CN102094493A CN 201110035421 CN201110035421A CN102094493A CN 102094493 A CN102094493 A CN 102094493A CN 201110035421 CN201110035421 CN 201110035421 CN 201110035421 A CN201110035421 A CN 201110035421A CN 102094493 A CN102094493 A CN 102094493A
Authority
CN
China
Prior art keywords
concrete
lattice
extruded sheet
construction method
seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110035421
Other languages
Chinese (zh)
Inventor
郝英华
贺伟
卫芷
常彦妮
刘小波
范晓宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN 201110035421 priority Critical patent/CN102094493A/en
Publication of CN102094493A publication Critical patent/CN102094493A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention relates to a construction method for a roof, in particular to a concrete construction method for a large parking roof. The concrete construction method for the large parking roof can solve the technical problems in construction for the parking roof, and comprises the following steps: clearing a base layer, laying a polypropylene fabric protective layer, surveying and setting out, snapping a line, sloping, pulling the line, manufacturing a dividing joint, binding steel bars, placing a cushion block of the protective layer, watering, humidifying, pouring concrete, finishing the surface, maintaining, resecting an extruded sheet at the dividing joint, pouring sealing paste and performing inspection and acceptance. The construction method is characterized in that the extruded sheet is sandwiched in a concrete conical rushed tape as the dividing joint for forming divided blocks in uniform size for pouring concrete, thereby not only solving the problem of formwork support, and improving the efficiency, but also ensuring the quality.

Description

The job practices of the large-scale roofing concrete of parking
Technical field
The present invention relates to a kind of job practices that is used for roofing, be specially a kind of job practices of the large-scale roofing concrete of parking.
Background technology
With respect to common roofing, the quality of the roofing requirement of parking is higher, and desired concrete thickness is also bigger, generally will cover a layer concrete again on common roofing.Traditional parking during the roofing concrete surface construction, prop up mold materials mainly based on wooden model, punching block, there is the defective of support system complexity, destructible waterproofing course, finished product corner angle destructible in these formwork ways, especially grasp for draining roof pitch in a organized way is extremely difficult, and the construction effect is low, cost is high.The job practices of developing a kind of novel large-scale roofing concrete of parking has become problem demanding prompt solution.
Summary of the invention
The present invention provides a kind of job practices of the large-scale roofing concrete of parking for the technical problem of the construction that solves the roofing of parking.
Job practices of the present invention is realized by following technical scheme: a kind of job practices of the large-scale roofing concrete of parking; step is that base cleaning is also spread the Polypropylene topping, measures unwrapping wire; snap the line is looked for the slope; backguy, make the lattice seam, assembling reinforcement, put the topping cushion block, it is moistening to water; build concrete, receive the face maintenance; the extruded sheet at lattice seam place excises downwards, and perfusion sealing compound is checked and accepted.
The present invention adopts density to be not less than 30Kg/m 3Extruded sheet stitch bar as lattice, spacing 5m, the C25 pea gravel concreten taper floating screed band of the wide 100mm of each shop fixtures of plate both sides carries out concrete with this formwork way and builds, and concrete solidifies the back and forms piecemeal limit mould naturally, build concrete then, its feature is to adopt extruded sheet to be clipped in the concrete taper to rush in and do the lattice seam in the band, forms lattice piece of uniform size and comes concreting, has both solved a modulus problem, improve efficient, guaranteed quality again.
Description of drawings
Fig. 1 is a roofing surface structure schematic diagram of the present invention,
Fig. 2 is one of roofing tangent plane structural representation of the present invention,
Fig. 3 is two of a roofing tangent plane structural representation of the present invention.
Among the figure: 1-lattice seam, 2-basic unit, 3-Polypropylene topping, 4-concrete, 5-reinforcing bar, 6-concrete floating screed band, 7-extruded sheet, 8-topping cushion block, 9-sealing compound.
The specific embodiment
Meaning as shown in the figure, a kind of job practices of the large-scale roofing concrete of parking, step be,
1, shop, basic unit 2 cleaning back Polypropylene topping 3, and basic level requirement cleans out the foreign material in the basic unit to ensure the quality of products, and basic unit is the SBS waterproof roll, must keep coiled material not have destruction.Spread Polypropylene topping preparation cement paste, lay polyethylene polypropylene cloth topping, protection bottom coiled material is not destroyed, and Polypropylene overlaps all 〉=50mm.
2, measure unwrapping wire, snap the line is looked for the slope; According to the roofing Design Requirement Drawing, drainage grade is 1%, and the design drain gully amounts to 20, according to the dividing ridge, roofing is divided into 20 bulks, each piece is the central plan drainage grade with the drain gully, eject grade line on parapet top, the interim patch block cake in middle part is looked for the slope.
3, backguy and utilize extruded sheet 7 to make lattices seam 1, look for the slope according to institute's patch block cake backguy, backguy is that 120mm is thick with the concrete consistency of thickness highly in theory, and extruded sheet 7 highly is 100mm, and the thick operation leeway of 20mm (extruded sheet intensity is more than the 30Kg/ ) is left in the bottom.Bottom, the every limits of extruded sheet 7 is fixing with the wide C25 taper pea gravel concreten floating screed band 6 of 100mm, to form in length and breadth the lattice piece to spacing 5m.Require this moment about the outstanding concrete floating screed bands 6 outer 30mm of assurance of extruded sheet 7, extruded sheet thickness is wide with designing requirement lattice seam, and it is thick to be 20mm.
4, assembling reinforcement 5, put topping cushion block 8, bar gauge, spacing are φ 8@250, carry out colligation at each lattice piece place, and 40mm spacer spacing 800mm places.
5, water moistening; watering moistening is a preceding most important work of concreting; except that the satisfied moistening requirement of a segment base layer; main because of summer high temperature at a time when the construction; Polypropylene topping bottom is SBS waterproof roll and plastic extrusion heated board; easily accumulation of heat is watered and can be reduced a part of basic unit temperature.
6, build concrete 4, the maintenance of receipts face, because the bottom is waterproofing course and extruded sheet insulation layer, so concrete is had special requirement, merchant's concrete sand coarse aggregate ratio is little, and it is big that coarse aggregate content is wanted, in the water/binder ratio 0.5, about slump 130mm, must add retarding agent, to slow down the rate of release of bottom water heat-transmission.
Avoid the high temperature period at noon, take to build in morning, afternoon operation, build in the process, taper concrete floating screed band waters moistening at any time, be beneficial to concrete combination, during the lattice that vibrates seam floating screed band periphery, guarantee in the vibrating spear oscillating region, to get final product, must not cross herein and shake, in case segregation has influence on lattice seam place intensity.Behind the vibration compacting, two human 6m darbys adopt the mode of low raising shovel that the gradient is found out along dividing strip.Before the final set, concrete surface is received face 3 times at least with disk sander.If concrete part, lattice seam place is a dry state, needs to clap the slurry press polish and handle with plasterer's trowel.After the final set, cotton-wadded quilt covers timely water seasoning, because concrete admixture retarding agent, curing time is no less than 14d.
7, the extruded sheet 7 at lattice seam place excises downwards, and concreting is intact, and the lattice portion of sewing on is regular naturally after 7 days splits, with the wallpaper cutter along lattice seam rejecting 15mm downwards.
8, perfusion sealing compound 9 is checked and accepted.Concreting is intact poured into sealing compound after 28 days in the lattice seam of rejecting, sealing compound is pressed into the concave surface seam with autocratic tooled joint rod in the lattice seam.

Claims (1)

1. the job practices of the large-scale roofing concrete of parking is characterized in that step is,
(1), basic unit (2) back cleaning shop Polypropylene topping (3),
(2), measure unwrapping wire, snap the line is looked for the slope; Drainage grade is 1%, and the design drain gully amounts to 20, and roofing is divided into 20 bulks, and each piece is the central plan drainage grade with the drain gully,
(3), backguy and utilize extruded sheet (7) to make lattice seam (1), bottom, the every limit of extruded sheet (7) is fixing with concrete floating screed band (6), forming lattice piece in length and breadth,
(4), assembling reinforcement (5), put topping cushion block (8),
(5), water moistening,
(6), build concrete (4), receive the face maintenance, curing time is no less than 14d,
(7), the excision downwards of the extruded sheet (7) at lattice seam place, concreting is intact, and the lattice portion of sewing on is regular naturally after 7 days splits, with the wallpaper cutter along lattice seam rejecting 15mm downwards,
(8), perfusion sealing compound (9), check and accept, concreting is intact poured into sealing compound after 28 days in the lattice seam of rejecting, sealing compound is pressed into concave surface with the tooled joint rod and stitches in the lattice seam.
CN 201110035421 2011-02-10 2011-02-10 Concrete construction method for large parking roof Pending CN102094493A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110035421 CN102094493A (en) 2011-02-10 2011-02-10 Concrete construction method for large parking roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110035421 CN102094493A (en) 2011-02-10 2011-02-10 Concrete construction method for large parking roof

Publications (1)

Publication Number Publication Date
CN102094493A true CN102094493A (en) 2011-06-15

Family

ID=44127741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110035421 Pending CN102094493A (en) 2011-02-10 2011-02-10 Concrete construction method for large parking roof

Country Status (1)

Country Link
CN (1) CN102094493A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612332A (en) * 2014-12-26 2015-05-13 山西四建集团有限公司 Fine aggregate concrete roof double-glass strip dividing joint construction method
CN105421679A (en) * 2015-11-06 2016-03-23 中国建筑第八工程局有限公司 Dividing joint structure of fine aggregate concrete roof surface layers and construction method of dividing joint structure
CN107013039A (en) * 2017-06-01 2017-08-04 中国十七冶集团有限公司 A kind of separation construction method of roof protecting layer
CN108086603A (en) * 2016-11-23 2018-05-29 北京中联天盛建材有限公司 A kind of anti-water-stopping system of existing roofing and prevent water roofing
CN108842994A (en) * 2018-06-15 2018-11-20 五冶集团上海有限公司 A kind of construction method of concrete building ground surface layer partitioning slot
CN110821023A (en) * 2019-11-28 2020-02-21 中国一冶集团有限公司 Villa flat tile large-gradient inclined roof construction method
CN111255169A (en) * 2020-01-16 2020-06-09 中国十七冶集团有限公司 Construction method for setting roof dividing joint
CN109898756B (en) * 2019-04-01 2020-08-25 南京桥新建设有限公司 Construction method for laying light aggregate concrete cushion
CN114197341A (en) * 2022-01-04 2022-03-18 北京金港场道工程建设有限公司 Box culvert settlement joint construction method
CN114658222A (en) * 2022-04-28 2022-06-24 山西四建集团有限公司 Anti-cracking bin casting method for roof waterproof protective layer
CN115162624A (en) * 2022-07-08 2022-10-11 北京城建五建设集团有限公司 Concrete protective layer division strip and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1265441A (en) * 2000-03-13 2000-09-06 王树林 Construction process of rigid waterproof roofing
CN1376845A (en) * 2001-03-22 2002-10-30 梁大勇 Technology for constructing large concrete roof
JP2004270383A (en) * 2003-03-11 2004-09-30 Isamu Nakagawa Lightweight, construction time reduction type fire resistant heat insulative roof asphalt waterproof method
CN101250929A (en) * 2008-04-08 2008-08-27 新蒲建设集团有限公司 Planting roofing as well as construction method thereof
CN101413326A (en) * 2008-11-12 2009-04-22 张建国 Flat roof structure and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1265441A (en) * 2000-03-13 2000-09-06 王树林 Construction process of rigid waterproof roofing
CN1376845A (en) * 2001-03-22 2002-10-30 梁大勇 Technology for constructing large concrete roof
JP2004270383A (en) * 2003-03-11 2004-09-30 Isamu Nakagawa Lightweight, construction time reduction type fire resistant heat insulative roof asphalt waterproof method
CN101250929A (en) * 2008-04-08 2008-08-27 新蒲建设集团有限公司 Planting roofing as well as construction method thereof
CN101413326A (en) * 2008-11-12 2009-04-22 张建国 Flat roof structure and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20101231 郝英华 大型泊车屋面混凝土施工质量控制 第222-223页第2、3节 1 第36卷, 第36期 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612332A (en) * 2014-12-26 2015-05-13 山西四建集团有限公司 Fine aggregate concrete roof double-glass strip dividing joint construction method
CN105421679A (en) * 2015-11-06 2016-03-23 中国建筑第八工程局有限公司 Dividing joint structure of fine aggregate concrete roof surface layers and construction method of dividing joint structure
CN108086603A (en) * 2016-11-23 2018-05-29 北京中联天盛建材有限公司 A kind of anti-water-stopping system of existing roofing and prevent water roofing
CN107013039A (en) * 2017-06-01 2017-08-04 中国十七冶集团有限公司 A kind of separation construction method of roof protecting layer
CN108842994A (en) * 2018-06-15 2018-11-20 五冶集团上海有限公司 A kind of construction method of concrete building ground surface layer partitioning slot
CN109898756B (en) * 2019-04-01 2020-08-25 南京桥新建设有限公司 Construction method for laying light aggregate concrete cushion
CN110821023A (en) * 2019-11-28 2020-02-21 中国一冶集团有限公司 Villa flat tile large-gradient inclined roof construction method
CN111255169A (en) * 2020-01-16 2020-06-09 中国十七冶集团有限公司 Construction method for setting roof dividing joint
CN114197341A (en) * 2022-01-04 2022-03-18 北京金港场道工程建设有限公司 Box culvert settlement joint construction method
CN114658222A (en) * 2022-04-28 2022-06-24 山西四建集团有限公司 Anti-cracking bin casting method for roof waterproof protective layer
CN115162624A (en) * 2022-07-08 2022-10-11 北京城建五建设集团有限公司 Concrete protective layer division strip and construction method
CN115162624B (en) * 2022-07-08 2023-06-16 北京城建五建设集团有限公司 Concrete protective layer dividing strip and construction method

Similar Documents

Publication Publication Date Title
CN102094493A (en) Concrete construction method for large parking roof
CN101832026B (en) Construction method of sole plate post-poured strip form bracing system
CN207499403U (en) A kind of FS composite thermal-insulating exterior formworks system
CN103321257A (en) Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN108442704A (en) The outer insulation integrated non-dismantling formwork construction method of cast-in-place concrete structure
CN108412093A (en) A kind of Modern Landscape decoration loam wall and its construction method
CN109707114A (en) Tile roofing antiskid construction technology engineering method
CN204781524U (en) Sulphur oxygen magnesium steel bar truss board
CN103615076A (en) Concrete construction method for big-gradient sloping roof
CN105822068B (en) Ultralong thin walled concrete walls under hot environment pour and maintenance process
CN201531035U (en) Foundation slab late poured band and construction joint steel wire mesh isolating device
CN206319592U (en) A kind of post-cast strip concrete side plugging structure
CN103286854B (en) A kind of manufacture of steam-pressing aero-concrete ultra-wide cantilevered plate and lapping construction method
CN205502373U (en) Evaporate and press whole wallboard that keeps warm of aerated concrete
CN201649639U (en) Supporting system of post-pouring belt template on foundation soleplate
CN201400959Y (en) Silo concrete protecting layer locating piece in slipform construction
CN204418691U (en) A kind of for cast-in-place vertical member and horizontal member junction concrete blocking apparatus
CN113914530B (en) Inclined roof fish scale type concrete structure and construction method
CN109537822A (en) Gutter construction technology
CN102767284B (en) Semi-prefabricating construction process for concrete thin-wall lower return eave
CN106436546B (en) A kind of pervious concrete joint-cutting device and its application method
CN114319875A (en) Seamless construction process for super-large-area concrete ground
CN107938907A (en) A kind of inclined roof exempts from formwork construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110615