device; 41. a recycling bin; 42. mounting blocks; 43. mounting grooves; 5. pulling a rope; 51. a pull ring; 52. a rubber sleeve; 6. a guide surface.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example (b):
a shear wall mould capable of being quickly leveled refers to fig. 1 and 2 and comprises a bottom plate 1, two side vertical plates 11 and two transverse vertical plates 12, wherein the two transverse vertical plates 12 are connected between the two side vertical plates 11, and the two side vertical plates 11 and the two transverse vertical plates 12 are connected on the bottom plate 1 and enclose a forming groove 13 for forming concrete. All set up the first groove 2 that slides of shape of falling T on two side riser 11, first groove 2 that slides is logical groove, its opening direction sets up to the end wall direction of side riser 11, the length direction of first groove 2 that slides sets up along the length direction of side riser 11, the slip is provided with sliding block 21 in the first groove 2 that slides, sliding block 21's lateral wall and the inside wall of first groove 2 that slides laminate each other, sliding block 21 can slide along the length direction of side riser 11 in first groove 2 that slides, when sliding block 21 is sliding, smear the board 3 and can strike off the unnecessary concrete in shaping groove 13 top, the top of guaranteeing the interior concrete of shaping groove 13 is in the horizontality.
Referring to fig. 1 and 2, two sliding blocks 21 are connected with a trowelling plate 3, the length direction of the trowelling plate 3 is arranged along the length direction of a transverse vertical plate 12, the lower surface of the trowelling plate 3 is attached to the upper surface of a side vertical plate 11, a group of enclosing plates 31 are symmetrically arranged on the side wall of the trowelling plate 3, the length direction of the enclosing plates 31 is perpendicular to the length direction of the trowelling plate 3, a second sliding groove 311 for the enclosing plates 31 to insert and slide is formed in the side vertical plate 11, the second sliding groove 311 is a through groove, the opening direction of the second sliding groove 311 is arranged towards the end wall direction of the side vertical plate 11, and the inner side wall of the second sliding groove 311 is attached to the outer; when the sliding block 21 slides in the first sliding groove 2, the enclosing plates 31 slide in the second sliding groove 311, and the concrete scraped off by the troweling plate 3 is located between the two enclosing plates 31, so that the concrete is prevented from falling off from the side vertical plate 11.
Referring to fig. 1 and 2, the top end of the trowelling plate 3 is provided with a limiting plate 32 inclined towards the direction away from the forming groove 13, the limiting plate 32 prevents the concrete between the enclosing plates 31 from being excessively high in stacking, and the scraped concrete is effectively gathered between the two enclosing plates 31.
Referring to fig. 1, the outer wall symmetry fixedly connected with stay cord 5 of troweling plate 3, stay cord 5 and troweling plate 3's junction are located directly over sliding block 21, and two stay cords 5's length is the same and be connected with pull ring 51 jointly, and the cover is equipped with rubber sleeve 52 on pull ring 51, and staff pulling pull ring 51 drives two sliding block 21 simultaneously, and rubber sleeve 52 has increased the comfort level that the staff gripped, and the staff of being convenient for stimulates troweling plate 3.
Referring to fig. 1 and 3, a recovery device 4 is disposed at one end of the transverse plate 12 away from the forming groove 13, the recovery device 4 includes a recovery box 41 and an installation block 42 integrally formed on a side wall of the recovery box 41, the installation block 42 is located at the top of an outer side wall of the recovery box 41, a length direction of the recovery box 41 is disposed along a length direction of the transverse plate 12, and an installation groove 43 for the installation block 42 to be inserted and abutted is disposed on a side wall of the transverse plate 12; insert installation piece 42 and establish to mounting groove 43 in, installation piece 42 offsets with mounting groove 43 inner wall, fixes collection box 41 in one side of horizontal pole, and the concrete that trowelling plate 3 struck off drops to collection box 41 in, realizes avoiding producing extravagantly to the quick collection of concrete, has reached the effect of environmental protection. The inside wall of collection box 41 just is located its roof and is provided with curved spigot surface 6, and when the concrete dropped from horizontal board 12, the concrete landing on spigot surface 6 avoided having more concrete to pile up at collection box 41 roof, has improved recovery unit 4's recovery efficiency.
The working principle is as follows:
when the top wall of the concrete in the effect groove needs to be smoothed, the mounting block 42 is inserted into the mounting groove 43, and the recycling box 41 is fixed on the side wall of the transverse rod; then insert the sliding block 21 and establish to first mounting groove 43 in, bounding wall 31 is inserted and is established to second sliding groove 311 in, the lower surface of trowelling plate 3 and the upper surface of side riser 11 laminate each other this moment, staff's pulling pull ring 51 this moment, order about sliding block 21 and slide in first sliding groove 2, bounding wall 31 slides in second sliding groove 311, trowelling plate 3 can be with the top of the interior concrete of shaping groove 13 floating, unnecessary concrete gathering is between two bounding walls 31 simultaneously, continue pulling pull ring 51, the concrete that finally shovels drops in collection box 41, realize the quick collection to unnecessary concrete, take out sliding block 21 from first sliding groove 2, dismantle trowelling plate 3, thereby accomplish quick floating work.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (8)

1. A shear wall die capable of being quickly leveled comprises a bottom plate (1), two side vertical plates (11) and two transverse vertical plates (12), wherein the two transverse vertical plates (12) are connected between the two side vertical plates (11), and the two side vertical plates (11) and the two transverse vertical plates (12) are connected on the bottom plate (1) to form a forming groove (13) for forming concrete; the method is characterized in that: the two side vertical plates (11) are respectively provided with an inverted T-shaped first sliding groove (2), the length direction of the first sliding grooves (2) is arranged along the length direction of the side vertical plates (11), sliding blocks (21) are arranged in the first sliding grooves (2) in a sliding manner, and the outer side walls of the sliding blocks (21) are mutually attached to the inner side walls of the first sliding grooves (2); the two sliding blocks (21) are connected with a trowelling plate (3), the length direction of the trowelling plate (3) is arranged along the length direction of the transverse vertical plate (12), the lower surface of the trowelling plate (3) is mutually attached to the upper surface of the side vertical plate (11), a group of enclosing plates (31) are symmetrically arranged on the side wall of the trowelling plate (3), and pull ropes (5) are symmetrically connected to the outer side wall of the trowelling plate (3); and a recovery device (4) is arranged at one end of the transverse plate (12) far away from the forming groove (13).
2. A shear wall mold for rapid trowelling according to claim 1, wherein: the length direction of bounding wall (31) and the length direction mutually perpendicular of trowelling plate (3), set up on side riser (11) and supply bounding wall (31) to insert and establish and the second groove (311) that slides, the inside wall of second groove (311) that slides with the lateral wall of bounding wall (31) is laminated each other.
3. A shear wall mold for rapid trowelling according to claim 2, wherein: and a limiting plate (32) inclined towards the direction away from the forming groove (13) is arranged at the top end of the trowelling plate (3).
4. A shear wall mold for rapid trowelling according to claim 1, wherein: the two pull ropes (5) are the same in length and are connected with pull rings (51) together.
5. A shear wall mold for rapid trowelling according to claim 4, wherein: the pull ring (51) is sleeved with a rubber sleeve (52).
6. A shear wall mold for rapid trowelling according to claim 1, wherein: the first sliding groove (2) and the second sliding groove (311) are both through grooves, and the opening directions of the first sliding groove (2) and the second sliding groove (311) are arranged towards the end wall direction of the side vertical plate (11).
7. A shear wall mold for rapid trowelling according to claim 1, wherein: the recycling device (4) comprises a recycling box (41) and an installation block (42) which is integrally formed on the side wall of the recycling box (41), the installation block (42) is located at the top of the outer side wall of the recycling box (41), the length direction of the recycling box (41) is arranged along the length direction of the transverse plate (12), and an installation groove (43) which is used for the installation block (42) to be inserted and abutted is formed in the side wall of the transverse plate (12).
8. A shear wall mold for rapid trowelling according to claim 7, wherein: the inner side wall of the recovery box (41) and the top wall of the recovery box are provided with arc-shaped guide surfaces (6).
CN201922289532.2U 2019-12-18 2019-12-18 Fast-floating shear wall mold Active CN211415605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922289532.2U CN211415605U (en) 2019-12-18 2019-12-18 Fast-floating shear wall mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922289532.2U CN211415605U (en) 2019-12-18 2019-12-18 Fast-floating shear wall mold

Publications (1)

Publication Number Publication Date
CN211415605U true CN211415605U (en) 2020-09-04

Family

ID=72251391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922289532.2U Active CN211415605U (en) 2019-12-18 2019-12-18 Fast-floating shear wall mold

Country Status (1)

Country Link
CN (1) CN211415605U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113305981A (en) * 2021-05-28 2021-08-27 昆明华城兴建材有限公司 Cement board forming device
CN113775156A (en) * 2021-10-15 2021-12-10 中交一公局西北工程有限公司 Concrete crash barrier top surface folding device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113305981A (en) * 2021-05-28 2021-08-27 昆明华城兴建材有限公司 Cement board forming device
CN113305981B (en) * 2021-05-28 2022-11-29 昆明华城兴建材有限公司 Cement board forming device
CN113775156A (en) * 2021-10-15 2021-12-10 中交一公局西北工程有限公司 Concrete crash barrier top surface folding device

Similar Documents

Publication Publication Date Title
CN211415605U (en) Fast-floating shear wall mold
CN111255208B (en) Wall tile laying device for building engineering construction
CN210459895U (en) Plastering device for building construction
CN201065634Y (en) Automatic plastering machine
CN110029803B (en) Ceramic tile laying facility and method
CN208702139U (en) A kind of construction template structure of toilet wall
CN211597144U (en) Noise reduction device for building construction management environmental protection and energy saving
CN202031306U (en) Wall plastering machine
CN205296852U (en) Concrete pouring hopper for construction column
CN211447686U (en) Pouring heating workbench
CN212078587U (en) Wall scraping device for building engineering
CN211621476U (en) Concrete lining machine suitable for channels with different slope ratios
CN210500709U (en) Subway segment arc surface trowelling device
CN207484981U (en) Secondary structure vertical member concrete construction pours device
CN113122286B (en) Multifunctional trolley auxiliary device for coke oven masonry
CN218881652U (en) Auxiliary tool is laid to mortar
CN213927368U (en) Rapid laying structure of assembly type building floor tiles
CN218036581U (en) Empty drum hammer for house building detection
CN213038890U (en) Back concrete flattening device for stair pouring aluminum mold
CN107605159A (en) Secondary structure vertical member concrete construction pours device and construction method
CN218406308U (en) Leveling device for plastering wall construction
CN215803147U (en) Prefabricated frame construction for building engineering
CN219826007U (en) Plastering device
CN212000977U (en) Floater fishing device for hydraulic engineering
CN215790681U (en) Concrete prefabricated component pouring equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant