CN104294771A - Square prefabricated reinforced concrete culvert - Google Patents

Square prefabricated reinforced concrete culvert Download PDF

Info

Publication number
CN104294771A
CN104294771A CN201410510947.7A CN201410510947A CN104294771A CN 104294771 A CN104294771 A CN 104294771A CN 201410510947 A CN201410510947 A CN 201410510947A CN 104294771 A CN104294771 A CN 104294771A
Authority
CN
China
Prior art keywords
concrete prefabricated
cell body
pipe
prefabricated pipe
junction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410510947.7A
Other languages
Chinese (zh)
Inventor
钟景尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410510947.7A priority Critical patent/CN104294771A/en
Publication of CN104294771A publication Critical patent/CN104294771A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a square prefabricated reinforced concrete culvert. The square prefabricated reinforced concrete culvert is formed by connecting a plurality of prefabricated concrete pipes in a butt joint mode. The cross section of each prefabricated concrete pipe is square. Each prefabricated concrete pipe is formed by connecting a large half groove body with a small half groove body through a transverse arc-shaped bolt, wherein the portion, close to the joint of the large half groove body and the small half groove body, of the inner wall of the large half groove body and the portion, close to the joint of the large half groove body and the small half groove body, of the inner wall of the small half groove body are correspondingly provided with a plurality of grooves at intervals, the portion, close to the joint, of the side wall in each groove is provided with a through hole, and the transverse arc-shaped bolt penetrates into the opposite through holes in the large half groove body and the small half groove body. Every two adjacent prefabricated concrete pipes are connected through longitudinal arc-shaped bolts. By adopting the structure that the grooves formed in the inner walls are matched with the transverse arc-shaped bolts, great convenience is brought to construction, particularly, connection through the longitudinal arc-shaped bolts is more convenient, and the connecting firmness of the prefabricated concrete pipes is greatly improved.

Description

Reinforced concrete prefabricated square culvert
Technical field
The present invention relates to a kind of culvert, specifically a kind of culvert of reinforced concrete.
Background technology
In underground construction, always need to make culvert with RC circular pipe splicing, these culverts are in underground, often will resist the pressure that many factors brings, and keep the safety in space in the intact of body and pipe.Pipe culvert in Practical Project is that job site is built, and needs to take a lot of place, affects greatly by weather, technical level etc., and it is very inconvenient to make; Pipe culvert aequum is very big, and concrete setting required time is long, and operation is many and complete a step and could start next step, seriously delays the duration; The most important thing is, the conditions such as field conditions, equipment, technology can not be perfect, and end product quality is uneven, and safety can not ensure.By this, design a kind of prefabricated pipe culvert that splicing directly uses at the scene that can be prefabricated in the factory to be necessary.
It is CN203080430U that State Intellectual Property Office discloses publication number on July 24th, 2013, patent name is a kind of patent document assembling the prefabricated cast culvert of cast-in-place Combined reinforced concrete, the invention discloses, it is characterized in that: be made up of cast-in-place basis and prefabricated pipe culvert, cast-in-place basis arranges base plate on bed course; Prefabricated pipe culvert is arranged along the longitudinal divisions of culvert, and each section of prefabricated pipe culvert is longitudinally adjacent one another are along culvert; Prefabricated pipe culvert is arranged on bed course, and in the soleplate pre-buried with the bottom reinforcement bars of prefabricated pipe culvert.Invention increases workmanship, reduce construction cost and shorten the engineering time.
There is the difference of essence in the connected mode of the connection between each section of the culvert of above-mentioned patent and each several part of every section and this patent.
Summary of the invention
The object of the invention is to overcome deficiency of the prior art, a kind of convenient transport and construction and installation are provided and make the reinforced concrete prefabricated square culvert of raising efficiency of construction.
For achieving the above object, the technical solution adopted in the present invention is:
Reinforced concrete prefabricated square culvert, it is docked by the concrete prefabricated pipe of more piece to form, the cross section of described concrete prefabricated pipe is square, often saving concrete prefabricated pipe is be connected by arc cross bolts with smaller part cell body by more than half cell body, multiple groove is intervally distributed with on the inwall of described more than half cell body and smaller part cell body and near the junction correspondence of more than half cell body and smaller part cell body, sidewall near junction in described groove is provided with through hole, is installed with described arc cross bolts in the described through hole that more than half cell body is relative with on smaller part cell body.
Described groove is V-shaped groove.
The junction of described more than half cell body and smaller part cell body is provided with weather strip or adhesive tape.
The surface of the junction of described more than half cell body and smaller part cell body is respectively equipped with the groove and projection that plug.
Connected by arc longitudinal bolt between adjacent described concrete prefabricated pipe, circumferentially multiple V-shaped groove is intervally distributed with respectively on the inwall of described concrete prefabricated pipe and near the two ends of concrete prefabricated pipe, the sidewall of the end near concrete prefabricated pipe in described V-shaped groove is provided with through hole, is installed with described arc longitudinal bolt in described through hole relative on adjacent described concrete prefabricated pipe.
The junction of adjacent described concrete prefabricated pipe is provided with weather strip or adhesive tape.
The surface of the junction of adjacent described concrete prefabricated pipe is respectively equipped with the groove and projection that plug.
More than half cell body in the seam of the more than half cell body in described concrete prefabricated pipe and smaller part cell body junction and adjacent concrete prefabricated pipe and the seam of smaller part cell body junction are staggered.
The tube wall of described concrete prefabricated pipe is reserved with longitudinal hole, can prestressed steel strand in described longitudinal hole, concrete prefabricated for more piece pipe is anchored at together by prestress wire, to increase the rigidity of square culvert.
Beneficial effect of the present invention: due to the form of structure adopting the above-mentioned groove opened on internal face to match with arc cross bolts, when the more than half cell body often saved in concrete prefabricated pipe and smaller part cell body are connected, first more than half cell body loop wheel machine can be hung in the physical location in the foundation trench of job site, the installation that constructor can carry out arc cross bolts in more than half cell body connects, therefore greatly facilitate construction, change existing first combination and the time-consuming form of construction work of the effort that hangs in physical location in foundation trench is again installed; Especially when carrying out the connection between adjacent described concrete prefabricated pipe, when utilizing arc longitudinal bolt to connect, convenient, not only two sides can be connected with end face, also can connect between bottom surface, also substantially increase the fastness connected between adjacent concrete prefabricated pipe.
In addition, the present invention has following characteristics: easy to use, number of assembling steps is few, become pipe quick, required manpower and materials are few, do not need cast in situs, eliminate place, saved cost, control quality, maintain the clean of place, the most important thing is to save the plenty of time than conventional method, substantially increase the progress of pipe culvert engineering, bring the change of reform property to industry; And can manufacture.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail:
Fig. 1 is fragmentary sectional view of the present invention;
Fig. 2 is the lateral view shown in Fig. 1;
Fig. 3 is the enlarged drawing at the place of B shown in Fig. 2;
Fig. 4 is the enlarged drawing at the place of A shown in Fig. 1.
In figure: 1, concrete prefabricated pipe; 2, more than half cell body; 3, smaller part cell body; 4, arc cross bolts; 5, groove; 6, through hole; 7, weather strip; 8, groove; 9, protruding; 10, arc longitudinal bolt; 11, V-shaped groove; 12, through hole; 13, weather strip; 14, groove; 15, protruding; 16, seam; 17, seam.
Detailed description of the invention
As shown in Figure 1, 2, 3, reinforced concrete prefabricated square culvert, it is docked by the concrete prefabricated pipe 1 of more piece to form, the cross section of described concrete prefabricated pipe 1 is square, often saving concrete prefabricated pipe 1 is be connected by arc cross bolts 4 with smaller part cell body 3 by more than half cell body 2, be intervally distributed with multiple groove 5 on the inwall of described more than half cell body 2 and smaller part cell body 3 and near the junction correspondence of more than half cell body and smaller part cell body, described groove 5 is V-shaped groove.Sidewall near junction in described groove 5 is provided with through hole 6, is installed with described arc cross bolts 4 in the described through hole that more than half cell body 2 is relative with on smaller part cell body 3.The junction of described more than half cell body and smaller part cell body is provided with weather strip 7.The surface of the junction of described more than half cell body 2 and smaller part cell body 3 is respectively equipped with the groove 8 and protruding 9 plugged.
As shown in Fig. 1,4, connected by arc longitudinal bolt 10 between adjacent described concrete prefabricated pipe 1, multiple V-shaped groove 11 is circumferentially intervally distributed with respectively on the inwall of described concrete prefabricated pipe 1 and near the two ends of concrete prefabricated pipe, the sidewall of the end near concrete prefabricated pipe in described V-shaped groove 11 is provided with through hole 12, is installed with described arc longitudinal bolt 10 in described through hole 12 relative on adjacent described concrete prefabricated pipe.The junction of adjacent described concrete prefabricated pipe 1 is provided with weather strip 13.The surface of the junction of adjacent described concrete prefabricated pipe is respectively equipped with the groove 14 and protruding 15 plugged.The seam 16 of the more than half cell body in described concrete prefabricated pipe 1 and smaller part cell body junction is staggered with the seam 17 of the more than half cell body in adjacent concrete prefabricated pipe and smaller part cell body junction.
In addition, the tube wall of described concrete prefabricated pipe is reserved with longitudinal hole (not shown), can prestressed steel strand in described longitudinal hole, concrete prefabricated for more piece pipe is anchored at together by prestress wire, to increase the rigidity of square culvert.
Concrete construction method of the present invention, comprises the following steps:
S0, dig foundation trench at the construction field (site), flat good substrate, carries out cure process.
S1, in foundation trench, often will save the alignment of two parts up and down of concrete prefabricated pipe with loop wheel machine, and the two-part projection with shearing resistance effect to be docked one by one with groove;
S2, the arc cross bolts of junction to be strained, complete the installation of this complete pipe.
S3, repeat S1, S2, complete the installation that next saves concrete prefabricated pipe, note allowing the seam staggered positions of the seam of this pipe and upper pipe joint.
S4, front and back two are managed end to end, the projection with shearing resistance effect are docked one by one with groove, the arc longitudinal bolt of tension joining place;
S5, repetition S1, S2, S3 and S4 several times, form the pipe culvert of appropriate length.Can to connect some joint concrete pipe according to putting on needed for situation steel strand;
S6, repetition S5, couple together with cast-in-situ concrete between some sections of pipe culverts, or arrange shrinkage joint at this.
By this, in embodiments of the present invention, described reinforced concrete prefabricated square culvert, easy to use, number of assembling steps is few, become pipe quick, required manpower and materials are few, do not need cast in situs, eliminate place, saved cost, control quality, maintain the clean of place, the most important thing is to save the plenty of time than conventional method, substantially increase the progress of pipe culvert engineering, bring the change of reform property to industry;
And the present invention produces in batches in factory, cost reduces, quality assurance.Arch screw bolt is that tunnel construction is applied always, does not need special, produces more easy with low cost, has larger application value, greatly will promote the development of industry.
The above is the preferred embodiment of the present invention; certainly the interest field of the present invention can not be limited with this; should be understood that; for those skilled in the art; technical scheme of the present invention is modified or equivalent replacement, do not depart from the protection domain of technical solution of the present invention.

Claims (9)

1. a reinforced concrete prefabricated square culvert, it is characterized in that: it is docked by the concrete prefabricated pipe of more piece to form, the cross section of described concrete prefabricated pipe is square, often saving concrete prefabricated pipe is be connected by arc cross bolts with smaller part cell body by more than half cell body, multiple groove is intervally distributed with on the inwall of described more than half cell body and smaller part cell body and near the junction correspondence of more than half cell body and smaller part cell body, sidewall near junction in described groove is provided with through hole, described arc cross bolts is installed with in the described through hole that more than half cell body is relative with on smaller part cell body.
2. reinforced concrete prefabricated square culvert according to claim 1, is characterized in that: described groove is V-shaped groove.
3. reinforced concrete prefabricated square culvert according to claim 1, is characterized in that: the junction of described more than half cell body and smaller part cell body is provided with weather strip or adhesive tape.
4. reinforced concrete prefabricated square culvert according to claim 1, is characterized in that: the surface of the junction of described more than half cell body and smaller part cell body is respectively equipped with the groove and projection that plug.
5. the reinforced concrete prefabricated square culvert according to any one of Claims 1-4, it is characterized in that: connected by arc longitudinal bolt between adjacent described concrete prefabricated pipe, circumferentially multiple V-shaped groove is intervally distributed with respectively on the inwall of described concrete prefabricated pipe and near the two ends of concrete prefabricated pipe, the sidewall of the end near concrete prefabricated pipe in described V-shaped groove is provided with through hole, is installed with described arc longitudinal bolt in described through hole relative on adjacent described concrete prefabricated pipe.
6. reinforced concrete prefabricated square culvert according to claim 5, is characterized in that: the junction of adjacent described concrete prefabricated pipe is provided with weather strip or adhesive tape.
7. reinforced concrete prefabricated square culvert according to claim 5, is characterized in that: the surface of the junction of adjacent described concrete prefabricated pipe is respectively equipped with the groove and projection that plug.
8. reinforced concrete prefabricated square culvert according to claim 5, is characterized in that: the more than half cell body in the seam of the more than half cell body in described concrete prefabricated pipe and smaller part cell body junction and adjacent concrete prefabricated pipe and the seam of smaller part cell body junction are staggered.
9. reinforced concrete prefabricated square culvert according to claim 5, it is characterized in that: the tube wall of described concrete prefabricated pipe is reserved with longitudinal hole, can prestressed steel strand in described longitudinal hole, concrete prefabricated for more piece pipe is anchored at together by prestress wire.
CN201410510947.7A 2014-09-29 2014-09-29 Square prefabricated reinforced concrete culvert Pending CN104294771A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410510947.7A CN104294771A (en) 2014-09-29 2014-09-29 Square prefabricated reinforced concrete culvert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410510947.7A CN104294771A (en) 2014-09-29 2014-09-29 Square prefabricated reinforced concrete culvert

Publications (1)

Publication Number Publication Date
CN104294771A true CN104294771A (en) 2015-01-21

Family

ID=52314701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410510947.7A Pending CN104294771A (en) 2014-09-29 2014-09-29 Square prefabricated reinforced concrete culvert

Country Status (1)

Country Link
CN (1) CN104294771A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986825A (en) * 2015-02-06 2016-10-05 大连中南维拓资源与环境技术研究有限公司 Arc-shaped underground shielding assembling concrete prefabricated square culvert
RU2610955C2 (en) * 2015-07-17 2017-02-17 Федеральное государственное бюджетное образовательное учреждение высшего образования "Уральский государственный университет путей сообщения" ( УрГУПС ) Culvert
CN106869174A (en) * 2017-04-18 2017-06-20 黑龙江省中信路桥材料有限公司 A kind of U-shaped Combined type concrete prefabricated box culvert
CN107366258A (en) * 2017-08-31 2017-11-21 中国电建集团贵阳勘测设计研究院有限公司 Using Precast Gallery structure and implementation method in the RCCD snapped connection
CN113756215A (en) * 2021-09-29 2021-12-07 山东泰东公路工程有限公司 Bridge and tunnel culvert prefabricated part and construction process
CN114457845A (en) * 2020-11-10 2022-05-10 内蒙古中朵远大建筑工业有限公司 Prefabricated part, assembly socket type square pipe culvert and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4940359A (en) * 1989-02-17 1990-07-10 Aco Polymer Products, Inc. Chemical safety conduit or trench
CN1102456A (en) * 1993-05-11 1995-05-10 东京瓦斯株式会社 Tunnel liner, its fabrication method, and its fabrication apparatus
JPH08296399A (en) * 1995-04-24 1996-11-12 Kyoritsu Kagaku Sangyo Kk Embedment method for joint groove in underground pipeline
KR20000040158A (en) * 1998-12-17 2000-07-05 박병무 Assembled type culvert unit
CN102425124A (en) * 2011-09-30 2012-04-25 江苏江扬建材机械有限公司 Prefabricated reinforced concrete box culvert
CN203080430U (en) * 2013-03-19 2013-07-24 中铁二十四局集团安徽工程有限公司 Assembly and cast-in-place combined type reinforced concrete pipe type culvert
CN103953359A (en) * 2014-05-12 2014-07-30 大连中南维拓资源与环境技术研究有限公司 Underground shield-assembling concrete precast square culvert
CN204097891U (en) * 2014-09-29 2015-01-14 钟景尧 Reinforced concrete prefabricated square culvert

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4940359A (en) * 1989-02-17 1990-07-10 Aco Polymer Products, Inc. Chemical safety conduit or trench
CN1102456A (en) * 1993-05-11 1995-05-10 东京瓦斯株式会社 Tunnel liner, its fabrication method, and its fabrication apparatus
JPH08296399A (en) * 1995-04-24 1996-11-12 Kyoritsu Kagaku Sangyo Kk Embedment method for joint groove in underground pipeline
KR20000040158A (en) * 1998-12-17 2000-07-05 박병무 Assembled type culvert unit
CN102425124A (en) * 2011-09-30 2012-04-25 江苏江扬建材机械有限公司 Prefabricated reinforced concrete box culvert
CN203080430U (en) * 2013-03-19 2013-07-24 中铁二十四局集团安徽工程有限公司 Assembly and cast-in-place combined type reinforced concrete pipe type culvert
CN103953359A (en) * 2014-05-12 2014-07-30 大连中南维拓资源与环境技术研究有限公司 Underground shield-assembling concrete precast square culvert
CN204097891U (en) * 2014-09-29 2015-01-14 钟景尧 Reinforced concrete prefabricated square culvert

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986825A (en) * 2015-02-06 2016-10-05 大连中南维拓资源与环境技术研究有限公司 Arc-shaped underground shielding assembling concrete prefabricated square culvert
RU2610955C2 (en) * 2015-07-17 2017-02-17 Федеральное государственное бюджетное образовательное учреждение высшего образования "Уральский государственный университет путей сообщения" ( УрГУПС ) Culvert
CN106869174A (en) * 2017-04-18 2017-06-20 黑龙江省中信路桥材料有限公司 A kind of U-shaped Combined type concrete prefabricated box culvert
CN107366258A (en) * 2017-08-31 2017-11-21 中国电建集团贵阳勘测设计研究院有限公司 Using Precast Gallery structure and implementation method in the RCCD snapped connection
CN114457845A (en) * 2020-11-10 2022-05-10 内蒙古中朵远大建筑工业有限公司 Prefabricated part, assembly socket type square pipe culvert and construction method thereof
CN113756215A (en) * 2021-09-29 2021-12-07 山东泰东公路工程有限公司 Bridge and tunnel culvert prefabricated part and construction process

Similar Documents

Publication Publication Date Title
CN104294771A (en) Square prefabricated reinforced concrete culvert
KR101069705B1 (en) Method for installing waterproofing steel plate in construction of undergound tunnel
CN103982199B (en) Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking
KR101179770B1 (en) Soil protection against build structure and the method
CN104790974A (en) City subway overlapped shield tunnel segment structure adopting special longitudinal connecting pieces
KR101278687B1 (en) Box-type thrust tube structure, and method of building underground structure using the box-type thrust tube structure
CN109356183B (en) Open caisson reserved hole plugging structure and construction method thereof
CN204097891U (en) Reinforced concrete prefabricated square culvert
JP2015001129A (en) Method and structure for connection of curved precast members with each other
KR20090114863A (en) Parallelly connected iron tube and construction method for underground structure using the same
JP4625796B2 (en) Multiple arc tunnel connection structure and construction method
KR101069702B1 (en) Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel
KR101312663B1 (en) Non-excavation type constructed tunnels and conduits using arc-shaped divided segments or rugged panels and its constructing method thereof
KR20130014160A (en) The tunel execution method
KR101638478B1 (en) Joint structure for perpendicular hall and horizontal hall
KR101312668B1 (en) Non-excavation type constructed tunnels and conduits using arc-shaped divided segments or rugged panels and its constructing method thereof
KR101567742B1 (en) PHC pile and construction method of underground structure using the same
KR200407437Y1 (en) Construction establishment method and the structure for underground tunnel formation
KR102310091B1 (en) Underground structure installation method that does not require the installation of temporary pillars
KR101275468B1 (en) The structure assembly for building a tunnel and building method thereof
CN214787400U (en) Mine roadway reservation structure adopting cemented filling mining method
KR101662096B1 (en) The Construction Method of Non-excavation tunnel what press in extruding Steel pipe by Arch type Precast Upperslab
CN109371984B (en) Assembled recyclable deep foundation pit supporting system and construction process thereof
CN206092009U (en) A convenient to detach component for underground works prefab
JP2010095907A (en) Reinforcing structure and reinforcing method for existing foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150121

RJ01 Rejection of invention patent application after publication