CN210621629U - A prefabricated corridor for roller compacted concrete dam - Google Patents

A prefabricated corridor for roller compacted concrete dam Download PDF

Info

Publication number
CN210621629U
CN210621629U CN201921406260.3U CN201921406260U CN210621629U CN 210621629 U CN210621629 U CN 210621629U CN 201921406260 U CN201921406260 U CN 201921406260U CN 210621629 U CN210621629 U CN 210621629U
Authority
CN
China
Prior art keywords
corridor
prefabricated
half side
prefabricated corridor
bellmouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921406260.3U
Other languages
Chinese (zh)
Inventor
吴正桥
王立成
谢蕾
毛深秋
吕振
曹荣国
房彬
李时成
马荣鑫
赵云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201921406260.3U priority Critical patent/CN210621629U/en
Application granted granted Critical
Publication of CN210621629U publication Critical patent/CN210621629U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a prefabricated corridor for roller compacted concrete dam, a serial communication port, including the prefabricated corridor of the first half side that has the bellmouth and the prefabricated corridor of the second half side that has the socket, the bellmouth of the prefabricated corridor of the first half side and the socket equipment of the prefabricated corridor of the second half side form one section complete corridor, the bellmouth of the prefabricated corridor of the first half side is located corridor arc top, the bellmouth is provided with the slot, be equipped with the stagnant water sticky tape on the slot trough surface of slot, the socket of the prefabricated corridor of the second half side is located corridor arc top, be provided with the plug on the socket, end and bottom contact surface all are equipped with sealed glue around the prefabricated corridor of the first half side and the prefabricated corridor of the second half side. The utility model has the advantages of easy to assemble need not the maintenance, need not fixedly, from steady, save storehouse face and roll the space, need not to dismantle, and can fully exert the advantage of the quick construction of roller compacted concrete dam.

Description

A prefabricated corridor for roller compacted concrete dam
Technical Field
The utility model relates to a prefabricated corridor, especially a prefabricated corridor of roller compacted concrete dam.
Background
The roller compacted concrete dam is the most commonly adopted dam type in China, and has the advantages that thin layers are quickly constructed and rolled through the warehouse, too many gallery formwork erection processes exist, warehouse face storage time can be occupied, interlayer interval time is too long, interlayer combination is affected, particularly in severe cold areas, the roller compacted concrete dam is unfavorable, the advantage of quick construction of the roller compacted concrete dam is difficult to play, the planned construction period is often delayed, loss is caused to construction units, adverse effects are brought to the whole construction organization plan, and difficulty is brought to the performance of benefits of a junction in advance.
Therefore, how to simplify the construction procedure and the gallery design and shorten the warehouse preparation time in the gallery construction process, the advantage of the rapid construction of the roller compacted concrete dam is brought into play, and the problem to be solved is needed urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a prefabricated corridor for roller compacted concrete dam is provided, need not to erect the template, need not the maintenance, and the installation of on-the-spot handling saves storehouse face space, and the later stage need not to dismantle, saves construction cost, can full play roller compacted concrete dam advantage of being under construction fast.
In order to solve the above problem, the utility model discloses the technical scheme who adopts is: the utility model provides a prefabricated corridor for roller compacted concrete dam, a serial communication port, including the prefabricated corridor of first half side that has the bellmouth and the prefabricated corridor of second half side that has the socket, the bellmouth of the prefabricated corridor of first half side and the socket equipment of the prefabricated corridor of second half side form one section complete corridor, the bellmouth of the prefabricated corridor of first half side is located corridor arc top, the bellmouth is provided with the slot, be equipped with the stagnant water sticky tape on the slot groove face, the socket of the prefabricated corridor of second half side is located corridor arc top, be provided with the plug on the socket, front and back end and the bottom contact surface of the prefabricated corridor of first half side and second half side all are equipped with sealed glue.
The structure of the first half side prefabricated gallery and the second half side prefabricated gallery is an arc gallery side wall connected to the middle of the base plate, and the whole prefabricated reinforced concrete structure of the self-stabilizing structure is formed.
The thickness of the first half-side prefabricated gallery is equal to that of the second half-side prefabricated gallery.
The sealant is polysulfide sealant, polyurethane sealant or silicone sealant.
The thickness of the first half side prefabricated gallery and the second half side prefabricated gallery is 30-40 cm, and the length of the first half side prefabricated gallery and the second half side prefabricated gallery is 2.5-3 m.
The utility model has the advantages that: need not to erect the template, need not the maintenance, the installation of on-the-spot handling saves storehouse face space, and the later stage need not to dismantle, saves construction cost, can full play roller compacted concrete dam advantage of being under construction fast.
Drawings
Fig. 1 is a perspective view of the prefabricated corridor for a roller compacted concrete dam of the present invention.
Fig. 2 is a schematic illustration of the field installation of fig. 1.
Detailed Description
The invention will be described in further detail with reference to the following drawings and embodiments:
as shown in fig. 1, 2, the utility model discloses a prefabricated corridor for roller compacted concrete dam, including the prefabricated corridor of the first half side 2 of having the bellmouth and the prefabricated corridor of the second half side 3 that has the socket, the bellmouth of the prefabricated corridor of the first half side 2 and the socket equipment of the prefabricated corridor of the second half side 3 form one section complete corridor, the bellmouth of the prefabricated corridor of the first half side 2 is located corridor arc top, the bellmouth is provided with slot 4, be equipped with stagnant water sticky tape 5 on slot 4 trough surface, the socket of the prefabricated corridor of the second half side 3 is located corridor arc top, be provided with plug 6 on the socket, end and bottom contact surface all are equipped with sealed glue 7 around the prefabricated corridor of the first half side 2 and the prefabricated corridor of the second half side 3.
Specifically speaking, the structure of the prefabricated corridor of first half side 2 and the prefabricated corridor of second half side 3 is the arc corridor lateral wall and connects at the middle part of bottom plate base 1, wholly prefabricated reinforced concrete structure who forms the self-stabilizing structure. The thickness of the first half-side prefabricated gallery 2 and the second half-side prefabricated gallery 3 is equal. The sealant 7 is a polysulfide sealant, a polyurethane sealant or a silicone sealant.
The thickness of the first half side prefabricated gallery 2 and the second half side prefabricated gallery 3 is 30-40 cm, and the length is 2.5-3 m.
And (3) carrying out lifting and installation on the site, aligning the plug 6 at the arc top of the second half side prefabricated gallery 3 to the slot 4 at the arc top of the first half side prefabricated gallery 2, lowering and clamping, and extruding the water-stopping adhesive tape 5 on the slot 4 to play a water-stopping role. When the gallery connecting section is installed, the sealant 7 at the end of the gallery can play a role in sealing, water-resisting and grout-isolating.
The utility model discloses prefabricated corridor, the size is ordered according to the designing requirement, and the corridor adopts mill's prefabrication, maintenance, and after the finished product, fortune to on-the-spot handling installation, twice end and concatenation position are equipped with the stagnant water measure, prevent the corridor infiltration, then at the corridor both sides concrete of building of installing, roll and accomplish the construction. The utility model discloses avoided the loaded down with trivial details of template dismantlement in roller compacted concrete dam corridor work progress, avoided erectting because of the template and making the inconvenience that the storehouse face diminishes and brings. The utility model has the advantages of easy to assemble need not the maintenance, need not fixedly, from steady, save storehouse face and roll the space, need not to dismantle, and can fully exert the advantage of the quick construction of roller compacted concrete dam.
The above-mentioned embodiments are only used for illustrating the technical ideas and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and to implement the same, and the scope of the present invention should not be limited by the embodiment, i.e. all equivalent changes or modifications made by the spirit of the present invention are still within the scope of the present invention.

Claims (5)

1. The utility model provides a prefabricated corridor for roller compacted concrete dam, a serial communication port, including first half side prefabricated corridor (2) that have the bellmouth and the half side prefabricated corridor (3) of second that have the socket, the bellmouth of the prefabricated corridor (2) of first half side and the socket equipment of the prefabricated corridor (3) of second half side form one section complete corridor, the bellmouth of the prefabricated corridor (2) of first half side is located corridor arc top, the bellmouth is provided with slot (4), be equipped with stagnant water sticky tape (5) on slot (4) trough surface, the socket of the prefabricated corridor (3) of second half side is located corridor arc top, be provided with plug (6) on the socket, end and bottom contact surface all are equipped with sealed glue (7) around the prefabricated corridor (2) of first half side and the half side prefabricated corridor (3) of second half side.
2. The prefabricated corridor for the roller compacted concrete dam according to claim 1, characterized in that the structures of the first half-side prefabricated corridor (2) and the second half-side prefabricated corridor (3) are both arc-shaped corridor side walls which are connected to the middle part of the base plate (1) and integrally prefabricated into a self-stable structure of reinforced concrete.
3. The prefabricated corridor for roller compacted concrete dams according to claim 1, characterized in that the thickness of the first half-side prefabricated corridor (2) and the second half-side prefabricated corridor (3) are equal.
4. The prefabricated corridor for roller compacted concrete dams according to claim 1, characterized in that the sealant (7) is a polysulfide sealant, a polyurethane sealant or a silicone sealant.
5. The prefabricated corridor for roller compacted concrete dams according to claim 1, characterized in that the thickness of the first half prefabricated corridor (2) and the second half prefabricated corridor (3) is 30-40 cm and the length is 2.5-3 m.
CN201921406260.3U 2019-08-27 2019-08-27 A prefabricated corridor for roller compacted concrete dam Active CN210621629U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921406260.3U CN210621629U (en) 2019-08-27 2019-08-27 A prefabricated corridor for roller compacted concrete dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921406260.3U CN210621629U (en) 2019-08-27 2019-08-27 A prefabricated corridor for roller compacted concrete dam

Publications (1)

Publication Number Publication Date
CN210621629U true CN210621629U (en) 2020-05-26

Family

ID=70760896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921406260.3U Active CN210621629U (en) 2019-08-27 2019-08-27 A prefabricated corridor for roller compacted concrete dam

Country Status (1)

Country Link
CN (1) CN210621629U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424337A (en) * 2019-08-27 2019-11-08 中水北方勘测设计研究有限责任公司 Precast Gallery for RCC dam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424337A (en) * 2019-08-27 2019-11-08 中水北方勘测设计研究有限责任公司 Precast Gallery for RCC dam

Similar Documents

Publication Publication Date Title
CN210621629U (en) A prefabricated corridor for roller compacted concrete dam
CN101775880A (en) Roof drainage structure and manufacturing method thereof
CN108130950A (en) A kind of component component of assembled arthitecutral structure and include its building
CN211817040U (en) Slurry leakage prevention structure at splicing part of assembled laminated slab
CN208862620U (en) A kind of curtain wall panel
CN210767362U (en) Outer wall light partition plate installation node
CN114718252A (en) Parapet waterproof protection layer structure and using method
CN214220178U (en) Prefabricated disassembly-free side mold and adjustable supporting system for one-step molding of floor water retaining strip
CN213539598U (en) Z-shaped support mounting device for preventing bearing part from cracking in finished product flue
CN114673202A (en) Anti-seepage method for connecting dock gallery expansion joint waterstop and steel sheet pile dock wall
CN111502063B (en) Assembled concrete corner wall
CN108396985B (en) Hole plugging structure
CN208220200U (en) L-type Quick Release Easy disassembling mould
CN213143510U (en) Concrete wall pouring template structure
CN110424337A (en) Precast Gallery for RCC dam
CN215803098U (en) Outer wall water intercepting structure depending on climbing frame
CN212562313U (en) Novel house flue
CN212002275U (en) Arc rib axillary beam top mould device
CN218323307U (en) Leveling device for assembled prefabricated part and energy-saving wall comprising leveling device
CN219118532U (en) Building block and brickwork
CN212388718U (en) Main structure of green assembly type building
CN215594523U (en) Prefabricated external wallboard structure of assembled
CN216239264U (en) Assembled heat preservation ramp plate reaches by its roof of constituteing
CN212453091U (en) Corner wall connecting piece of assembled concrete corner wall
CN220133332U (en) External corner splicing structure for integral bathroom wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant