CN203674590U - Stand construction platform - Google Patents
Stand construction platform Download PDFInfo
- Publication number
- CN203674590U CN203674590U CN201320877164.3U CN201320877164U CN203674590U CN 203674590 U CN203674590 U CN 203674590U CN 201320877164 U CN201320877164 U CN 201320877164U CN 203674590 U CN203674590 U CN 203674590U
- Authority
- CN
- China
- Prior art keywords
- fender bracket
- arm
- operation platform
- load
- bearing component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 238000009434 installation Methods 0.000 claims abstract description 27
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 22
- 239000010959 steel Substances 0.000 claims abstract description 22
- 241000276425 Xiphophorus maculatus Species 0.000 claims description 5
- 230000004888 barrier function Effects 0.000 claims description 4
- 230000017105 transposition Effects 0.000 abstract description 12
- 238000005516 engineering process Methods 0.000 description 2
- 230000036541 health Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 241000238557 Decapoda Species 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
Disclosed is a stand construction platform. The stand construction platform comprises bearing cross arms and a load-bearing part, wherein each bearing cross arm is configured to be vertical to channel steel and in a direction far from a stand, and the load-bearing part has a bearing surface. Each bearing cross arm comprises a bearing part and an installation part used for installing the channel steel. The bearing part is connected with the installation parts. The load-bearing part is installed on the bearing parts. Thus, construction personnel can carry out construction transposition on the bearing surface, the bearing cross arms provide enough support for the construction personnel to carry out construction on the bearing surface, and the construction safety is ensured. By arranging the bearing cross arms and the load-bearing part provided with the bearing surface, the construction personnel can carry out construction transposition conveniently, transposition time is saved, and construction progress is accelerated.
Description
Technical field
The utility model relates to the technical field of stand service kit, particularly relates to a kind of stand operation platform.
Background technology
In existing distribution transforming stand construction system, while particularly transformer high-low-voltage binding post being carried out to dismounting wire, transformer is fixed between two stands by channel-section steel conventionally, owing to being subject to the impact of transformer body fin, action inconvenience in workmen replaces back and forth on these two stands, and construction space is very limited.
For simplifying construction procedure, workmen can directly replace conventionally on stand.In transposition process, workmen need tie up to cross-arm by safety belt, and then the whole health of workmen encircles into shrimp shape, and pin is stood on tiptoe on transformer channel-section steel, and health recedes as far as possible, and the transposition of could constructing reluctantly, causes the length that expends time in, and construction schedule is slow.
Utility model content
Based on this, be necessary that the problem that construction schedule is slow, provides a kind of stand operation platform for the length that expends time in that replaces of constructing.
A kind of stand operation platform, comprise with channel-section steel away from the vertically disposed load cross-arm of stand direction, and be formed with the load bearing component of loading end, described load cross-arm comprises supporting part and the installation portion for installing with described channel-section steel, described supporting part is connected with described installation portion, and described load bearing component is installed on described supporting part.
In an embodiment, described installation position is in the center of described load cross-arm therein, and described installation portion is divided described supporting part equally.
Therein in an embodiment, described installation portion offers the installing hole for removably connecting with described channel-section steel.
In an embodiment, described load bearing component is platy structure therein.
In an embodiment, comprise fender bracket therein, described fender bracket is installed on described load cross-arm, and described fender bracket is positioned at the loading end homonymy of described load bearing component, and described fender bracket, described load bearing component and described load cross-arm form construction space.
In an embodiment, described fender bracket comprises the first fender bracket and the second fender bracket therein, and described the first fender bracket is vertically installed on the end of described load cross-arm, and described the second fender bracket arranges around described the first fender bracket annular.
In an embodiment, described the first fender bracket and described load cross-arm removably connect therein.
In an embodiment, described the second fender bracket is sheathed on described the first fender bracket therein.
Therein in an embodiment; described the second fender bracket comprises running-on fender bracket and hook fender bracket; the end of described running-on fender bracket is provided with the running-on that can mate with described the first fender bracket; the end of described hook fender bracket is provided with the hook that can hang on described running-on fender bracket, and described running-on fender bracket and described hook fender bracket are staggered.
In an embodiment, the outer surface of described load cross-arm, described load bearing component and described fender bracket is provided with insulating barrier therein.
Above-mentioned stand operation platform, is installed on channel-section steel by load cross-arm by installation portion, keeps load cross-arm arranging away from stand direction is vertical with channel-section steel, and load bearing component is installed on the supporting part of load cross-arm, and load bearing component is formed with loading end.So, workmen can be in the loading end transposition of constructing, and load cross-arm is constructed enough bearing supports are provided at loading end for workmen, ensures the fail safe of construction.By load cross-arm being set and being formed with the load bearing component of loading end, the convenient construction personnel transposition of construct, saving transposition time, accelerating construction progress.
Brief description of the drawings
Fig. 1 is the structural representation of an execution mode stand operation platform;
Fig. 2 is another visual angle structural representation of an execution mode stand operation platform;
Fig. 3 is another visual angle structural representation of an execution mode stand operation platform.
Embodiment
For the ease of understanding the utility model, below with reference to relevant drawings, the utility model is described more fully.In accompanying drawing, provide preferred embodiment of the present utility model.But the utility model can be realized in many different forms, be not limited to embodiment described herein.On the contrary, providing the object of these embodiment is to make to the understanding of disclosure of the present utility model more thoroughly comprehensively.
It should be noted that, when element is called as " being fixed on " another element, it can be directly on another element or also can have an element placed in the middle.When an element is considered to " connection " another element, it can be directly connected to another element or may have centering elements simultaneously.
Unless otherwise defined, all technology that use are herein identical with the implication that belongs to the common understanding of those skilled in the art of the present utility model with scientific terminology.The term using in specification of the present utility model herein, just in order to describe the object of specific embodiment, is not intended to be restriction the utility model.Term as used herein " and/or " comprise one or more relevant Listed Items arbitrarily with all combinations.
As shown in Figure 1, Figure 2 and Figure 3, a kind of stand operation platform, comprise with channel-section steel 230 away from the vertically disposed load cross-arm 110 of stand 210 direction, and be formed with the load bearing component 120 of loading end 122, load cross-arm 110 comprises supporting part 112 and the installation portion 114 for installing with channel-section steel 230, supporting part 112 is connected with installation portion 114, and load bearing component 120 is installed on supporting part 112.
In specific embodiment as shown in the figure, load cross-arm 110 is installed on channel-section steel 230 and is provided with a side of transformer 220 by installation portion 114, this load cross-arm 110 is strip structure, setting vertical with channel-section steel 230, load cross-arm 110 is simple in structure, is convenient to install and carry.This load cross-arm 110 is two, is installed on respectively channel-section steel 230 and is provided with the left and right sides of transformer 220, to enough bearing supports are provided.Load bearing component 120 is installed on load cross-arm 110 supporting parts 112, and the loading end 122 of load bearing component 120 is positioned near the fin of transformer 220, for workmen's transposition provides mobile platform.For ease of carrying, can be installed on supporting part 112 by dismountable load bearing component 120, as the mode such as be threaded connection realizes the object of detachable installation, certainly, load bearing component 120 also can be fixedly installed in supporting part 112.In other embodiments, this load cross-arm 110 also can be zigzag or other shape.Load cross-arm 110 can be installed according to physical location demand, and the quantity of load cross-arm 110 can be two or more.
Above-mentioned stand operation platform, load cross-arm 110 is installed on to channel-section steel 230 by installation portion 114, maintenance load cross-arm 110 away from vertical setting of stand 210 directions, is installed on load bearing component 120 supporting part 112 of load cross-arm 110 with channel-section steel 230, and load bearing component 120 is formed with loading end 122.So, workmen can be in loading end 122 transposition of constructing, and 110 of load cross-arms, for workmen constructs enough bearing supports are provided at loading end 122, ensure the fail safe of construction.By load cross-arm 110 being set and being formed with the load bearing component 120 of loading end 122, the convenient construction personnel transposition of construct, saving transposition time, accelerating construction progress.
Refer to Fig. 2 and Fig. 3, in an embodiment, installation portion 114 is positioned at load cross-arm 110 center therein, and installation portion 114 is divided supporting part 112 equally.So, installation portion 114 is arranged on to load cross-arm 110 center, supporting part 112 is positioned at the both sides of installation portion 114 and is mounted portion 114 to be divided equally, is conducive to ensure the stress balance at load cross-arm 110 two ends, ensures construction safety.
Refer to Fig. 1 and Fig. 2, therein in an embodiment, load cross-arm 110 installation portions 114 offer the installing hole 1140 for removably connecting with channel-section steel 230.In installation process, can use bolt to insert this installing hole 1140, with by tight to load cross-arm 110 and channel-section steel 230 bolts.So, by offer installing hole 1140 at installation portion, be convenient to Fast Installation and dismounting, save time, accelerating construction progress.It is pointed out that load cross-arm 110 installation portions 114 also can not offer installing hole 1140, by adopting separately the parts such as fixture, also can realize load cross-arm 110 and the channel-section steel 230 volume object that removably connects.In the present embodiment, this installing hole 1140 is positioned at load cross-arm 110 center.
Refer to Fig. 3, in an embodiment, load bearing component 120 is platy structure therein.So, adopt the load bearing component 120 of platy structure, the loading end 122 of this load bearing component 120 is without leak, can be workmen provides enough erect-position demands on the one hand, on the other hand so that workmen places working related device, the device of avoiding occurring small volume cannot be placed on the problem of loading end 122.This load bearing component 120 removably connects with load cross-arm 110, is convenient to dismounting and carries.
In the present embodiment, load bearing component 120 comprises at least two carrying pedals, and these carrying pedals are installed on load cross-arm 110 supporting parts 112 side by side, adopts at least two carrying pedals, is conducive to dwindle the volume of each carrying pedal, is easy to carry.It is pointed out that load bearing component 120 also can be non-platy structure, as other structures such as network structures, also can be embodied as workmen provides the object of the platform of standing.
Please participate in Fig. 1, Fig. 2 and Fig. 3; therein in an embodiment; stand operation platform comprises fender bracket 130; fender bracket 130 is installed on load cross-arm 110; fender bracket 130 is positioned at loading end 122 homonymies of load bearing component 120, and fender bracket 130, load bearing component 120 and load cross-arm 110 form construction space 140.So; by fender bracket 130 is set; and surround construction space 140 with load bearing component 120 and load cross-arm 110; workmen can only be in the interior activity of formed construction space 140; avoid workmen to step on sky in the time that loading end 122 is shifted and slip; shield, improved the fail safe of construction, ensured construction schedule.
Refer to Fig. 1 and Fig. 2, in an embodiment, fender bracket 130 comprises that the first fender bracket 132 and the second fender bracket 134, the first fender brackets 132 are vertically installed on the end of load cross-arm 110 therein, and the second fender bracket 134 arranges around the first fender bracket 132 annulars.So; arrange around the first fender bracket 132 annulars by the first fender bracket 132 and the second fender bracket 134, the second fender brackets 134 are set, the first fender bracket 132 is vertically installed on the end of load cross-arm 110; ensure enough construction spaces 140, for workmen's displacement facilitates.
In specific embodiment as shown in Figure 1; the first fender bracket 132 is vertically installed on load cross-arm 110 supporting parts 112 one end away from installation portion 114; the namely end of load cross-arm 110; the second fender bracket 134 is laterally arranged, and the middle part of the first fender bracket 132 and the equal annular in end away from load cross-arm 110 1 sides are provided with the second fender bracket 134.
In an embodiment, the first fender bracket 132 removably connects with load cross-arm 110 therein.So, so that dismounting and carry accelerating construction progress.In the present embodiment, load cross-arm 110 offers screw hole, and the first fender bracket 132 is inserted to this screw hole, by the tight screw of bolt, the first fender bracket 132 is installed on to load cross-arm 110, dismounting facility.
In an embodiment, the second fender bracket 134 is sheathed on the first fender bracket 132 therein.So, first the first fender bracket 132 is installed on to load cross-arm 110, then directly the second fender bracket 134 is inserted in and is installed away from the end of load cross-arm 110 from the first fender bracket 132, install simply, save the set-up time, accelerating construction progress.Wherein, to adopt tubular structure be good for the first fender bracket 132 and the second fender bracket 134.
Refer to Fig. 3; therein in an embodiment; the second fender bracket 134 comprises running-on fender bracket 1342 and hook fender bracket 1344; the end of running-on fender bracket 1342 is provided with the running-on that can mate with the first fender bracket 132; the end of hook fender bracket 1344 is provided with the hook that can hang on running-on fender bracket 1342, and running-on fender bracket 1342 is staggered with hook fender bracket 1344.Running-on fender bracket 1342 is first sheathed on the first fender bracket 132 by running-on, then between adjacent running-on fender bracket 1342, directly hangs hook fender bracket 1344 by linking up with, thus running-on fender bracket 1342 and the staggered saving of hook fender bracket 1344.So, the second fender bracket 134 comprises running-on fender bracket 1342 and the non-Integral design of hook fender bracket 1344, the second fender bracket 134, is easy to carry.Wherein adopt the design of hook, hook fender bracket 1344 can directly hang on running-on fender bracket 1342, convenient disassembly.The hook of this hook fender bracket 1344 hang on running-on fender bracket 1342 near running-on place, so that enough construction spaces 140 to be provided.
In specific embodiment as shown in Figure 3; the first fender bracket 132 surrounds square; the length of running-on fender bracket 1342 is less than the length of linking up with fender bracket 1344; running-on fender bracket 1342 is sheathed on the square minor face that the first fender bracket 132 surrounds, and hook fender bracket 1344 hang on the square long limit that the first fender bracket 132 surrounds.So, adopt the mode hanging to install for long limit, save manpower loss, thereby save the set-up time.
In an embodiment, the outer surface of load cross-arm 110, load bearing component 120 and fender bracket 130 is provided with insulating barrier therein.So, by insulating barrier is set, load cross-arm 110, load bearing component 120 and fender bracket 130 can not be conducted electricity, ensure workmen's safety.
The above embodiment has only expressed several execution mode of the present utility model, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the utility model the scope of the claims.It should be pointed out that for the person of ordinary skill of the art, without departing from the concept of the premise utility, can also make some distortion and improvement, these all belong to protection range of the present utility model.Therefore, the protection range of the utility model patent should be as the criterion with claims.
Claims (10)
1. a stand operation platform, it is characterized in that, comprise with channel-section steel away from the vertically disposed load cross-arm of stand direction, and be formed with the load bearing component of loading end, described load cross-arm comprises supporting part and the installation portion for installing with described channel-section steel, described supporting part is connected with described installation portion, and described load bearing component is installed on described supporting part.
2. stand operation platform according to claim 1, is characterized in that, described installation position is in the center of described load cross-arm, and described installation portion is divided described supporting part equally.
3. stand operation platform according to claim 1, is characterized in that, described installation portion offers the installing hole for removably connecting with described channel-section steel.
4. stand operation platform according to claim 1, is characterized in that, described load bearing component is platy structure.
5. stand operation platform according to claim 1; it is characterized in that, comprise fender bracket, described fender bracket is installed on described load cross-arm; described fender bracket is positioned at the loading end homonymy of described load bearing component, and described fender bracket, described load bearing component and described load cross-arm form construction space.
6. stand operation platform according to claim 5; it is characterized in that; described fender bracket comprises the first fender bracket and the second fender bracket, and described the first fender bracket is vertically installed on the end of described load cross-arm, and described the second fender bracket arranges around described the first fender bracket annular.
7. stand operation platform according to claim 6, is characterized in that, described the first fender bracket and described load cross-arm removably connect.
8. stand operation platform according to claim 6, is characterized in that, described the second fender bracket is sheathed on described the first fender bracket.
9. stand operation platform according to claim 8; it is characterized in that; described the second fender bracket comprises running-on fender bracket and hook fender bracket; the end of described running-on fender bracket is provided with the running-on that can mate with described the first fender bracket; the end of described hook fender bracket is provided with the hook that can hang on described running-on fender bracket, and described running-on fender bracket and described hook fender bracket are staggered.
10. according to the stand operation platform described in claim 1 to 9 any one, it is characterized in that, the outer surface of described load cross-arm, described load bearing component and described fender bracket is provided with insulating barrier.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320877164.3U CN203674590U (en) | 2013-12-27 | 2013-12-27 | Stand construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320877164.3U CN203674590U (en) | 2013-12-27 | 2013-12-27 | Stand construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203674590U true CN203674590U (en) | 2014-06-25 |
Family
ID=50970845
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320877164.3U Expired - Lifetime CN203674590U (en) | 2013-12-27 | 2013-12-27 | Stand construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203674590U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103715624A (en) * | 2013-12-27 | 2014-04-09 | 广东电网公司肇庆供电局 | Rack construction platform |
CN110212439A (en) * | 2019-04-24 | 2019-09-06 | 贵州电网有限责任公司 | A kind of transportable transformer maintenance assistance platform |
-
2013
- 2013-12-27 CN CN201320877164.3U patent/CN203674590U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103715624A (en) * | 2013-12-27 | 2014-04-09 | 广东电网公司肇庆供电局 | Rack construction platform |
CN103715624B (en) * | 2013-12-27 | 2016-06-22 | 广东电网公司肇庆供电局 | rack construction platform |
CN110212439A (en) * | 2019-04-24 | 2019-09-06 | 贵州电网有限责任公司 | A kind of transportable transformer maintenance assistance platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203491629U (en) | Ring buckle cable fixing support | |
CN203491621U (en) | Cantilever multi-specification cable fixing device | |
RU73905U1 (en) | SINGLE-RACK ANCHOR-ANGULAR SUPPORT OF THE THREE-PHASE ELECTRIC TRANSMISSION LINE (OPTIONS) | |
CN202663053U (en) | Wall-mounted cable clamp | |
CN203674590U (en) | Stand construction platform | |
CN206917982U (en) | A kind of street code hoop component | |
CN203021207U (en) | Large-load multifunctional gantry crane capable of being flexibly spliced | |
CN204144815U (en) | A kind of convenient cable rack | |
CN103715624A (en) | Rack construction platform | |
CN202513536U (en) | Cable support for power tunnel | |
CN204297936U (en) | A kind of detachable mast-up | |
CN204760979U (en) | Straight line pole combination formula insulator crossarm | |
CN204592635U (en) | A kind of flange with pile body mounting hole mould | |
CN103452371B (en) | Integral sleeve suspension chimney | |
CN210404692U (en) | Cable branch box is consolidated to formula of hanging convenient to dismantle | |
CN202691308U (en) | Gas riser fixing support for high-rise building | |
CN202226567U (en) | Lifter | |
CN202691286U (en) | Run-through type tunnel cable support | |
CN202602173U (en) | Overhead line supporting tower line-releasing/tightening operation platform | |
CN202689570U (en) | Concrete distributing device and concrete pump truck | |
CN205447177U (en) | Equipment for power transmission and distribution rack | |
CN105633890B (en) | One kind pendency strain insulator-string attachment means | |
CN205361761U (en) | Anchor chain mounted frame | |
CN220228092U (en) | Fire control pipeline fixed mounting device | |
CN204571450U (en) | A kind of EHV transmission steel tube tower cross-arm connector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140625 |
|
CX01 | Expiry of patent term |