CN107587483A - A kind of structure and its construction method that face dam bold shore slope is filled using compound - Google Patents

A kind of structure and its construction method that face dam bold shore slope is filled using compound Download PDF

Info

Publication number
CN107587483A
CN107587483A CN201710772480.7A CN201710772480A CN107587483A CN 107587483 A CN107587483 A CN 107587483A CN 201710772480 A CN201710772480 A CN 201710772480A CN 107587483 A CN107587483 A CN 107587483A
Authority
CN
China
Prior art keywords
compound
slope
dam
transition materials
filled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710772480.7A
Other languages
Chinese (zh)
Inventor
张合作
湛正刚
程瑞林
蔡大咏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201710772480.7A priority Critical patent/CN107587483A/en
Publication of CN107587483A publication Critical patent/CN107587483A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of structure and its construction method that face dam bold shore slope is filled using compound, and it is to have filled compound (1), Transition Materials (2) and stockpile (3) successively along bold shore slope (4);The compound (1) is that proportionally mixing and decking and rolling are repaiied slope and constructed and form by the Transition Materials (2), cement and water.The compound has certain viscosity and drying property, beneficial to the density after rolling apparatus roller compaction construction and construction.Compound paves, rolls and can ensure the duration with dam embankment synchronous construction in work progress.Compound in the technical scheme can fully contact with bank slope, avoid the inhomogeneous deformation between dam body enrockment and side slope, it is therefore prevented that because rockfill deforms the excessive or uneven generation for causing dam body seepage system to be destroyed, ensure dam safety.

Description

A kind of structure and its construction method that face dam bold shore slope is filled using compound
Technical field
The invention belongs to Hydraulic and Hydro-Power Engineering rock-fill dams to handle technical field of construction.
Background technology
CFRD has obtained numerous Ba Gongzhuanjia's because of its good adaptability, economy and security Favor.With the extensive use of the dam type, some problems are also spilt cruelly in operation, as dam deformation is excessive or uneven causes Embankment seepage amount increase, rock enrockment deformation has a great impact to upstream impervious body, once later stage enrockment deform It is excessive, then phenomena such as panel and joint seal breakage occurs.Found in survey face dam construction, the pad of many engineerings Phenomena such as layered material cracking, panel and joint seal breakage, is concentrated mainly on a range of bold shore hillside fields band of toe slab downstream, studies carefully Its reason is mainly that bold shore slope and rockfill deformation are uneven caused, strain tree bridge, the Tianshengqiao-I face dam in such as China.
While the experience and lessons of above-mentioned engineering are used for reference, the treatment measures of the face dam design specification in China to steep slope section Carry out clearly:" rockfill in the range of 0.3 times~0.5 times height of dam of toe slab downstream should not have hinder the counter-slope that rolls of enrockment and Suddenly in 1:0.25 steep bank." in engineering construction after specification promulgation, in for similar abrupt slope and counter-slope position according to specification It is required that employing the mode of " fill concrete or stone masonry ", the uneven change between dam body and bank slope is preferably limited Shape, upstream bedding material cracking, panel and sealing caused by deformation are taken precautions against and have deformed excessive possibility.But found in construction, The mode of " fill concrete either stone masonry " need to could be to corresponding until dam embankment closes on elevation to steep bank or counter-slope The excavation at position, then carry out fill concrete or stone masonry processing.Meanwhile fill concrete scene needs shuttering, very To arrangement joint bar, the pollution stockpile that cement grout also can be different degrees of, its permeability is influenceed, its feasibility and security are deposited Certain the defects of;And stone masonry is the material that a kind of opposite concrete has economic advantages, but the time length that artificial heap is built, Influence to the dam filing duration is particularly evident." fill concrete or stone masonry " technologies that are all, being commonly used at present in engineering The progress of flood section is crossed on dam embankment and flood control by dam to be influenceed greatly, and construction interference is big, and economy has to be optimized, thereby increases and it is possible to dam Certain potential safety hazard be present in the draining in body downstream.
The content of the invention
It is an object of the invention to provide a kind of structure and its construction method that face dam bold shore slope is filled using compound, solution Certainly the backfill processing of periphery steep slope section and dam embankment rise simultaneously during Rockfill Dam, it is ensured that abrupt slope counter-slope section bank slope and Dam body enrockment forms effective supporter, ensures upstream impervious body structure safety.Optimize the construction investment at backfill position simultaneously, ensure Dam crosses flood section and fills completion on schedule, excludes the influence that backfill position is constructed to dam body downstream enrockment drainage performance.
What the present invention was realized in:
The present invention is a kind of structure that face dam bold shore slope is filled using compound first, including bold shore slope, the bold shore slope Slope ratio is suddenly in 1:0.25, or angle be more than 76 °, gradient height 3m and more than, filled compound, transition successively along bold shore slope Material and stockpile;Compound is that proportionally mixing and decking and rolling are repaiied slope and constructed and form by the Transition Materials, cement and water.Should Compound has certain viscosity and drying property, beneficial to the density after rolling apparatus roller compaction construction and construction.In work progress Middle compound paves, rolls and can ensure the duration with dam embankment synchronous construction.Compound in the technical scheme can be with Fully contacted with bank slope, avoid the inhomogeneous deformation between dam body enrockment and side slope, it is therefore prevented that because rockfill deformation it is excessive or The uneven generation for causing dam body seepage system to be destroyed of person, has ensured dam safety.
Wherein, 1.6 times of the paving thickness of the compound no more than maximum particle diameter;The paving thickness of Transition Materials be 1~ 2m.Transition Materials maximum particle diameter used in compound is 200mm~300mm, and the granule content less than 5mm is 155~30%, clay content Less than 8%.
The construction method of the above-mentioned structure that face dam bold shore slope is filled using compound is comprised the following steps:
S1, fill the scum silica frost, outwash and the cleaning for loosening block stone on region bold shore slope;
S2, in-site measurement need the bold shore slope regional edge boundary line backfilled, and rower of going forward side by side shows;
S3, Transition Materials are weighed, then require to weigh cement and water according to mix;
S4, cement and Transition Materials mix matching somebody with somebody, then volume ratio as requested adds water, and mix repeatedly, until mixing Compound dry and wet is uniform;
S5, it is transported to bold shore slope region after the compound mixed and stirred is loaded and starts to pave, shaken using same Transition Materials identical Dynamic stone roller compound is first answered it is quiet grind 2 times, then rolled using the stone roller that shakes according to Transition Materials requirement;For equipment roll less than Position should use it is small-sized voluntarily grind or hydraulic pressure tamping plate coordinate complete;
S6, after the completion of material placement grinding to be mixed, require to complete filling out for periphery Transition Materials and stockpile according to dam filing Build and roller compaction construction;
S7, above-mentioned construction process is repeated until terminating.
Wherein, mix described in S3 requirement be:By mass, in the product after the completion of mix, cement content 60kg ~100kg/m3, water content is 70~120kg/m3
The abrupt slope position that counter plate Rockfill Dam of the present invention fills scope is carried out using the mixing material of Transition Materials mixing Backfill rolls so that bank processing can ensure the duration of a project with dam embankment with synchronous construction.Mixing in the technical scheme Material can fully contact with bank slope, avoids and inhomogeneous deformation occurs between dam body enrockment and bank slope, it is therefore prevented that because enrockment deforms Cause the destruction of dam body seepage system, ensure dam safety.
Compound in the technical scheme is to use Transition Materials and the compound of cement mixing, more traditional concrete material Low with cement consumption, aggregate requirements are low, without formwork erection.Because cement content is low in compound, so cement stream will not occur Material pollution is filled caused by altering, there is preferable economy and security.The technical scheme construction technology is simple, can and dam body Synchronous rising is filled, has saved the duration.So technical scheme can ensure the safety of dam, save the duration, and have Effect reduces construction investment, has obvious economic benefit.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Description of reference numerals:1- compounds, 2- Transition Materials, 3- stockpiles, 4- bold shores slope.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples, but not as any limitation of the invention.
As shown in figure 1, this structure of the present invention, is to fill compound 1, Transition Materials 2 successively along bold shore slope 4 to dam outside With stockpile 3, wherein Transition Materials maximum particle diameter is generally 200mm~300mm used in compound 1, and the granule content less than 5mm is 155~30%, clay content is less than 8%.To ensure the caking property and drying property of compound, it is desirable to which the content of cement is in compound 60kg~100kg/m3, water is 70~120kg/m3, compound 1 fills width and cannot be less than 1.0m, when use machine spreading rolls When should meet mechanical execution width requirement.(slope ratio is suddenly in 1 for the bank slope that bold shore slope 4 refers in the range of Rockfill Dam:0.25 or angle Degree be more than 76 °) or adverse slope be higher than 3m.
Embodiment 1:
A kind of method that face dam bold shore slope is filled using compound, specific implementation are as follows:
(1) using the construction equipment such as artificial or live backhoe fill the scum silica frost on region bold shore slope 4, outwash and Loosen the cleaning of block stone.
(2) in-site measurement needs the regional edge boundary line of bold shore slope 4 backfilled, and rower of going forward side by side shows.
(3) suitable place is selected on the bedding plant periphery of Transition Materials 2, a number of Transition Materials 2 is weighed, then according to water Cement content 60kg~100kg/m3, 70~120kg/m of water3Mix require to weigh cement and water.
(4) mix matching somebody with somebody with backhoe and Transition Materials 2 after cement is manually unpacked first, mix pass about 5~9 times, with mixed The color of compound is substantially uniform, and then volume ratio as requested adds water, treats that water base immerses the mixed of Transition Materials 2 and cement Behind compound inside, with backhoe mix repeatedly, until mixture dry and wet is uniform.
(5) it is transported to the region of bold shore slope 4 after the compound 1 mixed and stirred is loaded to start to pave, paving thickness is no more than maximum 1.6 times of particle diameter, using the same identical vibrating roller of Transition Materials 2 compound is first answered it is quiet grind twice, then using the stone roller that shakes Rolled according to the requirement of Transition Materials 2.For equipment roll less than position should use it is small-sized voluntarily grind or hydraulic pressure tamping plate coordinate complete.
(6) after the completion of the placement grinding of material 1 to be mixed, require to complete periphery Transition Materials 2 and stockpile 3 according to dam filing Fill and roller compaction construction.The paving thickness of wherein Transition Materials 2 typically takes 1~2m, dam embankment and rolls parameter according to rule Model requirement.
(7) above-mentioned construction process is repeated until terminating.
Certainly, the above is the concrete application example of the present invention, and the present invention also has other embodiments, all using equivalent The technical scheme that replacement or equivalent transformation are formed, all falls within protection domain of the presently claimed invention.

Claims (5)

1. a kind of structure that face dam bold shore slope is filled using compound, including bold shore slope (4), bold shore slope (4) slope than suddenly in 1:0.25, or angle be more than 76 °, gradient height 3m and more than, it is characterised in that:Mixing has been filled successively along bold shore slope (4) Expect (1), Transition Materials (2) and stockpile (3);The compound (1) is proportionally mixed by the Transition Materials (2), cement and water Make and decking and rolling is repaiied slope and constructed and forms.
2. the structure according to claim 1 that face dam bold shore slope is filled using compound, it is characterised in that:The mixing Expect that the paving thickness of (1) is no more than 1.6 times of maximum particle diameter;The paving thickness of the Transition Materials (2) is 1~2m.
3. the structure according to claim 2 that face dam bold shore slope is filled using compound, it is characterised in that:The mixing Expect that Transition Materials (2) maximum particle diameter used in (1) is 200mm~300mm, the granule content less than 5mm is 155~30%, clay content Less than 8%.
4. the construction method of the structure that face dam bold shore slope is filled using compound according to claim 1,2 or 3, it is special Sign is that this method comprises the following steps:
S1, fill the scum silica frost, outwash and the cleaning for loosening block stone on region bold shore slope (4);
S2, in-site measurement need bold shore slope (4) the regional edge boundary line backfilled, and rower of going forward side by side shows;
S3, Transition Materials (2) are weighed, then require to weigh cement and water according to mix;
S4, cement and Transition Materials (2) mix matching somebody with somebody, then volume ratio as requested adds water, and mix repeatedly, until mix Thing dry and wet is uniform;
S5, it is transported to bold shore slope (4) region after the compound mixed and stirred (1) is loaded and starts to pave, using identical with Transition Materials (2) Vibrating roller compound (1) is first answered it is quiet grind 2 times, then rolled using the stone roller that shakes according to Transition Materials (2) requirement;For setting It is standby roll less than position should use small-sized voluntarily grind or hydraulic pressure tamping plate coordinates and completed;
S6, after the completion of material (1) placement grinding to be mixed, require to complete periphery Transition Materials (2) and stockpile (3) according to dam filing Fill and roller compaction construction;
S7, above-mentioned construction process is repeated until terminating.
5. the construction method of the structure according to claim 4 that face dam bold shore slope is filled using compound, its feature are existed In:Mix described in S3 requires:By mass, in the product after the completion of mix, cement content is 60kg~100kg/m3, Water content is 70~120kg/m3
CN201710772480.7A 2017-08-31 2017-08-31 A kind of structure and its construction method that face dam bold shore slope is filled using compound Pending CN107587483A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710772480.7A CN107587483A (en) 2017-08-31 2017-08-31 A kind of structure and its construction method that face dam bold shore slope is filled using compound

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710772480.7A CN107587483A (en) 2017-08-31 2017-08-31 A kind of structure and its construction method that face dam bold shore slope is filled using compound

Publications (1)

Publication Number Publication Date
CN107587483A true CN107587483A (en) 2018-01-16

Family

ID=61050657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710772480.7A Pending CN107587483A (en) 2017-08-31 2017-08-31 A kind of structure and its construction method that face dam bold shore slope is filled using compound

Country Status (1)

Country Link
CN (1) CN107587483A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109338999A (en) * 2018-10-22 2019-02-15 中水电第十工程局(郑州)有限公司 Using the construction method of cement sand and gravel processing side slope in a kind of rock
CN111636385A (en) * 2020-06-15 2020-09-08 大连理工大学 Structure for preventing concrete dam bank slope dam section fracture water leakage

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195025A (en) * 2013-04-12 2013-07-10 中国水电顾问集团北京勘测设计研究院 Cracking protection method for concrete dams
CN103790166A (en) * 2014-01-25 2014-05-14 西安科技大学 Method for treating foundation of loess area saturated zone slope filling and digging joint part
CN105386448A (en) * 2015-10-08 2016-03-09 中国水利水电第十二工程局有限公司 Filling construction method for backward slope in rock-fill dam slope treatment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195025A (en) * 2013-04-12 2013-07-10 中国水电顾问集团北京勘测设计研究院 Cracking protection method for concrete dams
CN103790166A (en) * 2014-01-25 2014-05-14 西安科技大学 Method for treating foundation of loess area saturated zone slope filling and digging joint part
CN105386448A (en) * 2015-10-08 2016-03-09 中国水利水电第十二工程局有限公司 Filling construction method for backward slope in rock-fill dam slope treatment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何无产等: "《高寒地区混凝土面板堆石坝建设经验技术研讨会论文集》", 30 August 2013 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109338999A (en) * 2018-10-22 2019-02-15 中水电第十工程局(郑州)有限公司 Using the construction method of cement sand and gravel processing side slope in a kind of rock
CN111636385A (en) * 2020-06-15 2020-09-08 大连理工大学 Structure for preventing concrete dam bank slope dam section fracture water leakage

Similar Documents

Publication Publication Date Title
JP6841964B2 (en) Construction method of combined dam
CN107746223A (en) A kind of RCCD and its construction method
CN106192907B (en) Add the construction method of 150m~300m grade high concrete panel rock-fill dams of cement sand and gravel structure sheaf
CN104005539B (en) Larger area ground concrete jointless construction technique
CN106242482B (en) High fluidity hydraulic fill sea mud antiseepage curing materials and preparation method thereof
CN203546678U (en) Asphalt concrete core-wall rockfill dam structure
CN110578290A (en) Abutment back backfilling structure of bridgehead and construction method thereof
CN108049271B (en) Soft foundation treatment construction process
CN108442724B (en) Earthen site crack repairing method
CN107587483A (en) A kind of structure and its construction method that face dam bold shore slope is filled using compound
CN205576857U (en) Be suitable for hydraulic and hydroelectric engineering's super high enrockment dam structure
CN106087880B (en) A kind of dam that 300 meter level is high and its construction technology
CN103215950B (en) Pile foundation extension construction method in backfilling area
CN205917662U (en) Prevent concrete face rockfill dam that ftractures
CN214530810U (en) Dampproof course suitable for building ground
CN207537986U (en) A kind of structure that face dam bold shore slope is filled using mixture
CN108439867A (en) Using the rock-fill dams and its construction method of seamless panel
CN105780737A (en) Super-high rockfill dam structure suitable for water conservancy and hydropower engineering and construction method of dam structure
CN103866775A (en) Protection method of cold region dispersive soil side slope
CN111908853A (en) Self-compacting soil, preparation method thereof and construction method for backfilling municipal cavity
CN102535493B (en) Method for constructing inverted type foundation beam
CN207619863U (en) A kind of box culvert backfill structure
CN104775414A (en) Super-soft dredger fill surface layer solidification crusting and foundation treatment method
CN213115347U (en) Dampproof ground
CN103061352A (en) Salt lake region bridge foundation concrete anticorrosion structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180116