CN209261237U - A kind of prefabricated panel clamping device - Google Patents
A kind of prefabricated panel clamping device Download PDFInfo
- Publication number
- CN209261237U CN209261237U CN201822058609.0U CN201822058609U CN209261237U CN 209261237 U CN209261237 U CN 209261237U CN 201822058609 U CN201822058609 U CN 201822058609U CN 209261237 U CN209261237 U CN 209261237U
- Authority
- CN
- China
- Prior art keywords
- prefabricated panel
- interconnecting piece
- supporting rod
- clamping device
- panel clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000000712 assembly Effects 0.000 claims abstract description 13
- 238000000429 assembly Methods 0.000 claims abstract description 13
- 230000003014 reinforcing effect Effects 0.000 claims description 9
- 239000003351 stiffener Substances 0.000 claims description 7
- 230000002787 reinforcement Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 12
- 238000007711 solidification Methods 0.000 abstract description 4
- 230000008023 solidification Effects 0.000 abstract description 4
- 238000009423 ventilation Methods 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 238000010923 batch production Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000037237 body shape Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000007115 recruitment Effects 0.000 description 1
- 230000008929 regeneration Effects 0.000 description 1
- 238000011069 regeneration method Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000001932 seasonal effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of prefabricated panel clamping devices, it is related to technical field of building construction, its key points of the technical solution are that: including two support frames, the interconnecting piece being connected between two support frames, the elongated setting of interconnecting piece, at least one clamp assemblies that support is formed for clamping prefabricated panel two sidewalls is provided on the interconnecting piece, clamp assemblies include two supporting rods disposed in parallel, and supporting rod is arranged along the direction perpendicular to interconnecting piece length.Clamp assemblies are set, prefabricated panel is smoothly placed vertically, by by the vertical placement of prefabricated panel, so that the ventilation effect of prefabricated panel is stronger, so that prefabricated panel to dry effect more preferable, so that the solidification of the prefabricated panel after drawing off out of mold is faster, curing time is saved, shortens the process-cycle of prefabricated panel.
Description
Technical field
The utility model relates to technical field of building construction, more specifically, it relates to a kind of prefabricated panel clamping device.
Background technique
Prefabricated panel is called precast concrete wall panel, is processed into adding for building assembly in precast plant or construction site
Reinforced concrete board type members build assembled large panel building using precast concrete prefabricated panel, batch production, machinery can be improved
Change construction degree, reduce situ wet operation, saves live recruitment, overcome seasonal effect, shorten the construction period.
Existing prefabricated panel processing, by forming concrete or the regeneration concrete tool that pours into the mold, pre-
After wall board forming processed tentatively hardens, prefabricated panel is drawn off out of mold.It, will be prefabricated after taking-up since prefabricated panel is in plate body shape
Wallboard lies low placement, is further dried solidification, but due to the placement that lies low when prefabricated panel, underlying side is dried
It is ineffective, so that whole curing time is longer, have much room for improvement.
Utility model content
In view of the deficienciess of the prior art, the utility model provides a kind of prefabricated panel clamping device, with prefabricated
It is good that wallboard air-dries effect, curing time shorter advantage.
To achieve the above object, the utility model provides following technical solution:
A kind of prefabricated panel clamping device, including two support frames, the interconnecting piece being connected between two support frames, connection
The elongated setting in portion is provided at least one clamping that support is formed for clamping prefabricated panel two sidewalls on the interconnecting piece
Component, clamp assemblies include two supporting rods disposed in parallel, and supporting rod is arranged along the direction perpendicular to interconnecting piece length.
Through the above technical solutions, setting clamp assemblies, contradicted simultaneously by two supporting rods of clamp assemblies with it is prefabricated
On the both sides of the face of wallboard, so that prefabricated panel can be placed smoothly vertically.By by the vertical placement of prefabricated panel,
So that the ventilation effect of prefabricated panel is stronger so that prefabricated panel to dry effect more preferable so that being unloaded out of mold
The solidification of prefabricated panel after out faster, saves curing time, shortens the process-cycle of prefabricated panel.
Further, through slot is provided on the interconnecting piece, the through slot extends along the length direction of interconnecting piece, the folder
Bar is held to be removably connected on through slot.
Through the above technical solutions, supporting rod is detachably connected by setting through slot so that prefabricated panel vertically with folder
When holding device, the distance between two neighboring prefabricated panel can be adjusted freely, can also increase the placement amount of prefabricated panel, separately
Outer supporting rod is detachably connected, in the fixation for carrying out supporting rod after being first in place prefabricated panel, but also prefabricated
Wallboard is put into enhanced convenience.
Further, one end of the supporting rod is provided with the mounting plate for being inserted into and running through through slot, opens on mounting plate
Equipped with location hole, positioning hole is inserted with wedge block, and the wedge block is for supporting rod to be pressed on interconnecting piece to supporting rod
It is fixed.
Through the above technical solutions, setting mounting plate and wedge block first will folders when needing for supporting rod to be fixed
It holds the mounting plate on bar to be inserted into through slot and run through, the end face of supporting rod contacts on interconnecting piece at this time, then will be wedge-shaped
Block is inserted into positioning hole under upper, and wedge block is pushed against close to one end of interconnecting piece on interconnecting piece at this time, is struck by weight
Wedge block is hit, is fixed so that wedge block is further inserted into be formed in location hole, so that supporting rod is fixed on interconnecting piece.When need
When dismantling, wedge block is tapped from bottom to top, wedge block is detached from from positioning hole.Mounting plate and wedge block are set, made
The installing and dismounting for obtaining supporting rod is more convenient.
Further, the supporting rod is provided with card adapter plate close to one end of mounting plate, and the area of section of card adapter plate is greater than
Supporting rod setting.
Through the above technical solutions, setting card adapter plate, card adapter plate can increase the contact surface between supporting rod and interconnecting piece,
To increase the frictional force between supporting rod and interconnecting piece, so that the fixation of supporting rod is more stable.
Further, the supporting rod is in horizontally disposed.
Through the above technical solutions, supporting rod is horizontally disposed, compared to inclined setting, the supporting rod of equal length is to pre-
Effective bearing length of wallboard processed is longer, so that whole support is more stable.
It further, further include having at least a pair of cushion block for being used for padded prefabricated panel.
Through the above technical solutions, setting cushion block, it can be padded to wall progress by cushion block, so that the bottom of wall
Portion and surface separation further increase contact of the wall with air, so that whole, to dry effect stronger.
Further, the interconnecting piece is arranged at intervals with several for reinforcing the support rod of support along its length, adjacent
Stiffener assembly is provided between two support rods.
Through the above technical solutions, setting support rod and stiffener assembly, the case where reducing interconnecting piece deformation, further plus
The strong structural strength of interconnecting piece.
Further, the stiffener assembly includes two connecting rods arranged in a crossed manner, is fixed at the crossover location of two connecting rods
There is the stiffening plate for reinforcement structure intensity.
Through the above technical solutions, setting stiffening plate, further enhances the structure at connecting rod crossover location, so that
Whole structure further strengthens.
Further, support frame include support frame include the upright bar being vertically arranged, the cross bar for being set to upright bar lower end and
The reinforcing rod being connected between upright bar and cross bar, the cross bar are vertically arranged with upright bar, and cross bar is towards perpendicular to interconnecting piece length
Direction extend.
Through the above technical solutions, cross bar can be used for increasing the contact area on upright bar and ground, the support effect of support frame
Fruit is stronger, and reinforcing rod can further strengthen the structural strength of support frame, so that support frame is unlikely to deform, to strengthen support
The stability of frame.
Compared with prior art, the utility model has the beneficial effects that
(1) by setting clamp assemblies, prefabricated panel is smoothly placed vertically, passes through erecting prefabricated panel
It is straight to place so that the ventilation effect of prefabricated panel is stronger so that prefabricated panel to dry effect more preferable so that from mould
The solidification of prefabricated panel after drawing off in tool faster, saves curing time, shortens the process-cycle of prefabricated panel;
(2) by setting through slot, supporting rod is detachably connected so that prefabricated panel vertically with clamping device when, adjacent two
The distance between a prefabricated panel can be adjusted freely, can also increase the placement amount of prefabricated panel, in addition supporting rod is removable
Connection is unloaded, in the fixation for carrying out supporting rod after being first in place prefabricated panel, but also prefabricated panel is put into more
Convenience;
(3) by setting mounting plate and wedge block, so that the installing and dismounting of supporting rod is more convenient;
(4), can be padded to wall progress by cushion block by setting cushion block, so that the bottom of wall and ground distributor
From further increasing contact of the wall with air, to dry effect stronger so that whole.
Detailed description of the invention
Fig. 1 is the overall schematic of embodiment;
Fig. 2 is confined explosion's schematic diagram of embodiment.
Appended drawing reference: 1, interconnecting piece;2, support frame;21, upright bar;22, cross bar;23, reinforcing rod;3, through slot;4, clamping group
Part;41, supporting rod;5, mounting plate;6, location hole;7, wedge block;8, card adapter plate;9, stiffener assembly;91, connecting rod;10, it supports
Bar;11, stiffening plate;12, cushion block.
Specific embodiment
With reference to the accompanying drawings and examples, the utility model is described in detail.
Embodiment:
A kind of prefabricated panel clamping device, as shown in Figure 1, including two support frames 2 and the company being connected between support frame 2
Socket part 1.Support frame 2 includes the upright bar 21 being vertically arranged, is set to the cross bar 22 of 21 lower end of upright bar and is connected to 21 and of upright bar
Reinforcing rod 23 between cross bar 22, cross bar 22 are vertically arranged with upright bar 21, and cross bar 22 is towards the direction perpendicular to 1 length of interconnecting piece
Extend.Upright bar 21, cross bar 22 and reinforcing rod 23 are spliced to form triangle.
The both ends of interconnecting piece 1 are correspondingly connected on support frame 2, and interconnecting piece 1 is fixedly connected on the close upper end of upright bar 21
At position.Interconnecting piece 1 is by two horizontally disposed formation of square tube, so that the whole elongated setting of interconnecting piece 1.Two sides
Pipe is in setting up and down, and two square tubes are parallel to each other, and there are gaps to form through slot 3 between two square tubes, and through slot 3 is along interconnecting piece 1
Length direction extend.
At least one clamp assemblies 4 is additionally provided on interconnecting piece 1, clamp assemblies 4 include two supporting rods disposed in parallel
41, supporting rod 41 is round bar and is in horizontally disposed, and supporting rod 41 is along the direction setting perpendicular to 1 length of interconnecting piece, supporting rod
The groove width that 41 diameter is greater than through slot 3 is arranged.Clamping device in use, by prefabricated panel be vertically placed on two supporting rods 41 it
Between, at this point, the side wall that two supporting rods 41 contact at prefabricated panel respectively forms support, so that prefabricated panel is not easy to incline
?.Clamping device is in use, the half of height close to the prefabricated panel height of supporting rod 41 is arranged.
As shown in Fig. 2, the one end of supporting rod 41 along its length is provided with mounting plate 5, mounting plate 5 is along supporting rod 41
Length direction extends.Location hole 6, the elongated setting of location hole 6 are offered on mounting plate 5.Wedge block is inserted in location hole 6
7, supporting rod 41 is realized by wedge block 7 with location hole 6 detachable on through slot 3.Supporting rod 41 is close to one end of mounting plate 5
It is additionally provided with card adapter plate 8, card adapter plate 8 is square setting, and the area of section of card adapter plate 8 is arranged greater than supporting rod 41.
When supporting rod 41 is installed, the mounting plate 5 on supporting rod 41 is inserted into through slot 3 first and is run through,
Card adapter plate 8 contacts on interconnecting piece 1 far from one end of supporting rod 41 at this time, and wedge block 7 is then inserted into positioning from top to bottom
In hole 6, wedge block 7 is pushed against towards one end of supporting rod 41 on interconnecting piece 1.Wedge block 7 is tapped by weight, so that wedge block
7 are further inserted into location hole 6, and wedge block 7 is further pressed on interconnecting piece 1 towards one end of supporting rod 41 at this time.Wedge
Supporting rod 41 is pressed on interconnecting piece 1 by shape block 7, and wedge block 7 will not occur under the action of wedge block 7 and card adapter plate 8 at this time
Movement along its length, in addition again under the action of the frictional force of card adapter plate 8 and connecting plate, so that supporting rod 41 will not be along
Through slot 3 slides, to reach the fixation to supporting rod 41.
As shown in Figure 1, interconnecting piece 1 is arranged at intervals with several support rods 10 along its length, support rod 10 is passed through inimically
Face is to achieve the effect that reinforce support.Stiffener assembly 9 is provided between two neighboring support rod 10, stiffener assembly 9 includes two
A connecting rod 91 arranged in a crossed manner, the both ends of each connecting rod 91 are correspondingly connected to the top and bottom of two neighboring support rod 10.Two
It is further fixed on stiffening plate 11 at the crossover location of a connecting rod 91, stiffening plate 11 is square setting, and stiffening plate 11 can be used for reinforcing
The bonding strength of crossover location.
As shown in Figure 1, each clamp assemblies 4 are correspondingly arranged on a pair of of cushion block 12, cushion block 12 can be used for dry wall
Plate is padded, and the lower end surface of prefabricated panel is enabled to have preferable ventilation effect.
The working principle of the present embodiment is:
When prefabricated panel is placed vertically, first a pair of of cushion block 12 is put along the direction interval perpendicular to 1 length of interconnecting piece
Be placed in ground, then by the equipment such as driving by prefabricated panel it is vertical be placed in two cushion blocks, 12 top.Then corresponding to press from both sides
It holds component 4 to be fixed on interconnecting piece 1, so that two supporting rods 41 of clamp assemblies 4 contact at the two sides of prefabricated panel respectively
Form support.
When needing to split prefabricated panel from clamping device, the equipment such as driving are first caught on into prefabricated panel, pass through weight
Object taps wedge block 7 and wedge block 7 is detached from out of location hole 6, to corresponding two supporting rods 41 be dismantled, then
It is transported by equipment such as drivings.
The above is only the preferred embodiment of the utility model, and the protection scope of the utility model is not limited merely to
Above-described embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model.It should refer to
Out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and
Retouching, these improvements and modifications also should be regarded as the protection scope of the utility model.
Claims (9)
1. a kind of prefabricated panel clamping device, it is characterised in that: including two support frames (2), be connected to two support frames (2) it
Between interconnecting piece (1), it is prefabricated for clamping to be provided at least one on the interconnecting piece (1) interconnecting piece (1) elongated setting
Wallboard two sidewalls form the clamp assemblies (4) of support, and clamp assemblies (4) include two supporting rods (41) disposed in parallel, clamping
Bar (41) is arranged along the direction perpendicular to interconnecting piece (1) length.
2. a kind of prefabricated panel clamping device according to claim 1, it is characterised in that: be arranged on the interconnecting piece (1)
Have through slot (3), the through slot (3) extends along the length direction of interconnecting piece (1), and the supporting rod (41) is removably connected to through slot
(3) on.
3. a kind of prefabricated panel clamping device according to claim 2, it is characterised in that: one end of the supporting rod (41)
It is provided with the mounting plate (5) for being inserted into and running through through slot (3), is offered location hole (6) on mounting plate (5), in location hole (6)
Be inserted with wedge block (7), the wedge block (7) be used for by supporting rod (41) be pressed on interconnecting piece (1) to supporting rod (41) into
Row is fixed.
4. a kind of prefabricated panel clamping device according to claim 3, it is characterised in that: the supporting rod (41) is close to peace
One end of loading board (5) is provided with card adapter plate (8), and the area of section of card adapter plate (8) is arranged greater than supporting rod (41).
5. a kind of prefabricated panel clamping device according to claim 1 to 4, it is characterised in that: the supporting rod (41)
In horizontally disposed.
6. a kind of prefabricated panel clamping device according to claim 1 to 4, it is characterised in that: further include having at least one
To the cushion block (12) for padded prefabricated panel.
7. a kind of prefabricated panel clamping device according to claim 1, it is characterised in that: the interconnecting piece (1) is along length
Direction is arranged at intervals with several support rods (10) for reinforcing supporting, and is provided with reinforcement group between two neighboring support rod (10)
Part (9).
8. a kind of prefabricated panel clamping device according to claim 7, it is characterised in that: the stiffener assembly (9) includes
Two connecting rods (91) arranged in a crossed manner are fixed with the stiffening plate for reinforcement structure intensity at the crossover location of two connecting rods (91)
(11).
9. a kind of prefabricated panel clamping device according to claim 1, it is characterised in that: support frame (2) includes support frame
(2) include the upright bar (21) being vertically arranged, be set to the cross bar (22) of upright bar (21) lower end and be connected to upright bar (21) and cross
Reinforcing rod (23) between bar (22), the cross bar (22) are vertically arranged with upright bar (21), and cross bar (22) is towards perpendicular to connection
The direction of portion (1) length extends.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822058609.0U CN209261237U (en) | 2018-12-08 | 2018-12-08 | A kind of prefabricated panel clamping device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822058609.0U CN209261237U (en) | 2018-12-08 | 2018-12-08 | A kind of prefabricated panel clamping device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209261237U true CN209261237U (en) | 2019-08-16 |
Family
ID=67562641
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822058609.0U Expired - Fee Related CN209261237U (en) | 2018-12-08 | 2018-12-08 | A kind of prefabricated panel clamping device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209261237U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111764669A (en) * | 2020-07-20 | 2020-10-13 | 哈尔滨学院 | Building module installation device |
| CN111997387A (en) * | 2020-09-02 | 2020-11-27 | 广州市创搏装饰工程有限公司 | Movable assembling robot for prefabricated partition boards in construction engineering |
| CN113148434A (en) * | 2021-04-30 | 2021-07-23 | 上海汉石昀升住宅工业发展有限公司 | Prefabricated wall rack |
-
2018
- 2018-12-08 CN CN201822058609.0U patent/CN209261237U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111764669A (en) * | 2020-07-20 | 2020-10-13 | 哈尔滨学院 | Building module installation device |
| CN111764669B (en) * | 2020-07-20 | 2021-03-23 | 哈尔滨学院 | Building module installation device |
| CN111997387A (en) * | 2020-09-02 | 2020-11-27 | 广州市创搏装饰工程有限公司 | Movable assembling robot for prefabricated partition boards in construction engineering |
| CN111997387B (en) * | 2020-09-02 | 2021-04-30 | 广州市创搏装饰工程有限公司 | Movable assembling robot for prefabricated partition boards in construction engineering |
| CN113148434A (en) * | 2021-04-30 | 2021-07-23 | 上海汉石昀升住宅工业发展有限公司 | Prefabricated wall rack |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204019724U (en) | Make the mold of prefabricated case beam framework of steel reinforcement | |
| CN103774749A (en) | Large-span prestressed concrete F plate frame structure system | |
| CN214996081U (en) | A interception instrument for different grade concrete placement | |
| CN212614754U (en) | Tunnel ditch cable duct moving die carrier | |
| CN208057132U (en) | Tunnel Central drain self-propelled moveable formwork | |
| CN106320373A (en) | Supporting system at position of post-pouring belt of underground garage roof and construction method | |
| CN210827998U (en) | double-T plate of underground garage | |
| JP3029411U (en) | Formwork attachment device for forming concrete bands and lintels | |
| CN207904931U (en) | A kind of turnover type excavation slope stable supporting device | |
| CN206839486U (en) | A kind of prefabricated box culvert framework of steel reinforcement welding tooling | |
| CN215256220U (en) | Tunnel portal guide wall hangs mould structure | |
| CN214658788U (en) | Retractable's concrete floor formwork structure | |
| CN210530084U (en) | Open type steel reinforced concrete composite truss floor | |
| CN209918784U (en) | Inner support frame of steel bar binding mould | |
| CN210013093U (en) | Novel concrete road side form template reinforcing device | |
| CN209741674U (en) | Civil engineering cement pouring device | |
| CN103397647B (en) | Method for mounting high-slope sash girder templates rapidly | |
| CN207032681U (en) | A kind of detachable architectural engineering baseplate reinforcing bar support frame | |
| CN212534786U (en) | High-strength autoclaved aerated concrete slab | |
| CN104790402A (en) | Mould bag concrete construction support and construction method | |
| CN218436993U (en) | Secant pile guide wall | |
| CN222878490U (en) | An integral movable pedestrian bridge used in the construction of the superstructure of a high-pile wharf | |
| CN112323835A (en) | Construction method of raft plate split heads of foundation | |
| CN210032357U (en) | Lower hanging type hanger device for installing reinforcing steel bars | |
| CN217974048U (en) | Clamping and shaping device for stirrup laying |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190816 Termination date: 20211208 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |