CN107366258A - Prefabricated gallery structure in roller compacted concrete dam adopting buckle connection and implementation method - Google Patents

Prefabricated gallery structure in roller compacted concrete dam adopting buckle connection and implementation method Download PDF

Info

Publication number
CN107366258A
CN107366258A CN201710774153.5A CN201710774153A CN107366258A CN 107366258 A CN107366258 A CN 107366258A CN 201710774153 A CN201710774153 A CN 201710774153A CN 107366258 A CN107366258 A CN 107366258A
Authority
CN
China
Prior art keywords
connecting rod
gallery
groove
buckle
prefabricated component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710774153.5A
Other languages
Chinese (zh)
Other versions
CN107366258B (en
Inventor
苏鹏
郝鹏
王荣荣
姚元成
何福娟
张斌
彭成佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201710774153.5A priority Critical patent/CN107366258B/en
Publication of CN107366258A publication Critical patent/CN107366258A/en
Application granted granted Critical
Publication of CN107366258B publication Critical patent/CN107366258B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a prefabricated gallery structure in a roller compacted concrete dam connected by a buckle and an implementation method thereof. The prefabricated component joint structure is ingenious in structure and convenient and fast to use, can eliminate precision errors generated during manual hoisting, can completely avoid irregular slab staggering caused by vibration rolling exciting force in the roller compacted concrete construction process, greatly improves the overall attractiveness of the inner surface of the prefabricated corridor, greatly reduces the probability of leakage at the joint position of the prefabricated component along the corridor after water storage of a reservoir, and is worthy of popularization.

Description

Using Precast Gallery structure and implementation method in the RCCD snapped connection
Technical field
The present invention relates to Hydraulic and Hydro-Power Engineering technical field, more particularly to the RCCD that a kind of use snaps connection Interior Precast Gallery structure and its implementation.
Background technology
To carry high roller compacted concrete speed of perfusion, shorten the engineering construction cycle, gallery is more using pre- in RCCD The pattern of product, i.e., processing and fabricating that is advance outside the venue or synchronously completing gallery prefabricated component, in native (the gallery cloth of dam body grinding coagulation Put layer) rise before, prefabricated component is lifted to grinding coagulation soil lift surface and spliced, continue after the completion of splicing dam body stone roller Press concrete construction.
Grinding coagulation soil is a kind of poor cementitious material concrete of dry, uses portland cement, flyash, water, additional The dry concrete without slump that the coarse aggregate mixing of agent, sand and grading control forms, using identical with rock fill dam construction Transport and paving equipment, with vibrating roller compaction in layers.To meet requirement of the specification on compactness, vibrating roller exciting force is often It is larger.
It is pre- in RCCD and existing gallery prefabricated component is influenceed by artificial lifting precision and vibrating roller exciting force Gallery processed often produces faulting of slab ends in prefabricated component seam crossing, influences the overall appearance of gallery inner surface, edge can be also caused when serious Embankment seepage at gallery seam faulting of slab ends, it is totally unfavorable to dam safety.
The content of the invention
The invention aims to solve gallery prefabricated component in the prior art to be lifted precision and vibrating roller exciting by artificial The influence of power, Precast Gallery often produces faulting of slab ends in prefabricated component seam crossing in RCCD, influences gallery inner surface Overall appearance, the problem of also being caused when serious along embankment seepage at gallery seam faulting of slab ends, and the one kind proposed uses buckle Precast Gallery structure and its implementation in the RCCD of connection.
To achieve these goals, present invention employs following technical scheme:
It is a kind of to use Precast Gallery structure in the RCCD snapped connection, including gallery prefabricated component, the gallery The side of prefabricated component is provided with positive buckle, and the side of the gallery prefabricated component away from positive buckle is provided with anti-buckle, on the anti-buckle Contiguous block is fixedly connected with, the first groove is offered on the positive buckle, limited block is provided with first groove, it is described spacing Two the first fixed disks and two the second fixed disks are arranged with block, first connecting rod is rotatably connected on first fixed disk And second connecting rod, L-type connecting rod, the described one end of L-type connecting rod away from the second fixed disk are rotatably connected on second fixed disk It is rotatably connected on first connecting rod, the one end of the first connecting rod away from the first fixed disk is fixedly connected with the first support plate, described The first spring is connected between first connecting rod and L-type connecting rod, second spring is connected between first support plate and second connecting rod, The 3rd spring is connected between the inwall of the second connecting rod and the first groove, common be provided with is fixed on two first support plates Block, the second groove is offered on the fixed block, and contiguous block is located in the second groove, the lower surface of the fixed block is symmetrically set There are two the second support plates, each second support plate is provided with connecting rod, and the lower end of the connecting rod is fixedly connected with piston, institute State and two the 3rd grooves are symmetrically offered on limited block, and piston is located in the 3rd groove, the lower surface of the anti-buckle is provided with Multiple expansion sealing strips.
Preferably, the length of the gallery prefabricated component is 0.5m~1m or so.
Preferably, the general length 15cm of size of the positive buckle and anti-buckle.
Preferably, the quantity of the expansion sealing strip is two.
Preferably, the side wall of the piston and the madial wall of the 3rd groove offset.
Preferably, second support plate uses integrated formed structure with connecting rod.
The present invention is achieved in that that the contiguous block on one of gallery prefabricated component is placed on into another gallery is prefabricated In the second groove on part on fixed block, contiguous block extruding fixed block, fixed block moves on the direction of the first groove, and Moved downward by connecting rod band piston in the 3rd groove, then the first spring, second spring and the 3rd spring-compressed, give The certain scope of activities of contiguous block, avoid the first groove inner wall from producing friction to contiguous block, while be close to buckle arrangement expansion and stop Water bar, expansion sealing strip typically often save gallery prefabricated component and arrange two, also can be according to tool if engineering dam head is higher Body situation increase arrangement bar number, the setting of expansion sealing strip are considerably reduced after reservoir filling along gallery prefabricated component joint area There is the probability of seepage.
Clever structure of the present invention, it is easy to use, the trueness error occurred during artificial lifting can be eliminated, while can be with complete It is complete avoid during grinding concrete construction because vibrating roller exciting force and caused by irregular faulting of slab ends, substantially increase Precast Gallery The overall aesthetics of inner surface, and considerably reduce after reservoir filling and the machine of seepage occur along gallery prefabricated component joint area Rate, it is worthy to be popularized.
Brief description of the drawings
Fig. 1 is that a kind of structure using Precast Gallery structure in the RCCD snapped connection proposed by the present invention is shown It is intended to;
Fig. 2 is that a kind of gallery using Precast Gallery structure in the RCCD snapped connection proposed by the present invention is pre- The scheme of installation of product;
Fig. 3 is proposed by the present invention a kind of using knot at a in Precast Gallery structure in the RCCD snapped connection Structure enlarged diagram.
Description of reference numerals:1- gallery prefabricated components, 2- expansion sealing strips, 3- connecting rods, 4- first connecting rods, the bullets of 5- first Spring, 6- second connecting rods, 7-L type connecting rods, the fixed disks of 8- second, 9- pistons, 10- limited blocks, the springs of 11- the 3rd, 12- first are fixed Disk, 13- second springs, 14- fixed blocks, 15- contiguous blocks, the positive buckles of 16-, the anti-buckles of 17-.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples, but not as any limitation of the invention.
Reference picture 1-3, it is a kind of using Precast Gallery structure in the RCCD snapped connection, including gallery prefabricated component 1, the length of gallery prefabricated component 1 is 0.5m~1m or so, visual hanging device carrying situation adjustment, the side of gallery prefabricated component 1 Provided with positive buckle 16, side of the gallery prefabricated component 1 away from positive buckle 16 is provided with anti-buckle 17, the chi of positive buckle 16 and anti-buckle 17 Very little general length 15cm, contiguous block 15 is fixedly connected with anti-buckle 17, the first groove, the first groove are offered on positive buckle 16 It is interior to be provided with limited block 10, two the first fixed disks 12 and two the second fixed disks 8, the first fixed disk are arranged with limited block 10 First connecting rod 4 and second connecting rod 6 are rotatably connected on 12, L-type connecting rod 7 is rotatably connected on the second fixed disk 8, L-type connecting rod 7 is remote One end from the second fixed disk 8 is rotatably connected on first connecting rod 4, and the one end of first connecting rod 4 away from the first fixed disk 12 is fixed The first support plate is connected with, the first spring 5 is connected between first connecting rod 4 and L-type connecting rod 7, between the first support plate and second connecting rod 6 Second spring 13 is connected with, is connected with the 3rd spring 11 between the inwall of the groove of second connecting rod 6 and first, on two the first support plates Fixed block 14 is provided with jointly, the second groove is offered on fixed block 14, and contiguous block 15 is located in the second groove, fixed block 14 Lower surface is arranged with two the second support plates, and each second support plate is provided with connecting rod 3, and the second support plate uses one with connecting rod 3 Forming structure, the lower end of connecting rod 3 are fixedly connected with piston 9, and two the 3rd grooves are symmetrically offered on limited block 10, and living In the 3rd groove, the side wall of piston 9 and the madial wall of the 3rd groove offset plug 9, and the lower surface of anti-buckle 17 is provided with multiple Expansion sealing strip 2, the quantity of expansion sealing strip 2 is two, if engineering dam head is higher, can also be increased as the case may be Arrange bar number, the setting of expansion sealing strip 2 is considerably reduced after reservoir filling seepage occurs along the joint area of gallery prefabricated component 1 Probability.
The present invention is achieved in that is placed on another gallery by the contiguous block 15 on one of gallery prefabricated component 1 In the second groove on prefabricated component 1 on fixed block 14, contiguous block 15 extrudes fixed block 14, and fixed block 14 is to close to the first groove Move on direction, and moved downward by connecting rod 3 with piston 9 in the 3rd groove, then the first spring 5, second spring 13 Compressed with the 3rd spring 11, give contiguous block 15 certain scope of activities, avoided the first groove inner wall from producing contiguous block 15 and rub To wipe, while be close to buckle arrangement expansion sealing strip 2, the general gallery prefabricated component 1 that often saves of expansion sealing strip 2 arranges two, if When engineering dam head is higher, it can also increase arrangement bar number as the case may be, the setting of expansion sealing strip 2 considerably reduces There is the probability of seepage along the joint area of gallery prefabricated component 1 after reservoir filling.
Certainly, the above is the concrete application example of the present invention, and the present invention also has other embodiments, all using equivalent The technical scheme that replacement or equivalent transformation are formed, all falls within protection domain of the presently claimed invention.

Claims (7)

1. a kind of existed using Precast Gallery structure in the RCCD snapped connection, including gallery prefabricated component (1), its feature Be provided with positive buckle (16) in the side of, the gallery prefabricated component (1), the gallery prefabricated component (1) away from positive buckle (16) one Side is provided with anti-buckle (17), and contiguous block (15) is fixedly connected with the anti-buckle (17), is offered on the positive buckle (16) First groove, first groove is interior to be provided with limited block (10), and two the first fixed disks are arranged with the limited block (10) (12) first connecting rod (4) and second connecting rod and two the second fixed disks (8), are rotatably connected on first fixed disk (12) (6) L-type connecting rod (7), is rotatably connected on second fixed disk (8), remote second fixed disk (8) of the L-type connecting rod (7) One end is rotatably connected on first connecting rod (4), and the one end of the first connecting rod (4) away from the first fixed disk (12) is fixedly connected with First support plate, the first spring (5), first support plate and second are connected between the first connecting rod (4) and L-type connecting rod (7) Second spring (13) is connected between connecting rod (6), the 3rd bullet is connected between the second connecting rod (6) and the inwall of the first groove Spring (11), fixed block (14) is provided with jointly on two first support plates, the second groove is offered on the fixed block (14), and Contiguous block (15) is located in the second groove, and the lower surface of the fixed block (14) is arranged with two the second support plates, each described Second support plate is provided with connecting rod (3), and the lower end of the connecting rod (3) is fixedly connected with piston (9), on the limited block (10) Two the 3rd grooves symmetrically are offered, and piston (9) is located in the 3rd groove, the lower surface of the anti-buckle (17) is provided with multiple Expansion sealing strip (2).
It is 2. according to claim 1 a kind of using Precast Gallery structure in the RCCD snapped connection, its feature It is, the length of the gallery prefabricated component (1) is 0.5m~1m or so.
It is 3. according to claim 1 a kind of using Precast Gallery structure in the RCCD snapped connection, its feature It is, the general length 15cm of size of the positive buckle (16) and anti-buckle (17).
It is 4. according to claim 1 a kind of using Precast Gallery structure in the RCCD snapped connection, its feature It is, the quantity of the expansion sealing strip (2) is two.
It is 5. according to claim 1 a kind of using Precast Gallery structure in the RCCD snapped connection, its feature It is, the side wall and the madial wall of the 3rd groove of the piston (9) offset.
It is 6. according to claim 1 a kind of using Precast Gallery structure in the RCCD snapped connection, its feature It is, second support plate uses integrated formed structure with connecting rod (3).
7. Precast Gallery knot in the RCCD that the use in a kind of 1-6 such as claim as described in any one snaps connection The implementation of structure, it is characterised in that:Contiguous block (15) on one of gallery prefabricated component (1) is placed on another gallery In the second groove on prefabricated component (1) on fixed block (14), contiguous block (15) extruding fixed block (14), fixed block (14) is to close Move on the direction of first groove, and moved downward by connecting rod (3) band piston (9) in the 3rd groove, then the first bullet Spring (5), second spring (13) and the compression of the 3rd spring (11), give contiguous block (15) certain scope of activities, avoid first recessed Groove inwall produces friction to contiguous block (15), while is close to buckle arrangement expansion sealing strip (2).
CN201710774153.5A 2017-08-31 2017-08-31 Prefabricated gallery structure in roller compacted concrete dam adopting buckle connection and implementation method Active CN107366258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710774153.5A CN107366258B (en) 2017-08-31 2017-08-31 Prefabricated gallery structure in roller compacted concrete dam adopting buckle connection and implementation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710774153.5A CN107366258B (en) 2017-08-31 2017-08-31 Prefabricated gallery structure in roller compacted concrete dam adopting buckle connection and implementation method

Publications (2)

Publication Number Publication Date
CN107366258A true CN107366258A (en) 2017-11-21
CN107366258B CN107366258B (en) 2023-04-07

Family

ID=60312471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710774153.5A Active CN107366258B (en) 2017-08-31 2017-08-31 Prefabricated gallery structure in roller compacted concrete dam adopting buckle connection and implementation method

Country Status (1)

Country Link
CN (1) CN107366258B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424337A (en) * 2019-08-27 2019-11-08 中水北方勘测设计研究有限责任公司 Precast Gallery for RCC dam
CN114411615A (en) * 2022-02-28 2022-04-29 中国水利水电第九工程局有限公司 Dam climbing corridor rapid construction structure and construction method
CN114575385A (en) * 2022-03-25 2022-06-03 四川仟坤建设集团有限责任公司 Municipal comprehensive pipe gallery and construction method thereof
CN115506403A (en) * 2022-10-12 2022-12-23 辽宁工程技术大学 Assembled cable tunnel shock-resistant structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08184025A (en) * 1994-12-29 1996-07-16 Kensetsusho Hokurikuchihou Kensetsukyoku Method of construction of dam bank path and bank path cell to be used therefor
JP2001288730A (en) * 2000-04-05 2001-10-19 Taisei Corp Method for installing precast form
CN202812553U (en) * 2012-07-27 2013-03-20 广东联塑科技实业有限公司 Square tube socket with guiding function
CN104294771A (en) * 2014-09-29 2015-01-21 钟景尧 Square prefabricated reinforced concrete culvert
CN204326032U (en) * 2014-12-10 2015-05-13 中国电建集团贵阳勘测设计研究院有限公司 Drainage gallery structure in concrete dam
CN105908776A (en) * 2016-04-22 2016-08-31 苏交科集团股份有限公司 Segmented connection structure of precast concrete culvert and construction method thereof
CN205804406U (en) * 2016-07-06 2016-12-14 中国电建集团贵阳勘测设计研究院有限公司 Outward-turning type dense-rib energy dissipation type underground comprehensive pipe gallery
CN207537985U (en) * 2017-08-31 2018-06-26 中国电建集团贵阳勘测设计研究院有限公司 Adopt prefabricated corridor structure in roller compacted concrete dam of buckle connection

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08184025A (en) * 1994-12-29 1996-07-16 Kensetsusho Hokurikuchihou Kensetsukyoku Method of construction of dam bank path and bank path cell to be used therefor
JP2001288730A (en) * 2000-04-05 2001-10-19 Taisei Corp Method for installing precast form
CN202812553U (en) * 2012-07-27 2013-03-20 广东联塑科技实业有限公司 Square tube socket with guiding function
CN104294771A (en) * 2014-09-29 2015-01-21 钟景尧 Square prefabricated reinforced concrete culvert
CN204326032U (en) * 2014-12-10 2015-05-13 中国电建集团贵阳勘测设计研究院有限公司 Drainage gallery structure in concrete dam
CN105908776A (en) * 2016-04-22 2016-08-31 苏交科集团股份有限公司 Segmented connection structure of precast concrete culvert and construction method thereof
CN205804406U (en) * 2016-07-06 2016-12-14 中国电建集团贵阳勘测设计研究院有限公司 Outward-turning type dense-rib energy dissipation type underground comprehensive pipe gallery
CN207537985U (en) * 2017-08-31 2018-06-26 中国电建集团贵阳勘测设计研究院有限公司 Adopt prefabricated corridor structure in roller compacted concrete dam of buckle connection

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王金宽等: "白石水库碾压混凝土坝预制水平廊道的设计与施工", 《水利水电技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424337A (en) * 2019-08-27 2019-11-08 中水北方勘测设计研究有限责任公司 Precast Gallery for RCC dam
CN114411615A (en) * 2022-02-28 2022-04-29 中国水利水电第九工程局有限公司 Dam climbing corridor rapid construction structure and construction method
CN114575385A (en) * 2022-03-25 2022-06-03 四川仟坤建设集团有限责任公司 Municipal comprehensive pipe gallery and construction method thereof
CN114575385B (en) * 2022-03-25 2023-10-31 四川仟坤建设集团有限责任公司 Municipal utility tunnel and construction method thereof
CN115506403A (en) * 2022-10-12 2022-12-23 辽宁工程技术大学 Assembled cable tunnel shock-resistant structure

Also Published As

Publication number Publication date
CN107366258B (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN107366258A (en) Prefabricated gallery structure in roller compacted concrete dam adopting buckle connection and implementation method
Zhang et al. A review of the current progress and application of 3D printed concrete
CN107746223B (en) Roller compacted concrete dam and construction method thereof
CN105298133B (en) Lift the design and construction method of mass concrete invert crack resistance
CN107700435B (en) The cementing rock-fill dams of rock-fill concrete core-wall and its construction method
CN110130278B (en) Construction method of cemented dam
CN102425307B (en) Casting method for avoiding formation of mass concrete cracks
CN105971159B (en) A kind of masonry shell mechanism in 3D printing reinforced masonry shear wall
CN104005539B (en) Larger area ground concrete jointless construction technique
CN204676609U (en) The reinforced waterproof construction of a kind of basement bottom plate rear pouring tape
CN110306726A (en) Composite structure and preparation method thereof
CN206737417U (en) A kind of PC prefabricated outer wall panels grouting typified form
CN105239502B (en) Uniform force transmission device used for bridge support and installation method of uniform force transmission device
CN104499498A (en) Construction method of mass concrete construction
CN207537985U (en) Adopt prefabricated corridor structure in roller compacted concrete dam of buckle connection
CN104805950A (en) Steel wire framework heat preservation building block
CN111827465B (en) Reinforced rockfill concrete structure and construction method thereof
CN108049651B (en) Concrete crack plugging method
CN105780737B (en) A kind of super-high rockfill dam structure and its construction method for being applicable Hydraulic and Hydro-Power Engineering
CN110409609B (en) Pouring method for preventing concrete from cracking in ultra-long interval period
Verient et al. Investigations on telescope yielding elements with porous filling
CN110777854A (en) High-rise building basement roof structure, waterproof coiled material and construction method for protecting layer to survive in one step
CN207878500U (en) The prefabricated abutment wall structure of rock
CN107587483A (en) Structure for filling steep bank slope of face dam by adopting mixture and construction method thereof
CN111535323A (en) Full-section quasi-tertiary matching long-age roller compacted concrete construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant