CN211007616U - Steel springboard for civil engineering - Google Patents

Steel springboard for civil engineering Download PDF

Info

Publication number
CN211007616U
CN211007616U CN201921825561.XU CN201921825561U CN211007616U CN 211007616 U CN211007616 U CN 211007616U CN 201921825561 U CN201921825561 U CN 201921825561U CN 211007616 U CN211007616 U CN 211007616U
Authority
CN
China
Prior art keywords
springboard
steel
civil engineering
clamping plate
plywood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921825561.XU
Other languages
Chinese (zh)
Inventor
李慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921825561.XU priority Critical patent/CN211007616U/en
Application granted granted Critical
Publication of CN211007616U publication Critical patent/CN211007616U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Springs (AREA)

Abstract

The utility model discloses a steel springboard for civil engineering, including the springboard body, the both ends of springboard body are provided with and are used for hanging the couple of putting on the scaffold frame, and the bottom between two adjacent springboard bodies links together through the maintenance subassembly, the both sides of springboard body bottom are provided with the collar, the maintenance subassembly including be used for with the collar clamp tight punch holder and lower plate, the punch holder with the lower plate passes through the bolt fastening and is in the same place. The utility model discloses a both sides in the steel springboard bottom set up the collar to fix every two adjacent steel springboards together through the maintenance subassembly, thereby connect the steel springboard into a whole, avoid the steel springboard the condition of drunkenness to appear, guaranteed the stability of steel springboard on same horizontal plane, ensured the factor of safety of construction operation.

Description

Steel springboard for civil engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to a steel springboard for civil engineering.
Background
The scaffold frame of setting up is going on smoothly and in order to guarantee each work progress in the civil engineering construction, the scaffold frame sets up the completion back, still need lay the gangway in order to provide the platform of a work for constructor, under general condition, steel gangway can all be chooseed for use in the construction, current steel gangway, generally directly put or hang through the couple and put on two adjacent scaffold frame horizontal poles, because all independently place between each steel gangway, when constructor constructed on the above, the condition of drunkenness can often appear in the gangway, this brings very big risk for the construction operation, there is certain construction hidden danger.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to avoid prior art's weak point, provide a steel springboard for civil engineering to effectively solve the weak point that exists among the prior art.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a steel gangplank for civil construction comprises gangplank bodies, hooks for hanging on a scaffold are arranged at two ends of each gangplank body, the bottoms between two adjacent gangplank bodies are connected together through a fixing component,
the springboard comprises a springboard body and is characterized in that mounting rings are arranged on two sides of the bottom of the springboard body, the fixing component comprises an upper clamping plate and a lower clamping plate, the upper clamping plate and the lower clamping plate are clamped by the mounting rings, and the upper clamping plate and the lower clamping plate are fixed together through bolts.
Further, the lower plate is the ship type, the punch holder is the L font, and the punch holder lid closes on the lower plate, the bolt runs through the center department of two splint simultaneously, and the bottom of bolt is provided with the nut that is used for locking two splint.
Furthermore, the both sides of lower plate are provided with the draw-in groove, the collar setting is in the draw-in groove, the upper plate gland is at the up end of collar.
Furthermore, the number of the mounting rings is four, and the four mounting rings are uniformly distributed on two sides of the springboard body.
Further, the mounting ring is disposed proximate to the end of the diving board body.
Furthermore, the top of springboard body is provided with water drainage tank.
Furthermore, a drain hole is also formed in the top of the springboard body.
The above technical scheme of the utility model following beneficial effect has: the utility model discloses a both sides in the steel springboard bottom set up the collar to fix every two adjacent steel springboards together through the maintenance subassembly, thereby connect the steel springboard into a whole, avoid the steel springboard the condition of drunkenness to appear, guaranteed the stability of steel springboard on same horizontal plane, ensured the factor of safety of construction operation.
Drawings
Fig. 1 is a schematic perspective view of an embodiment of the present invention;
FIG. 2 is an enlarged view of FIG. 1 at A;
fig. 3 is a schematic view of a connection state of the springboard body according to an embodiment of the present invention.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-3, the steel gangplank for civil engineering according to the embodiment comprises gangplank bodies 1, hooks 11 for hanging on a scaffold are arranged at two ends of the gangplank bodies 1, the bottoms between two adjacent gangplank bodies 1 are connected together through a fixing component 2,
the two sides of the bottom of the springboard body 1 are provided with mounting rings 12, the fixing component 2 comprises an upper clamping plate 21 and a lower clamping plate 22 which are used for clamping the mounting rings 12, and the upper clamping plate 21 and the lower clamping plate 22 are fixed together through bolts 23.
The lower clamping plate 22 is ship-shaped, the upper clamping plate 21 is L-shaped, the upper clamping plate 21 covers the lower clamping plate 22, the bolt 23 penetrates through the centers of the two clamping plates simultaneously, the bottom of the bolt 23 is provided with a nut 24 for locking the two clamping plates, two downward turned ends of the upper clamping plate 21 are abutted against two turned ends of the lower clamping plate 22, the two clamping plates are pressed together to form a closed space in the middle, and the mounting ring 12 is clamped in the space.
Clamping grooves 25 are formed in two sides of the lower clamping plate 22, the mounting ring 12 is arranged in the clamping grooves, and the upper clamping plate 21 is pressed on the upper end face of the mounting ring 12.
The number of the mounting rings 12 is four, and the four mounting rings 12 are uniformly distributed on two sides of the springboard body 1.
The mounting ring 12 is provided at a position near the end of the diving board body 1.
Preferably, the top of the diving board body 1 is provided with a drainage channel 13.
Preferably, the top of the springboard body 1 is also provided with a drainage hole 14.
The utility model discloses when using, hang each springboard body 1 in proper order and put on two adjacent scaffold frame horizontal poles, then become flexible nut 24 on the maintenance subassembly 2 for two splint separation, aim at the draw-in groove at lower plate 22 both ends two mounting rings 12 on the adjacent springboard body 1, then take punch holder 21 and put on the up end of two mounting rings 12, use bolt 23 to pass two splint and use nut 24 to support two splint tightly, accomplished two adjacent springboard body 1's connection promptly.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (7)

1. The utility model provides a steel springboard for civil engineering which characterized in that: comprises a springboard body, hooks for hanging on a scaffold are arranged at two ends of the springboard body, the bottoms between two adjacent springboard bodies are connected together through a fixing component,
the springboard comprises a springboard body and is characterized in that mounting rings are arranged on two sides of the bottom of the springboard body, the fixing component comprises an upper clamping plate and a lower clamping plate, the upper clamping plate and the lower clamping plate are clamped by the mounting rings, and the upper clamping plate and the lower clamping plate are fixed together through bolts.
2. The steel springboard for civil engineering as claimed in claim 1, wherein the lower plywood is in a ship shape, the upper plywood is in an L shape, the upper plywood covers the lower plywood, the bolt simultaneously penetrates the centers of the two plywood, and the bottom of the bolt is provided with a nut for locking the two plywood.
3. The steel gangboard for civil engineering according to claim 2, wherein: the both sides of lower plate are provided with the draw-in groove, the collar setting is in the draw-in groove, the punch holder gland is at the up end of collar.
4. The steel gangboard for civil engineering according to claim 3, wherein: the mounting rings are four and are uniformly distributed on two sides of the springboard body.
5. The steel springboard for civil engineering according to claim 4, wherein: the mounting ring is arranged at a position close to the end part of the springboard body.
6. The steel gangboard for civil engineering according to claim 1, wherein: and a drainage channel is arranged at the top of the springboard body.
7. The steel gangboard for civil engineering according to claim 1, wherein: the top of the springboard body is also provided with a drain hole.
CN201921825561.XU 2019-10-29 2019-10-29 Steel springboard for civil engineering Expired - Fee Related CN211007616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921825561.XU CN211007616U (en) 2019-10-29 2019-10-29 Steel springboard for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921825561.XU CN211007616U (en) 2019-10-29 2019-10-29 Steel springboard for civil engineering

Publications (1)

Publication Number Publication Date
CN211007616U true CN211007616U (en) 2020-07-14

Family

ID=71480692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921825561.XU Expired - Fee Related CN211007616U (en) 2019-10-29 2019-10-29 Steel springboard for civil engineering

Country Status (1)

Country Link
CN (1) CN211007616U (en)

Similar Documents

Publication Publication Date Title
CN204040439U (en) A kind of reducing operation platform installed for steel rectangle column
CN211007616U (en) Steel springboard for civil engineering
CN210577486U (en) Boats and ships cable link up piece
CN203856224U (en) Portable protection railing
KR20130110467A (en) Zig for fixing vertical bracket of ship
CN210126624U (en) Ship body support frame convenient to disassemble and used for shipbuilding
CN214656304U (en) Bridge pier reinforcing apparatus
CN207724300U (en) A kind of transport snake-shaped robot for the disaster relief
KR200467302Y1 (en) Safety guard rail pole
CN212829951U (en) High-strength workpiece protection device
CN209837868U (en) Easy-to-disassemble safety railing
CN214642093U (en) Workpiece overturning device suitable for being matched with hoisting machinery to overturn workpieces
CN210976848U (en) Battle fence
CN218682290U (en) A clamping structure for helmet joins externally equipment
CN212471247U (en) Combined transformer iron clamp
CN208964379U (en) Bridge-collision-avoidance buoyancy tank hoisting fixture
CN214656985U (en) Anti-drop joint follow-up protective sleeve
CN217206263U (en) A cat ladder that is arranged in boats and ships segmentation to build quick fixation and dismantlement
CN212678727U (en) Office chair
CN210235233U (en) Heightening square keel for fishing boat
CN211396779U (en) Safety tent
CN213233982U (en) Color steel plate convenient to butt joint and assemble
CN213535000U (en) Two hull connection structure
CN210374696U (en) Cooling tower for fluorine industrial production
CN211247543U (en) Part cleaning jig

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200714

Termination date: 20211029