EP1206611B1 - Scaffolding - Google Patents
Scaffolding Download PDFInfo
- Publication number
- EP1206611B1 EP1206611B1 EP00950116A EP00950116A EP1206611B1 EP 1206611 B1 EP1206611 B1 EP 1206611B1 EP 00950116 A EP00950116 A EP 00950116A EP 00950116 A EP00950116 A EP 00950116A EP 1206611 B1 EP1206611 B1 EP 1206611B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- scaffolding structure
- arm
- load bearing
- members
- bamboo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 60
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 60
- 241001330002 Bambuseae Species 0.000 claims description 60
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 60
- 239000011425 bamboo Substances 0.000 claims description 60
- 238000004873 anchoring Methods 0.000 claims description 45
- 229910000831 Steel Inorganic materials 0.000 claims description 38
- 239000010959 steel Substances 0.000 claims description 38
- 238000000034 method Methods 0.000 claims description 26
- 230000008878 coupling Effects 0.000 claims description 6
- 238000010168 coupling process Methods 0.000 claims description 6
- 238000005859 coupling reaction Methods 0.000 claims description 6
- 239000004677 Nylon Substances 0.000 claims description 5
- 229920001778 nylon Polymers 0.000 claims description 5
- 229920002430 Fibre-reinforced plastic Polymers 0.000 claims description 3
- 239000011151 fibre-reinforced plastic Substances 0.000 claims description 3
- 230000000295 complement effect Effects 0.000 claims 2
- 239000002184 metal Substances 0.000 description 24
- 229910052751 metal Inorganic materials 0.000 description 24
- 239000000463 material Substances 0.000 description 6
- 239000011241 protective layer Substances 0.000 description 6
- 239000010410 layer Substances 0.000 description 4
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 3
- 229910052725 zinc Inorganic materials 0.000 description 3
- 239000011701 zinc Substances 0.000 description 3
- 229910000746 Structural steel Inorganic materials 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 206010000372 Accident at work Diseases 0.000 description 1
- 241000282326 Felis catus Species 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000009970 fire resistant effect Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/10—Steps or ladders specially adapted for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G1/152—Platforms made of metal or with metal-supporting frame
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/155—Platforms with an access hatch for getting through from one level to another
Definitions
- the present invention relates to scaffolding. More particularly, the invention relates to safety aspects of scaffolding.
- bamboo has been traditionally used for scaffolding.
- bamboo scaffolding is still in use in China and Hong Kong.
- bamboo has a number of advantages.
- bamboo is economical and can be simply constructed without special tools.
- bamboo scaffolding can also be constructed within a short period of time in a limited working space.
- the most significant advantage of bamboo scaffolding is its very strong bending strength and elasticity when freshly cut.
- the strength of bamboo decreases as time goes by because it gradually dehydrates over time. When the water content has reduced below 10% the bamboo becomes dry and cracks will appear.
- the maximum lifespan of bamboo scaffolding members is thus relatively short, only about 12 to 18 months. Thus bamboo is considered somewhat unreliable.
- a scaffolding structure for a building being erected, the scaffolding structure comprising: a scaffold of a substantially two dimensional inner grid interconnected with a substantially two dimensional outer grid, each of the grids being comprised of load bearing members having relatively constant strength over time under expected loading conditions of the scaffolding structure characterised in that additional bamboo members are secured on the outer grid such that the interstices defined by the load bearing members and the bamboo members of the outer grid are smaller than the interstices defined by the load bearing members of the inner grid; and an anchoring device which includes: an arm coupled to the scaffold, the arm having a longitudinal axis; and an anchoring member anchoring the device and the scaffold to the building, the anchoring member being coupled to the arm and being of an L-shape having a first leg in the form of a rod or bar which extends beyond the arm, the rod or bar being anchored into the building and a second leg is coupled to said arm.
- the load bearing members are elongate structural members intersecting in a regular pattern to form the grids.
- the elongate members may be coupled by right angle metal couplers at all or some of the intersections in the grid.
- the load bearing members are steel members, preferably of tubular cross section.
- the load bearing members may comprise fibre reinforced plastic tubes.
- the grids are preferably constructed of load bearing members arranged at 90° to each other although other configurations are possible. Each grid may therefore have upright load bearing standards and substantially horizontal load bearing ledgers. Desirably, at least some-of the load bearing ledgers in the inner grid correspond to a respective load bearing ledger in the outer grid provided at the same height.
- the additional bamboo members are preferably secured between the load bearing members in the outer grid.
- the scaffolding structure is erected such that each of the distances between any two adjacent bamboo members and between any bamboo member and an adjacent load bearing member, are substantially equal.
- the bamboo members include upright standards and horizontal ledgers with intersections between any bamboo members and other members being effected by nylon ties.
- bamboo transoms may provide the interconnection between the inner grid and the outer grid.
- the invention may further comprise one or more platforms on the structure, the or each platform disposed between two corresponding load bearing ledgers from the inner and outer grids which are of the same level, wherein the platform is of elongate configuration and includes a planar supporting surface and attachment means coupling the platform to the two load bearing ledgers.
- the attachment means comprise hook portions. These hook portions may extend transversely out either side of the platform. Preferably there is a minimum of four hook portions, each extending from a respective corner of the platform.
- the scaffolding structure of the present invention may be supported from the building being erected.
- This building suitably includes at least one concrete slab with one or more structural beams supported from and extending outwardly from the concrete slab in a cantilevered fashion.
- the scaffolding structure is then supported on the one or more structural beams.
- the spacing between adjacent cantilevered structural beams will depend upon the particular application but a preferred spacing would be about 3 metres.
- the above method may be used in conjunction with supporting brackets mounted on support columns of the building. The above method is especially appropriate where the column spacing of the building is more than 3 metres apart and the slab depth is insufficient to mount the brackets across the depth of the slab. Accordingly, the supporting brackets may be mounted to the support columns with an appropriate number of structural beams spaced between neighbouring supporting brackets mounted on respective building columns.
- the structural beams comprise I-beams.
- other types of structural beams are considered within the scope of the present invention including box-section beams.
- the present invention consists in a method of constructing a scaffolding structure for a building being erected, the method including:
- the anchoring member may be alignable such that the first leg extends substantially parallel to the longitudinal axis of the arm with the remote end of the first leg extending beyond the arm.
- the scaffolding structure 10 illustrated in Figure 1 is a three dimensional structure.
- the scaffolding structure 10 includes an inner two dimensional grid 12 illustrated in Figure 2 and an outer two dimensional grid 14 illustrated in Figure 3.
- the inner grid 12 is disposed adjacent the wall of the building 15 being constructed.
- the spacing of the inner grid 12 from the wall of the building 15 is generally about 200 mm.
- the outer grid 14 is disposed outwardly of the scaffolding structure 10 relative to the building 15.
- the outer grid 14 and the inner grid 12 are spaced approximately 600 to 700 mm apart. They are joined together by bamboo transoms 18 as shown in Figure 4 and Figure 1.
- the inner grid is comprised of upright standards 20 and horizontal ledgers 22.
- Each of the standards and ledgers are elongate steel tubular members.
- the tubular members are joined by metal couplers (not shown).
- the metal couplers are protected by covers to prevent contamination, particularly from concrete.
- each of the upright standards 20 are spaced 1.5 metres apart whereas the horizontal ledgers 22 are spaced 2.25 metres apart.
- This rectangular window created by the intersecting tubular members defines an interstice in the grid through which workers on the scaffolding structure can access the various parts of the building 15 as required. Due to the inherent strength of the steel ledgers 22 and standards 20, the interstices are comparatively large enabling easy access to the building 15 for the workers on the scaffolding structure 10.
- the outside grid illustrated in Figure 3 comprises bamboo ledgers 25 and bamboo standards 27 in combination with steel standards 24 and steel ledgers 26.
- the bamboo ledgers and standards are illustrated by the thin lines in Figure 3 whereas the steel ledgers 26 and standards 24 are illustrated by the thick vertical and horizontal lines of Figure 3.
- the steel ledgers 26 and standards 24 provide the structural strength for the outer grid 14 whereas the bamboo ledgers 25 and standards 27 provide guard rails for the safety of the workman on the scaffolding structure 10.
- the bamboo ledgers 25 and standards 27 thus increase the safety for workers on the scaffolding structure 10 without unnecessarily increasing the cost or weight of the structure.
- the steel standards 24 in the outer grid 14 are spaced at intervals of 3 metres (in contrast to the 1.5 metre spacing of the inner grid 12).
- the steel ledgers 26 are arranged at a vertical spacing of 2.25 metres. This corresponds to the spacing of the horizontal ledgers 22 so that the levels of the ledgers 26 in the outer grid correspond to the levels of the ledgers 22 in the inner grid.
- the spacing of the bamboo transoms horizontally in the scaffolding structure 10 in line with the ledgers 26, 22 corresponds to the spacing of the bamboo standards 27 in the outer grid.
- the bamboo standards 27 are arranged at spacings of 0.75 metres which allows for three at equal spacing from and between adjacent steel standards 24.
- the bamboo ledgers 25 are arranged at equal spacing of 0.75 metres from and between adjacent steel ledgers 26. Given that the steel ledgers are spaced 2.25 metres, apart this enables two bamboo ledgers 25 at equal spacing therebetween.
- the intersecting steel elongate members are joined by metal couplers.
- the intersecting bamboo members are joined by nylon tie.
- Figure 4 also illustrates the arrangement of netting 28 on the outer grid of the scaffolding structure. This prevents materials or tools dropping outside the scaffolding structure.
- the netting 28 should be securely attached to the scaffolding structure by nylon tics or metal wire as illustrated.
- FIG 6a shows diagrammatically only, the main structural components of the scaffolding structure 10.
- Each of the steel standards 20, 24 is about 6 metres long.
- Each level of the scaffolding structure 10 is referred to as a "zone” and is 24 metres in height as indicated in Figure 6a.
- each zone is made up of 4 x 6 metre lengths of the steel standards 20, 24.
- the region between adjacent steel standards 20, 24 in each zone is referred to as a "bay”.
- the height of each bay is defined by the vertical distance between support brackets 30.
- the support brackets disposed at vertical intervals corresponding to the length of four steel standards 20, 24, the height of each bay is thus 24 metres.
- the vertical spacing of the brackets will naturally depend upon the weight of the scaffold and the expected loading.
- the configuration of the support bracket 30 is illustrated schematically in Figure 15a.
- the steel standards 20, 24 of the scaffolding structure 10 fit into suitable recesses (not shown) on one arm of the bracket.
- the support bracket 30 is constructed from angle iron configured in the shape of a right angle isosceles triangle having side lengths of 900 mm.
- the angle iron might be 80x80x8 angle grade 43 depending on the particular application.
- One side of the support bracket 30 is secured to the wall of the concrete building, preferably at an upright support column of the building 15.
- An array of supporting brackets 30 thus provides support for the scaffolding structure 10 at the base thereof and at intervening levels of the scaffolding structure.
- a temporary bamboo structure may be first erected. Once the first layer of steel brackets 30 has been installed, the temporary bamboo structure may be transformed to be components of the scaffolding structure.
- Figure 15b illustrates an alternative form of support bracket 30b. It can be seen from Figure 6a that the appropriate vertical spacing for the brackets is 24m. However, by using the higher strength brackets illustrated in Figure 15b together with closer spacing of the anchoring devices (see Figures 9, 10a and 10b), the bracket spacing can be increased to 30 m as shown in Figure 6b.
- Figure 6b also illustrates that a bracket 30b of one level should be offset by an appropriate amount (80mm) in relation to the bracket 30b on an adjacent upper or lower level. This enables the steel standards to be overlapped (preferably by about 3m) and clamped together in the manner illustrated.
- the clamps 30c are arranged at a spacing of about 750mm.
- the building columns may be located too far apart for effective securement of adjacent supporting brackets 30.
- an alternative supporting arrangement for the scaffolding structure will be required as illustrated in Figure 7.
- Figure 7 illustrates adjacent columns 40 of the building 15 with a slab 42 extending therebetween.
- Two supporting brackets 30 are bolted by bolts 46 to respective columns 40 as illustrated.
- these supporting brackets 30 exceed the maximum permissible spacing therebetween for properly supporting the scaffolding structure 10. Therefore, cantilevered I-beams 44 are bolted to the slab to extend outwardly beyond the slab 42 as illustrated in Figure 8.
- the inner grid 12 and the outer grid 14 are supported on the I-beam 44 as illustrated in Figure 8, provided that the outer grid 14 is a minimum of 200 mm from the cantilevered end of the I-beam 44 and the inner grid 12 is a minimum of 200 mm from the end of the slab.
- the I-beams 44 are temporary and may be removed once the scaffolding has been disassembled.
- FIG 9 illustrates one method of anchoring the scaffolding structure 10 to the building 15.
- the anchoring is achieved by way of an anchoring device 50 as shown in Figure 9.
- the anchoring device 50 is illustrated more clearly in Figure 10a.
- the anchoring device 50 comprises a relatively short arm of metal tube of approximately 1 metre in length having an outside diameter of 48.6 mm.
- an anchoring plate 54 adapted to be bolted to the concrete building 15 as shown in Figure 9.
- the metal tube 52 is secured to the upright standards of the inner grid 12 and the outer grid 14 by way of metal right-angle couplers (see Figure 9).
- the anchoring plate 54 also provides an eyelet 56 for attachment of a steel cable 58.
- the other end of the steel cable 58 of R6 steel wire is provided with a coupling 59 for securement to a member of the outer grid 14 as shown in Figure 9.
- a coupling 59 for securement to a member of the outer grid 14 as shown in Figure 9.
- the anchoring method illustrated in Figure 9 serves to anchor both the inner grid 12 and the outer grid 14 to the building given that only bamboo transoms 18 are provided between the two grids.
- the anchoring method may serve as a backup in case of any failure of the brackets 30.
- FIG 10b illustrates an alternative anchoring device 50b.
- the anchoring device 50b includes a short arm 52b of about 1m in length. At one end of the arm, a through-aperture 50d is provided into which an anchoring member 50c in the form of an L-shaped rod is received.
- the anchoring member 50c has a first leg having a free end which, in the configuration shown in the drawing, extends past the end of the arm. The free end of the first leg is threaded to enable the anchoring member to be secured into the structure of the building being erected.
- the small footprint of the first leg onto the building enables the first leg to be secured almost anywhere, thereby allowing greater flexibility in locating the anchoring device.
- the anchoring member 50c may be cast into position or alternatively secured to the concrete structure of the building 15 after the concrete has set.
- the threaded end may extend into the concrete about 750mm.
- the anchoring member 50c also includes a second leg which is received in the through- aperture 50d.
- the second leg also has a threaded free end. This threaded free end receives a nut (not shown) to retain the second leg within the aperture.
- the length of the second leg is such that the arm 52b can slide along the second leg, hence increasing the flexibility in locating the first leg at an appropriate location on the building 15.
- frequent use of the anchoring devices reduces the demand for support brackets. Desirably, the vertical spacing should not exceed 2.25m and the horizontal spacing should not exceed 3m. From a comparison of Figures 6a and 6b, it can be seen that the vertical spacing between brackets can be increased from 24m to 30m. This is achieved with frequent use of the anchoring devices 50b and the modified form of brackets 30b.
- FIG 11 illustrates appropriate bracing 60 for the scaffolding structure 10.
- the outside grid 14 of the scaffolding structure 10 is illustrated diagrammatically by the spaced upright steel standards 24.
- diagonal cross bracing is typically arranged at an angle of 45- 60° plus or minus 5°.
- Figure 12 illustrates a detail of the outer grid 14 with the dotted line 70 illustrating the location of an intended opening to be formed in the outer grid 14.
- An opening 70 such as that illustrated might be required to load materials onto the site.
- Figure 13 illustrates the detail of the outside grid 14 with the opening cut 70.
- the bamboo and steel members have been cut as illustrated.
- additional bracing members 72 are installed. These extend diagonally as shown. Additionally, warning signs are installed to notify workers on the scaffolding structure of potential danger.
- the catch fan 80 comprises a catchment surface 82 extending upwardly and outwardly from the scaffolding structure 10.
- the catchment surface 82 is defined by spaced metal tubes 84 extending upwardly and outwardly from the outer grid 14 with a canvas-like fire resistant material extending over the metal support tubes 84.
- the upper and outer ends of the metal support tubes 84 are supported by further metal tubes 86.
- Each metal tube 86 is joined to the end of one of the metal tubes 84 and extends from that end upwardly and inwardly towards the outer grid 14.
- the catchment surface 82 is arranged at an angle of 45° from the horizontal but is adjustable with adjustment of the further metal tubes 86.
- the catchment surface 82 is provided to catch materials falling off the building 15 or scaffolding structure 10 for easy collection of debris and removal.
- Catch fans 80 are generally provided at each ten storey interval. However, individual contractors may install the catch fans 80 to suit the requirements of a particular building site.
- protective layers 90 are disposed at regular intervals, preferably immediately above the supporting brackets ie every ten storeys.
- the projective layers 90 provide access for workers as well as protect the workers from falling. Additionally, the protective layers 90 protect the workers from falling debris.
- Each protective layer 90 comprises a layer of horizontally arranged bamboo members 92 extending between adjacent transoms 18. The spacing of the bamboo members should not exceed 200mm.
- the bamboo members 92 can be above or below the transoms 18. These bamboo members provide a buffer effect in case heavy objects fall from above.
- zinc sheet 94 is laid down. The zinc sheet may be formed with upturned edges 94a of about 100mm in height.
- a bamboo ledger (not shown) fastened on top of the zinc sheet prevents the sheet from blowing away.
- catwalks metal workers' platforms, referred to as "cat walks” may be installed in addition to the protective layers 90 or in place of the protective layers 90.
- An appropriate catwalk 100 is illustrated in Figure 16.
- the catwalk 100 is of generally elongate planar form defined by an elongate rectangular metal frame 101 with a metal sheet 102 providing an elongate rectangular supporting surface.
- the catwalk 100 is supported by a horizontal steel ledger 26 of the outer grid 14 on one side and a horizontal steel ledger 22 of corresponding height of the inner grid 12, on the other side.
- Hook portions 107 extend transversely from the sides of the metal frame 101 to hook over the associated horizontal steel ledgers 22, 26.
- Figure 18 illustrates a slightly modified form of the catwalk.
- the catwalk illustrated includes toeboards 100b on each longitudinal side.
- the specific form of the toeboards 100b is illustrated in Figure 20.
- the toeboards are in the form of generally rectangular panels, the bottom corners being removed to enable the toeboards to be held within a pair of opposed brackets.
- the form of the brackets 100c is illustrated most clearly in Figure 19.
- the metal brackets 100c are an L-shape in plan with a height corresponding to the height of the platform 102.
- Each longitudinal side of the platform is provided with a pair of opposed brackets 100c.
- the toeboard is held between the opposed brackets 100c. Accordingly, the length between the opposed brackets TL corresponds to the distance between the upright edges of the cut-out corners of the toeboard.
- the overall length of the toeboard corresponds to the length of the platform 102.
- Figure 19 also illustrates the form of a special corner platform with brackets 100c on adjacent sides.
- the metal staircases comprise a pair of spaced stiles 110 with appropriately spaced stair treads 112 extending therebetween.
- the ends of the elongate stiles 110 are provided with hook or loop portions 114 for attachment to appropriate structural members of the scaffolding structure 10.
- FIGs 21 and 22 illustrate an alternative form of the ladder 120 which can be installed at intermediate locations along the platforms.
- a particular type of platform 125 has been developed for use in connection with the alternative form of the ladder 120.
- the platform 125 incorporates an access opening 127 of sufficient size to position the ladder therein and enable a worker to pass therethrough.
- An access hatch 128 is hingedly connected to the platform 125 by means of hinges 129.
- the access hatch covers a portion of the opening 127, leaving a space sufficient for the ladder 120 to pass therethrough.
- a hand-hole 130 in the access hatch enables a worker to open the hatch 128 from above.
- the specific form of the ladder is illustrated in Figure 22.
- the ladder 120 has stiles 132 and rungs 133.
- the rungs 133 are of rectangular cross-section.
- the stiles are shaped in a U-shape, with the respective ends being formed in a C-bracket 135 to conform to the contour of the steel ledger on which they are supported.
- the lower ends of the stiles 132 are formed with respective C-brackets 137.
- the lower ends of the stiles are formed with a step since the upper and lower C-brackets 135, 137 must necessarily align.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
Description
- The present invention relates to scaffolding. More particularly, the invention relates to safety aspects of scaffolding.
- In western countries the use of timber in scaffolding structures was prevalent in the early part of the twentieth century. Due to the high number of industrial accidents and fires arising from timber scaffolding, timber scaffolding has generally been replaced worldwide by steel tubular scaffolding. A scaffolding structure with the features of the preamble of
claim 1 is disclosed inDE 195 32 894 A1 . - However, in Asia, bamboo has been traditionally used for scaffolding. Bamboo scaffolding is still in use in China and Hong Kong. As a scaffolding material, bamboo has a number of advantages. Bamboo is economical and can be simply constructed without special tools. Bamboo scaffolding can also be constructed within a short period of time in a limited working space. The most significant advantage of bamboo scaffolding is its very strong bending strength and elasticity when freshly cut. However, the strength of bamboo decreases as time goes by because it gradually dehydrates over time. When the water content has reduced below 10% the bamboo becomes dry and cracks will appear. The maximum lifespan of bamboo scaffolding members is thus relatively short, only about 12 to 18 months. Thus bamboo is considered somewhat unreliable.
- In view of the limitations of bamboo, it is gradually being superseded in Hong Kong by steel scaffolding members. Steel scaffolding members still possess disadvantages none the least of which is cost. The weight of steel scaffolding structures may also be problematic in some situations. Because of the cost and strength characteristics of steel, the distances between the structural members are generally very wide to reduce material by taking advantage of steel strength. These distances are often inconvenient for workers climbing on the scaffolding and pose safety problems.
-
discloses a convention scaffolding structure with an additional guard panel spaced outwardly from the scaffolding structure. This guard panel adds substantial additional weight to the structure and requires special brackets to secure the guard panel to the scaffolding structure. It is therefore an objective to overcome or ameliorate at least one of the aforementioned disadvantages or to provide the public with a useful choice.Australian Patent Specification No. 45247/85 - In accordance with a first aspect of the present invention there is provided a scaffolding structure for a building being erected, the scaffolding structure comprising: a scaffold of a substantially two dimensional inner grid interconnected with a substantially two dimensional outer grid, each of the grids being comprised of load bearing members having relatively constant strength over time under expected loading conditions of the scaffolding structure characterised in that additional bamboo members are secured on the outer grid such that the interstices defined by the load bearing members and the bamboo members of the outer grid are smaller than the interstices defined by the load bearing members of the inner grid; and an anchoring device which includes: an arm coupled to the scaffold, the arm having a longitudinal axis; and an anchoring member anchoring the device and the scaffold to the building, the anchoring member being coupled to the arm and being of an L-shape having a first leg in the form of a rod or bar which extends beyond the arm, the rod or bar being anchored into the building and a second leg is coupled to said arm.
- Preferably the load bearing members are elongate structural members intersecting in a regular pattern to form the grids. The elongate members may be coupled by right angle metal couplers at all or some of the intersections in the grid. In a most preferred form of the invention the load bearing members are steel members, preferably of tubular cross section. In an alternative aspect of the invention, the load bearing members may comprise fibre reinforced plastic tubes. The grids are preferably constructed of load bearing members arranged at 90° to each other although other configurations are possible. Each grid may therefore have upright load bearing standards and substantially horizontal load bearing ledgers. Desirably, at least some-of the load bearing ledgers in the inner grid correspond to a respective load bearing ledger in the outer grid provided at the same height.
- The additional bamboo members are preferably secured between the load bearing members in the outer grid. In a most preferred form of the invention, the scaffolding structure is erected such that each of the distances between any two adjacent bamboo members and between any bamboo member and an adjacent load bearing member, are substantially equal. Preferably the bamboo members include upright standards and horizontal ledgers with intersections between any bamboo members and other members being effected by nylon ties.
- Additionally, bamboo transoms may provide the interconnection between the inner grid and the outer grid.
- The invention may further comprise one or more platforms on the structure, the or each platform disposed between two corresponding load bearing ledgers from the inner and outer grids which are of the same level, wherein the platform is of elongate configuration and includes a planar supporting surface and attachment means coupling the platform to the two load bearing ledgers.
- Preferably, the attachment means comprise hook portions. These hook portions may extend transversely out either side of the platform. Preferably there is a minimum of four hook portions, each extending from a respective corner of the platform.
- The scaffolding structure of the present invention may be supported from the building being erected. This building suitably includes at least one concrete slab with one or more structural beams supported from and extending outwardly from the concrete slab in a cantilevered fashion. The scaffolding structure is then supported on the one or more structural beams.
- The spacing between adjacent cantilevered structural beams will depend upon the particular application but a preferred spacing would be about 3 metres. The above method may be used in conjunction with supporting brackets mounted on support columns of the building. The above method is especially appropriate where the column spacing of the building is more than 3 metres apart and the slab depth is insufficient to mount the brackets across the depth of the slab. Accordingly, the supporting brackets may be mounted to the support columns with an appropriate number of structural beams spaced between neighbouring supporting brackets mounted on respective building columns.
- In a preferred form of the invention the structural beams comprise I-beams. However other types of structural beams are considered within the scope of the present invention including box-section beams.
- In accordance with a second aspect the present invention consists in a method of constructing a scaffolding structure for a building being erected, the method including:
- erecting the structure which comprises a scaffold of a substantially two dimensional inner grid interconnected with a substantially two dimensional outer grid, each of the grids being comprised of load bearing members having relatively constant strength over time under expected loading conditions of the scaffolding structure ; and
- securing additional bamboo members on the outer grid such that the interstices defined by the load bearing members and the bamboo members of the outer grid are smaller than the interstices defined by the load bearing members of the inner grid; and providing an anchoring device which includes: an arm coupled to the scaffold, the arm having a longitudinal axis; and an anchoring member anchoring the device and the scaffold to the building, the anchoring member being coupled to the arm and being of an L-shape having a first leg in the form of a rod or bar which extends beyond the arm, the rod or bar being anchored into the building and a second leg is coupled to said arm.
- In accordance with a further aspect of the invention, the anchoring member may be alignable such that the first leg extends substantially parallel to the longitudinal axis of the arm with the remote end of the first leg extending beyond the arm.
- The invention consists in the foregoing and also envisages constructions of which the following gives examples only.
- In order that the invention may be more fully understood, one embodiment will now be described with reference to the drawings in which:-
- Figure 1 is a partial schematic perspective view of a scaffolding structure according to a first preferred embodiment of the invention;
- Figure 2 is a diagrammatic view of an inner grid of the scaffolding structure illustrated in Figure 1;
- Figure 3 is a diagrammatic view of an outer grid of the scaffolding structure of Figure 1;
- Figure 4 is a side view of the scaffolding structure of Figure 1;
- Figure 5 is a diagrammatic front elevation view of a base detail of the scaffolding structure of Figure 1;
- Figure 6a is a diagrammatic front elevation view of the scaffolding of Figure 1, illustrating the main structural components only;
- Figure 6b is a diagrammatic perspective view of a slightly modified arrangement of the supporting brackets for the scaffolding structure;
- Figure 7 is a front view of an alternative support detail for the scaffolding structure of Figure 1;
- Figure 8 is a side view of the alternative support detail illustrated in Figure 7;
- Figure 9 is a diagrammatic side view of an anchoring method for the scaffolding illustrated in Figure 1;
- Figure 10a is a perspective view of an anchoring device used to implement the anchoring method illustrated in Figure 9;
- Figure 10b is a side view of an alternative form of an anchoring device;
- Figure 11 is a diagrammatic view of appropriate bracing for the scaffolding structure illustrated in Figure 1;
- Figure 12 illustrates a typical detail of the outer grid of the scaffolding structure of Figure 1, with the outline of an intended opening in the outer grid;
- Figure 13 illustrates the outer grid detail illustrated in Figure 12 with an opening cut therein with appropriate bracing to strengthen the outer grid;
- Figure 14 is a side view of a catch fan for use with the scaffolding structure illustrated in Figure 1;
- Figure 15a is a side view of a supporting bracket and a protective layer for use with the scaffolding structure illustrated in Figure 1;
- Figure 15b is a side view of an alternative form of supporting bracket;
- Figure 16 is a perspective view of a detail of the scaffolding of Figure 1 showing a workers' platform installed;
- Figure 17 is a detail of the scaffolding structure of Figure 1 with a staircase installed;
- Figure 18 is a schematic perspective view of the scaffolding structure with an alternative form of workers' platform installed;
- Figure 19 is a plan view of a corner detail for the alternative form of the workers' platform;
- Figure 20 is a side view of a toeboard for use in the workers' platforms illustrated in Figures 18 and 19;
- Figure 21 is a schematic perspective view of a particular form of workers' platform illustrating an access opening and a ladder; and
- Figure 22 is a side and front view of the ladder illustrated in Figure 21.
- The
scaffolding structure 10 illustrated in Figure 1 is a three dimensional structure. Thescaffolding structure 10 includes an inner twodimensional grid 12 illustrated in Figure 2 and an outer twodimensional grid 14 illustrated in Figure 3. As shown in Figure 4, theinner grid 12 is disposed adjacent the wall of thebuilding 15 being constructed. The spacing of theinner grid 12 from the wall of thebuilding 15 is generally about 200 mm. Theouter grid 14 is disposed outwardly of thescaffolding structure 10 relative to thebuilding 15. Theouter grid 14 and theinner grid 12 are spaced approximately 600 to 700 mm apart. They are joined together bybamboo transoms 18 as shown in Figure 4 and Figure 1. - Referring to Figure 2, the inner grid is comprised of
upright standards 20 andhorizontal ledgers 22. Each of the standards and ledgers are elongate steel tubular members. At each intersection of a ledger and standard, the tubular members are joined by metal couplers (not shown). The metal couplers are protected by covers to prevent contamination, particularly from concrete. - As can be seen in Figure 2, each of the
upright standards 20 are spaced 1.5 metres apart whereas thehorizontal ledgers 22 are spaced 2.25 metres apart. This rectangular window created by the intersecting tubular members defines an interstice in the grid through which workers on the scaffolding structure can access the various parts of thebuilding 15 as required. Due to the inherent strength of the steel ledgers 22 andstandards 20, the interstices are comparatively large enabling easy access to thebuilding 15 for the workers on thescaffolding structure 10. - On the other hand, the outside grid illustrated in Figure 3 comprises bamboo ledgers 25 and
bamboo standards 27 in combination withsteel standards 24 and steel ledgers 26. The bamboo ledgers and standards are illustrated by the thin lines in Figure 3 whereas the steel ledgers 26 andstandards 24 are illustrated by the thick vertical and horizontal lines of Figure 3. The steel ledgers 26 andstandards 24 provide the structural strength for theouter grid 14 whereas the bamboo ledgers 25 andstandards 27 provide guard rails for the safety of the workman on thescaffolding structure 10. The bamboo ledgers 25 andstandards 27 thus increase the safety for workers on thescaffolding structure 10 without unnecessarily increasing the cost or weight of the structure. - The
steel standards 24 in theouter grid 14 are spaced at intervals of 3 metres (in contrast to the 1.5 metre spacing of the inner grid 12). The steel ledgers 26 are arranged at a vertical spacing of 2.25 metres. This corresponds to the spacing of thehorizontal ledgers 22 so that the levels of theledgers 26 in the outer grid correspond to the levels of theledgers 22 in the inner grid. This is appropriate because thebamboo transoms 18 extend between theledger 22 of the inner grid and theledgers 26 of the outer grid as can be seen in Figure 4. Further, as shown in Figure 1, the spacing of the bamboo transoms horizontally in thescaffolding structure 10 in line with the 26, 22 corresponds to the spacing of theledgers bamboo standards 27 in the outer grid. - Reverting to Figure 3, the
bamboo standards 27 are arranged at spacings of 0.75 metres which allows for three at equal spacing from and betweenadjacent steel standards 24. Similarly, the bamboo ledgers 25 are arranged at equal spacing of 0.75 metres from and between adjacent steel ledgers 26. Given that the steel ledgers are spaced 2.25 metres, apart this enables twobamboo ledgers 25 at equal spacing therebetween. Generally speaking, the intersecting steel elongate members are joined by metal couplers. The intersecting bamboo members are joined by nylon tie. - Figure 4 also illustrates the arrangement of netting 28 on the outer grid of the scaffolding structure. This prevents materials or tools dropping outside the scaffolding structure. The netting 28 should be securely attached to the scaffolding structure by nylon tics or metal wire as illustrated.
- Figure 6a shows diagrammatically only, the main structural components of the
scaffolding structure 10. Each of the 20, 24 is about 6 metres long. Each level of thesteel standards scaffolding structure 10 is referred to as a "zone" and is 24 metres in height as indicated in Figure 6a. Thus each zone is made up of 4 x 6 metre lengths of the 20, 24. The region betweensteel standards 20, 24 in each zone is referred to as a "bay". In the present case the height of each bay is defined by the vertical distance betweenadjacent steel standards support brackets 30. In the present case, with the support brackets disposed at vertical intervals corresponding to the length of four 20, 24, the height of each bay is thus 24 metres. However, the vertical spacing of the brackets will naturally depend upon the weight of the scaffold and the expected loading.steel standards - The configuration of the
support bracket 30 is illustrated schematically in Figure 15a. The 20, 24 of thesteel standards scaffolding structure 10 fit into suitable recesses (not shown) on one arm of the bracket. Thesupport bracket 30 is constructed from angle iron configured in the shape of a right angle isosceles triangle having side lengths of 900 mm. The angle iron might be 80x80x8 angle grade 43 depending on the particular application. One side of thesupport bracket 30 is secured to the wall of the concrete building, preferably at an upright support column of thebuilding 15. An array of supportingbrackets 30 thus provides support for thescaffolding structure 10 at the base thereof and at intervening levels of the scaffolding structure. - In order to erect the scaffolding structure, a temporary bamboo structure may be first erected. Once the first layer of
steel brackets 30 has been installed, the temporary bamboo structure may be transformed to be components of the scaffolding structure. - Figure 15b illustrates an alternative form of support bracket 30b. It can be seen from Figure 6a that the appropriate vertical spacing for the brackets is 24m. However, by using the higher strength brackets illustrated in Figure 15b together with closer spacing of the anchoring devices (see Figures 9, 10a and 10b), the bracket spacing can be increased to 30 m as shown in Figure 6b. Figure 6b also illustrates that a bracket 30b of one level should be offset by an appropriate amount (80mm) in relation to the bracket 30b on an adjacent upper or lower level. This enables the steel standards to be overlapped (preferably by about 3m) and clamped together in the manner illustrated. The clamps 30c are arranged at a spacing of about 750mm.
- In some instances, the building columns may be located too far apart for effective securement of adjacent supporting
brackets 30. In this case, an alternative supporting arrangement for the scaffolding structure will be required as illustrated in Figure 7. Figure 7 illustratesadjacent columns 40 of thebuilding 15 with aslab 42 extending therebetween. Two supportingbrackets 30 are bolted bybolts 46 torespective columns 40 as illustrated. However, these supportingbrackets 30 exceed the maximum permissible spacing therebetween for properly supporting thescaffolding structure 10. Therefore, cantilevered I-beams 44 are bolted to the slab to extend outwardly beyond theslab 42 as illustrated in Figure 8. Theinner grid 12 and theouter grid 14 are supported on the I-beam 44 as illustrated in Figure 8, provided that theouter grid 14 is a minimum of 200 mm from the cantilevered end of the I-beam 44 and theinner grid 12 is a minimum of 200 mm from the end of the slab. The I-beams 44 are temporary and may be removed once the scaffolding has been disassembled. - Figure 9 illustrates one method of anchoring the
scaffolding structure 10 to thebuilding 15. The anchoring is achieved by way of ananchoring device 50 as shown in Figure 9. The anchoringdevice 50 is illustrated more clearly in Figure 10a. The anchoringdevice 50 comprises a relatively short arm of metal tube of approximately 1 metre in length having an outside diameter of 48.6 mm. At one end of themetal tube 52 is provided ananchoring plate 54 adapted to be bolted to theconcrete building 15 as shown in Figure 9. Themetal tube 52 is secured to the upright standards of theinner grid 12 and theouter grid 14 by way of metal right-angle couplers (see Figure 9). The anchoringplate 54 also provides aneyelet 56 for attachment of asteel cable 58. The other end of thesteel cable 58 of R6 steel wire is provided with acoupling 59 for securement to a member of theouter grid 14 as shown in Figure 9. By attaching thecoupling 59 to theouter grid 14, thescaffolding structure 10 will be effectively tethered to thebuilding 15. - The anchoring method illustrated in Figure 9 serves to anchor both the
inner grid 12 and theouter grid 14 to the building given thatonly bamboo transoms 18 are provided between the two grids. The anchoring method may serve as a backup in case of any failure of thebrackets 30. - Figure 10b illustrates an
alternative anchoring device 50b. Theanchoring device 50b includes ashort arm 52b of about 1m in length. At one end of the arm, a through-aperture 50d is provided into which an anchoringmember 50c in the form of an L-shaped rod is received. The anchoringmember 50c has a first leg having a free end which, in the configuration shown in the drawing, extends past the end of the arm. The free end of the first leg is threaded to enable the anchoring member to be secured into the structure of the building being erected. The small footprint of the first leg onto the building enables the first leg to be secured almost anywhere, thereby allowing greater flexibility in locating the anchoring device. The anchoringmember 50c may be cast into position or alternatively secured to the concrete structure of thebuilding 15 after the concrete has set. The threaded end may extend into the concrete about 750mm. The anchoringmember 50c also includes a second leg which is received in the through-aperture 50d. The second leg also has a threaded free end. This threaded free end receives a nut (not shown) to retain the second leg within the aperture. However, the length of the second leg is such that thearm 52b can slide along the second leg, hence increasing the flexibility in locating the first leg at an appropriate location on thebuilding 15. As mentioned above, frequent use of the anchoring devices reduces the demand for support brackets. Desirably, the vertical spacing should not exceed 2.25m and the horizontal spacing should not exceed 3m. From a comparison of Figures 6a and 6b, it can be seen that the vertical spacing between brackets can be increased from 24m to 30m. This is achieved with frequent use of theanchoring devices 50b and the modified form of brackets 30b. - Figure 11 illustrates appropriate bracing 60 for the
scaffolding structure 10. Theoutside grid 14 of thescaffolding structure 10 is illustrated diagrammatically by the spacedupright steel standards 24. As illustrated, for every 15 metre width ie 5 bays, diagonal cross bracing is typically arranged at an angle of 45- 60° plus or minus 5°. - Figure 12 illustrates a detail of the
outer grid 14 with the dottedline 70 illustrating the location of an intended opening to be formed in theouter grid 14. Anopening 70 such as that illustrated might be required to load materials onto the site. Figure 13 illustrates the detail of theoutside grid 14 with the opening cut 70. The bamboo and steel members have been cut as illustrated. To reinforce thegrid 14, additional bracingmembers 72 are installed. These extend diagonally as shown. Additionally, warning signs are installed to notify workers on the scaffolding structure of potential danger. - An additional feature of the
scaffolding structure 10 is the provision of a catch fan as illustrated in Figure 14. Thecatch fan 80 comprises acatchment surface 82 extending upwardly and outwardly from thescaffolding structure 10. Thecatchment surface 82 is defined by spacedmetal tubes 84 extending upwardly and outwardly from theouter grid 14 with a canvas-like fire resistant material extending over themetal support tubes 84. The upper and outer ends of themetal support tubes 84 are supported byfurther metal tubes 86. Eachmetal tube 86 is joined to the end of one of themetal tubes 84 and extends from that end upwardly and inwardly towards theouter grid 14. Generally, thecatchment surface 82 is arranged at an angle of 45° from the horizontal but is adjustable with adjustment of thefurther metal tubes 86. Thecatchment surface 82 is provided to catch materials falling off thebuilding 15 orscaffolding structure 10 for easy collection of debris and removal.Catch fans 80 are generally provided at each ten storey interval. However, individual contractors may install thecatch fans 80 to suit the requirements of a particular building site. - As shown in Figure 15, for the protection of workers on the
scaffolding structure 10,protective layers 90 are disposed at regular intervals, preferably immediately above the supporting brackets ie every ten storeys. The projective layers 90 provide access for workers as well as protect the workers from falling. Additionally, theprotective layers 90 protect the workers from falling debris. Eachprotective layer 90 comprises a layer of horizontally arrangedbamboo members 92 extending betweenadjacent transoms 18. The spacing of the bamboo members should not exceed 200mm. Thebamboo members 92 can be above or below thetransoms 18. These bamboo members provide a buffer effect in case heavy objects fall from above. Above thehorizontal bamboo members 92,zinc sheet 94 is laid down. The zinc sheet may be formed with upturned edges 94a of about 100mm in height. A bamboo ledger (not shown) fastened on top of the zinc sheet prevents the sheet from blowing away. - Optionally, metal workers' platforms, referred to as "cat walks" may be installed in addition to the
protective layers 90 or in place of the protective layers 90. Anappropriate catwalk 100 is illustrated in Figure 16. Thecatwalk 100 is of generally elongate planar form defined by an elongaterectangular metal frame 101 with ametal sheet 102 providing an elongate rectangular supporting surface. Thecatwalk 100 is supported by ahorizontal steel ledger 26 of theouter grid 14 on one side and ahorizontal steel ledger 22 of corresponding height of theinner grid 12, on the other side.Hook portions 107 extend transversely from the sides of themetal frame 101 to hook over the associated horizontal steel ledgers 22, 26. It will be appreciated that the horizontal steel ledgers 22, 26 on the inner and outer grids ought to be provided at the same height in order to ensure that the catwalk resting thereon is level. For this reason, during construction a piece of catwalk may be put into position on theouter grid 14 prior to the erection of theinner layer 12. - Figure 18 illustrates a slightly modified form of the catwalk. The catwalk illustrated includes toeboards 100b on each longitudinal side. The specific form of the toeboards 100b is illustrated in Figure 20. The toeboards are in the form of generally rectangular panels, the bottom corners being removed to enable the toeboards to be held within a pair of opposed brackets. The form of the brackets 100c is illustrated most clearly in Figure 19. The metal brackets 100c are an L-shape in plan with a height corresponding to the height of the
platform 102. Each longitudinal side of the platform is provided with a pair of opposed brackets 100c. The toeboard is held between the opposed brackets 100c. Accordingly, the length between the opposed brackets TL corresponds to the distance between the upright edges of the cut-out corners of the toeboard. The overall length of the toeboard corresponds to the length of theplatform 102. - Figure 19 also illustrates the form of a special corner platform with brackets 100c on adjacent sides.
- An additional feature of the
scaffolding structure 10 is the provision of metal staircases as illustrated in Figure 17. The metal staircases comprise a pair of spacedstiles 110 with appropriately spaced stair treads 112 extending therebetween. The ends of theelongate stiles 110 are provided with hook orloop portions 114 for attachment to appropriate structural members of thescaffolding structure 10. - It will be appreciated that the form of the metal staircases illustrated in Figure 17 can only be installed at the corner of the scaffolding structure otherwise the platform will be blocked. Figures 21 and 22 illustrate an alternative form of the
ladder 120 which can be installed at intermediate locations along the platforms. A particular type of platform 125 has been developed for use in connection with the alternative form of theladder 120. The platform 125 incorporates an access opening 127 of sufficient size to position the ladder therein and enable a worker to pass therethrough. Anaccess hatch 128 is hingedly connected to the platform 125 by means ofhinges 129. The access hatch covers a portion of theopening 127, leaving a space sufficient for theladder 120 to pass therethrough. A hand-hole 130 in the access hatch enables a worker to open thehatch 128 from above. - The specific form of the ladder is illustrated in Figure 22. The
ladder 120 hasstiles 132 andrungs 133. Therungs 133 are of rectangular cross-section. At the top of theladder 120, the stiles are shaped in a U-shape, with the respective ends being formed in a C-bracket 135 to conform to the contour of the steel ledger on which they are supported. Likewise, the lower ends of thestiles 132 are formed with respective C-brackets 137. Additionally, the lower ends of the stiles are formed with a step since the upper and lower C- 135, 137 must necessarily align.brackets
Claims (44)
- A scaffolding structure (10) for a building (15) being erected, the scaffolding structure (10) comprising: a scaffold of a substantially two dimensional inner grid (12) interconnected with a substantially two dimensional outer grid (14), each of the grids (12, 14) being comprised of load bearing members (20, 22, 24, 26) having relatively constant strength over time under expected loading conditions of the scaffolding structure, and an anchoring device (50b) which includes: an arm (52b) coupled to the scaffold, the arm (52b) having a longitudinal axis; and an anchoring member (50c) suitable for anchoring the device (50b) and the scaffold to the building (15), the anchoring member (50c) being coupled to the arm (52b) and being of an L-shape having a first leg in the form of a rod or bar which extends beyond the arm, the rod or bar being anchorable into the building (15) and a second leg being coupled to said arm (52b) characterised in that additional bamboo members (25, 27) are secured on the outer grid (14) such that the interstices defined by the load bearing members (24, 26) and the bamboo members (25, 27) of the outer grid (14) are smaller than the interstices defined by the load bearing members (20, 22) of the inner grid (12).
- The scaffolding structure (10) as claimed in claim 1 wherein the load bearing members (20, 22, 24, 26) are steel members of tubular cross section.
- The scaffolding structure (10) as claimed in claim 1 wherein the load bearing members (20, 22, 24, 26) comprise fibre reinforced plastic tubes.
- The scaffolding structure (10) as claimed in any one of the preceding claims wherein the bamboo members (25, 27) include upright standards (27) and substantially horizontal ledgers (25) with the intersection between any two bamboo members or a bamboo member and another member being effected by nylon ties.
- The scaffolding structure (10) as claimed in any one of the preceding claims wherein bamboo transoms (18) provide the interconnection between the inner grid (12) and the outer grid (14).
- The scaffolding structure (10) as claimed in any one of the preceding claims wherein each of the distances between any two adjacent bamboo members (25, 27) and between any bamboo member (25, 27) and an adjacent load bearing member (20, 22, 24, 26) are substantially equal.
- The scaffolding structure (10) as claimed in claim 1 wherein the load bearing members (20, 22, 24, 26) are elongate structural members including substantially horizontal ledgers (22, 26) and upright standards (20, 24) intersecting in a regular pattern to form the inner and outer grids (12, 14).
- The scaffolding structure (10) as claimed in claim 7 wherein the structure is erected such that at least some of the load bearing ledgers (22) in the inner grid (12) correspond to respective load bearing ledgers (26) in the outer grid (14) provided at the same height.
- The scaffolding structure (10) as claimed in claim 8 further including one or more platforms (102), the or each platform (102) disposed between two corresponding load bearing ledgers (22, 26) from the inner and the outer grid (12, 14) which are of the same level, wherein the platform (102) includes a planar supporting surface and attachment means coupling the platform (102) to the two load bearing ledgers (22, 26).
- The scaffolding structure (10) as claimed in claim 9 wherein the attachment means comprise hook portions (107).
- The scaffolding structure (10) as claimed in claim 9 or claim 10 wherein the platform (102) is elongate and the attachment means extend transversely out either side of the platform (102).
- The scaffolding structure (10) as claimed in any one of claims 9 to 11 wherein there are four hook portions (107), each extending from a respective corner of the platform (102).
- The scaffolding structure (10) as claimed in any one of the preceding claims wherein the building (15) being erected includes at least one concrete slab (42) with one or more temporary structural beams (44) supported by and extending outwardly from the concrete slab (42) in a cantilevered fashion, the scaffolding structure (10) being supported on the one or more structural beams (44).
- The scaffolding structure (10) as claimed in claim 13 wherein the spacing between any two adjacent cantilevered structural beams (44) is about 3 metres.
- The scaffolding structure (10) as claimed in either claim 13 or 14 wherein one or more of such cantilevered structural beams (44) are spaced between two neighbouring supporting brackets (30) mounted on respective neighbouring support columns (40) of the building (15).
- The scaffolding structure (10) as claimed in any one of claims 13 to 15 wherein the structural beams comprise I-beams (44).
- The scaffolding structure (10) as claimed in any one of the preceding claims, wherein the arm (52b) is movable relative to the anchoring member (50c) in a direction transverse to the longitudinal axis.
- The scaffolding structure (10) as claimed in claim 1 wherein the second leg of the L-shaped member is received in an aperture (50d) in the arm, the arm being slidable along the second leg, with a stop provided to limit movement along the arm.
- The scaffolding structure (10) as claimed in any one of claims 9 to 12 wherein an access opening (127) is provided in the planar supporting surface for access to a lower region of the scaffolding structure (10), the scaffolding structure (10) further comprising a ladder (120) mounted on the scaffolding structure (10) and disposed for access by a worker through the access opening (127).
- The scaffolding structure (10) as claimed in claim 19 further including an access hatch (128) movable between a closed position to at least partially close the access opening (127) and an open position which provides sufficient space for a worker to use the ladder (120).
- The scaffolding structure (10) as claimed in claim 20 wherein the access hatch (128) is such to leave a space in the access opening (127) when in the closed position, the ladder (120) extending through the space.
- The scaffolding structure (10) as claimed in claim 21 wherein the ladder (120) includes rungs (133) and stiles (132), the stiles at the upper end being formed in a U-shape, the remote ends of the U-shape having respective couplers (135) which are complementary to the shape of the ledgers (26), the stiles at the bottom end also having respective couplers (137) complementary to the shape of the ledgers (26).
- A method of constructing a scaffolding structure (10) for a building (15) being erected, the method including:erecting the structure (10) which comprises a scaffold of a substantially two dimensional inner grid (12) interconnected with a substantially two dimensional outer grid (14), each of the grids (12, 14) being comprised of load bearing members (20, 22, 24, 26) having relatively constant strength over time under expected loading conditions of the scaffolding structure (10); andsecuring additional bamboo members (25, 27) on the outer grid (14) such that the interstices defined by the load bearing members (24, 26) and the bamboo members (25, 27) of the outer grid_ (14) are smaller than the interstices_defined by the load bearing members (20, 22) of the inner grid (12); and providing an anchoring device (50b) which includes: an arm (52b) coupled to the scaffold, the arm (52b) having a longitudinal axis; and an anchoring member (50c) anchoring the device (52b) and the scaffold to the building (15), the anchoring member (50c) being coupled to the arm (52b) and being of an L-shape having a first leg in the form of a rod or bar which extends beyond the arm (52b), the rod or bar being anchored into the building (15) and a second leg is coupled to said arm (52b).
- The method as claimed in claim 23 wherein the load bearing members (20, 22, 24, 26) are steel members of tubular cross section.
- The method as claimed in claim 23 wherein the load bearing members (20, 22, 24, 26) comprise fibre reinforced plastic tubes.
- The method as claimed in any one claims 23 to 25 wherein the bamboo members (25, 27) include upright standards (27) and substantially horizontal ledgers (25) with the intersection between any two bamboo members or a bamboo member and another member being effected by nylon ties.
- The method as claimed in any one of claims 23 to 26 wherein bamboo transoms (18) provide the interconnection between the inner grid (12) and the outer grid (14).
- The method as claimed in any one claims 23 to 27 wherein the structure (10) is erected such that each of the distances between any two adjacent bamboo members and between any bamboo member and an adjacent load bearing member, are substantially equal.
- The method as claimed in claim 23 wherein the load bearing members (20, 22, 24, 26) are elongate structural members including substantially horizontal ledgers (22, 26) and upright standards (20, 24) intersecting in a regular pattern to form the inner and outer grids (12, 14).
- The method as claimed in claim 29 wherein the structure is erected such that at least some of the load bearing ledgers (22) in the inner grid (12) correspond to respective load bearing ledgers (26) in the outer grid (14) provided at the same height.
- The method as claimed in claim 30 further including erecting one or more platforms (102) on the structure (10), the or each platform (102) disposed between two corresponding load bearing ledgers (22, 26) from the inner and outer grid (12, 14) which are of the same level, wherein the platform (102) is of elongate configuration and includes a planar supporting surface and attachment means coupling the platform to the two load bearing ledgers (22, 26).
- The method as claimed in claim 31 wherein the attachment means comprise hook portions (107).
- The method as claimed in claim 31 or claim 32 wherein the attachment means extend transversely out either side of the platform (102).
- The method as claimed in any one of claims 31 to 33 wherein there are four hook portions (107), each extending from a respective corner of the platform.
- The method as claimed in any one of claims 23 to 34 wherein the building (15) being erected includes at least one concrete slab (42), the method including:extending and supporting one or more structural beams (44) outwardly from the concrete slab (42) in a cantilevered fashion; andsupporting the scaffolding structure (10) on the one or more structural beams (44).
- The method as claimed in claim 35 wherein the spacing between any two adjacent cantilevered structural beams (44) is about 3 metres.
- The method as claimed in any one of claims 35 to 36 wherein the structural beams comprise I-beams (44).
- A scaffolding structure (10) as defined in claim 1, the anchoring member (50c) being alignable such that the first leg extends substantially parallel to the longitudinal axis of the arm (52b) with the remote end of the first leg extending beyond the arm (52b).
- The scaffolding structure (10) as claimed in claim 38 wherein the arm (52b) is movable relative to the anchoring member (50c) in a direction transverse to the longitudinal axis.
- The scaffolding structure (10) as claimed in claim 39 wherein the L-shaped anchoring member (50c) is pivotable about the coupling relative to the arm (52b).
- The scaffolding structure (10) as claimed in claim 39 or 40 wherein the second leg of the L-shaped member is received in an aperture (50d) in the arm (52b), the ann (52b) being slidable along the second leg, with a stop provided to limit movement along the second arm.
- The scaffolding structure (10) as claimed in claim 41 wherein the second leg is threaded at a remote end thereof and receives a nut.
- The scaffolding structure (10) as claimed in claim 42 wherein the remote end of the first leg is threaded.
- The scaffolding structure (10) as claimed in any one of claims 38 to 43 including one or more couplers to couple the arm (52b) to each of the grids (12, 14).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP07016534A EP1854940A1 (en) | 1999-07-28 | 2000-07-28 | Scaffolding |
Applications Claiming Priority (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NZ33695999 | 1999-07-28 | ||
| NZ336959A NZ336959A (en) | 1999-07-28 | 1999-07-28 | Scaffolding |
| AUPQ3192A AUPQ319299A0 (en) | 1999-09-27 | 1999-09-27 | Scaffolding |
| AUPQ319299 | 1999-09-27 | ||
| PCT/NZ2000/000142 WO2001007730A1 (en) | 1999-07-28 | 2000-07-28 | Scaffolding |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP07016534A Division EP1854940A1 (en) | 1999-07-28 | 2000-07-28 | Scaffolding |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP1206611A1 EP1206611A1 (en) | 2002-05-22 |
| EP1206611A4 EP1206611A4 (en) | 2005-08-03 |
| EP1206611B1 true EP1206611B1 (en) | 2007-09-12 |
Family
ID=25646160
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP07016534A Withdrawn EP1854940A1 (en) | 1999-07-28 | 2000-07-28 | Scaffolding |
| EP00950116A Expired - Lifetime EP1206611B1 (en) | 1999-07-28 | 2000-07-28 | Scaffolding |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP07016534A Withdrawn EP1854940A1 (en) | 1999-07-28 | 2000-07-28 | Scaffolding |
Country Status (4)
| Country | Link |
|---|---|
| EP (2) | EP1854940A1 (en) |
| GB (1) | GB2355752B (en) |
| HK (1) | HK1045721B (en) |
| WO (1) | WO2001007730A1 (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7637351B2 (en) | 2005-01-25 | 2009-12-29 | Roger Langsmead | Scaffold safety apparatus |
| DE102008005182A1 (en) * | 2008-01-19 | 2009-07-23 | Weiss, Johannes | Scaffolding decking with access hatch whose swing angle is limited |
| ITRM20130720A1 (en) * | 2013-12-24 | 2015-06-25 | Mario Martina | METALLIC STRUCTURE FOR THE SUPPORT OF SCAFFOLDING BY POSTS OF BUILDINGS IN C.A. |
| FI11281U1 (en) * | 2016-02-24 | 2016-06-13 | Erik Ahto Oy | Modular Scaffolding |
| JP6281015B1 (en) * | 2017-08-02 | 2018-02-14 | 藤本 隆 | Seismic construction method for temporary scaffolds for base-isolated buildings |
| CN108560892A (en) * | 2018-03-21 | 2018-09-21 | 北京城建科技促进会 | A kind of hoisting type modularization scaffold and its installation method |
| CN113323395B (en) * | 2021-06-11 | 2022-09-09 | 中铁十二局集团建筑安装工程有限公司 | Winter construction method of steel structure thick-coating type non-expansion fireproof coating |
| CN116696028A (en) * | 2023-06-09 | 2023-09-05 | 中铁十六局集团城市建设发展有限公司 | Upright post base and cantilever scaffold mounting method |
| CN116733107B (en) * | 2023-06-15 | 2025-11-25 | 中国华西企业股份有限公司 | A core-insertion type grid frame and its assembly method |
Family Cites Families (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE809598C (en) * | 1949-09-02 | 1951-07-30 | Dortmunder Brueckenbau C H Juc | Scaffolding made of profiled steel strip |
| DE1116378B (en) * | 1956-01-17 | 1961-11-02 | Bernhard Schwarz | Console frame |
| FR1355507A (en) * | 1959-12-10 | 1964-03-20 | removable tubular metal ladder for metal scaffolding | |
| US3762110A (en) * | 1971-11-03 | 1973-10-02 | J Boss | Movable windbreaker for steel buildings |
| GB1396602A (en) * | 1972-05-12 | 1975-06-04 | Thomas Ltd Martin | Builders staging |
| US3870124A (en) * | 1974-01-09 | 1975-03-11 | Ivy J Howard | Scaffold ladder structure |
| DE2531526A1 (en) * | 1975-07-15 | 1977-02-03 | Leo Menhofer | Building scaffolding platform fall safety device - with swivelling flap on ladder to cover platform entry opening |
| JPS6146123Y2 (en) * | 1978-12-12 | 1986-12-25 | ||
| GB2127124B (en) * | 1982-07-28 | 1985-11-20 | Finlay Colin Turner Mclay | A fitting for anchoring scaffold tubes to fixed structures |
| JPS60141421A (en) * | 1983-12-29 | 1985-07-26 | Kawasaki Heavy Ind Ltd | Apparatus for adjusting side trimming width used in metal strip treating line |
| AU573869B2 (en) * | 1984-07-26 | 1988-06-23 | S G B Brooker Pty. Ltd. | Scaffold guard panel |
| DE3702256A1 (en) * | 1987-01-27 | 1988-08-04 | Ruth Geb Layher Langer | RISING DEVICE FOR SCAFFOLDING |
| JP2686889B2 (en) * | 1992-10-23 | 1997-12-08 | 四電エンジニアリング株式会社 | Fictitious scaffolding for electrical work |
| DE4329604A1 (en) * | 1993-09-02 | 1995-03-09 | Stefan Hill | Ladders and scaffoldings based on "bamboo" products made from glass-fibre-reinforced plastic |
| FR2726841A1 (en) * | 1994-11-10 | 1996-05-15 | Laine Bernard | Fixing of guard rail slides |
| DE19545654C2 (en) * | 1995-08-10 | 2000-05-04 | Guckel Frank | Horizontal scaffolding anchoring device |
| DE19532894A1 (en) * | 1995-09-06 | 1997-03-13 | Markus Weimar | Fixture for attaching scaffolding to wall |
| JP2968195B2 (en) * | 1995-11-01 | 1999-10-25 | 株式会社ダイサン | Wall tie for temporary scaffolding |
-
2000
- 2000-07-28 EP EP07016534A patent/EP1854940A1/en not_active Withdrawn
- 2000-07-28 EP EP00950116A patent/EP1206611B1/en not_active Expired - Lifetime
- 2000-07-28 HK HK02107303.5A patent/HK1045721B/en not_active IP Right Cessation
- 2000-07-28 GB GB0025045A patent/GB2355752B/en not_active Expired - Fee Related
- 2000-07-28 WO PCT/NZ2000/000142 patent/WO2001007730A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| EP1854940A1 (en) | 2007-11-14 |
| GB2355752A8 (en) | 2001-05-22 |
| WO2001007730A1 (en) | 2001-02-01 |
| EP1206611A1 (en) | 2002-05-22 |
| GB2355752A (en) | 2001-05-02 |
| HK1033739A1 (en) | 2001-08-31 |
| GB2355752B (en) | 2001-07-04 |
| HK1096133A1 (en) | 2007-05-25 |
| HK1045721A1 (en) | 2002-12-06 |
| HK1045721B (en) | 2008-03-20 |
| EP1206611A4 (en) | 2005-08-03 |
| GB0025045D0 (en) | 2000-11-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7547047B2 (en) | Safety Rail System | |
| EP2539521B1 (en) | Scaffolding | |
| WO2006119613A1 (en) | A temporary guard rail support | |
| US20100293875A1 (en) | Stairway for Use on Building Sites | |
| US9556624B1 (en) | Scaffold system | |
| KR102940902B1 (en) | Methods for constructing multi-story structures and facades | |
| EP1854940A1 (en) | Scaffolding | |
| EP0606948B1 (en) | Universal supporting construction | |
| JPH11343742A (en) | Safety fence | |
| NZ336959A (en) | Scaffolding | |
| KR200340325Y1 (en) | Bridge inspection | |
| WO2024173786A1 (en) | Bridge overhang shielding and formwork | |
| AU2017101328A4 (en) | Rooftop access and safety system | |
| HK1110918A (en) | Scaffolding | |
| NZ516534A (en) | Scaffolding | |
| AU2009206174A1 (en) | Fall prevention system | |
| CN218147841U (en) | Template construction platform integrated device | |
| AU2003204102B2 (en) | Temporary Flooring Support and System | |
| CN218758596U (en) | Finalized temporary bearing operation platform | |
| AU2006202497B2 (en) | A Scaffolding Assembly | |
| KR200276904Y1 (en) | Safety construction of pier for bridge's inspection | |
| AU2020202171B2 (en) | Stanchion Mount | |
| GB2550562A (en) | Scaffold | |
| HK1096133B (en) | Scaffolding | |
| KR200368372Y1 (en) | Protection structure for dropping materials |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20020228 |
|
| AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): GB |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: 8566 |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20050617 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04G 1/04 20060101AFI20070321BHEP |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): GB |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: HK Ref legal event code: GR Ref document number: 1045721 Country of ref document: HK |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20080613 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20130725 Year of fee payment: 14 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20140728 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140728 |