CN210806589U - Operating platform for installing wire backup wire clamp - Google Patents
Operating platform for installing wire backup wire clamp Download PDFInfo
- Publication number
- CN210806589U CN210806589U CN201921331082.2U CN201921331082U CN210806589U CN 210806589 U CN210806589 U CN 210806589U CN 201921331082 U CN201921331082 U CN 201921331082U CN 210806589 U CN210806589 U CN 210806589U
- Authority
- CN
- China
- Prior art keywords
- horizontal
- hoop
- wire
- installation
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model relates to an operation platform is used in installation of wire spare fastener. The method is characterized in that: the device comprises two suspension brackets (1), wherein the two suspension brackets (1) are detachably connected through at least 2 horizontal brackets (2) and at least 1 hoop (3), and the number of the horizontal brackets (2) is 1 more than that of the hoops (3); the hanging bracket (1) comprises a hanging rack, the top end of the hanging rack is provided with a U-shaped elbow, and the bottom end of the hanging rack is fixedly provided with 1 hoop (3); the cross section of the horizontal support (2) is T-shaped, T-shaped cavities are arranged in the hoops (3), and two ends of each horizontal support (2) are respectively inserted into the two hoops (3). Adopt the utility model discloses, can be in the installation of the backup fastener of single split conductor, for electric power installer provides convenient operating space, improve the installation effectiveness, ensure personal safety.
Description
Technical Field
The utility model relates to an operation platform is used in installation of wire spare fastener.
Background
With the rapid development of high-voltage transmission lines in China, a plurality of transmission lines adopt a single-split conductor structure to cross important crossings such as high-speed railways, expressways, important transmission channels and the like. In order to ensure the safety of important objects to be crossed below a power transmission line and avoid power supply loss, public property loss and personal safety threat caused by accidental disconnection of a single-split conductor of a high-voltage power transmission line, a power supply company adds a conductor backup wire clamp on a 35-330 kV single-split conductor, a crane operation platform can be adopted for installation in areas with good terrain and unrestricted traffic, but most areas have complex terrain, a crane cannot reach the areas, and the crane operation platform cannot be adopted for installation.
Along with the rise of voltage class, the length of wire backup wire clamp is constantly increased to 18 meters from 6 meters, the diameter of transmission line wire is usually less than 27mm, power supply installer climbs on the wire of diameter less than 27mm in the air far away from the electric power pole tower height, and no place occupation or force borrowing exists when installing the wire backup wire clamp, and the easy emergence health rolls and falls from the high altitude, leads to the installation progress slow, seriously endangers power supply installer personal safety.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an operation platform is used in installation of wire backup cable clamp can guarantee during the installation of single-bundled wire backup cable clamp, and the installer has the occupy-place, borrows the power platform, improves personal safety guarantee, promotes the installation effectiveness, reduces personnel high altitude risk of falling.
An operation platform is used in installation of wire spare clamp, its characterized in that: the device comprises two suspension brackets, wherein the two suspension brackets are detachably connected with at least 1 hoop through at least 2 horizontal brackets, and the number of the horizontal brackets is 1 more than that of the hoops; the hanging bracket comprises a hanging rack, the top end of the hanging rack is provided with a U-shaped elbow, and the bottom end of the hanging rack is fixedly provided with 1 hoop; the cross section of the horizontal bracket is T-shaped, a T-shaped cavity is arranged in the anchor ear, and two ends of each horizontal bracket are respectively inserted into the two anchor ears; wherein all be equipped with the mounting hole on horizontal stand and staple bolt, horizontal stand and staple bolt pass through fastener demountable installation together.
Wherein, each horizontal bracket is provided with at least 2 mounting holes, and each hoop is provided with at least 2 mounting holes.
Wherein the bottom welding of stores pylon has 1 staple bolt.
Wherein the hanging bracket, the horizontal bracket and the hoop are all made of steel.
Through the proof of trying out, adopt the utility model discloses backup fastener installation operation platform of wire can provide convenient operating space for the electric power installer in the backup fastener installation of single split conductor, improves the installation effectiveness, ensures personal safety, avoids personnel's high altitude to fall, has satisfied the enterprise and has fallen this requirement of carrying the effect, and the security and the efficiency of the backup fastener installation of single split conductor also will obtain very big improvement.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a sectional view of the horizontal bracket 2 of the present invention;
figure 3 is the utility model discloses well staple bolt 3's cross-sectional view.
Detailed Description
As shown in fig. 1, 2 and 3, the utility model relates to an operation platform for installing wire backup cable clamp, including two suspension support 1, can dismantle the connection through 2 at least horizontal stand 2 and 1 at least staple bolt 3 between these two suspension support 1 to the quantity of horizontal stand 2 is 1 more than the quantity of staple bolt 3, for example connects through 2 horizontal stand 2 and 1 staple bolt 3 in fig. 1.
The hanging bracket 1 comprises a hanging rack, a U-shaped elbow is arranged at the top end of the hanging rack, and 1 hoop 3 is fixedly arranged at the bottom end of the hanging rack in a welded mode; the cross section of the horizontal bracket 2 is T-shaped, a T-shaped cavity is arranged in the anchor ear 3, and two ends of each horizontal bracket 2 are respectively inserted into the two anchor ears 3; wherein all be equipped with the mounting hole on horizontal stand 2 and staple bolt 3, horizontal stand 2 and staple bolt 3 pass through fastener such as bolt and nut demountable installation together.
Wherein, each horizontal bracket 2 is provided with at least 2 mounting holes, each hoop 3 is provided with at least 2 mounting holes, and the number of the two mounting holes should be matched. Wherein, the hanging bracket 1, the horizontal bracket 2 and the hoop 3 are all made of steel.
As shown in fig. 1, the utility model provides a novel backup fastener installation operation platform of wire, include to constitute by suspension bracket 1, horizontal stand 2 and staple bolt 3. The suspension support 1 is connected with the horizontal supports 2 through bolts, and the horizontal supports 2 are connected through bolts through anchor ears 3. The whole set of wire backup wire clamp operating platform is hung on the wire through a hook (U-shaped elbow) of the hanging support 1 for operators to use.
The utility model discloses a use method and theory of operation are:
1. assembling a platform ground: the welding of 1 one end of suspension support has staple bolt 3, and staple bolt 3 adopts 1 bolt reinforcement to be connected, and 2 bolted connection are used to the horizontal stand 2 grafting back of a suspension support 1 and leftmost end through welding staple bolt 3. The operation platform with any length can be formed by connecting the plurality of horizontal supports 2 and the plurality of anchor ears 3 through bolts after insertion, the horizontal support 2 at the rightmost end is connected with the anchor ear 3 welded on the other suspension support 1 through bolts after insertion, and a set of novel wire backup wire clamp installation operation platform can be assembled on the ground.
2. Hanging and installing a lead and performing an impact test: the whole set of novel wire backup wire clamp installation operation platform is hung on a single wire through two hooks of the two-end hanging supports 1 respectively, and a rope is connected to the platform, so that an impact test can be performed.
3. Personnel bench work: and when the operator goes out of the wire, the operator steps on the operating platform by feet to install the single-wire backup wire clamp.
Claims (4)
1. The utility model provides an operation platform is used in installation of spare fastener of wire which characterized in that: the device comprises two suspension brackets (1), wherein the two suspension brackets (1) are detachably connected through at least 2 horizontal brackets (2) and at least 1 hoop (3), and the number of the horizontal brackets (2) is 1 more than that of the hoops (3); the hanging bracket (1) comprises a hanging rack, the top end of the hanging rack is provided with a U-shaped elbow, and the bottom end of the hanging rack is fixedly provided with 1 hoop (3); the cross section of the horizontal support (2) is T-shaped, a T-shaped cavity is arranged in the anchor ear (3), and two ends of each horizontal support (2) are respectively inserted into the two anchor ears (3); wherein, mounting holes are arranged on the horizontal bracket (2) and the hoop (3), and the horizontal bracket (2) and the hoop (3) are detachably mounted together through fasteners.
2. The operating platform for installing the wire backup clip as claimed in claim 1, wherein: wherein each horizontal bracket (2) is provided with at least 2 mounting holes, and each hoop (3) is provided with at least 2 mounting holes.
3. The operating platform for installing the wire backup clip as claimed in claim 1, wherein: wherein, the bottom end of the hanging rack is welded with 1 hoop (3).
4. The operating platform for installing the wire backup clip as claimed in claim 1, wherein: wherein the hanging bracket (1), the horizontal bracket (2) and the hoop (3) are all made of steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921331082.2U CN210806589U (en) | 2019-08-16 | 2019-08-16 | Operating platform for installing wire backup wire clamp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921331082.2U CN210806589U (en) | 2019-08-16 | 2019-08-16 | Operating platform for installing wire backup wire clamp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210806589U true CN210806589U (en) | 2020-06-19 |
Family
ID=71247630
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921331082.2U Expired - Fee Related CN210806589U (en) | 2019-08-16 | 2019-08-16 | Operating platform for installing wire backup wire clamp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210806589U (en) |
-
2019
- 2019-08-16 CN CN201921331082.2U patent/CN210806589U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101834416B (en) | Device and construction method for live repairing of strand-broken overhead earth wire of transmission line | |
CN203799586U (en) | Signboard mounting support for power transmission line steel tube tower | |
CN208608639U (en) | Aerial earth wire hanging point bolt replaces tool | |
RU170640U1 (en) | TWO-CHAIN INTERMEDIATE MULTI-DIMENSIONAL SUPPORT OF ELECTRIC TRANSMISSION LINES | |
CN201517022U (en) | Hoisting tool for apparatus on column | |
CN210806589U (en) | Operating platform for installing wire backup wire clamp | |
CN208264028U (en) | A kind of novel combination type carrier cable homing device | |
CN105311771A (en) | Safety belt suspending device for upper construction of transformer | |
RU184101U1 (en) | Item complete transitional supporting cable-air (PKPO-KV) | |
CN203398639U (en) | Vibration-proof hammer moving recovering device for overhead ground wire | |
CN107217912B (en) | A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction | |
CN203112379U (en) | Quick-mounting tower cap climbing ladder of tower crane | |
CN203022328U (en) | Climbing operation platform | |
CN213626902U (en) | Transmission line shaft tower atress deformation and wire galloping monitoring device | |
RU193916U1 (en) | TWO-CHAINED INTERMEDIATE INTERMEDIATE MULTI-DIMENSIONAL SUPPORT OF ELECTRIC TRANSMISSION LINES | |
CN203674590U (en) | Stand construction platform | |
CN112683668A (en) | Static load test device for communication support | |
CN102629744A (en) | Wire releasing and tightening operation platform of pole and tower | |
CN202602173U (en) | Overhead line supporting tower line-releasing/tightening operation platform | |
CN206976050U (en) | A kind of wind-proof cable | |
CN220985232U (en) | Six-split large-section wire tension paying-off pulley hanger | |
CN210182971U (en) | Special coaster of transformer substation's generating line installation | |
CN219060814U (en) | Tunnel cable construction device of ascending a height | |
CN216794475U (en) | Supplementary hanging wire device in high altitude | |
CN218420708U (en) | Safety protection device suitable for high-place operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200619 |