CN210887221U - Raft foundation maintenance structure - Google Patents

Raft foundation maintenance structure Download PDF

Info

Publication number
CN210887221U
CN210887221U CN201921471629.9U CN201921471629U CN210887221U CN 210887221 U CN210887221 U CN 210887221U CN 201921471629 U CN201921471629 U CN 201921471629U CN 210887221 U CN210887221 U CN 210887221U
Authority
CN
China
Prior art keywords
raft foundation
heat preservation
template
temperature sensors
raft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921471629.9U
Other languages
Chinese (zh)
Inventor
高波
李茂树
孙海青
简征西
李军阳
韩天送
蔡亚亮
程闯
徐婧
胡国徽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaochuang Construction Project Co ltd
Original Assignee
Gaochuang Construction Project Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gaochuang Construction Project Co ltd filed Critical Gaochuang Construction Project Co ltd
Priority to CN201921471629.9U priority Critical patent/CN210887221U/en
Application granted granted Critical
Publication of CN210887221U publication Critical patent/CN210887221U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a raft foundation maintenance structure, which comprises a raft foundation and is characterized in that a plastic film, a first heat preservation layer, a second heat preservation layer and a waste template are sequentially arranged on the surface of the raft foundation from bottom to top, and the waste template is fixedly connected with the raft foundation; the raft foundation is provided with a plurality of test axes, each test axis is provided with at least 4 monitoring points, each monitoring point is vertically provided with at least 3 temperature sensors along the thickness direction of the raft foundation, and all the temperature sensors at the position are electrically connected with a temperature measuring instrument at the position through sensor leads. The utility model discloses a maintenance structure, the effectual heat and the moisture loss that have reduced the concrete surface and reduce temperature gradient can carry out one structure construction down on old and useless template in short time, can guarantee the continuous building construction, and do not influence raft foundation maintenance, have shortened construction period.

Description

Raft foundation maintenance structure
Technical Field
The utility model belongs to raft foundation maintenance field, concretely relates to raft foundation maintenance structure.
Background
With the rapid development of national economy and the large-scale promotion of central city construction, high-rise buildings and super high-rise buildings such as bamboo shoots in spring after rain in cities are pulled out at a glance, and particularly, the development and construction scale requirements of urban commodity houses are increased day by day. The structural foundation of the basement of the high-rise building with more than 20 floors is generally a large-volume reinforced concrete raft foundation. The raft foundation bulky concrete has large thickness of the bottom plate, more concrete sequential continuous pouring dosage, high hydration heat and the like, and is a technical key for bulky concrete construction, wherein cracks are not required to appear in design. After the large-volume concrete is poured, heat preservation, maintenance and temperature measurement are also important work. The heat preservation and maintenance period needs 15-20 days at least, which means that the next construction can be carried out at least after 15-20 days, thus the continuous construction can not be realized to a certain extent, and the construction period is prolonged.
SUMMERY OF THE UTILITY MODEL
To above-mentioned raft foundation maintenance period long, construction can not be continuous, increases construction period's problem, the utility model aims at providing a raft foundation maintenance structure can continuous building construction, shortens construction period.
The purpose of the utility model is realized through the following technical scheme.
A raft foundation maintenance structure comprises a raft foundation, wherein a plastic film, a first heat insulation layer, a second heat insulation layer and a waste template are sequentially arranged on the surface of the raft foundation from bottom to top, and the waste template is fixedly connected with the raft foundation; the raft foundation is provided with a plurality of test axes, each test axis is provided with at least 4 monitoring points, each monitoring point is vertically provided with at least 3 temperature sensors along the thickness direction of the raft foundation, and all the temperature sensors at the position are electrically connected with a temperature measuring instrument at the position through sensor leads.
Every monitoring point position sets up 3 temperature sensor, and 3 temperature sensor are located raft foundation bottom surface upside 50mm department, raft foundation middle department and raft foundation top surface downside 50mm department respectively, and temperature sensor and sensor wire are all fixed to be set up on a vertical reinforcement, and vertical reinforcement vertical fixation sets up in raft foundation.
The first heat preservation layer and the second heat preservation layer are both made of cotton felts, the cotton felts of the first heat preservation layer are uniformly staggeredly paved, the cotton felts of the second heat preservation layer are uniformly staggeredly paved, and the cotton felts of the second heat preservation layer and the cotton felts of the first heat preservation layer are vertically staggeredly paved.
The waste template is of a rectangular structure, and the waste template is vertically spliced and paved vertically and horizontally.
The utility model has the advantages that: by paving the plastic film and the heat-insulating layer, the heat and moisture loss on the surface of the concrete is effectively reduced, the temperature gradient is reduced, and surface cracks are prevented; a temperature sensor is arranged in the raft foundation, so that the temperature in the raft foundation is effectively monitored; the waste templates are laid on the heat insulation layer, and the next structural construction can be carried out on the waste templates in a short time, so that the continuous building construction can be ensured, the maintenance of the raft foundation is not influenced, and the construction period is shortened; simple structure and reasonable design, the reuse of old and useless template, low cost, used construction equipment is few.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure, 1 is raft foundation, 2 is plastic film, 3 is first heat preservation, 4 is the second heat preservation, 5 is old and useless template, 6 is temperature sensor, 7 is the sensor wire, 8 is the thermoscope, 9 is vertical reinforcing bar.
Detailed Description
As shown in fig. 1, a raft foundation maintenance structure, including raft foundation 1, raft foundation 1 surface is from up having laid plastic film 2, first heat preservation 3, second heat preservation 4 and old and useless template 5 down in proper order, and old and useless template 5 is the rectangle structure, and old and useless template 5 is the vertical tiling of moving about freely and quickly, and old and useless template 5 and raft foundation 1 fixed connection, old and useless template 5 can prevent old and useless template 5 dislocation through screw and 1 fixed surface connection of raft foundation. Preferably, when the strength of the raft foundation 1 reaches 1.2Mpa, the waste template 5 is fixedly connected with the surface of the raft foundation 1.
The waste template 5 is a template for a building, is a temporary supporting structure, is manufactured according to design requirements, enables a concrete structure and a member to be formed according to specified positions and geometric dimensions, keeps the correct positions of the concrete structure and the member, and bears the self weight of the building template and external loads acting on the building template; the template is a bearing plate directly contacting with newly poured concrete and can be divided into a building template, a building wood-rubber plate, a film-coated plate, a multilayer plate, double-faced compound glue, a double-faced film-coated building template and the like according to the properties of materials. The utility model discloses an old and useless template 5 adopts wooden material more, and wooden template easily takes place the warpage after 3 ~ 5 times of continuous use, appears deckle edge, leads to phenomena such as rupture membrane, hourglass thick liquid can appear if continuing to use, increases the treatment cost in later stage, and consequently these templates that are not conform to the construction requirement just become for old and useless template. The processing mode of old and useless template on the building site is mostly retrieved to the mode of waste material is handled, has caused ligneous waste to a certain extent. The utility model discloses a what old and useless template 5 chooseed for use is that this kind takes place warpage, unedged wooden material template appears.
The raft foundation 1 is provided with a plurality of test axes, each test axis is provided with at least 4 monitoring point positions, each monitoring point position is vertically provided with at least 3 temperature sensors 6 along the thickness direction of the raft foundation 1, and the temperature sensors 6 at the positions are all electrically connected with a temperature measuring instrument 8 at the positions through sensor leads 7. Preferably, evenly set up 8 test axes on bulky concrete raft basis 1, test the axis and be parallel to each other between the test axis.
Preferably, every monitoring point position sets up 3 temperature sensor, and 3 temperature sensor 6 are located raft foundation 1 bottom surface upside 50mm department, raft foundation 1 middle department and raft foundation 1 top surface downside 50mm department respectively, and temperature sensor 6 and sensor wire 7 all set up on a vertical reinforcement 9, and vertical reinforcement 9 vertical fixation sets up in raft foundation 1. The temperature detector 8 can also be arranged on the vertical reinforcement 9.
Preferably, the first heat preservation layer 3 and the second heat preservation layer 4 both adopt cotton felts, the cotton felts of the first heat preservation layer 3 are uniformly staggeredly paved, the cotton felts of the second heat preservation layer 4 are uniformly staggeredly paved, and the cotton felts of the second heat preservation layer 4 and the cotton felts of the first heat preservation layer 3 are paved in a vertically staggered mode.
The utility model discloses a working process does: before construction, a temperature sensor 6, a sensor lead 7, a temperature measuring instrument 8, vertical steel bars 9, a plastic film 2, a cotton felt and a waste template 5 are prepared, wherein the waste template 5 is subjected to edge punching and straightening treatment, and burrs of the template are removed, so that the waste template 5 is of a rectangular structure.
Before raft foundation 1 concretes, weld vertical reinforcement 9 on raft foundation 1's reinforcing bar, be connected to temperature sensor 6 on sensor wire 7, then place corresponding position with temperature sensor 6 and sensor wire 7, raft foundation 1 bottom surface upside 50mm department, raft foundation 1 middle department and raft foundation 1 top surface downside 50mm department promptly, and fix temperature sensor 6 and sensor wire 7 on vertical reinforcement 9. And arranging other temperature measuring points in the same way, pouring the raft foundation 1 after the arrangement of each temperature measuring point is finished, and immediately and uniformly covering the exposed concrete surface of the raft foundation 1 with the plastic film 2 to prevent the water on the concrete surface of the raft foundation 1 from evaporating. After the concrete is secondarily plastered, pressed and collected, spraying and maintaining are carried out, the plastic film 2 is uniformly covered at the moment, when the concrete is secondarily plastered, pressed and collected, the plastic film needs to be lifted temporarily, and after the concrete is plastered, pressed and collected, the plastic film is covered immediately; then, the cotton felts of the first heat-insulating layer 3 and the second heat-insulating layer 4 are evenly staggered and covered. And splicing and laying the waste templates 5 on the second heat-insulating layer 4, and simply fixing the spliced and laid waste templates 5 after the raft foundation 1 reaches a certain concrete strength to prevent dislocation. A temperature detector 8 is connected to the other end of the sensor lead 7 and is used for temperature monitoring strictly according to the regulations. After 1-5 days, the next structure construction can be carried out, so that the raft foundation 1 and the next structure construction are carried out synchronously, and the construction period can be saved by about 15 days.
The above description is only a preferred embodiment of the present invention, and is not a limitation to the technical solution of the present invention, it should be noted that, further improvements and changes can be made by those skilled in the art on the premise of the technical solution of the present invention, and all such improvements and changes should be covered in the protection scope of the present invention.

Claims (4)

1. A raft foundation maintenance structure comprises a raft foundation and is characterized in that a plastic film, a first heat insulation layer, a second heat insulation layer and a waste template are sequentially arranged on the surface of the raft foundation from bottom to top, and the waste template is fixedly connected with the raft foundation; the raft foundation is provided with a plurality of test axes, each test axis is provided with at least 4 monitoring points, each monitoring point is vertically provided with at least 3 temperature sensors along the thickness direction of the raft foundation, and all the temperature sensors at the position are electrically connected with a temperature measuring instrument at the position through sensor leads.
2. The raft foundation curing structure of claim 1, wherein 3 temperature sensors are arranged at each monitoring point, the 3 temperature sensors are respectively positioned at 50mm above the bottom surface of the raft foundation, at the middle of the raft foundation and at 50mm below the top surface of the raft foundation, the temperature sensors and the sensor leads are fixedly arranged on a vertical steel bar, and the vertical steel bar is vertically and fixedly arranged in the raft foundation.
3. The raft foundation maintenance structure of claim 1, wherein the first and second heat preservation layers are all made of cotton felts, the cotton felts of the first heat preservation layer are uniformly and staggeredly laid, the cotton felts of the second heat preservation layer are uniformly and staggeredly laid, and the cotton felts of the second heat preservation layer and the cotton felts of the first heat preservation layer are vertically and staggeredly laid.
4. The raft foundation maintenance structure of claim 1, wherein the waste templates are rectangular structures, and the waste templates are vertically and horizontally spliced.
CN201921471629.9U 2019-09-05 2019-09-05 Raft foundation maintenance structure Active CN210887221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921471629.9U CN210887221U (en) 2019-09-05 2019-09-05 Raft foundation maintenance structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921471629.9U CN210887221U (en) 2019-09-05 2019-09-05 Raft foundation maintenance structure

Publications (1)

Publication Number Publication Date
CN210887221U true CN210887221U (en) 2020-06-30

Family

ID=71318137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921471629.9U Active CN210887221U (en) 2019-09-05 2019-09-05 Raft foundation maintenance structure

Country Status (1)

Country Link
CN (1) CN210887221U (en)

Similar Documents

Publication Publication Date Title
CN100575632C (en) The job practices of cast-in-situ hollow building roof
CN106592426B (en) The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN107297810A (en) A kind of making of precast wall body component and installation method
CN103410269B (en) Prestressing without bondn cast-in-place reinforced concrete hollow slab constructing structure and construction method
CN104018673A (en) Extra-huge-volume concrete one-time continuous pouring multi-cycle real-time temperature control construction technology
CN104372890A (en) Construction method of bare concrete prefabricated box beam with complicated structure
WO2023056984A1 (en) Waterproof structure and construction method for foundation pit support
CN103806656A (en) Construction method of cast-in-place concrete flat slab built-in thin-wall hollow box body
CN110056189B (en) Method for monitoring and controlling large-volume concrete construction by using Internet of things
CN102094493A (en) Concrete construction method for large parking roof
CN110080454A (en) LPM light filling body Construction of Cast-in-situ Concrete Hollow
CN112761292A (en) Construction method for prefabricated ribbed cavity floor slab
CN113202222A (en) Construction method for assembled type superposed beam slab
CN106351129B (en) It is close to both wired large-span continuous beam construction methods
CN210887221U (en) Raft foundation maintenance structure
CN106932254B (en) Light-gauge steel section and foam concrete interface sliding method for testing performance
CN108518070B (en) Be used for general fine tuning control of cast-in-situ slab reinforcement protective layer turnover
CN209907694U (en) Ribbed steel mesh hollow-out cast-in-situ concrete T-shaped section hollow floor structure
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN206917031U (en) A kind of cast-in-place concrete bamboo core floor construction
CN114856224A (en) Construction method for controlling ultra-thick heavy concrete cracks of linear accelerator chamber
CN107938907A (en) A kind of inclined roof exempts from formwork construction method
CN202119771U (en) Entity simulation test device of mass concrete
CN208039581U (en) A kind of Cast-in-place concrete light filling core model superstructure anti-floating system