CN211312210U - A zigzag tower ladder for high mound construction - Google Patents
A zigzag tower ladder for high mound construction Download PDFInfo
- Publication number
- CN211312210U CN211312210U CN201921599437.6U CN201921599437U CN211312210U CN 211312210 U CN211312210 U CN 211312210U CN 201921599437 U CN201921599437 U CN 201921599437U CN 211312210 U CN211312210 U CN 211312210U
- Authority
- CN
- China
- Prior art keywords
- zigzag
- high pier
- stair
- platform
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to a zigzag tower ladder for high mound construction, including fixing device and the device of ascending a height, the device of ascending a height passes through fixing device to be fixed on high mound, and the device of ascending a height includes a plurality of rectangular bodily form braced frame that range upon range of about links together, is equipped with stair in the braced frame, and the protection platform is installed to the braced frame bottom, is equipped with the through-hole that can supply stair and staff to pass on the protection platform. The utility model improves the safety factor of the worker in the climbing process, and if the worker has an accident in the climbing process, the worker falls down to the protection platform in the support frame; the utility model discloses it is fixed convenient, and be convenient for remove.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a zigzag tower ladder for high mound construction.
Background
In the construction, to under high mound top high altitude construction environment, the staff climbs to high mound top through the tower ladder and carries out the operation, and the tower ladder is fixed on high mound, because high mound is higher apart from ground distance, in case the staff in the process of climbing accident appears, then can cause the loss that is difficult to save.
Disclosure of Invention
The utility model aims at solving the defects of the prior art and providing a zigzag tower ladder for high pier construction.
The utility model discloses a realize above-mentioned purpose, adopt following technical scheme: a zigzag tower ladder for high pier construction comprises a fixing device and a climbing device, wherein the climbing device is fixed on a high pier through the fixing device and comprises a plurality of rectangular supporting frames which are connected together in an up-down stacked manner, a stair is arranged in each supporting frame, one end of each stair is connected with the bottom of each supporting frame, the other end of each stair is connected with the top of each supporting frame, adjacent stairs in the supporting frames which are connected together in an up-down stacked manner are connected end to end and are connected in a zigzag manner, each fixing device comprises a pair of adjusting devices which are arranged in parallel and a plurality of layers of temporary supporting rods which are arranged in an up-down stacked manner, at least two temporary supporting rods are arranged on each layer, each adjusting device is positioned between the high pier and the supporting frames, one end of each adjusting device is fixed on the supporting frames through a first steel wire rope connected with the other end of each adjusting device, two steel wire ropes are connected with two adjusting devices, one end and the braced frame fixed connection of interim bracing piece, the interim bracing piece other end even has the arc fixture block, and the inner wall and the laminating of high mound outer wall of arc fixture block lie in the bottom surface of the arc fixture block of superiors and the laminating of the template system top surface of high mound, and the protection platform is installed to the braced frame bottom, is equipped with the through-hole that can supply stair and staff to pass on the protection platform.
Four sides of the supporting frame are provided with protective nets.
The template system is an annular platform, the annular platform is fixed on the upper portion of the high pier, and the inner side wall of the annular platform is fixedly connected with the outer side wall of the high pier.
And a plurality of bearing universal wheels are arranged on the bottom surface of the protective platform positioned at the lowest part.
And an expansion bolt for fixing on the ground is arranged on one side of the bottom of the supporting frame.
Adjusting device is equipped with a pair of screw hole including solid fixed ring, solid fixed ring bilateral symmetry, and solid fixed ring's screw hole female connection has the threaded rod, and a threaded rod and a wire rope in two threaded rods are connected, and another threaded rod is connected with wire rope No. two.
The utility model has the advantages that: the utility model improves the safety factor of the worker in the climbing process, and if the worker has an accident in the climbing process, the worker falls down to the protection platform in the support frame; the utility model discloses it is fixed convenient, and be convenient for remove.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of A in FIG. 1;
FIG. 3 is a schematic view of the structure of the adjusting device;
in the figure: 1-a fixture; 2-ascending device; 3-high pier; 4-a support frame; 5-stairs; 6-a regulating device; 7-temporary support bars; 8-second steel wire rope; 9-first steel wire rope; 10-arc fixture block; 11-a template system; 12-a protection platform; 13-load bearing universal wheels; 14-expansion bolts; 15-a fixing ring; 16-a threaded rod;
in order to clearly show the stairs, the meshes on the protective net are omitted in fig. 1;
the following detailed description will be made in conjunction with embodiments of the present invention with reference to the accompanying drawings.
Detailed Description
The invention will be further explained with reference to the following figures and examples:
as shown in fig. 1 to 3, a zigzag tower ladder for high pier construction comprises a fixing device 1 and a climbing device 2, wherein the climbing device 2 is fixed on a high pier 3 through the fixing device 1, the climbing device 2 comprises a plurality of cuboid-shaped supporting frames 4 which are connected together in an up-and-down stacking manner, the height of each supporting frame 4 is 3 meters, a stair 5 is arranged in each supporting frame 4, one end of each stair 5 is connected with the bottom of each supporting frame 4, the other end of each stair 5 is connected with the top of each supporting frame 4, adjacent stairs 5 in the supporting frames 4 which are connected together in an up-and-down stacking manner are connected end to end and connected into a zigzag shape, the fixing device 1 comprises a pair of adjusting devices 6 which are arranged in parallel and a plurality of layers of temporary supporting rods 7 which are arranged in an up-and-down stacking manner, each layer of temporary supporting rods 7 is at least two, the length of each supporting rod 7 is 2 meters, 6 one end of adjusting device is fixed on braced frame 4 through being connected with a wire rope 9, the adjusting device 6 other end has No. two wire rope 8 jointly, No. two wire rope 8 surround high mound 3 back both ends and are connected with two adjusting device 6 respectively, the one end and the braced frame 4 fixed connection of interim bracing piece 7, the interim bracing piece 7 other end even has arc fixture block 10, the inner wall and the 3 outer wall laminating of high mound of arc fixture block 10, the bottom surface of the arc fixture block 10 that is located the superiors laminates with the 11 top surfaces of template system of high mound 3.
Four sides of braced frame 4 all are equipped with the protection network, and braced frame 4 bottom is installed and is protected platform 12, is equipped with the through-hole that can supply stair 5 and staff to pass on protecting platform 12.
The template system 11 is an annular platform, the annular platform is fixed on the upper part of the high pier 3, and the inner side wall of the annular platform is fixedly connected with the outer side wall of the high pier 3.
And a plurality of load-bearing universal wheels 13 are arranged on the bottom surface of the lowermost protective platform 12.
An expansion bolt 14 for fixing on the ground is installed at one side of the bottom of the support frame 4.
Adjusting device 6 is equipped with a pair of screw hole including solid fixed ring 15, solid fixed ring 15 bilateral symmetry, and solid fixed ring 15's screw hole female connection has threaded rod 16, and one threaded rod 16 in two threaded rods 16 is connected with wire rope 9, and another threaded rod 16 is connected with wire rope 8 No. two.
The utility model discloses the during operation, laminate ARC card 10 and 3 lateral walls of high mound, gu fixed ring 15 through rotatory adjusting device 6 finely tunes the length of adjusting device 6, and then make ARC card 10 closely laminate with 3 lateral walls of high mound, 10 bottoms of the ARC card 10 of top are supported by template system 11, it is fixed subaerial to climb device 2 through expansion bolts 14, be equipped with the switch door on the protection network of below, the staff enters into through the switch door and climbs inside device 2, and climb to the braced frame 4 top of top through stair 5, build the walking platform on the interim bracing piece 7 of top, the staff climbs to 3 tops of high mound through the walking platform. The utility model discloses a climbing device 2 has improved the factor of safety of staff in the climbing process, if the staff has the accident in the climbing process, then falls on the protection platform 12 in the braced frame 4; the utility model discloses it is fixed convenient, and setting up of bearing universal wheel 13 conveniently removes device 2 of ascending a height.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above embodiments, and various improvements made by the method concept and technical solution of the present invention or directly applied to other occasions without improvement are all within the protection scope of the present invention.
Claims (6)
1. A zigzag tower ladder for high pier construction comprises a fixing device (1) and a climbing device (2), and is characterized in that the climbing device (2) is fixed on a high pier (3) through the fixing device (1), the climbing device (2) comprises a plurality of cuboid-shaped supporting frames (4) which are connected together in an up-down stacking manner, a stair (5) is arranged in each supporting frame (4), one end of the stair (5) is connected with the bottom of each supporting frame (4), the other end of the stair (5) is connected with the top of each supporting frame (4), adjacent stairs (5) in the supporting frames (4) which are connected together in an up-down stacking manner are connected end to end and form a zigzag shape, the fixing device (1) comprises a pair of adjusting devices (6) which are arranged in parallel and a plurality of layers of temporary supporting rods (7) which are arranged in an up-down stacking manner, and each layer of temporary supporting rods (7) is at least two, adjusting device (6) are located between high mound (3) and braced frame (4), adjusting device (6) one end is fixed on braced frame (4) through being connected a wire rope (9), adjusting device (6) other end links jointly No. two wire rope (8), both ends are connected with two adjusting device (6) respectively behind No. two wire rope (8) encirclement high mound (3), the one end and braced frame (4) fixed connection of interim bracing piece (7), interim bracing piece (7) other end links arc fixture block (10), the inner wall and the laminating of high mound (3) outer wall of arc fixture block (10), the bottom surface that is located the arc fixture block (10) of superiors laminates with formwork system (11) top surface of high mound (3), protective platform (12) are installed to braced frame (4) bottom, be equipped with the through-hole that can supply stair (5) and staff to pass on protective platform (12).
2. The zigzag tower ladder for high pier construction according to claim 1, wherein the support frame (4) is provided with a protective mesh on four sides.
3. The zigzag ladder for high pier construction according to claim 1, wherein the formwork system (11) is a ring platform, and the ring platform is fixed on the upper part of the high pier (3), and the inner side wall of the ring platform is fixedly connected with the outer side wall of the high pier (3).
4. The zigzag tower ladder for high pier construction according to claim 3, wherein a plurality of load-bearing universal wheels (13) are installed on the bottom surface of the lowermost protection platform (12).
5. The zigzag ladder for high pier construction according to claim 1, wherein an expansion bolt (14) for fixing to the ground is installed at one side of the bottom of the support frame (4).
6. The zigzag tower ladder for high pier construction according to claim 1, wherein the adjusting device (6) comprises a fixing ring (15), a pair of threaded holes are symmetrically formed in two sides of the fixing ring (15), a threaded rod (16) is connected to the threaded hole of the fixing ring (15) in a threaded manner, one threaded rod (16) of the two threaded rods (16) is connected to the first steel wire rope (9), and the other threaded rod (16) is connected to the second steel wire rope (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921599437.6U CN211312210U (en) | 2019-09-25 | 2019-09-25 | A zigzag tower ladder for high mound construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921599437.6U CN211312210U (en) | 2019-09-25 | 2019-09-25 | A zigzag tower ladder for high mound construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211312210U true CN211312210U (en) | 2020-08-21 |
Family
ID=72066514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921599437.6U Expired - Fee Related CN211312210U (en) | 2019-09-25 | 2019-09-25 | A zigzag tower ladder for high mound construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211312210U (en) |
-
2019
- 2019-09-25 CN CN201921599437.6U patent/CN211312210U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088565B (en) | Attachment type raise scaffold tiltedly climbs method and attachment type raise scaffold | |
WO2022252829A1 (en) | Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building | |
CN106592962A (en) | Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus | |
WO2024045332A1 (en) | Modular assembled guide frame climbing type working platform | |
CN206205415U (en) | A kind of climbing frame | |
CN209145256U (en) | The dedicated climbing frame of assembled architecture | |
CN211312210U (en) | A zigzag tower ladder for high mound construction | |
CN108005373A (en) | Integrated lifting platform system and assembling method thereof | |
CN107806237A (en) | A kind of high building hydraulic climbing protecting screen and its construction method | |
CN112376881A (en) | Climbing formula scaffold frame support increases subassembly | |
CN213061745U (en) | Basket protective structure is hung to continuous beam bridge construction template | |
CN211998568U (en) | Standard knot and tower crane | |
CN211644382U (en) | Tower crane attached stay bar walkway platform system | |
CN212897815U (en) | Modular maintenance platform structure and maintenance platform for cement plant storage warehouse | |
CN211079872U (en) | Landscape footpath suitable for suspension type monorail | |
CN107217912A (en) | It is a kind of to be used for the superelevation physical isolation construction method of neighbouring high ferro Business Line construction | |
CN109989357B (en) | Overhead working construction platform and box girder bridge building method | |
CN207776393U (en) | Lighting roof steel construction operating platform | |
CN217484989U (en) | High-altitude rescue training device | |
CN213572939U (en) | Climbing frame with stairs | |
CN102677595B (en) | A kind of multifunctional platform being applicable to Character of Cable Force of Cable stayed Bridge construction | |
CN218147841U (en) | Template construction platform integrated device | |
CN211421796U (en) | Outer reinforcement binding frame for caisson production | |
CN211851622U (en) | Anti-falling assembled vertical ladder with conversion rest platform | |
CN217453745U (en) | Shore bridge girder installation frock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200821 |
|
CF01 | Termination of patent right due to non-payment of annual fee |