CN215803147U - Prefabricated frame construction for building engineering - Google Patents

Prefabricated frame construction for building engineering Download PDF

Info

Publication number
CN215803147U
CN215803147U CN202121927775.5U CN202121927775U CN215803147U CN 215803147 U CN215803147 U CN 215803147U CN 202121927775 U CN202121927775 U CN 202121927775U CN 215803147 U CN215803147 U CN 215803147U
Authority
CN
China
Prior art keywords
frame
fixedly connected
connecting plate
formwork
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121927775.5U
Other languages
Chinese (zh)
Inventor
马国磊
刘宝田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121927775.5U priority Critical patent/CN215803147U/en
Application granted granted Critical
Publication of CN215803147U publication Critical patent/CN215803147U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model discloses a prefabricated frame structure for construction engineering, which comprises a frame template, wherein two groups of connecting plates are arranged on the upper side of the frame template, a moving block is arranged between the two groups of connecting plates, a scraper is fixedly connected to the lower side of the moving block, a pull rod is fixedly connected to the outer side of the moving block, a connecting rod is arranged at the other end of the pull rod, and a collecting mechanism is arranged on the outer side of the frame template. The frame formwork trowelling machine can trowel concrete inside a frame formwork through the connecting plates and the moving blocks, is simple and rapid to operate, and can effectively simplify working steps of workers, so that working efficiency in the using process can be effectively improved.

Description

Prefabricated frame construction for building engineering
Technical Field
The utility model relates to the technical field of building construction, in particular to a prefabricated frame structure for building engineering.
Background
When carrying out concrete placement in the construction, need use prefabricated frame construction to pour main positions such as crossbeam, ground.
But its self of current prefabricated frame is when using, and the frame-type setting that is single structure mostly needs the staff to take the instrument and carries out floating operation to the concrete surface in the frame after pouring the completion to guarantee to pour the quality, because floating instrument's area is effective, thereby need consume longer operating time when using, lead to staff's efficiency of construction to descend by a wide margin.
To this end, we propose a prefabricated frame structure for construction engineering to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art and provides a prefabricated frame structure for construction engineering.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a prefabricated frame construction for building engineering, includes the frame template, the upside of frame template is provided with two sets of connecting plates, and is two sets of install the movable block between the connecting plate, the downside fixedly connected with scraper blade of movable block, the outside fixedly connected with pull rod of movable block, and the other end of pull rod is provided with the connecting rod, the outside of frame template is provided with collects the mechanism.
Preferably, the frame template is fixedly connected with reinforcing ribs inside, and the reinforcing ribs are arranged in an X-shaped structure.
Preferably, the inserting rods are symmetrically inserted into the connecting plates, pull blocks are fixedly connected to the outer sides of the inserting rods, and the inner ends of the inserting rods extend into the frame formwork.
Preferably, the outer side of the connecting plate is provided with a limiting block, and the limiting block is fixedly connected to the front surface and the back surface of the connecting plate.
Preferably, the inner end of the connecting plate is fixedly connected with a guide block, and a sliding groove matched with the guide block is formed in the moving block.
Preferably, the outer side of the connecting rod is fixedly connected with a handle, and the outer side of the handle is glued with a rubber mat.
Preferably, the collecting mechanism comprises collecting frames, the collecting frames are symmetrically distributed on the front surface and the back surface of the frame template, one side, close to each other, of each collecting frame is fixedly connected with an inserting block, a butt joint groove matched with the inserting block is formed in the frame template, and the inner side size of the butt joint groove is matched with the outer side size of the inserting block.
Compared with the prior art, the utility model has the beneficial effects that:
1. the device is through being provided with connecting plate and movable block, and in the use, staff's accessible pulling handle to the realization can realize carrying out floating work to the inside concrete of frame template to the pulling of movable block, and easy operation is swift, can effectively simplify staff's work step, thereby can effectively promote the work efficiency in the use.
2. The device is through being provided with the collection frame and inserting the piece of establishing, and during the use, the staff can install the avris position department at the frame template with the collection frame, can concentrate the collection with unnecessary concrete when carrying out the flattening to the concrete to subsequent recycle, and reduce the pollution to the construction environment.
Drawings
Fig. 1 is a schematic perspective view of a prefabricated frame structure for construction engineering according to the present invention;
FIG. 2 is a schematic perspective cross-sectional view of the structure of FIG. 1;
FIG. 3 is a perspective view of the moving block and scraper structure of FIG. 1;
FIG. 4 is a perspective view of the frame form and stiffener construction of FIG. 1;
fig. 5 is a perspective view of the collecting frame and the inserting block in fig. 1.
In the figure: 1. a frame template; 2. a connecting plate; 3. a limiting block; 4. a moving block; 5. a squeegee; 6. a guide block; 7. a pull rod; 8. a connecting rod; 9. a grip; 10. inserting the rod; 11. pulling the block; 12. reinforcing ribs; 13. a collection frame; 14. inserting the block; 15. and (4) butting the grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-5, a prefabricated frame structure for building engineering, includes frame formwork 1, and the upside of frame formwork 1 is provided with two sets of connecting plates 2, and installs movable block 4 between two sets of connecting plates 2, and the downside fixedly connected with scraper blade 5 of movable block 4, and the outside fixedly connected with pull rod 7 of movable block 4, and the other end of pull rod 7 is provided with connecting rod 8, and the outside of frame formwork 1 is provided with the collection mechanism.
Further, as can be known by referring to fig. 1, 2 and 4, the reinforcing ribs 12 are fixedly connected to the inside of the frame formwork 1, and the reinforcing ribs 12 are arranged in an X-shaped structure, so that when the frame formwork is used, the overall structural strength of the frame formwork 1 can be effectively improved through the reinforcing ribs 12 arranged in the X-shaped structure, and the service life of the frame formwork 1 can be prolonged.
Further, as can be known by referring to fig. 1, 2, 3 and 4, the insertion rods 10 are symmetrically inserted into the inner portion of the connecting plate 2, the outer side of each insertion rod 10 is fixedly connected with a pull block 11, the inner ends of the insertion rods 10 extend into the frame formwork 1, when the connecting plate 2 is used, a worker can place the connecting plate 2 on the upper side of the frame formwork 1, the insertion rods 10 can be sequentially inserted into the connecting plate 2 at the moment, the pull blocks 11 are pushed, the inner ends of the insertion rods 10 extend into the frame formwork 1, and therefore the connecting plate 2 is installed, the connecting plate 2 can be conveniently detached from the upper side of the device, and the connecting plate can be conveniently reused.
Further, refer to fig. 1, fig. 2 and fig. 3 and learn, the outside of connecting plate 2 is provided with stopper 3, and stopper 3 fixed connection is on the tow sides of connecting plate 2, when using, through stopper 3's setting, can realize spacing to movable block 4 to prevent the phenomenon that slippage appears at gliding in-process in movable block 4, and then can effectively promote the reliability in this device use.
Further, as can be known by referring to fig. 1, 2 and 3, the guide block 6 is fixedly connected to the inner end of the connecting plate 2, and the sliding groove matched with the guide block 6 is formed in the moving block 4, so that when the scraper is used, the guide of the moving block 4 is realized by the arrangement of the guide block 6, and the scraper 5 can move horizontally all the time to ensure the floating effect.
Further, as can be known by referring to fig. 1, 2 and 3, the outside of the connecting rod 8 is fixedly connected with the handle 9, and the outside of the handle 9 is glued with the rubber mat, when in use, a worker can hold the handle 9, so as to drive the connecting rod 8 to move, and the phenomenon of slippery hands can be effectively prevented by the arrangement of the rubber mat.
Further, as can be known by referring to fig. 1, 2 and 4, the collecting mechanism includes collecting frames 13, collecting frames 13 are symmetrically distributed on the front and back sides of frame formwork 1, one side of collecting frames 13 close to each other is fixedly connected with inserting blocks 14, butt-joint grooves 15 matched with inserting blocks 14 are formed in frame formwork 1, the inner side sizes of butt-joint grooves 15 are matched with the outer side sizes of inserting blocks 14, a worker can place two groups of collecting frames 13 at the side positions of frame formwork 1 in sequence, so that inserting blocks 14 connected at the inner ends of collecting frames 13 can be inserted into butt-joint grooves 15 formed in frame formwork 1, rapid installation of collecting frames 13 is achieved, redundant concrete can be collected in a centralized manner when the concrete is leveled, and subsequent recycling is facilitated.
When the rapid installation device is used, a worker can sequentially place two groups of collecting frames 13 at the side positions of a frame template 1, namely, inserting blocks 14 connected with the inner ends of the collecting frames 13 can be inserted into butt-joint grooves 15 formed in the frame template 1 so as to rapidly install the collecting frames 13, then, the worker can place a connecting plate 2 at the upper side of the frame template 1, at the moment, inserting rods 10 can be sequentially inserted into the connecting plate 2, and the inner ends of the inserting rods 10 extend into the frame template 1 by pushing pull blocks 11, so that the connecting plate 2 can be installed;
after the pouring is finished, a worker can manually pull the handle 9 to drive the connecting rod 8 and bear force, so that the moving block 4 is stressed to drive the lower side of the scraper 5 to be in contact with the upper surface of concrete in the frame template 1, the trowelling work of the concrete is realized, in the trowelling process, the template height of the front side and the back side of the frame template 1 is lower than the height of the left side and the right side, so that redundant concrete can fall into the collecting frame 13 to be collected through the pushing of the scraper 5, and after the trowelling work is finished, the collecting frame 13 can be taken out from the outer side of the frame template 1 to realize the treatment of the concrete.
In the present invention, the installation manner, the connection manner, or the setting manner of all the components described above are all common mechanical manners, and the specific structures, models, and coefficient indexes of all the components are their own technologies, which can be implemented as long as the beneficial effects thereof can be achieved, and thus, the details are not repeated.
The above embodiments are preferred embodiments of the present invention, but the present invention is not limited to the above embodiments, and any other changes, modifications, substitutions, combinations, and simplifications which do not depart from the spirit and principle of the present invention should be construed as equivalents thereof, and all such changes, modifications, substitutions, combinations, and simplifications are intended to be included in the scope of the present invention.
In the present invention, unless otherwise specified, the terms "upper, lower, left, right, front, back, inner, outer, vertical and horizontal" and the like included in the terms only represent the orientation of the terms in the conventional use state or are colloquially understood by those skilled in the art, and should not be construed as limiting the terms, and meanwhile, the terms "first", "second" and "third" and the like do not represent specific numbers and sequences, but are merely used for name differentiation, and the terms "include", "include" and any other variations are intended to cover non-exclusive inclusions, so that a process, method, article, or apparatus including a series of elements includes not only those elements but also other elements not explicitly listed, or also includes elements inherent to such process, method, article, or apparatus.

Claims (7)

1. The utility model provides a prefabricated frame construction for building engineering, includes frame formwork (1), its characterized in that, the upside of frame formwork (1) is provided with two sets of connecting plate (2), and two sets of install movable block (4) between connecting plate (2), the downside fixedly connected with scraper blade (5) of movable block (4), the outside fixedly connected with pull rod (7) of movable block (4), and the other end of pull rod (7) is provided with connecting rod (8), the outside of frame formwork (1) is provided with collection mechanism.
2. The precast frame structure for construction engineering according to claim 1, wherein the reinforcing bars (12) are fixedly connected to the inside of the frame formwork (1), and the reinforcing bars (12) are arranged in an X-shaped structure.
3. The precast frame structure for construction engineering according to claim 1, wherein the insertion rods (10) are symmetrically inserted into the inside of the connection plate (2), and pull blocks (11) are fixedly connected to the outer sides of the insertion rods (10), and the inner ends of the insertion rods (10) extend to the inside of the frame formwork (1).
4. The prefabricated frame structure for building engineering according to claim 1, wherein the outer side of the connecting plate (2) is provided with a limiting block (3), and the limiting block (3) is fixedly connected to the front surface and the back surface of the connecting plate (2).
5. The precast frame structure for construction engineering according to claim 1, wherein the inner end of the connecting plate (2) is fixedly connected with a guide block (6), and a sliding groove matched with the guide block (6) is formed in the moving block (4).
6. The precast frame structure for construction engineering according to claim 1, wherein a grip (9) is fixedly connected to the outside of the connecting rod (8), and a rubber mat is glued to the outside of the grip (9).
7. The prefabricated frame structure for the building engineering according to claim 1, wherein the collecting mechanism comprises collecting frames (13), the collecting frames (13) are symmetrically distributed on the front surface and the back surface of the frame formwork (1), one sides of the collecting frames (13) close to each other are fixedly connected with inserting blocks (14), butt joint grooves (15) matched with the inserting blocks (14) are formed in the frame formwork (1), and the inner side sizes of the butt joint grooves (15) are matched with the outer side sizes of the inserting blocks (14).
CN202121927775.5U 2021-08-17 2021-08-17 Prefabricated frame construction for building engineering Active CN215803147U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121927775.5U CN215803147U (en) 2021-08-17 2021-08-17 Prefabricated frame construction for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121927775.5U CN215803147U (en) 2021-08-17 2021-08-17 Prefabricated frame construction for building engineering

Publications (1)

Publication Number Publication Date
CN215803147U true CN215803147U (en) 2022-02-11

Family

ID=80132499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121927775.5U Active CN215803147U (en) 2021-08-17 2021-08-17 Prefabricated frame construction for building engineering

Country Status (1)

Country Link
CN (1) CN215803147U (en)

Similar Documents

Publication Publication Date Title
CN110847620B (en) Assembled wall body temporary connection fixed equipment
CN209817422U (en) Concrete pouring mould
CN215331522U (en) Building construction template waste material clearing device
CN215803147U (en) Prefabricated frame construction for building engineering
CN209261237U (en) A kind of prefabricated panel clamping device
CN211415605U (en) Fast-floating shear wall mold
CN211662290U (en) Prefabricated stair are made with pouring mould
CN108214857A (en) Pretensioning prestressed concrete track board assembly line demoulds jack-up system and its application
KR102124031B1 (en) Apparatus for hydraulically separating core steel from
CN216150955U (en) Reinforcing bar cutting equipment for building
CN206329035U (en) Can discharging dustpan mouth template system at the top of a kind of constructional column
CN111688009B (en) Building maintenance spray set for construction
CN211492078U (en) Formwork pouring formwork capable of being rapidly disassembled
CN212897492U (en) Climbing frame model
CN213859906U (en) Support for concrete maintenance
CN220705172U (en) Reserved cleaning opening for stair bench construction
CN215790681U (en) Concrete prefabricated component pouring equipment
CN214145519U (en) Rail sliding type inverted arch template
CN215803454U (en) Building element demolishs equipment
CN220619637U (en) Portable pulp lifting and flour collecting device
CN212888154U (en) Concrete slab manufacturing mold convenient to take
CN216429034U (en) Concrete cantilever beam template reinforcing apparatus
CN220223389U (en) Civil engineering construction device
CN110453927A (en) A kind of fixing means of construction wall diagonal brace and floor
CN216340533U (en) Inclined roof concrete pouring fixing measure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant