CN220223389U - Civil engineering construction device - Google Patents

Civil engineering construction device Download PDF

Info

Publication number
CN220223389U
CN220223389U CN202321539017.5U CN202321539017U CN220223389U CN 220223389 U CN220223389 U CN 220223389U CN 202321539017 U CN202321539017 U CN 202321539017U CN 220223389 U CN220223389 U CN 220223389U
Authority
CN
China
Prior art keywords
frame
mounting frame
fixedly connected
plates
electric telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321539017.5U
Other languages
Chinese (zh)
Inventor
杨泽宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qianshan Curtain Wall Decoration Engineering Co ltd
Original Assignee
Beijing Qianshan Curtain Wall Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Qianshan Curtain Wall Decoration Engineering Co ltd filed Critical Beijing Qianshan Curtain Wall Decoration Engineering Co ltd
Priority to CN202321539017.5U priority Critical patent/CN220223389U/en
Application granted granted Critical
Publication of CN220223389U publication Critical patent/CN220223389U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a civil engineering construction device, which relates to the field of construction devices, and comprises a mounting frame, a lifting device and a placement device, wherein one side of the mounting frame is provided with a mounting frame, the lifting device for driving the mounting frame to move is mounted on the mounting frame, and the placement device is movably connected to the inner side of the mounting frame through a driving device.

Description

Civil engineering construction device
Technical Field
The utility model relates to the field of construction devices, in particular to a civil engineering construction device.
Background
Civil engineering is a generic term for science and technology in building various engineering facilities. Modern civil engineering is characterized by adapting to the requirements of high-speed development of various engineering construction, and has the requirements of high quality, quick construction and high economic benefit.
The material basis for constructing engineering facilities is land, building materials, construction equipment and construction tools. By means of the material conditions, the engineering facility which can not only meet the use requirements and aesthetic requirements of people, but also safely bear various loads is economically and conveniently built, and is the departure point and destination of civil engineering subjects.
In the construction stage, especially in the construction of some small-sized buildings, the brick construction materials are required to be moved upwards to the hands of required staff through corresponding lifting mechanisms, a plurality of bricks and tiles are required to be placed in a frame when being carried, then the bricks and tiles are lifted to a high position through driving mechanisms, and after the bricks and tiles are lifted to the high position, the staff is required to take out the bricks and tiles in the frame one by one, so that the operation is troublesome and the time of the staff is wasted.
Accordingly, it is necessary to provide a new civil engineering construction device that solves the above-mentioned technical problems.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a civil engineering construction device.
The civil engineering construction device comprises a mounting frame, a lifting device and a placement device, wherein a mounting frame is arranged on one side of the mounting frame, the lifting device for driving the mounting frame to move is mounted on the mounting frame, and the placement device is movably connected to the inner side of the mounting frame through a driving device;
the placing device comprises a moving frame, placing pieces and two supporting pieces, wherein the side walls of the moving frame are fixedly connected with one end of the driving device, the two placing pieces are arranged and movably arranged on the inner side of the moving frame and used for supporting the placing pieces, the supporting pieces are respectively and fixedly connected with the two opposite side walls of the moving frame, and the two end parts of the supporting pieces are located at the bottom of the placing pieces and can stretch out and draw back.
Preferably, the placing piece comprises a placing plate and two bottom plates, wherein the tops of the two bottom plates are fixedly connected to the bottom of the placing plate, and two handheld holes are formed in the placing plate.
Preferably, the support piece comprises two first electric telescopic cylinders and two movable plates, the two first electric telescopic cylinders are arranged in a mirror image mode, the first electric telescopic cylinders are fixedly connected to the outer surface of the movable frame, one ends of the two movable plates are fixedly connected to the telescopic ends of the two first electric telescopic cylinders respectively, one ends, far away from the first electric telescopic cylinders, of the movable plates are fixedly connected with baffle plates, and the baffle plates are movably inserted into through holes formed in the side walls of the movable frame.
Preferably, the driving device comprises two mounting plates and two second electric telescopic cylinders, one ends of the two mounting plates are fixedly mounted on the side walls of the mounting frame, the two second electric telescopic cylinders are fixedly mounted on the tops of the two mounting plates, the telescopic ends of the second electric telescopic cylinders are fixedly connected to the side walls of the movable frame, inserting rods are arranged above and below the second electric telescopic cylinders, one ends of the inserting rods are fixedly connected to the side walls of the movable frame, and the inserting rods are movably inserted into through holes formed in the side walls of the mounting frame.
Preferably, the lifting device comprises a rotating rod, a motor and a guide rod, wherein the rotating rod is movably connected to the inner side of the mounting frame, the motor is fixedly arranged at the top of the mounting frame, the output end of the motor is fixedly connected to one end of the rotating rod, the transmission plate is in threaded connection with the rotating rod, one end of the transmission plate is fixedly connected to the side wall of the mounting frame, the guide rod is fixedly arranged on the inner side of the mounting frame, and the guide rod is movably inserted into a through hole formed in the transmission plate.
Preferably, after the placing plate is placed inside the moving frame, the horizontal plane of the bottom plate is lower than the horizontal plane of the bottom of the moving frame.
Preferably, the support plates are fixedly connected to the two sides of the installation frame.
Compared with the related art, the civil engineering construction device provided by the utility model has the following beneficial effects:
through the placer who sets up, elevating gear is after moving the place piece that is equipped with the tile to the eminence, can be under drive arrangement's effect with remove the frame to one side promotion, then, through removing the one end of support piece from the bottom of place piece, the frame that is removing is being driven through elevating gear again, at this moment, the place piece that is equipped with the tile is because gravity stays in place to the staff's use of being convenient for, the device is after the tile moves to required place, need not to take out the tile one by one, to a certain extent, has saved staff's time.
Drawings
FIG. 1 is a schematic view of a construction apparatus for civil engineering provided by the present utility model;
FIG. 2 is a schematic diagram of a side view of the structure shown in FIG. 1;
FIG. 3 is a schematic view of the placement device shown in FIG. 1;
FIG. 4 is a schematic illustration of the exploded structure of FIG. 3;
fig. 5 is a schematic top view of the moving frame and the support shown in fig. 3.
Reference numerals in the drawings: 1. a mounting frame; 2. a support plate; 3. a moving frame; 4. a first electric telescopic cylinder; 5. a moving plate; 6. a baffle; 7. placing a plate; 8. a bottom plate; 9. a hand-held hole; 10. a rotating lever; 11. a motor; 12. a drive plate; 13. a mounting frame; 14. a guide rod; 15. a mounting plate; 16. a second electric telescopic cylinder; 17. and a plunger.
Detailed Description
The utility model will be further described with reference to the drawings and embodiments.
Referring to fig. 1, fig. 2, fig. 3, fig. 4, and fig. 5 in combination, fig. 1 is a schematic structural diagram of a civil engineering construction device according to the present utility model; FIG. 2 is a schematic diagram of a side view of the structure shown in FIG. 1;
FIG. 3 is a schematic view of the placement device shown in FIG. 1; FIG. 4 is a schematic illustration of the exploded structure of FIG. 3; fig. 5 is a schematic top view of the moving frame and the support shown in fig. 3. Comprising the following steps: mounting frame, elevating gear and placer.
In the specific implementation process, as shown in fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5, the two sides of the installation frame 1 are fixedly connected with the supporting plates 2, one side of the installation frame 1 is provided with the installation frame 13, the lifting device for driving the installation frame 13 to move is installed on the installation frame 1, the placement device is movably connected to the inner side of the installation frame 13 through the driving device, the placement device comprises a movable frame 3, placement pieces and two supporting pieces, the side wall of the movable frame 3 is fixedly connected with one end of the driving device, the placement pieces are provided with two, the placement pieces are movably arranged on the inner side of the movable frame 3, the two supporting pieces for supporting the placement pieces are respectively fixedly connected with the two opposite side walls of the movable frame 3, the two end parts of the supporting pieces are positioned at the bottom of the placement pieces and can stretch out and draw back, the placement pieces comprise the placement plate 7 and the two bottom plates 8, the tops of the two bottom plates 8 are fixedly connected to the bottom of the placement plate 7, two handheld holes 9 are formed in the placement plate 7, the horizontal plane of the bottom plate 8 is lower than the horizontal plane of the bottom of the movable frame 3 after the placement plate 7 is placed inside the movable frame 3, through the placement device, after the placement piece filled with bricks is moved to a high position by the lifting device, the movable frame 3 can be pushed to one side under the action of the driving device, then, one end of the supporting piece is moved away from the bottom of the placement piece, the movable frame 3 is driven to move upwards by the lifting device again, at the moment, the placement piece filled with the bricks is left in place due to gravity, so that the use of workers is facilitated, and after the bricks are moved to a required place, the bricks do not need to be taken out one by one;
the support piece comprises two first electric telescopic cylinders 4 and two movable plates 5, the two first electric telescopic cylinders 4 are arranged in a mirror image mode, the first electric telescopic cylinders 4 are fixedly connected to the outer surface of the movable frame 3, one ends of the two movable plates 5 are respectively fixedly connected to telescopic ends of the two first electric telescopic cylinders 4, one ends of the movable plates 5, far away from the first electric telescopic cylinders 4, are fixedly connected with baffle plates 6, the baffle plates 6 are movably inserted into through holes formed in the side walls of the movable frame 3, the movable plates 5 and the baffle plates 6 are driven to move through the first electric telescopic cylinders 4, one ends of the baffle plates 6 move to the bottom of the placing plate 7, and the placing plate 7 is supported conveniently;
the driving device comprises two mounting plates 15 and two second electric telescopic cylinders 16, one ends of the two mounting plates 15 are fixedly arranged on the side wall of the mounting frame 13, the two second electric telescopic cylinders 16 are fixedly arranged at the tops of the two mounting plates 15, the telescopic ends of the second electric telescopic cylinders 16 are fixedly connected to the side wall of the movable frame 3, inserting rods 17 are arranged above and below the second electric telescopic cylinders 16, one ends of the inserting rods 17 are fixedly connected to the side wall of the movable frame 3, and the inserting rods 17 are movably inserted into through holes formed in the side wall of the mounting frame 13;
the lifting device comprises a rotating rod 10, a motor 11 and a guide rod 14, wherein the rotating rod 10 is movably connected to the inner side of the installation frame 1, the motor 11 is fixedly arranged at the top of the installation frame 1, the output end of the motor 11 is fixedly connected to one end of the rotating rod 10, a transmission plate 12 is in threaded connection with the rotating rod 10, one end of the transmission plate 12 is fixedly connected to the side wall of the installation frame 13, the guide rod 14 is fixedly arranged on the inner side of the installation frame 1, the guide rod 14 is movably inserted into a through hole formed in the transmission plate 12, the rotating rod 10 is driven to rotate by the motor 11, and the transmission plate 12 drives the installation frame 13 and the movable frame 3 to move upwards along with the rotation of the rotating rod 10.
The working principle provided by the utility model is as follows: when the device is used, the placing plate 7 is placed in the moving frame 3, at this moment, the bottom plate 8 plays a supporting role on the placing plate 7, bricks and tiles are placed on the top of the placing plate 7, after the placing is completed, the moving plate 5 and the baffle 6 are driven by the first electric telescopic cylinder 4, one end of the baffle 6 moves to the bottom of the placing plate 7, the rotating rod 10 is driven by the motor 11 to rotate, the mounting frame 13 and the moving frame 3 are driven by the driving plate 12 to move upwards along with the rotation of the rotating rod 10, at this moment, the baffle 6 plays a supporting role on the placing plate 7, after moving to a proper position, the moving frame 3 is driven by the second electric telescopic cylinder 16 to move, the moving frame 3 is driven by the moving frame 3 to support the placing plate 7, the baffle 6 is driven by the first electric telescopic cylinder 4 to move away from the bottom of the placing plate 7, the placing plate 7 filled with bricks and tiles can be used in the position when other bricks and tiles are carried.
The circuits and control involved in the present utility model are all of the prior art, and are not described in detail herein.
The foregoing description is only illustrative of the present utility model and is not intended to limit the scope of the utility model, and all equivalent structures or equivalent processes or direct or indirect application in other related technical fields are included in the scope of the present utility model.

Claims (7)

1. The civil engineering construction device is characterized by comprising a mounting frame (1), a lifting device and a placing device, wherein a mounting frame (13) is arranged on one side of the mounting frame (1), the lifting device for driving the mounting frame (13) to move is mounted on the mounting frame (1), and the placing device is movably connected to the inner side of the mounting frame (13) through a driving device;
the placing device comprises a moving frame (3), placing pieces and two supporting pieces, wherein the side walls of the moving frame (3) are fixedly connected with one end of the driving device, the two placing pieces are arranged on the inner side of the moving frame (3) and are used for supporting the placing pieces, the two supporting pieces are respectively and fixedly connected with the two opposite side walls of the moving frame (3), and the two end parts of the supporting pieces are located at the bottom of the placing pieces and can stretch out and draw back.
2. The civil engineering construction device according to claim 1, wherein the placement member comprises a placement plate (7) and two bottom plates (8), the tops of the two bottom plates (8) are fixedly connected to the bottom of the placement plate (7), and two handheld holes (9) are formed in the placement plate (7).
3. The civil engineering construction device according to claim 2, wherein the supporting member comprises two first electric telescopic cylinders (4) and two moving plates (5), the two first electric telescopic cylinders (4) are arranged in a mirror image mode, the first electric telescopic cylinders (4) are fixedly connected to the outer surface of the moving frame (3), one ends of the two moving plates (5) are respectively fixedly connected to telescopic ends of the two first electric telescopic cylinders (4), one ends of the moving plates (5) away from the first electric telescopic cylinders (4) are fixedly connected with baffle plates (6), and the baffle plates (6) are movably inserted into through holes formed in the side walls of the moving frame (3).
4. The civil engineering construction device according to claim 3, wherein the driving device comprises two mounting plates (15) and two second electric telescopic cylinders (16), one ends of the two mounting plates (15) are fixedly mounted on the side walls of the mounting frame (13), the two second electric telescopic cylinders (16) are fixedly mounted on the tops of the two mounting plates (15), telescopic ends of the second electric telescopic cylinders (16) are fixedly connected to the side walls of the movable frame (3), inserting rods (17) are arranged above and below the second electric telescopic cylinders (16), one ends of the inserting rods (17) are fixedly connected to the side walls of the movable frame (3), and the inserting rods (17) are movably inserted into through holes formed in the side walls of the mounting frame (13).
5. The civil engineering construction device according to claim 4, wherein the lifting device comprises a rotating rod (10), a motor (11) and a guide rod (14), the rotating rod (10) is movably connected to the inner side of the mounting frame (1), the motor (11) is fixedly mounted at the top of the mounting frame (1), the output end of the motor (11) is fixedly connected to one end of the rotating rod (10), the transmission plate (12) is in threaded connection with the rotating rod (10), one end of the transmission plate (12) is fixedly connected to the side wall of the mounting frame (13), the guide rod (14) is fixedly mounted to the inner side of the mounting frame (1), and the guide rod (14) is movably inserted into a through hole formed in the transmission plate (12).
6. The civil engineering construction device according to claim 5, characterized in that the placement plate (7) is placed inside the moving frame (3) with the bottom of the bottom plate (8) at a lower level than the bottom of the moving frame (3).
7. The civil engineering construction device according to claim 6, wherein the support plates (2) are fixedly connected to both sides of the mounting frame (1).
CN202321539017.5U 2023-06-16 2023-06-16 Civil engineering construction device Active CN220223389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321539017.5U CN220223389U (en) 2023-06-16 2023-06-16 Civil engineering construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321539017.5U CN220223389U (en) 2023-06-16 2023-06-16 Civil engineering construction device

Publications (1)

Publication Number Publication Date
CN220223389U true CN220223389U (en) 2023-12-22

Family

ID=89172709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321539017.5U Active CN220223389U (en) 2023-06-16 2023-06-16 Civil engineering construction device

Country Status (1)

Country Link
CN (1) CN220223389U (en)

Similar Documents

Publication Publication Date Title
CN205531231U (en) Wall plastering rubs flat napper
CN112813838B (en) Integral concrete vibrating device for viaduct pier body and construction method thereof
CN220223389U (en) Civil engineering construction device
CN207700642U (en) A kind of even husky equipment before construction floor tile
CN111070378A (en) A mobile troweling and vibrating equipment for concrete prefabricated components
CN214062373U (en) Vibrating device for civil construction
CN114961812A (en) Temporary support device for tunnel construction
CN220565747U (en) Masonry robot
CN115788078B (en) High-altitude roller sliding device of long-span steel structure truss
CN114016745B (en) Building concrete construction work platform
CN212151383U (en) Novel concrete precast slab is with upset device
CN212404735U (en) Automatic laying device of ceramic tile
CN212532141U (en) Electromechanical integrated lifting device
CN110093840B (en) A new pavement laying auxiliary board erection device and erection method and dismantling method
CN212198282U (en) Aluminum mould board lifting devices for building
CN222348592U (en) A construction material hoist
CN219364621U (en) Concrete pouring device for foundation pit
CN223164210U (en) Adjustable diagonal bracing type hoistway operation construction platform
CN109723238B (en) Civil engineering building pillar
CN105965225B (en) A reactor graphite removal device
CN221894637U (en) A material hoist for decoration engineering
CN207373425U (en) A kind of model moving system
CN222590193U (en) Precast box girder is with pouring concrete template cleaning equipment
CN217595551U (en) Leveling device is restoreed to building steel form
CN219469643U (en) An easy-to-adjust electrical engineering maintenance stand

Legal Events