CN218147841U - Template construction platform integrated device - Google Patents

Template construction platform integrated device Download PDF

Info

Publication number
CN218147841U
CN218147841U CN202222404766.9U CN202222404766U CN218147841U CN 218147841 U CN218147841 U CN 218147841U CN 202222404766 U CN202222404766 U CN 202222404766U CN 218147841 U CN218147841 U CN 218147841U
Authority
CN
China
Prior art keywords
construction platform
template
construction
formwork
integration apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222404766.9U
Other languages
Chinese (zh)
Inventor
王永涛
苏琦
颜佳
张琴
李艳荣
唐家齐
刘农
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Hanyang Municipal Construction Group Co Ltd
Original Assignee
Wuhan Hanyang Municipal Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Hanyang Municipal Construction Group Co Ltd filed Critical Wuhan Hanyang Municipal Construction Group Co Ltd
Priority to CN202222404766.9U priority Critical patent/CN218147841U/en
Application granted granted Critical
Publication of CN218147841U publication Critical patent/CN218147841U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a template construction platform integrated device, it includes: a template; the construction platforms are vertically spaced and fixedly connected with the template, and are provided with upper and lower manholes; the crawling ladder is installed in the construction platform, and the crawling ladder is connected with the upper manhole and the lower manhole of the two adjacent layers of construction platforms. Can realize template and construction platform's integrative installation, improve the efficiency of construction, and construction platform is fixed in the template, and the position that need not adjust construction platform in the work progress adapts to the template, has saved construction platform's accommodation step, has improved the efficiency of construction to can make things convenient for constructor's the construction of ascending a height through the cat ladder.

Description

Template construction platform integrated device
Technical Field
The utility model relates to a bridge construction field, in particular to template construction platform integrated device.
Background
At present, in order to satisfy the eminence construction of pier, generally can build the scaffold frame on one side of pier stud, build the pouring that the template satisfied the pier through constructor on the scaffold frame.
However, the existing bridge piers are various in style, and not only are traditional columnar bridge piers, but also bottle-shaped bridge piers with the diameter changing along with the height, or bridge piers extending upwards along a curve. To the columnar pier structure of non-tradition, the interval between scaffold and the pier is wayward, need demolish the scaffold sometimes and just can install the template, causes the scaffold to build repeatedly, and construction process is complicated.
SUMMERY OF THE UTILITY MODEL
An embodiment of the utility model provides a template construction platform integrated device to scaffold puts up and builds repeatedly when solving pier construction among the correlation technique, the problem that the process is complicated.
In a first aspect, a formwork construction platform integrated device is provided, which comprises: a template; the construction platforms are vertically spaced and fixedly connected with the template, and are provided with upper and lower manholes; the crawling ladder is installed in the construction platform, and the crawling ladder is connected with the upper manhole and the lower manhole of the two adjacent layers of construction platforms.
In some embodiments, the construction platform comprises a walkway plate and a guard rail; the walkway plate is fixedly connected with the template, the walkway plate extends along the horizontal direction, and the bottom of the protective railing is fixed on the walkway plate far away from one side of the template.
In some embodiments, the walkway plate includes spaced-apart beams, and a deck supported above the beams; the crawling ladder is hung on the cross beam of the construction platform.
In some embodiments, a safety net is arranged outside the guard rail.
In some embodiments, the manhole is mounted to the walkway plate, and the ladder is positioned between the guard rail and the formwork.
In some embodiments, the construction platform further comprises an inclined strut, the top of the inclined strut is fixedly connected with one side of the walkway plate far away from the formwork, and the bottom of the inclined strut is fixed on the formwork.
In some embodiments, the brace is fixedly connected to the walkway plate by a U-bolt, and the U-bolt fixedly connects the guard rail to the walkway plate.
In some embodiments, the guard rail comprises a plurality of vertical rods and a plurality of cross rods, the vertical rods are arranged on one side, away from the template, of the walkway plate at intervals, the cross rods are arranged on the vertical rods, and the cross rods are arranged at intervals in the vertical direction.
In some embodiments, the formworks are connected end to form a pouring space, the construction platform surrounds the formworks by one circle, and the guard rail surrounds the construction platform by one circle.
In some embodiments, the construction platform is secured to the formwork by bolting.
The utility model provides a beneficial effect that technical scheme brought includes:
the embodiment of the utility model provides a template construction platform integrated device, because construction platform is fixed in on the template, can accomplish construction platform's the buildding through the erection template, and construction platform is fixed with the interval of template, the position that need not adjust construction platform repeatedly adapts to the change of template position, manhole about still being provided with on construction platform, the cat ladder through connecting manhole about two-layer construction platform can supply the pedestrian to ascend a height, satisfy the requirement of the construction of ascending a height, manhole about seting up, the manhole can allow constructor to ascend a height along the cat ladder when opening, the manhole can prevent that constructor on construction platform from falling by the hole when closing. Therefore, the template and the construction platform can be integrally installed, the construction efficiency is improved, the construction platform is fixed on the template, the position of the construction platform does not need to be adjusted in the construction process to adapt to the template, the adjusting step of the construction platform is omitted, and the construction efficiency is improved.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is the embodiment of the utility model provides a template construction platform integrated device's that provides a schematic structure diagram.
In the figure:
1. a template;
2. a construction platform; 21. an upper manhole and a lower manhole; 22. a walkway plate; 23. a guard rail; 231. a vertical rod; 232. a cross bar; 24. bracing;
3. climbing a ladder;
9. and (5) pier studs.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The embodiment of the utility model provides a template construction platform integrated device, scaffold puts up repeatedly when it can solve the pier construction, the problem that the process is complicated.
Referring to fig. 1, for the embodiment of the present invention provides a template construction platform integrated device, it may include: a template 1;
the construction platform 2 is vertically spaced, the construction platform 2 is fixedly connected with the formwork 1, and the construction platforms 2 are provided with upper and lower manholes 21;
the ladder stand 3, the ladder stand 3 install in construction platform 2, just the manhole 21 about the adjacent two-layer construction platform 2 is connected to ladder stand 3. That is, by fixing the construction platform 2 to the formwork 1, the construction platform can be installed when the formwork 1 is installed, so that the construction personnel can perform ascending construction. Compare and build the scaffold frame in other open ground of pier stud, the construction platform 2 of direct setting on template 1 not only can not occupy construction space, and because its snap-on is on template 1, can adapt to different figurative pier bodys. Can satisfy the arrangement of bottled pier body or the pier that upwards extends along the curve. Meanwhile, the upper manhole 21 and the lower manhole 21 are arranged on the construction platform 2, and constructors can conveniently ascend or fall down through the ladder stands 3 connected with the adjacent upper manhole 21 and the adjacent lower manhole 21. Through setting up manhole 21 from top to bottom, can make things convenient for constructor's current. Wherein a cover plate may be provided at the upper and lower manholes 21 to cover the upper and lower manholes 21 after a constructor reaches the construction platform 2 of a target height through the upper and lower manholes 21. The safety of constructors in the construction process is ensured.
Referring to fig. 1, in some alternative embodiments, the construction platform 2 includes a walkway plate 22 and a guard rail 23;
walkways board 22 with template 1 fixed connection, walkways board 22 extends along the horizontal direction, the bottom of protection railing 23 is fixed in walkways board 22 keeps away from one side of template 1. That is, the walkway plate 22 is used for the constructor to walk when constructing at high altitude, and the walkway plate 22 can be enclosed by the guard rail 23 to improve the safety of the constructor during the construction.
Referring to fig. 1, in some alternative embodiments, the walkway plate 22 includes spaced cross beams and a deck supported above the cross beams;
the crawling ladder 3 is hung on the cross beam of the construction platform 2. That is, the panels are supported on the cross beams and utilized to provide support for the constructors. The ladder stand 3 is hung on the cross beam, so that the ladder stand 3 is installed. The cross beam not only serves as a support for the panel but also can provide support for the ladder stand. Specifically, the hook can be arranged at the top of the ladder stand 3 and is hung on the cross beam through the hook, so that the ladder stand 3 is fixed, and the ladder stand 3 is convenient to disassemble. The walkway plate 22 is formed by providing a ribbed panel on the cross beam. In this embodiment the ladder 3 is a custom made steel ladder to meet the different height intervals of the walkway plates 22.
Preferably, a safety net is arranged outside the guard rail 23. In this embodiment, the guard rail 23 is made of a steel pipe with a diameter of 48 mm, and a fine mesh safety net is hung on the outer side of the guard rail 23. Through setting up the safety net can reduce debris on the construction platform 2 and drop by construction platform 2. The falling object from the high altitude is reduced to injure people walking below the falling object.
Referring to fig. 1, in some alternative embodiments, the manhole 21 is installed in the walkway plate 22, and the ladder stand 3 is positioned between the guard rail 23 and the formwork 1. That is to say, constructor by cat ladder 3 directly can walk on the guidance tape 22 after climbing up the construction platform 2 of higher one deck, compare in setting up cat ladder 3 in guard rail 23 department, it is more convenient that constructor ascends a height, and the in-process of ascending a height can provide safeguard by guard rail 23 to constructor's the construction of ascending a height.
Referring to fig. 1, in some alternative embodiments, the construction platform 2 further includes a diagonal brace 24, a top of the diagonal brace 24 is fixedly connected to a side of the walkway plate 22 away from the formwork 1, and a bottom of the diagonal brace 24 is fixed to the formwork 1. A triangular space can be formed between the template 1 and the walkway plate 22 through the support of the inclined strut 24, and the stability of the construction platform 2 is improved.
Preferably, the inclined strut 24 is fixedly connected with the walkway plate 22 through a U-shaped bolt, and the U-shaped bolt fixedly connects the guard rail 23 with the walkway plate 22. That is, the walkway plate 22, the guard rail 23 and the diagonal brace 24 are connected by U-shaped bolts. Compare bolt commonly used, can be connected a plurality of parts through U type bolt, made things convenient for building of construction platform 2. Specifically, the U-shaped bolt has two parallel studs, one of which is used to connect the brace 24 and the walkway plate 22, and the other of which is used to connect the guard rail 23 and the walkway plate 22, and the U-shaped bolt can be used to determine the relative positions of the three components before the nut is tightened.
Referring to fig. 1, in some alternative embodiments, the guard rail 23 includes a plurality of vertical bars 231 and a plurality of horizontal bars 232, the vertical bars 231 are disposed at intervals on one side of the walkway plate 22 away from the formwork 1, the horizontal bars 232 are mounted on the vertical bars 231, and the horizontal bars 232 are arranged at intervals along the vertical direction. That is, the protection balustrade 23 is formed by connecting criss-cross rod-shaped structures, which is lighter in weight, lower in cost and substantially uniform in protection effect compared with a plate-shaped structure. The construction cost of the construction platform 2 is reduced.
Referring to fig. 1, in some alternative embodiments, the formworks 1 are connected end to form a pouring space, as shown in the figure, the formworks 1 surround the pier stud 9 for one circle, the construction platform 2 surrounds the formworks 1 for one circle, and the guard rails 23 surround the construction platform 2 for one circle. That is to say, interconnect has enclosed the space of pouring of pier construction between the template 1, provides the support for the construction of ascending a height through the construction platform 2 around template 1 outside round, utilizes the outside of guard rail 23 with construction platform 2 to enclose the safety of the construction of guaranteeing constructor ascending a height.
Preferably, the construction platform 2 is fixed to the formwork 1 by bolting. Convenient disassembly and assembly can be realized through bolt connection. And is convenient to be used for the next construction.
The embodiment of the utility model provides a pair of template construction platform integrated device's principle does:
support is provided for constructor through the construction platform 2 of direct setting on template 1, need not build the scaffold frame by the pier stud. Construction platform 2 can be accomplished through installation template 1 to build, and construction platform 2 is fixed with the interval of template 1, need not adjust construction platform 2's position repeatedly and adapt to the change of template 1 position, and the pier stud construction that very is suitable for the cross-section change. And still set up on construction platform 2 by upper and lower manhole 21, can supply constructor to ascend a height through the cat ladder 3 of connecting upper and lower manhole 21 of two-layer construction platform 2, made things convenient for constructor's ascending a height.
In the description of the present invention, it should be noted that the terms "upper", "lower", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Unless expressly stated or limited otherwise, the terms "mounted," "connected," and "coupled" are to be construed broadly and encompass, for example, both fixed and removable coupling as well as integral coupling; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
It is noted that, in the present invention, relational terms such as "first" and "second", and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising a," "8230," "8230," or "comprising" does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.
The above description is only exemplary of the invention, and is intended to enable those skilled in the art to understand and implement the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The utility model provides a template construction platform integrated device which characterized in that, it includes:
a template (1);
the construction platform (2) is vertically spaced, the construction platform (2) is fixedly connected with the formwork (1), and the construction platforms (2) are provided with upper and lower manholes (21);
the ladder stand (3), the ladder stand (3) install in construction platform (2), just manhole (21) about adjacent two-layer construction platform (2) are connected in ladder stand (3).
2. The formwork construction platform integration apparatus of claim 1, wherein:
the construction platform (2) comprises a walkway plate (22) and a guard rail (23);
walkways board (22) with template (1) fixed connection, walkways board (22) extend along the horizontal direction, the bottom of preventing railing (23) is fixed in walkways board (22) is kept away from one side of template (1).
3. The formwork construction platform integration apparatus of claim 2, wherein:
the walkway plate (22) comprises cross beams arranged at intervals and a panel supported above the cross beams;
the crawling ladder (3) is hung on the cross beam of the construction platform (2).
4. The formwork construction platform integration apparatus of claim 2, wherein:
and a safety net is arranged on the outer side of the protective barrier (23).
5. The formwork construction platform integration apparatus of claim 2, wherein:
the upper manhole and the lower manhole (21) are installed on the walkway plate (22), and the crawling ladder (3) is located between the guard rail (23) and the template (1).
6. The formwork construction platform integration apparatus of claim 2, wherein:
construction platform (2) still include bracing (24), the top of bracing (24) with walk about board (22) is kept away from one side fixed connection of template (1), the bottom of bracing (24) is fixed in template (1).
7. The formwork construction platform integration apparatus of claim 6, wherein:
the inclined strut (24) is fixedly connected with the walkway plate (22) through a U-shaped bolt, and the U-shaped bolt is used for fixedly connecting the guard rail (23) with the walkway plate (22).
8. The formwork construction platform integration apparatus of claim 2, wherein:
guard rail (23) include a plurality of montants (231) and a plurality of horizontal pole (232), montant (231) mutual spaced set up in walk guidance tape (22) keep away from one side of template (1), horizontal pole (232) install in montant (231), horizontal pole (232) are along vertical direction interval arrangement.
9. The formwork construction platform integration apparatus of claim 2, wherein:
the formwork (1) is connected end to form a pouring space in an enclosing mode, the construction platform (2) surrounds the formwork (1) for one circle, and the protective railing (23) surrounds the construction platform (2) for one circle.
10. The template construction platform integrated device according to claim 1, characterized in that:
the construction platform (2) is fixed on the template (1) through bolt connection.
CN202222404766.9U 2022-09-09 2022-09-09 Template construction platform integrated device Active CN218147841U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222404766.9U CN218147841U (en) 2022-09-09 2022-09-09 Template construction platform integrated device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222404766.9U CN218147841U (en) 2022-09-09 2022-09-09 Template construction platform integrated device

Publications (1)

Publication Number Publication Date
CN218147841U true CN218147841U (en) 2022-12-27

Family

ID=84561195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222404766.9U Active CN218147841U (en) 2022-09-09 2022-09-09 Template construction platform integrated device

Country Status (1)

Country Link
CN (1) CN218147841U (en)

Similar Documents

Publication Publication Date Title
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN109898819B (en) Foldable telescopic overhanging tool type scaffold system and installation method thereof
CN206768611U (en) Bridge pier hanging basket mounting operation platform
CN211472143U (en) Pier steel form
CN110685226A (en) Hydraulic integral self-climbing construction platform
CN205475250U (en) Pin -connected panel steel stair in foundation ditch
CN213626818U (en) Frame type safety ladder cage
CN218147841U (en) Template construction platform integrated device
EP1206611B1 (en) Scaffolding
CN110886225A (en) Construction method of cable tower stay cable installation system
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN213174700U (en) Building block type splicing operation frame
CN213539818U (en) Modular square tube safety ladder cage
CN213804900U (en) Pier body construction platform of high pier bridge
CN212478487U (en) Construction platform for building construction
CN211639872U (en) Multi-specification PC component placing frame
CN112726416A (en) Support structure meeting field construction security and construction method
CN111962850A (en) Construction method of overhanging scaffold
CN218912334U (en) Edge protection structure
CN217923129U (en) Assembled construction channel and operation platform
CN218231633U (en) A escape way for tower crane
CN111021699A (en) Aerial platform and installation method thereof
CN217810545U (en) Construction system for steel truss girder bridge
CN214303034U (en) Interim escape way is used to foundation ditch
NZ336959A (en) Scaffolding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant