CN110424337A - Precast Gallery for RCC dam - Google Patents

Precast Gallery for RCC dam Download PDF

Info

Publication number
CN110424337A
CN110424337A CN201910796093.6A CN201910796093A CN110424337A CN 110424337 A CN110424337 A CN 110424337A CN 201910796093 A CN201910796093 A CN 201910796093A CN 110424337 A CN110424337 A CN 110424337A
Authority
CN
China
Prior art keywords
gallery
half side
precast
socket
precast gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910796093.6A
Other languages
Chinese (zh)
Inventor
吴正桥
王立成
谢蕾
毛深秋
吕振
曹荣国
房彬
李时成
马荣鑫
赵云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201910796093.6A priority Critical patent/CN110424337A/en
Publication of CN110424337A publication Critical patent/CN110424337A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages

Abstract

The invention discloses a kind of Precast Galleries for RCC dam, it is characterized in that, including the first half side Precast Gallery with bellmouth and the second half side Precast Gallery with socket, the socket of the bellmouth of first half side Precast Gallery and the second half side Precast Gallery assembles to form one section of complete gallery, the bellmouth of first half side Precast Gallery is located at the top of gallery arc, bellmouth is provided with slot, water-stop glue band is equipped on slot groove face, the socket of second half side Precast Gallery is located at the top of gallery arc, plug is provided on socket, end and base contact surface are equipped with sealant before and after the first half side Precast Gallery and the second half side Precast Gallery.The present invention, which has, facilitates installation, and without maintenance, without fixing, from steady, saving storehouse surface rolls space, the advantages that without dismantling, and can give full play of the advantage of RCC dam rapid construction.

Description

Precast Gallery for RCC dam
Technical field
The present invention relates to a kind of Precast Gallery, especially a kind of Precast Gallery of RCC dam.
Background technique
RCC dam is that the commonly used dam type in China quickly rolls it is advantageous that thin layer leads to storehouse rapid construction, But excessive gallery template erection process is various, can occupy storehouse surface for the storehouse time, cause the interlayer intermittent time too long, influence interlayer In conjunction with especially severe cold area is even more unfavorable, and the advantage of RCC dam rapid construction is made to be difficult to bring into play, past Toward causing plan time to delay, causes damages to unit in charge of construction, entire construction organization plan is adversely affected, is shifted to an earlier date to hinge It plays benefit and brings difficulty.
Therefore, how in gallery work progress, simplify operational procedure, more simplify Corridor Design, shorten storehouse surface The standby storehouse time, so that the advantage of RCC dam rapid construction is brought into play, it is a urgent problem to be solved.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of Precast Galleries for RCC dam, are not necessarily to frame If template, without maintenance, storehouse surface space is saved in live handling installation, and the later period without disassembly, saves construction cost, can sufficiently send out Wave the advantage of RCC dam rapid construction.
To solve the above-mentioned problems, the technical scheme adopted by the invention is that: it is a kind of for the prefabricated of RCC dam Gallery, which is characterized in that the second half side Precast Gallery including having the first half side Precast Gallery of bellmouth and with socket, the The socket of the bellmouth of one half side Precast Gallery and the second half side Precast Gallery assembles to form one section of complete gallery, and first is half side prefabricated The bellmouth of gallery is located at the top of gallery arc, and bellmouth is provided with slot, water-stop glue band is equipped on slot groove face, second is half side prefabricated The socket of gallery is located at the top of gallery arc, plug is provided on socket, in the first half side Precast Gallery and the second half side prefabricated corridor The front and back end in road and base contact surface are equipped with sealant.
The structure of the first half side Precast Gallery and the second half side Precast Gallery is that arc gallery side wall is connected to bottom The middle part of plate pedestal, the integral prefabricated reinforced concrete structure into from steady structure.
The thickness of the first half side Precast Gallery and the second half side Precast Gallery is equal.
The sealant is polysulfide sealant, polyurethane sealant or silicone sealant.
The first half side Precast Gallery and the second half side Precast Gallery with a thickness of 30~40cm, length is 2.5~3m.
Beneficial effects of the present invention: without setting up template, without maintenance, storehouse surface space, later period are saved in live handling installation Without disassembly, construction cost is saved, the advantage of RCC dam rapid construction can be given full play to.
Detailed description of the invention
Fig. 1 is perspective view of the present invention for the Precast Gallery of RCC dam.
Fig. 2 is the field erected schematic diagram of Fig. 1.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and detailed description:
As shown in Figure 1, 2, the Precast Gallery for RCC dam of the invention, it is half side including first with bellmouth Precast Gallery 2 and the second half side Precast Gallery 3 with socket, the bellmouth of the first half side Precast Gallery 2 and second half side prefabricated The socket of gallery 3 assembles to form one section of complete gallery, and the bellmouth of the first half side Precast Gallery 2 is located at the top of gallery arc, and bellmouth is set It is equipped with slot 4, water-stop glue band 5 is equipped on 4 groove face of slot, the socket of the second half side Precast Gallery 3 is located at the top of gallery arc, inserts It is provided with plug 6 on mouthful, end and base contact surface before and after the first half side Precast Gallery 2 and the second half side Precast Gallery 3 It is equipped with sealant 7.
Specifically, the structure of the first half side Precast Gallery 2 and the second half side Precast Gallery 3 is arc gallery side Wall is connected to the middle part of bottom plate pedestal 1, the integral prefabricated reinforced concrete structure into from steady structure.Described first is half side prefabricated The thickness of gallery 2 and the second half side Precast Gallery 3 is equal.The sealant 7 is polysulfide sealant, polyurethane sealant or silicone Sealant.
The first half side Precast Gallery 2 and the second half side Precast Gallery 3 with a thickness of 30~40cm, length is 2.5~ 3m。
Live handling installation, is directed at the first half side 2 arc of Precast Gallery for the plug 6 at the top of the second half side 3 arc of Precast Gallery The decentralization of slot 4 at top is blocked, and the water-stop glue band 5 on slot 4 plays sealing effect after being extruded.When gallery connects section installation, The sealant 7 of gallery end can play the role of sealing water proof every slurry.
Precast Gallery of the present invention, size is tailor-made according to design requirement, and gallery uses prefabrication, conserves, and after finished product, is transported to Live handling installation, twice end and stitching position are equipped with measures of preventing water, prevent gallery from seeping water, then in mounted gallery two Side making concrete carries out rolling completion construction.The invention avoids tear open in RCC dam gallery template in construction process That unloads is cumbersome, avoids and becomes smaller bring inconvenience because template erection to roll storehouse surface.The present invention, which has, facilitates installation, without supporting Shield from steady, save storehouse surface and rolls space without fixing, and the advantages that without dismantling, and it is fast to give full play of RCC dam The advantage of speed construction.
The above embodiments are merely to illustrate technical idea and feature of the invention, and its object is to make skill in the art Art personnel only cannot limit the scope of the patents of the invention with the present embodiment it will be appreciated that the contents of the present invention and implement accordingly, Same changes or modifications made by i.e. all disclosed spirit, still fall in the scope of the patents of the invention.

Claims (5)

1. a kind of Precast Gallery for RCC dam, which is characterized in that the first half side prefabricated corridor including having bellmouth Road (2) and the second half side Precast Gallery (3) with socket, the bellmouth of the first half side Precast Gallery (2) and second half side prefabricated The socket of gallery (3) assembles to form one section of complete gallery, and the bellmouth of the first half side Precast Gallery (2) is located at the top of gallery arc, holds Mouth is provided with slot (4), is equipped with water-stop glue band (5) on slot (4) groove face, and the socket of the second half side Precast Gallery (3) is located at At the top of gallery arc, plug (6) are provided on socket, before the first half side Precast Gallery (2) and the second half side Precast Gallery (3) Follower head and base contact surface are equipped with sealant (7).
2. being used for the Precast Gallery of RCC dam according to claim 1, which is characterized in that described first is half side prefabricated The structure of gallery (2) and the second half side Precast Gallery (3) is the middle part that arc gallery side wall is connected to bottom plate pedestal (1), whole The prefabricated reinforced concrete structure into from steady structure of body.
3. being used for the Precast Gallery of RCC dam according to claim 1, which is characterized in that described first is half side prefabricated Gallery (2) and the thickness of the second half side Precast Gallery (3) are equal.
4. being used for the Precast Gallery of RCC dam according to claim 1, which is characterized in that the sealant (7) is Polysulfide sealant, polyurethane sealant or silicone sealant.
5. being used for the Precast Gallery of RCC dam according to claim 1, which is characterized in that described first is half side prefabricated Gallery (2) and the second half side Precast Gallery (3) with a thickness of 30~40cm, length is 2.5~3m.
CN201910796093.6A 2019-08-27 2019-08-27 Precast Gallery for RCC dam Pending CN110424337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910796093.6A CN110424337A (en) 2019-08-27 2019-08-27 Precast Gallery for RCC dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910796093.6A CN110424337A (en) 2019-08-27 2019-08-27 Precast Gallery for RCC dam

Publications (1)

Publication Number Publication Date
CN110424337A true CN110424337A (en) 2019-11-08

Family

ID=68416098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910796093.6A Pending CN110424337A (en) 2019-08-27 2019-08-27 Precast Gallery for RCC dam

Country Status (1)

Country Link
CN (1) CN110424337A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005353A (en) * 2019-12-27 2020-04-14 中水北方勘测设计研究有限责任公司 A precast concrete movable formwork subassembly for construction of concrete dam back slope

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202055263U (en) * 2011-04-21 2011-11-30 中国水利水电第五工程局有限公司 Reinforced concrete corridor
CN203669880U (en) * 2013-12-31 2014-06-25 西南交通大学 Assembly type tunnel lining segment
CN204531414U (en) * 2015-04-23 2015-08-05 李春奇 Building pipe hole to be provided special tool
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN107366258A (en) * 2017-08-31 2017-11-21 中国电建集团贵阳勘测设计研究院有限公司 Using Precast Gallery structure and implementation method in the RCCD snapped connection
CN109356126A (en) * 2018-11-22 2019-02-19 中水电第十工程局(郑州)有限公司 Double of Precast Gallery structure and gallery construction method
CN210621629U (en) * 2019-08-27 2020-05-26 中水北方勘测设计研究有限责任公司 A prefabricated corridor for roller compacted concrete dam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202055263U (en) * 2011-04-21 2011-11-30 中国水利水电第五工程局有限公司 Reinforced concrete corridor
CN203669880U (en) * 2013-12-31 2014-06-25 西南交通大学 Assembly type tunnel lining segment
CN204531414U (en) * 2015-04-23 2015-08-05 李春奇 Building pipe hole to be provided special tool
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN107366258A (en) * 2017-08-31 2017-11-21 中国电建集团贵阳勘测设计研究院有限公司 Using Precast Gallery structure and implementation method in the RCCD snapped connection
CN109356126A (en) * 2018-11-22 2019-02-19 中水电第十工程局(郑州)有限公司 Double of Precast Gallery structure and gallery construction method
CN210621629U (en) * 2019-08-27 2020-05-26 中水北方勘测设计研究有限责任公司 A prefabricated corridor for roller compacted concrete dam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005353A (en) * 2019-12-27 2020-04-14 中水北方勘测设计研究有限责任公司 A precast concrete movable formwork subassembly for construction of concrete dam back slope

Similar Documents

Publication Publication Date Title
CN102777103B (en) Energy-saving door and window attached frame and door and window installation method
CN211850066U (en) Waterproof structure for joint of prefabricated external wall panel of prefabricated building
CN110424337A (en) Precast Gallery for RCC dam
CN203547375U (en) Novel plate installation system for aluminum-made auxiliary frame window unit with vertical draining function
CN113006334B (en) Assembly type light partition wall batten connecting device adopting double dovetail connection
CN204040374U (en) A kind of mounting structure of shingle nail
CN205399892U (en) Thermal insulation decorates wall body board system
CN204940566U (en) A kind of Corner Seal bar
CN103741904A (en) Waterproof type external wall thermal insulating decoration board and mounting method
CN204059964U (en) Reusable window construction closing-in mould can be had enough to meet the need
CN203654652U (en) Waterproof thermal insulating decoration board for external wall
CN210621629U (en) A prefabricated corridor for roller compacted concrete dam
CN216007634U (en) Green building energy-saving wallboard mounting structure
CN213174555U (en) Semi-hidden assembled wall surface external corner binding off system
CN211623085U (en) Door and window
CN211849232U (en) Novel frame-type arch bar device for drainage well of tailing pond
CN103835415A (en) Sealing structure between curtain wall face plates
CN205348655U (en) External wall insulation decorates production board's mounting structure
CN203626094U (en) Unit curtain wall transversely-continuous inserting-connection waterproof structure
CN204781482U (en) Bright circle of dry seal formula grafting frame curtain system
CN204456560U (en) A kind of concealed frame glass curtain wall structure
CN209384881U (en) The window hole for exempting from plastering wall improves structure
CN213563275U (en) Building templates convenient to concrete placement
CN215330024U (en) Prefabricated side wall structure of entrance is reserved to subway station
CN110284801B (en) Window heat-insulation mounting structure and mounting method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination