CN213572939U - Climbing frame with stairs - Google Patents

Climbing frame with stairs Download PDF

Info

Publication number
CN213572939U
CN213572939U CN202022252381.6U CN202022252381U CN213572939U CN 213572939 U CN213572939 U CN 213572939U CN 202022252381 U CN202022252381 U CN 202022252381U CN 213572939 U CN213572939 U CN 213572939U
Authority
CN
China
Prior art keywords
scaffold
scaffolds
stairs
rods
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022252381.6U
Other languages
Chinese (zh)
Inventor
肖晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Hongzhu Technology Co ltd
Original Assignee
Hunan Hongzhu Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Hongzhu Technology Co ltd filed Critical Hunan Hongzhu Technology Co ltd
Priority to CN202022252381.6U priority Critical patent/CN213572939U/en
Application granted granted Critical
Publication of CN213572939U publication Critical patent/CN213572939U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a climbing frame with stairs, which comprises a plurality of outer vertical rods and a plurality of layers of scaffolds arranged among the outer vertical rods, wherein corresponding scaffold boards are paved on part of the scaffolds; stairs are arranged between the multiple layers of scaffolds without the scaffold boards, and corresponding inner cantilever boards are arranged between the scaffolds without the scaffold boards and the concrete structure; the inner cantilever plate is connected with the upper-layer scaffold through a plurality of inner pull rods. The utility model discloses a board is chosen in the welding of stair breach department to improved the security of climbing the frame, and be connected through the pull rod with interior board of choosing, thereby the stability of the board of choosing in guaranteeing. The utility model discloses a connected mode of bolt is fixed, and not only easy dismounting, dismouting are efficient moreover, in addition, the utility model discloses a set up a plurality of shelves poles to guarantee the stability of scaffold board, improved the security of high altitude construction.

Description

Climbing frame with stairs
Technical Field
The utility model belongs to the technical field of climb the frame technique and specifically relates to a climb frame with stair.
Background
With the rapid increase of high-rise and super high-rise buildings in China, a series of hidden dangers such as excessive material consumption, excessive high-altitude assembling and disassembling operation, excessive safety risk and the like in the traditional scaffold construction are obvious, the risk of high-altitude operation is greatly reduced by a fully-closed operation system of the climbing frame, the operation intensity is reduced by mechanical lifting, and good safety and applicability are embodied.
In recent years, the aluminum template is rapidly popularized, and the market share of the climbing frame is promoted. The climbing frame is continuously improved after 30 years since birth through iteration of a product system, and a multi-turn policy, standard support and perfection of a building department are developed into a new-generation all-steel climbing frame system with mature and stable technology through abrasion. Attached to a building structure, the outer scaffold can climb or descend layer by layer according to the construction requirements of an engineering structure by depending on self lifting equipment and devices.
The attached lifting scaffold is an external scaffold which is erected at a certain height, attached to a building, capable of climbing or descending along the building layer by virtue of self lifting equipment and devices and provided with an anti-overturning and anti-falling device.
However, when the construction worker is going to realize the lifting between different layers of the building, the scaffold can only be lifted integrally by relying on the lifting device, which is inconvenient, on the other hand, the energy waste is also caused by the integral lifting of the scaffold, moreover, because of the installation limitation of the lifting device, the construction worker can not reach the top layer of the building only by the integral lifting of the scaffold, the construction activity is limited, therefore, the big defect is solved by climbing stairs, but the potential safety hazard of the stairs is very serious, the square pipe on the upper part of the stairs is inconvenient to operate because of too small width, the connecting plate is welded beside the square pipe in the patent, the width is increased, two diagonal draw bars are adopted to tie the connecting plate to the upper walkway plate, the fixing is good, the safety of the working face is effectively enhanced, and the life safety of.
Disclosure of Invention
Not enough to prior art, the utility model provides a climb frame with stair, this climb frame stair can guarantee construction safety, and stability is good moreover.
The technical scheme of the utility model is that: a climbing frame with stairs comprises a plurality of outer vertical rods and a plurality of layers of scaffolds arranged among the outer vertical rods, wherein corresponding scaffold boards are paved on part of the scaffolds;
stairs are arranged between the multiple layers of scaffolds without the scaffold boards, and corresponding inner cantilever boards are arranged between the scaffolds without the scaffold boards and the concrete structure; the inner cantilever plate is connected with the upper-layer scaffold through a plurality of inner pull rods.
Preferably, a plurality of corresponding through holes are formed in the outer side walls of the scaffold and the outer vertical rods, and the scaffold and the outer vertical rods are connected with the through holes through corresponding bolts.
Preferably, the stair include two mobile poles and set up connecting rod and the footboard between two mobile poles, two mobile poles upper ends pass through a stair fixing base and be connected with the scaffold frame.
Preferably, the inner cantilever plate is welded with the outer side wall of the scaffold close to the concrete structure.
Preferably, a plurality of through holes are formed in the outer side wall of the inner cantilever plate, and the inner cantilever plate is matched with corresponding bolts through the through holes in the inner cantilever plate and is connected with the inner pull rods.
Preferably, the number of the inner pull rods is at least 2.
Preferably, a plurality of stop rods are further arranged between the scaffolds, and the stability of the scaffold boards is ensured through the stop rods.
The utility model has the advantages that:
1. the utility model discloses a board is chosen in the welding of stair breach department to improved the security of climbing the frame, and be connected through the pull rod with interior board of choosing, thereby the stability of the board of choosing in guaranteeing.
2. The utility model discloses a connected mode of bolt is fixed, and not only easy dismounting, dismouting are efficient moreover, in addition, the utility model discloses a set up a plurality of shelves poles to guarantee the stability of scaffold board, improved the security of high altitude construction.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of a partial structure of the present invention;
in the figure, 1-an outer vertical rod, 2-a scaffold, 3-a scaffold board, 4-a stair, 5-a concrete structure, 6-an inner cantilever board, 7-an inner pull rod, 8-a through hole, 9-a main rod, 10-a connecting rod, 11-a pedal, 12-a stair fixing seat and 13-a stop lever.
Detailed Description
The following description of the embodiments of the present invention will be made with reference to the accompanying drawings:
as shown in fig. 1 and 2, the embodiment relates to a climbing frame, and in particular to a climbing frame with stairs, the climbing frame comprises a plurality of outer vertical rods 1, the number of the outer vertical rods 1 can be set according to the length of the climbing frame, the embodiment provides an implementation mode, the number of the outer vertical rods 1 in the implementation mode is 4, and the four outer vertical rods 1 are symmetrically arranged. The climbing frame of this embodiment further includes a plurality of layers of scaffolds 2 disposed between the plurality of outer vertical rods 1, the number of layers of the scaffolds 2 is also determined according to the construction height, and for better illustration, this embodiment is provided with 3 layers of scaffolds 2. Corresponding scaffold boards 3 are laid on the scaffold 2; in order to ensure stability, the present embodiment provides a plurality of stop rods 13 between the two cross bars of the scaffold 2. The present embodiment provides a staircase 4 between the first-level scaffold 2 and the second-level scaffold 2. Wherein, the junction of second floor scaffold frame 2 and stair 4 is the breach, for laying scaffold board 3. In order to ensure the safety of construction, in the embodiment, a corresponding inner cantilever plate 6 is arranged between the scaffold 2 on which the scaffold plate 3 is not laid and the concrete structure 5; in this embodiment, the inner cantilever plate 6 is welded to the outer side of the scaffold 2 and extends towards the concrete structure 5. Simultaneously, in order to guarantee the stability of interior board 6 of choosing, the outside of this embodiment interior board 6 of choosing is provided with 2 at least inner pull rods 7, the other end of inner pull rod 7 be connected with the lateral wall of the scaffold 2 on upper strata, in this embodiment, inner pull rod 7 with interior board 6 of choosing, scaffold 2 between through corresponding bolt fastening, make things convenient for the dismouting.
Preferably, the staircase 4 of this embodiment includes two main rods 9, and a connecting rod 10 and a pedal 11 disposed between the two main rods 9, and the upper ends of the two main rods 9 are connected to the scaffold 3 through a staircase fixing base 12.
The foregoing embodiments and description have been provided to illustrate the principles and preferred embodiments of the present invention, and various changes and modifications may be made without departing from the spirit and scope of the invention, which fall within the scope of the invention as claimed.

Claims (7)

1. The climbing frame with the stairs is characterized by comprising a plurality of outer vertical rods and a plurality of layers of scaffolds arranged among the outer vertical rods, wherein corresponding scaffold boards are paved on part of the scaffolds;
stairs are arranged between the multiple layers of scaffolds without the scaffold boards, and corresponding inner cantilever boards are arranged between the scaffolds without the scaffold boards and the concrete structure; the inner cantilever plate is connected with the upper-layer scaffold through a plurality of inner pull rods.
2. A climbing shelf having stairs according to claim 1, wherein: the scaffold frame, all be provided with a plurality of corresponding through-holes on the lateral wall of a plurality of outer pole settings, scaffold frame and outer pole setting pass through corresponding bolt and be connected with the through-hole thereon.
3. A climbing shelf having stairs according to claim 1, wherein: and the inner cantilever plate is welded with the outer side wall of the scaffold close to the concrete structure.
4. A climbing shelf having stairs according to claim 3, wherein: the outer side wall of the inner cantilever plate is provided with a plurality of through holes, and the inner cantilever plate is connected with a plurality of inner pull rods through the through holes on the inner cantilever plate and corresponding bolts in a matching manner.
5. The climbing shelf according to claim 4, wherein: the number of the inner pull rods is at least 2.
6. A climbing shelf having stairs according to claim 1, wherein: a plurality of stop rods are further arranged among the scaffolds.
7. A climbing shelf having stairs according to claim 1, wherein: the stair comprise two main rods, a connecting rod and a pedal, wherein the connecting rod and the pedal are arranged between the two main rods, and the upper ends of the two main rods are connected with the scaffold through a stair fixing seat.
CN202022252381.6U 2020-10-12 2020-10-12 Climbing frame with stairs Active CN213572939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022252381.6U CN213572939U (en) 2020-10-12 2020-10-12 Climbing frame with stairs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022252381.6U CN213572939U (en) 2020-10-12 2020-10-12 Climbing frame with stairs

Publications (1)

Publication Number Publication Date
CN213572939U true CN213572939U (en) 2021-06-29

Family

ID=76581640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022252381.6U Active CN213572939U (en) 2020-10-12 2020-10-12 Climbing frame with stairs

Country Status (1)

Country Link
CN (1) CN213572939U (en)

Similar Documents

Publication Publication Date Title
CN102287045B (en) Square steel tube lifting outside scaffold
CN204876578U (en) Building construction system
CN213572939U (en) Climbing frame with stairs
CN204876577U (en) Building construction system
CN201610632U (en) Self-climbing construction platform
CN214885380U (en) Portable tower crane construction platform passageway
CN204754150U (en) Dish -type node formula scaffold
CN214576004U (en) Staircase regularization platform of going up people
CN107642241A (en) The stress supporting construction and construction method of a kind of prefabricated balcony
CN210655915U (en) Connecting device for climbing frame and tower crane
JP2013133695A (en) Extension method for existent building and extension structure
CN220955428U (en) Upper and lower device with antiskid function
CN207228673U (en) A kind of cage combination vertical passage
CN207003972U (en) A kind of portable construction operation platform
CN207374992U (en) The accumulating stent of concrete plate-type component
CN217105963U (en) Domestic elevator well is installed additional to double entry building
CN215331353U (en) Outer support composite structure of lifting scaffold
CN216949441U (en) Steel ladder stand for assembly type building stairwell
CN212507124U (en) Steel assembled stair
CN214834676U (en) Assembled aluminum alloy climbs a stair
CN211312210U (en) A zigzag tower ladder for high mound construction
CN214144652U (en) Triangular support for climbing frame body
CN219931561U (en) Integral lifting type elevator shaft operation platform
CN215055076U (en) Two operation platform that run are used in construction of prefabricated building stairwell
CN221001902U (en) Construction hanger for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant