steel pipe
bottom plate
inclined strut
bracing
basement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920858416.5U
Other languages
Chinese (zh)
Inventor
王才勇
马世强
方庆
邵丽娟
樊琛琛
陈晓旭
陈�胜
刘雪珠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Geotechnical Engineering Co
Original Assignee
Jiangsu Geotechnical Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Geotechnical Engineering Co filed Critical Jiangsu Geotechnical Engineering Co
Priority to CN201920858416.5U priority Critical patent/CN210368980U/en
Application granted granted Critical
Publication of CN210368980U publication Critical patent/CN210368980U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses an earlier prop formula bracing supporting construction system obtains reverse bracing power through inserting the bracing steel pipe in the bored concrete pile to can be under construction envelope and bracing system simultaneously, need not to stay soil at the foundation ditch excavation in-process and establish the bracing, bottom plate structure need not to establish the post-cast strip at bracing point position again, and the bracing steel pipe can partly retrieve, can shorten the period, saves the cost, convenient construction. Constructing a building envelope system; constructing an oblique cast-in-place pile, and inserting an oblique bracing steel pipe; constructing a crown beam, and connecting the upper end of the inclined strut steel pipe with the crown beam to form a whole; excavating earth to the bottom of the pit, pouring a bottom plate cushion layer, arranging a water stop steel plate at the position where the inclined strut steel pipe penetrates through the bottom plate and the outer wall, and constructing the bottom plate and the outer wall of the basement; after the top plate of the basement is constructed, cutting off the inclined strut steel pipe in sections; the oval steel plates are welded in the inclined strut steel pipes penetrating through the bottom plate and the outer wall, the expansion water stop strips are arranged, and finally, the holes are sealed by micro-expansion concrete with the same strength as the bottom plate, so that the defects of the traditional inclined strut structure system are overcome.

Description

Earlier prop formula bracing strut supporting construction system
Technical Field
The utility model relates to a building foundation structure especially relates to an earlier prop formula bracing supporting construction system.
Background
With the rapid development of economy in China, the pace of urbanization progress is accelerated, people continuously upgrade living environment, the land used in cities is greatly reduced, building engineering projects bloom all over the corners of the cities, more and more foundation pit engineering projects are provided, the number of supporting forms is relatively large, and under the condition that a certain foundation pit cantilever supporting structure cannot be met, the traditional supporting form considers adding transverse supports, inclined pull anchor cables or inclined throwing supports, the transverse supports are high in manufacturing cost and long in construction period, excavation of soil is difficult, the inclined pull anchor cables face the problem of a red line, the traditional inclined throwing support design condition has the following two defects that ① soil needs to be reserved at the pit edge for erecting the inclined throwing support, ② a post-cast strip needs to be reserved at the lower end of the inclined throwing support due to the fact that a bottom plate needs to be constructed firstly, ③ soil needs to be reserved at the pit edge for secondary digging, and the construction difficulty is large.
The utility model relates to an earlier prop formula bracing supporting construction, its characteristics are that can't implement in foundation ditch cantilever support, under the tighter condition of construction cycle, solve traditional horizontal or diagonal bracing and bring not enough and defect.
SUMMERY OF THE UTILITY MODEL
Utility model purpose: the utility model discloses under the unable condition that satisfies to foundation ditch cantilever supporting construction, provided an earlier prop formula bracing supporting construction system, solved the not enough of traditional inclined throwing support design.
A pre-bracing type inclined strut supporting structure system comprises an enclosure structure (1), wherein the upper end of the enclosure structure (1) is connected with a crown beam (4); the crown beam (4) is connected with the upper end of the inclined strut steel pipe (3) to form a whole; the lower end of the diagonal bracing steel pipe (3) is inserted into the cast-in-place pile (2), and the diagonal bracing steel pipe (3) penetrates through the basement outer wall (8), the basement bottom plate (5) and the bottom plate cushion layer (6); the cast-in-place pile (2) is positioned below the bottom plate cushion layer (6); the basement bottom plate (5) is positioned above the bottom plate cushion layer (6), the basement bottom plate (5) is connected with the basement outer wall (8), and the upper part of the basement bottom plate is provided with a basement top plate (9);
waterproof structures are arranged at the inner positions of the penetrating basement outer wall (8) and the basement bottom plate (5) of the inclined strut steel pipe (3);
the waterproof structure includes: the water-stopping steel plate (7), the elliptical steel plate (10), the expansion water-stopping strip (11) and the micro-expansion concrete (12); the water stop steel plate (7) is welded outside the inclined strut steel pipe (3); the oval steel plate (10) is positioned in the inclined strut steel pipe (3) and is completely contacted with the inside of the inclined strut steel pipe (3), and the expansion water stop bar (11) is positioned on the inner side of the inclined strut steel pipe (3) and is arranged along the welding position of the oval steel plate (10) and the inclined strut steel pipe (3); the expansion water stop bar (11) is filled on all the surfaces of the welding position, and the micro-expansion concrete (12) is filled in the cut inclined strut steel pipe (3).
Has the advantages that: compared with the prior art, the utility model provides a pair of prop earlier formula bracing supporting construction system obtains reverse bracing power through inserting the bracing steel pipe in the bored concrete pile to can be under construction envelope and bracing system simultaneously, need not to stay soil at the excavation of foundation ditch in-process and establish the bracing, the floor structure need not to establish the post-cast strip at bracing point position again, and the bracing steel pipe can partly retrieve, has solved traditional not enough and the defect of throwing bracing supporting construction system in the past. The structure is not only simple and easy to operate, but also can save the construction period.
Drawings
FIG. 1 is a schematic view of a pre-bracing type bracing support structure system;
FIG. 2 is an enlarged view of a portion of FIG. 1;
fig. 3 is a schematic view of a waterproof structure.
In the figure: 1. an enclosure structure; 2. filling piles; 3. bracing the steel pipe; 4. a crown beam; 5. a basement floor; 6. a bottom plate cushion layer; 7. a water stop steel plate; 8. a basement exterior wall; 9. a basement roof; 10. an oval steel plate; 11. an expansion water stop bar; 12. and (3) micro-expansion concrete.
Detailed Description
The present invention is further explained in detail with reference to the following embodiments, which are to be understood as illustrative only and not limiting the scope of the invention, and modifications of the various equivalent forms of the present invention by those skilled in the art after reading the present invention are within the scope of the appended claims.
As shown in fig. 1 and fig. 2, the utility model provides a bracing-type bracing structure system, wherein fig. 1 is the bracing-type bracing structure system, specifically, the bracing-type bracing structure system comprises a building enclosure (1), and the upper end of the building enclosure (1) is connected with a crown beam (4); the crown beam (4) is connected with the upper end of the inclined strut steel pipe (3) to form a whole; the lower end of the diagonal bracing steel pipe (3) is inserted into the cast-in-place pile (2), and the diagonal bracing steel pipe (3) penetrates through the basement outer wall (8), the basement bottom plate (5) and the bottom plate cushion layer (6); the cast-in-place pile (2) is positioned below the bottom plate cushion layer (6); the basement bottom plate (5) is positioned above the bottom plate cushion layer (6), the basement bottom plate (5) is connected with the basement outer wall (8), and the upper part of the basement bottom plate is provided with a basement top plate (9);
the inclined strut steel pipe (3) is provided with waterproof structures at the inner positions of the passing basement outer wall (8) and the basement bottom plate (5).
The waterproof structure includes: a water stop steel plate (7), an elliptical steel plate (10), an expansion water stop bar (11) and micro-expansion concrete (12).
The water stop steel plate (7) is welded outside the inclined strut steel pipe (3), and plays a role in cutting off a water permeation path and preventing underground water from permeating into the underground chamber; the oval steel plate (10) is positioned in the inclined strut steel pipe (3) and is completely contacted with the inner wall of the inclined strut steel pipe (3), and the expansion water stop bar (11) is positioned at the inner side of the inclined strut steel pipe (3) and is arranged along the welding position of the oval steel plate (10) and the inclined strut steel pipe (3); the expansion water stop bar (11) is filled on all surfaces of the welding position, if the expansion water stop bar meets water, expansion deformation of 2-3 times is generated, and meanwhile, huge contact pressure is generated, and leakage is further prevented. The micro-expansion concrete (12) is filled in the cut inclined strut steel pipe (3). The concrete can be expanded to a certain extent under the action of the expanding agent during hydration, and leakage is completely prevented.
Fig. 3 is a schematic view of the water proofing of the diagonal bracing steel pipe through the bottom plate, belonging to the enlarged node view of fig. 1. The method can solve the problems of the deficiency and the defect of the traditional inclined throwing support structure system.
The specific implementation steps are as follows: as shown in fig. 1, a building envelope 1 is constructed; constructing an inclined cast-in-place pile 2, and then inserting an inclined strut steel pipe 3; then constructing a crown beam 4, and connecting the upper end of the inclined strut steel pipe 3 with the crown beam 4 to form a whole; excavating earth to the bottom of the bottom plate cushion layer 6, and pouring the bottom plate cushion layer 6; a water stop steel plate 7 is arranged at the position where the inclined strut steel pipe 3 penetrates through the basement bottom plate 5 and the basement outer wall 8, and the basement bottom plate 5 and the basement outer wall 8 are constructed; after the top plate 9 of the basement is constructed, the diagonal bracing steel pipes 3 are cut off in sections; an oval steel plate 10 is welded in the inclined strut steel pipe 3 penetrating through the basement bottom plate 5 and the basement outer wall 8, an expansion water stop bar 11 is arranged along the welding position of the oval steel plate 10 and the inclined strut steel pipe 3, and finally, micro-expansion concrete 12 with the same structural strength is used for hole sealing, so that the defects of the traditional inclined strut structure system are overcome.

Claims (1)

1. The utility model provides an earlier prop formula bracing supporting construction system which characterized in that: the building enclosure structure comprises an enclosure structure (1), wherein the upper end of the enclosure structure (1) is connected with a crown beam (4); the crown beam (4) is connected with the upper end of the inclined strut steel pipe (3) to form a whole; the lower end of the diagonal bracing steel pipe (3) is inserted into the cast-in-place pile (2), and the diagonal bracing steel pipe (3) penetrates through the basement outer wall (8), the basement bottom plate (5) and the bottom plate cushion layer (6); the cast-in-place pile (2) is positioned below the bottom plate cushion layer (6); the basement bottom plate (5) is positioned above the bottom plate cushion layer (6), the basement bottom plate (5) is connected with the basement outer wall (8), and the upper part of the basement bottom plate is provided with a basement top plate (9);
waterproof structures are arranged at the inner positions of the penetrating basement outer wall (8) and the basement bottom plate (5) of the inclined strut steel pipe (3);
the waterproof structure includes: the water-stopping steel plate (7), the elliptical steel plate (10), the expansion water-stopping strip (11) and the micro-expansion concrete (12);
the water stop steel plate (7) is welded outside the inclined strut steel pipe (3); the oval steel plate (10) is positioned in the inclined strut steel pipe (3) and is completely contacted with the inner wall of the inclined strut steel pipe (3), and the expansion water stop bar (11) is positioned at the inner side of the inclined strut steel pipe (3) and is arranged along the welding position of the oval steel plate (10) and the inclined strut steel pipe (3); the expansion water stop bar (11) is filled on all the surfaces of the welding position, and the micro-expansion concrete (12) is filled in the cut inclined strut steel pipe (3).
CN201920858416.5U 2019-06-10 2019-06-10 Earlier prop formula bracing strut supporting construction system Expired - Fee Related CN210368980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920858416.5U CN210368980U (en) 2019-06-10 2019-06-10 Earlier prop formula bracing strut supporting construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920858416.5U CN210368980U (en) 2019-06-10 2019-06-10 Earlier prop formula bracing strut supporting construction system

Publications (1)

Publication Number Publication Date
CN210368980U true CN210368980U (en) 2020-04-21

Family

ID=70263901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920858416.5U Expired - Fee Related CN210368980U (en) 2019-06-10 2019-06-10 Earlier prop formula bracing strut supporting construction system

Country Status (1)

Country Link
CN (1) CN210368980U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761166A (en) * 2021-02-23 2021-05-07 广东科能工程管理有限公司 Construction method for shallow foundation pit of combined support of piles and pre-grouting steel pipes based on SMW (soil mixing wall) construction method
CN113529731A (en) * 2021-06-03 2021-10-22 浙江省建筑设计研究院 Inclined pile construction method
CN114411757A (en) * 2022-02-08 2022-04-29 中建八局南方建设有限公司 Early-dismantling construction method for inner support partition of deep foundation pit
CN114737618A (en) * 2022-03-18 2022-07-12 五冶集团上海有限公司 Water-stopping construction method for front-support grouting steel pipe

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761166A (en) * 2021-02-23 2021-05-07 广东科能工程管理有限公司 Construction method for shallow foundation pit of combined support of piles and pre-grouting steel pipes based on SMW (soil mixing wall) construction method
CN113529731A (en) * 2021-06-03 2021-10-22 浙江省建筑设计研究院 Inclined pile construction method
CN114411757A (en) * 2022-02-08 2022-04-29 中建八局南方建设有限公司 Early-dismantling construction method for inner support partition of deep foundation pit
CN114737618A (en) * 2022-03-18 2022-07-12 五冶集团上海有限公司 Water-stopping construction method for front-support grouting steel pipe

Similar Documents

Publication Publication Date Title
CN210368980U (en) Earlier prop formula bracing strut supporting construction system
CN106400820A (en) Cofferdam formed by latched steel tube and concrete combined piles and construction method
CN205024712U (en) Modular tower crane basis
CN216041201U (en) Earlier prop and dig double-deck diagonal bracing foundation ditch enclosure system afterwards
CN107326896A (en) One kind combination steel construction support pile and construction method
CN113202112A (en) Assembled foundation pit supporting method
CN107326932B (en) Quasi-semi-reverse construction method for underground garage
CN109469068A (en) A kind of rich water soft stratum excavation of foundation pit and Support Method
CN214169078U (en) Prestressed advance inclined throwing support supporting structure system capable of being applied
CN209924485U (en) Basement additionally built inside existing factory building
CN216973425U (en) Inclined prefabricated steel pile foundation pit supporting system capable of being supported and excavated firstly
CN110777803A (en) Construction method of foundation pit staged structure
CN110607800A (en) Turnover type steel open caisson supporting device and construction method thereof
CN111894036B (en) Construction method for additionally arranging basement on strip-shaped foundation building
CN115370368A (en) Construction method for rapidly deslagging auxiliary structure of underground excavated subway station
CN211312527U (en) Support stand bottom plate watertight fittings in ultra-deep foundation ditch
CN211143079U (en) Structure is built to underground structure's level
CN113718752A (en) Ground diaphragm wall composite grouting method and grouting structure
CN214784003U (en) Assembled underground structure
CN206245325U (en) One kind lock steel pipe and Combined concrete pile cofferdam
CN220579971U (en) Special-shaped pile capable of being used as anti-floating roof
CN204780965U (en) Complicated geology and existing system construction structures that struts of environment access subway
CN106088759B (en) The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind
CN220080117U (en) Basement bottom plate screw thread enlarges body steel pile sealing device
CN216475227U (en) Device for detecting ultimate bearing capacity of advanced inclined projectile support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200421