CN212388718U - Main structure of green assembly type building - Google Patents

Main structure of green assembly type building Download PDF

Info

Publication number
CN212388718U
CN212388718U CN202020514248.0U CN202020514248U CN212388718U CN 212388718 U CN212388718 U CN 212388718U CN 202020514248 U CN202020514248 U CN 202020514248U CN 212388718 U CN212388718 U CN 212388718U
Authority
CN
China
Prior art keywords
base
wall body
building
groove
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020514248.0U
Other languages
Chinese (zh)
Inventor
黄甫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiafeng Construction Co ltd
Original Assignee
Jiafeng Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiafeng Construction Co ltd filed Critical Jiafeng Construction Co ltd
Priority to CN202020514248.0U priority Critical patent/CN212388718U/en
Application granted granted Critical
Publication of CN212388718U publication Critical patent/CN212388718U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a major structure of green assembled building, including building base and building wall, the building base includes first base and second base, the building wall includes straight face wall body and a roll over a wall body, the first fixture block of upper surface difference fixedly connected with and second fixture block of first base and second base, first draw-in groove and second draw-in groove have been seted up respectively to straight face wall body and the surface of a roll over a wall body, the both ends of straight face wall body are provided with first spout and first slider respectively, the both ends of a roll over a wall body are provided with second spout and second slider respectively. This major structure of green assembly type structure through the setting of first base, second base, straight wall body and a wall body, makes things convenient for the installation of assembly type structure base and wall body on the one hand, labour saving and time saving, and work efficiency is high, and on the other hand can arrange the combination according to actual place demand to base and wall body.

Description

Main structure of green assembly type building
Technical Field
The utility model relates to an assembly type structure technical field specifically is a green assembly type structure's major structure.
Background
For traditional cast-in-place reinforced concrete and masonry building, the prefabricated assembly building adopts a mode that the building components including beams, plates, columns, outer walls and the like are prefabricated in factory production, and the prefabricated assembly building is transported to a building mode of completing on-site installation and construction after maintenance and acceptance, and the existing main structure of the prefabricated assembly building is not mature, is not very convenient when the prefabricated assembly building is installed, and needs a large amount of time when the prefabricated assembly building is installed.
Traditional assembled building major structure, the prefab is various, is unsuitable for batch production in the time of making, when installing assembled building main part, installs inconveniently on the one hand, and on the other hand can not arrange the combination according to different place demands, has increased assembled building main part's installation time, has wasted a large amount of manpowers simultaneously, and to a great extent has reduced the work efficiency of installation, consequently, needs the major structure of a green assembled building.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a green assembly type structure's major structure has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a major structure of green assembled building, includes building base and building wall, the building base includes first base and second base, building wall includes straight face wall body and rolls over a wall body, the first fixture block of last fixed surface of first base is connected with, the last fixed surface of second base is connected with the second fixture block, first draw-in groove has all been seted up to the top and the bottom of straight face wall body, roll over the top and the bottom of a wall body and all seted up the second draw-in groove, first spout has been seted up to the one end of straight face wall body, the first slider of other end fixedly connected with of straight face wall body, roll over the one end of a wall body and seted up the second spout, roll over the other end fixedly connected with second slider of a wall body.
Optionally, the first clamping block is matched with the first clamping groove.
Optionally, the second fixture block is matched with the second fixture groove.
Optionally, the first sliding groove and the second sliding groove are matched with the first sliding block and the second sliding block.
Optionally, rubber bumps are arranged on the surfaces of the first clamping block and the second clamping block, grooves are formed in the inner walls of the first clamping groove and the second clamping groove, and the rubber bumps are matched with the grooves.
(III) advantageous effects
The utility model provides a major structure of green assembly type structure possesses following beneficial effect:
1. this major structure of green assembled building through the setting of first base, second base, straight wall body and a wall body, conveniently carries out mass production to the prefab, can arrange the combination according to actual place demand to the prefab moreover.
2. This major structure of green assembled building through the setting of first fixture block and first draw-in groove, conveniently docks straight a wall body and first base, through the setting of second fixture block and second draw-in groove, conveniently docks a wall body and a second base, through the setting of first spout, first slider, second spout and second slider, conveniently straightens the concatenation of a wall body and a wall body to reach the mesh of easy to assemble, improve work efficiency.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the split structure of the building base and the building wall of the present invention;
FIG. 3 is a schematic view of the bottom structure of the building wall of the present invention;
FIG. 4 is a schematic structural view of the straight wall of the present invention;
FIG. 5 is a schematic structural view of the folded wall of the present invention;
fig. 6 is a schematic view of a connection structure between the first clamping block and the first clamping groove of the present invention.
In the figure: 1. a building base; 101. a first base; 102. a second base; 2. building a wall body; 201. a straight wall body; 202. a folded wall body; 3. a first clamping block; 4. a second fixture block; 5. a first card slot; 6. a second card slot; 7. a first chute; 8. a first slider; 9. a second chute; 10. a second slider; 11. a rubber bump; 12. and (4) a groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 6, the present invention provides a technical solution: a main body structure of a green environment-friendly assembly type building comprises a building base 1 and a building wall body 2, wherein the building base 1 comprises a first base 101 and a second base 102, the building wall body 2 comprises a straight wall body 201 and a folded wall body 202, the prefabricated parts can be conveniently produced in large batch through the arrangement of the first base 101, the second base 102, the straight wall body 201 and the folded wall body 202, and can be matched and combined according to actual site requirements, a first clamping block 3 is fixedly connected to the upper surface of the first base 101, a second clamping block 4 is fixedly connected to the upper surface of the second base 102, first clamping grooves 5 are respectively arranged at the top and the bottom of the straight wall body 201, second clamping grooves 6 are respectively arranged at the top and the bottom of the folded wall body 202, the first clamping block 3 is matched with the first clamping groove 5, the second clamping block 4 is matched with the second clamping groove 6, and through the arrangement of the first clamping block 3 and the first clamping groove 5, the straight wall 201 and the first base 101 are convenient to butt, the folded wall 202 and the second base 102 are convenient to butt through the arrangement of the second clamping block 4 and the second clamping groove 6, so that the aim of convenient installation is achieved, the surfaces of the first clamping block 3 and the second clamping block 4 are respectively provided with the rubber bump 11, the inner walls of the first clamping groove 5 and the second clamping groove 6 are respectively provided with the groove 12, the rubber bump 11 is matched with the groove 12, the tightness of combination can be improved when the clamping blocks are in butt joint with the clamping grooves through the arrangement of the rubber bump 11 and the groove 12, one end of the straight wall 201 is provided with the first sliding groove 7, the other end of the straight wall 201 is fixedly connected with the first sliding block 8, one end of the folded wall 202 is provided with the second sliding groove 9, the other end of the folded wall 202 is fixedly connected with the second sliding block 10, the first sliding groove 7 and the second sliding groove 9 are both matched with the first sliding block 8 and the second sliding block 10, through the arrangement of the first sliding groove 7, the first sliding block 8, the second sliding groove 9 and the second sliding block 10, the straight wall body 201 and the folded wall body 202 can be spliced conveniently, and the purpose of convenient installation is achieved.
To sum up, this major structure of green assembled building, through first base 101, second base 102, straight face wall 201 and the setting of a wall 202, conveniently carry out mass production to the prefab, and can arrange the combination according to the actual place demand to the prefab, through the setting of first fixture block 3 with first draw-in groove 5, conveniently dock straight face wall 201 with first base 101, through the setting of second fixture block 4 with second draw-in groove 6, conveniently dock a wall 202 with second base 102, through first spout 7, first slider 8, the setting of second spout 9 and second slider 10, make things convenient for the concatenation of straight face wall 201 and a wall 202, thereby reach the mesh of easy to assemble.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a major structure of green assembled building, includes building base (1) and building wall (2), its characterized in that: the building base (1) comprises a first base (101) and a second base (102), the building wall (2) comprises a straight wall (201) and a folded wall (202), a first clamping block (3) is fixedly connected to the upper surface of the first base (101), a second clamping block (4) is fixedly connected to the upper surface of the second base (102), the top and the bottom of the straight wall body (201) are both provided with a first clamping groove (5), the top and the bottom of the folded wall body (202) are both provided with a second clamping groove (6), one end of the straight wall body (201) is provided with a first sliding chute (7), the other end of the straight wall body (201) is fixedly connected with a first sliding block (8), and a second sliding groove (9) is formed in one end of the folded wall (202), and a second sliding block (10) is fixedly connected to the other end of the folded wall (202).
2. The main structure of a green environmental-friendly fabricated building according to claim 1, wherein: the first clamping block (3) is matched with the first clamping groove (5).
3. The main structure of a green environmental-friendly fabricated building according to claim 1, wherein: the second clamping block (4) is matched with the second clamping groove (6).
4. The main structure of a green environmental-friendly fabricated building according to claim 1, wherein: the first sliding groove (7) and the second sliding groove (9) are matched with the first sliding block (8) and the second sliding block (10).
5. The main structure of a green environmental-friendly fabricated building according to claim 1, wherein: the surface of the first clamping block (3) and the surface of the second clamping block (4) are both provided with rubber bumps (11), the inner walls of the first clamping groove (5) and the second clamping groove (6) are both provided with grooves (12), and the rubber bumps (11) are matched with the grooves (12).
CN202020514248.0U 2020-04-10 2020-04-10 Main structure of green assembly type building Active CN212388718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020514248.0U CN212388718U (en) 2020-04-10 2020-04-10 Main structure of green assembly type building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020514248.0U CN212388718U (en) 2020-04-10 2020-04-10 Main structure of green assembly type building

Publications (1)

Publication Number Publication Date
CN212388718U true CN212388718U (en) 2021-01-22

Family

ID=74257577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020514248.0U Active CN212388718U (en) 2020-04-10 2020-04-10 Main structure of green assembly type building

Country Status (1)

Country Link
CN (1) CN212388718U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116145884A (en) * 2023-01-04 2023-05-23 安徽省润乾节能建材科技股份有限公司 Autoclaved aerated block convenient to splice and production process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116145884A (en) * 2023-01-04 2023-05-23 安徽省润乾节能建材科技股份有限公司 Autoclaved aerated block convenient to splice and production process thereof

Similar Documents

Publication Publication Date Title
CN205976072U (en) Assembly type structure wall body and prefabricated concrete structure
CN107687210A (en) A kind of method of construction of full prefabricated buildings
CN212388718U (en) Main structure of green assembly type building
CN210622306U (en) Assembly type floor post-cast strip template splicing structure
CN108130950A (en) A kind of component component of assembled arthitecutral structure and include its building
CN208380099U (en) Concrete casting device
CN212427508U (en) Dry-type connected node of assembled concrete beam column
CN213391541U (en) Assembled enclosure structure
CN209779560U (en) Steel formwork for irrigation and water conservancy concrete channel
CN111809729A (en) Dry-type connected node of assembled concrete beam column
CN111519659A (en) Integrated comprehensive pipe gallery
CN110273506A (en) Brick body, wall and building body
CN215055316U (en) Primary and secondary beam node post-cast section template device
CN211548336U (en) Concrete hollow block product group special for assembled reinforced block masonry wall structure
CN208346844U (en) A kind of assembly concrete retaining wall
CN210507501U (en) Novel finished product prefabricated brick fetal membrane assembly structure
CN207453108U (en) A kind of full prefabricated buildings system
CN110593302A (en) Basic device for supporting heavy-load equipment of transformer substation and assembly method
CN205976361U (en) Prefabricated type elevartor shaft
CN110374241A (en) A kind of floor bottom mould block, floor and the method for constructing floor
CN209837448U (en) Assembled building block wall outer wall high-precision interlocking alignment building block
CN111236482A (en) Fabricated concrete slab wall structure reinforcing steel bar avoidance and reinforced connection linear node
CN214658051U (en) Novel combination of cement side fascia and general fossil fragments device
CN215407406U (en) Simple and easy adjustable precast column grout seals storehouse mould
CN204876191U (en) Hollow brick wall body that can cut

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant