CN102094493A - Concrete construction method for large parking roof - Google Patents
Concrete construction method for large parking roof Download PDFInfo
- Publication number
- CN102094493A CN102094493A CN 201110035421 CN201110035421A CN102094493A CN 102094493 A CN102094493 A CN 102094493A CN 201110035421 CN201110035421 CN 201110035421 CN 201110035421 A CN201110035421 A CN 201110035421A CN 102094493 A CN102094493 A CN 102094493A
- Authority
- CN
- China
- Prior art keywords
- concrete
- lattice
- extruded sheet
- construction method
- seam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The invention relates to a construction method for a roof, in particular to a concrete construction method for a large parking roof. The concrete construction method for the large parking roof can solve the technical problems in construction for the parking roof, and comprises the following steps: clearing a base layer, laying a polypropylene fabric protective layer, surveying and setting out, snapping a line, sloping, pulling the line, manufacturing a dividing joint, binding steel bars, placing a cushion block of the protective layer, watering, humidifying, pouring concrete, finishing the surface, maintaining, resecting an extruded sheet at the dividing joint, pouring sealing paste and performing inspection and acceptance. The construction method is characterized in that the extruded sheet is sandwiched in a concrete conical rushed tape as the dividing joint for forming divided blocks in uniform size for pouring concrete, thereby not only solving the problem of formwork support, and improving the efficiency, but also ensuring the quality.
Description
Technical field
The present invention relates to a kind of job practices that is used for roofing, be specially a kind of job practices of the large-scale roofing concrete of parking.
Background technology
With respect to common roofing, the quality of the roofing requirement of parking is higher, and desired concrete thickness is also bigger, generally will cover a layer concrete again on common roofing.Traditional parking during the roofing concrete surface construction, prop up mold materials mainly based on wooden model, punching block, there is the defective of support system complexity, destructible waterproofing course, finished product corner angle destructible in these formwork ways, especially grasp for draining roof pitch in a organized way is extremely difficult, and the construction effect is low, cost is high.The job practices of developing a kind of novel large-scale roofing concrete of parking has become problem demanding prompt solution.
Summary of the invention
The present invention provides a kind of job practices of the large-scale roofing concrete of parking for the technical problem of the construction that solves the roofing of parking.
Job practices of the present invention is realized by following technical scheme: a kind of job practices of the large-scale roofing concrete of parking; step is that base cleaning is also spread the Polypropylene topping, measures unwrapping wire; snap the line is looked for the slope; backguy, make the lattice seam, assembling reinforcement, put the topping cushion block, it is moistening to water; build concrete, receive the face maintenance; the extruded sheet at lattice seam place excises downwards, and perfusion sealing compound is checked and accepted.
The present invention adopts density to be not less than 30Kg/m
3Extruded sheet stitch bar as lattice, spacing 5m, the C25 pea gravel concreten taper floating screed band of the wide 100mm of each shop fixtures of plate both sides carries out concrete with this formwork way and builds, and concrete solidifies the back and forms piecemeal limit mould naturally, build concrete then, its feature is to adopt extruded sheet to be clipped in the concrete taper to rush in and do the lattice seam in the band, forms lattice piece of uniform size and comes concreting, has both solved a modulus problem, improve efficient, guaranteed quality again.
Description of drawings
Fig. 1 is a roofing surface structure schematic diagram of the present invention,
Fig. 2 is one of roofing tangent plane structural representation of the present invention,
Fig. 3 is two of a roofing tangent plane structural representation of the present invention.
Among the figure: 1-lattice seam, 2-basic unit, 3-Polypropylene topping, 4-concrete, 5-reinforcing bar, 6-concrete floating screed band, 7-extruded sheet, 8-topping cushion block, 9-sealing compound.
The specific embodiment
Meaning as shown in the figure, a kind of job practices of the large-scale roofing concrete of parking, step be,
1, shop, basic unit 2 cleaning back Polypropylene topping 3, and basic level requirement cleans out the foreign material in the basic unit to ensure the quality of products, and basic unit is the SBS waterproof roll, must keep coiled material not have destruction.Spread Polypropylene topping preparation cement paste, lay polyethylene polypropylene cloth topping, protection bottom coiled material is not destroyed, and Polypropylene overlaps all 〉=50mm.
2, measure unwrapping wire, snap the line is looked for the slope; According to the roofing Design Requirement Drawing, drainage grade is 1%, and the design drain gully amounts to 20, according to the dividing ridge, roofing is divided into 20 bulks, each piece is the central plan drainage grade with the drain gully, eject grade line on parapet top, the interim patch block cake in middle part is looked for the slope.
3, backguy and utilize extruded sheet 7 to make lattices seam 1, look for the slope according to institute's patch block cake backguy, backguy is that 120mm is thick with the concrete consistency of thickness highly in theory, and extruded sheet 7 highly is 100mm, and the thick operation leeway of 20mm (extruded sheet intensity is more than the 30Kg/ ) is left in the bottom.Bottom, the every limits of extruded sheet 7 is fixing with the wide C25 taper pea gravel concreten floating screed band 6 of 100mm, to form in length and breadth the lattice piece to spacing 5m.Require this moment about the outstanding concrete floating screed bands 6 outer 30mm of assurance of extruded sheet 7, extruded sheet thickness is wide with designing requirement lattice seam, and it is thick to be 20mm.
4, assembling reinforcement 5, put topping cushion block 8, bar gauge, spacing are φ 8@250, carry out colligation at each lattice piece place, and 40mm spacer spacing 800mm places.
5, water moistening; watering moistening is a preceding most important work of concreting; except that the satisfied moistening requirement of a segment base layer; main because of summer high temperature at a time when the construction; Polypropylene topping bottom is SBS waterproof roll and plastic extrusion heated board; easily accumulation of heat is watered and can be reduced a part of basic unit temperature.
6, build concrete 4, the maintenance of receipts face, because the bottom is waterproofing course and extruded sheet insulation layer, so concrete is had special requirement, merchant's concrete sand coarse aggregate ratio is little, and it is big that coarse aggregate content is wanted, in the water/binder ratio 0.5, about slump 130mm, must add retarding agent, to slow down the rate of release of bottom water heat-transmission.
Avoid the high temperature period at noon, take to build in morning, afternoon operation, build in the process, taper concrete floating screed band waters moistening at any time, be beneficial to concrete combination, during the lattice that vibrates seam floating screed band periphery, guarantee in the vibrating spear oscillating region, to get final product, must not cross herein and shake, in case segregation has influence on lattice seam place intensity.Behind the vibration compacting, two human 6m darbys adopt the mode of low raising shovel that the gradient is found out along dividing strip.Before the final set, concrete surface is received face 3 times at least with disk sander.If concrete part, lattice seam place is a dry state, needs to clap the slurry press polish and handle with plasterer's trowel.After the final set, cotton-wadded quilt covers timely water seasoning, because concrete admixture retarding agent, curing time is no less than 14d.
7, the extruded sheet 7 at lattice seam place excises downwards, and concreting is intact, and the lattice portion of sewing on is regular naturally after 7 days splits, with the wallpaper cutter along lattice seam rejecting 15mm downwards.
8, perfusion sealing compound 9 is checked and accepted.Concreting is intact poured into sealing compound after 28 days in the lattice seam of rejecting, sealing compound is pressed into the concave surface seam with autocratic tooled joint rod in the lattice seam.
Claims (1)
1. the job practices of the large-scale roofing concrete of parking is characterized in that step is,
(1), basic unit (2) back cleaning shop Polypropylene topping (3),
(2), measure unwrapping wire, snap the line is looked for the slope; Drainage grade is 1%, and the design drain gully amounts to 20, and roofing is divided into 20 bulks, and each piece is the central plan drainage grade with the drain gully,
(3), backguy and utilize extruded sheet (7) to make lattice seam (1), bottom, the every limit of extruded sheet (7) is fixing with concrete floating screed band (6), forming lattice piece in length and breadth,
(4), assembling reinforcement (5), put topping cushion block (8),
(5), water moistening,
(6), build concrete (4), receive the face maintenance, curing time is no less than 14d,
(7), the excision downwards of the extruded sheet (7) at lattice seam place, concreting is intact, and the lattice portion of sewing on is regular naturally after 7 days splits, with the wallpaper cutter along lattice seam rejecting 15mm downwards,
(8), perfusion sealing compound (9), check and accept, concreting is intact poured into sealing compound after 28 days in the lattice seam of rejecting, sealing compound is pressed into concave surface with the tooled joint rod and stitches in the lattice seam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110035421 CN102094493A (en) | 2011-02-10 | 2011-02-10 | Concrete construction method for large parking roof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110035421 CN102094493A (en) | 2011-02-10 | 2011-02-10 | Concrete construction method for large parking roof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102094493A true CN102094493A (en) | 2011-06-15 |
Family
ID=44127741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110035421 Pending CN102094493A (en) | 2011-02-10 | 2011-02-10 | Concrete construction method for large parking roof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102094493A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612332A (en) * | 2014-12-26 | 2015-05-13 | 山西四建集团有限公司 | Fine aggregate concrete roof double-glass strip dividing joint construction method |
CN105421679A (en) * | 2015-11-06 | 2016-03-23 | 中国建筑第八工程局有限公司 | Dividing joint structure of fine aggregate concrete roof surface layers and construction method of dividing joint structure |
CN107013039A (en) * | 2017-06-01 | 2017-08-04 | 中国十七冶集团有限公司 | A kind of separation construction method of roof protecting layer |
CN108086603A (en) * | 2016-11-23 | 2018-05-29 | 北京中联天盛建材有限公司 | A kind of anti-water-stopping system of existing roofing and prevent water roofing |
CN108842994A (en) * | 2018-06-15 | 2018-11-20 | 五冶集团上海有限公司 | A kind of construction method of concrete building ground surface layer partitioning slot |
CN110821023A (en) * | 2019-11-28 | 2020-02-21 | 中国一冶集团有限公司 | Villa flat tile large-gradient inclined roof construction method |
CN111255169A (en) * | 2020-01-16 | 2020-06-09 | 中国十七冶集团有限公司 | Construction method for setting roof dividing joint |
CN109898756B (en) * | 2019-04-01 | 2020-08-25 | 南京桥新建设有限公司 | Construction method for laying light aggregate concrete cushion |
CN114197341A (en) * | 2022-01-04 | 2022-03-18 | 北京金港场道工程建设有限公司 | Box culvert settlement joint construction method |
CN114658222A (en) * | 2022-04-28 | 2022-06-24 | 山西四建集团有限公司 | Anti-cracking bin casting method for roof waterproof protective layer |
CN115162624A (en) * | 2022-07-08 | 2022-10-11 | 北京城建五建设集团有限公司 | Concrete protective layer division strip and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1265441A (en) * | 2000-03-13 | 2000-09-06 | 王树林 | Construction process of rigid waterproof roofing |
CN1376845A (en) * | 2001-03-22 | 2002-10-30 | 梁大勇 | Technology for constructing large concrete roof |
JP2004270383A (en) * | 2003-03-11 | 2004-09-30 | Isamu Nakagawa | Lightweight, construction time reduction type fire resistant heat insulative roof asphalt waterproof method |
CN101250929A (en) * | 2008-04-08 | 2008-08-27 | 新蒲建设集团有限公司 | Planting roofing as well as construction method thereof |
CN101413326A (en) * | 2008-11-12 | 2009-04-22 | 张建国 | Flat roof structure and construction method thereof |
-
2011
- 2011-02-10 CN CN 201110035421 patent/CN102094493A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1265441A (en) * | 2000-03-13 | 2000-09-06 | 王树林 | Construction process of rigid waterproof roofing |
CN1376845A (en) * | 2001-03-22 | 2002-10-30 | 梁大勇 | Technology for constructing large concrete roof |
JP2004270383A (en) * | 2003-03-11 | 2004-09-30 | Isamu Nakagawa | Lightweight, construction time reduction type fire resistant heat insulative roof asphalt waterproof method |
CN101250929A (en) * | 2008-04-08 | 2008-08-27 | 新蒲建设集团有限公司 | Planting roofing as well as construction method thereof |
CN101413326A (en) * | 2008-11-12 | 2009-04-22 | 张建国 | Flat roof structure and construction method thereof |
Non-Patent Citations (1)
Title |
---|
《山西建筑》 20101231 郝英华 大型泊车屋面混凝土施工质量控制 第222-223页第2、3节 1 第36卷, 第36期 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612332A (en) * | 2014-12-26 | 2015-05-13 | 山西四建集团有限公司 | Fine aggregate concrete roof double-glass strip dividing joint construction method |
CN105421679A (en) * | 2015-11-06 | 2016-03-23 | 中国建筑第八工程局有限公司 | Dividing joint structure of fine aggregate concrete roof surface layers and construction method of dividing joint structure |
CN108086603A (en) * | 2016-11-23 | 2018-05-29 | 北京中联天盛建材有限公司 | A kind of anti-water-stopping system of existing roofing and prevent water roofing |
CN107013039A (en) * | 2017-06-01 | 2017-08-04 | 中国十七冶集团有限公司 | A kind of separation construction method of roof protecting layer |
CN108842994A (en) * | 2018-06-15 | 2018-11-20 | 五冶集团上海有限公司 | A kind of construction method of concrete building ground surface layer partitioning slot |
CN109898756B (en) * | 2019-04-01 | 2020-08-25 | 南京桥新建设有限公司 | Construction method for laying light aggregate concrete cushion |
CN110821023A (en) * | 2019-11-28 | 2020-02-21 | 中国一冶集团有限公司 | Villa flat tile large-gradient inclined roof construction method |
CN111255169A (en) * | 2020-01-16 | 2020-06-09 | 中国十七冶集团有限公司 | Construction method for setting roof dividing joint |
CN114197341A (en) * | 2022-01-04 | 2022-03-18 | 北京金港场道工程建设有限公司 | Box culvert settlement joint construction method |
CN114658222A (en) * | 2022-04-28 | 2022-06-24 | 山西四建集团有限公司 | Anti-cracking bin casting method for roof waterproof protective layer |
CN115162624A (en) * | 2022-07-08 | 2022-10-11 | 北京城建五建设集团有限公司 | Concrete protective layer division strip and construction method |
CN115162624B (en) * | 2022-07-08 | 2023-06-16 | 北京城建五建设集团有限公司 | Concrete protective layer dividing strip and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102094493A (en) | Concrete construction method for large parking roof | |
CN101832026B (en) | Construction method of sole plate post-poured strip form bracing system | |
CN207499403U (en) | A kind of FS composite thermal-insulating exterior formworks system | |
CN103321257A (en) | Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement | |
CN106801517A (en) | A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method | |
CN106437034A (en) | Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof | |
CN108442704A (en) | The outer insulation integrated non-dismantling formwork construction method of cast-in-place concrete structure | |
CN108412093A (en) | A kind of Modern Landscape decoration loam wall and its construction method | |
CN109707114A (en) | Tile roofing antiskid construction technology engineering method | |
CN204781524U (en) | Sulphur oxygen magnesium steel bar truss board | |
CN103615076A (en) | Concrete construction method for big-gradient sloping roof | |
CN105822068B (en) | Ultralong thin walled concrete walls under hot environment pour and maintenance process | |
CN201531035U (en) | Foundation slab late poured band and construction joint steel wire mesh isolating device | |
CN206319592U (en) | A kind of post-cast strip concrete side plugging structure | |
CN103286854B (en) | A kind of manufacture of steam-pressing aero-concrete ultra-wide cantilevered plate and lapping construction method | |
CN205502373U (en) | Evaporate and press whole wallboard that keeps warm of aerated concrete | |
CN201649639U (en) | Supporting system of post-pouring belt template on foundation soleplate | |
CN201400959Y (en) | Silo concrete protecting layer locating piece in slipform construction | |
CN204418691U (en) | A kind of for cast-in-place vertical member and horizontal member junction concrete blocking apparatus | |
CN113914530B (en) | Inclined roof fish scale type concrete structure and construction method | |
CN109537822A (en) | Gutter construction technology | |
CN102767284B (en) | Semi-prefabricating construction process for concrete thin-wall lower return eave | |
CN106436546B (en) | A kind of pervious concrete joint-cutting device and its application method | |
CN114319875A (en) | Seamless construction process for super-large-area concrete ground | |
CN107938907A (en) | A kind of inclined roof exempts from formwork construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110615 |