CN210288107U - Hanging basket for bridge engineering - Google Patents

Hanging basket for bridge engineering Download PDF

Info

Publication number
CN210288107U
CN210288107U CN201920775703.XU CN201920775703U CN210288107U CN 210288107 U CN210288107 U CN 210288107U CN 201920775703 U CN201920775703 U CN 201920775703U CN 210288107 U CN210288107 U CN 210288107U
Authority
CN
China
Prior art keywords
hanging
sliding
basket
welded
substrate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920775703.XU
Other languages
Chinese (zh)
Inventor
王中华
姜河
姜雨峰
康甫
王乐
干祺
叶未萍
杨键
霍续涛
张雁平
张涛
陈武
崔长宇
王齐华
姜国青
侯红丽
余丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Traffic Engineering Consulting Supervision Co ltd
Original Assignee
Ningbo Traffic Engineering Consulting Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Traffic Engineering Consulting Supervision Co ltd filed Critical Ningbo Traffic Engineering Consulting Supervision Co ltd
Priority to CN201920775703.XU priority Critical patent/CN210288107U/en
Application granted granted Critical
Publication of CN210288107U publication Critical patent/CN210288107U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a hanging basket for bridge engineering, which relates to the technical field of bridge construction and solves the problems that each maintenance construction needs to repeatedly build a scaffold, the repeated invalid labor is wasted, time and labor are wasted, the construction period is long, and the construction efficiency is low; the welding has the board of standing on the link, and the welding has four connecting rods in one side that the hanging flower basket is close to the link, and the welding has the dead lever with the connecting rod one-to-one on the link, wears to be equipped with the fixing bolt who links firmly the connecting rod on the dead lever, sets up the long waist hole that supplies fixing bolt to wear to establish on the dead lever, still is equipped with on the dead lever to be connected with the connecting rod in order to adjust the adjusting part of hanging flower basket. The utility model discloses need not repeated scaffold frame of setting up when having at every turn to maintain the construction, labour saving and time saving has shortened construction period, has improved the effect of efficiency of construction.

Description

Hanging basket for bridge engineering
Technical Field
The utility model belongs to the technical field of the technique of bridge construction and specifically relates to a hanging flower basket for bridge engineering is related to.
Background
In recent years, with the rapid development of economy, the traffic flow is also increased rapidly, and the damage speed of some bridges is accelerated in the overload operation process, so that road administration departments often maintain the bridges.
The existing bridge maintenance construction is to construct a scaffold for workers to maintain and construct, and the scaffold is dismantled after the construction is completed.
The above prior art solutions have the following drawbacks: the scaffold needs to be repeatedly built for each maintenance and construction, the repeated ineffective labor is wasted, the time and the labor are wasted, the construction period is long, the construction efficiency is low, and the improvement space is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a hanging flower basket for bridge engineering need not repeated building scaffold frame when maintaining the construction at every turn, and labour saving and time saving has shortened construction period, has improved the efficiency of construction.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
a hanging basket for bridge engineering comprises a wall hanging frame, universal wheels arranged at the lower end of the wall hanging frame and in rolling and abutting contact with the ground, a connecting frame arranged on the wall hanging frame and a hanging basket arranged at one end of the connecting frame, which is far away from the wall hanging frame;
the welding has the board of standing that supplies constructor temporarily to stand on the link, the welding of hanging flower basket is close to one side of link has four connecting rods, the welding has the dead lever with the connecting rod one-to-one on the link, wear to be equipped with the fixing bolt who links firmly the connecting rod on the dead lever, set up the long waist hole that supplies fixing bolt to wear to establish on the dead lever, still be provided with on the dead lever and be connected the adjusting part in order to adjust the hanging flower basket height with the connecting rod.
By adopting the technical scheme, the scaffold does not need to be repeatedly built during maintenance and construction each time, time and labor are saved, the construction period is shortened, and the construction efficiency is improved; the height of user's accessible adjusting part regulation hanging flower basket to the height of convenient bridge according to different sizes regulation hanging flower basket has improved the application scope of hanging flower basket.
The utility model discloses further set up to: the adjustment assembly includes:
a support plate welded to the upper side of the fixing rod;
a connecting plate welded to an upper side of the connecting rod;
the studs sequentially penetrate through the supporting plate and the connecting plate;
the abutting disc is integrally arranged at one end, far away from the connecting plate, of the stud and abuts against the connecting plate;
the adjusting nuts are at least one in quantity and are in threaded connection with one side, far away from the abutting disc, of the stud and are abutted with the supporting plate to adjust the height of the hanging basket.
Through adopting above-mentioned technical scheme, the height of user's accessible rotation regulation nut, the regulation hanging flower basket to the height of convenient bridge according to not unidimensional regulation hanging flower basket has improved the application scope of hanging flower basket.
The utility model discloses further set up to: and a plurality of cross rods for construction personnel to climb are uniformly welded between every two adjacent connecting rods.
Through adopting above-mentioned technical scheme, the setting of horizontal pole makes things convenient for constructor to climb to the hanging flower basket from the link, has improved the efficiency and the security of climbing.
The utility model discloses further set up to: the hanging basket comprises:
the fixing part is welded with the connecting rod into a whole;
the sliding part is connected to the inner side of the fixing part in a sliding manner;
one side of the sliding part, which is close to the fixed part, is provided with a sliding plate which is abutted to the fixed part to slide, and the sliding plate is provided with a connecting bolt which sequentially penetrates through the sliding plate and the fixed part and a sliding hole for the connecting bolt to penetrate through and slide;
the fixed part is also provided with an actuating component for actuating the sliding part to be connected with the fixed part in a sliding manner.
Through adopting above-mentioned technical scheme, the portion of sliding accessible orders about the subassembly and adjusts its length that stretches out the fixed part to be applicable to the requirement of different bridge constructions, provide the application scope of hanging flower basket.
The utility model discloses further set up to: the urging assembly includes:
the first substrate is welded on one side of the fixed part, which is close to the connecting rod and far away from the sliding part;
the second substrate is welded on one side of the sliding part close to the fixing part and corresponds to the first substrate;
the screw rod sequentially penetrates through the second substrate and the first substrate and is in threaded connection with the second substrate;
and the two abutting nuts are in threaded connection with the screw rod and are respectively abutted against two ends of the first substrate.
Through adopting above-mentioned technical scheme, the tight first base plate of butt nut clamp, when the lead screw rotated, the butt nut rotated and lateral shifting along with the lead screw to order about the removal of the portion of sliding, the user accessible rotated the lead screw and adjusted the length that the portion of sliding stretches out the fixed part, with the requirement that is applicable to different bridge constructions, provided the application scope of hanging flower basket.
The utility model discloses further set up to: the end cover that the first base plate was kept away from to the lead screw is equipped with the spanner that supplies the hand to grip, the lead screw is kept away from the one end of first base plate and is provided with the inserted block integratively, set up the jack that supplies the inserted block to peg graft on the spanner.
Through adopting above-mentioned technical scheme, the user can hold the spanner and control the lead screw and rotate to adjust the length that the portion of sliding stretches out the fixed part, and need not to provide the availability factor of lead screw with the help of other instruments again, provide the availability factor of hanging flower basket.
The utility model discloses further set up to: the wall-mounted frame is welded with a ladder stand for an applicator to climb.
Through adopting above-mentioned technical scheme, the climbing when making things convenient for constructor to use is realized to the setting of cat ladder, provides the availability factor of hanging flower basket, provides the efficiency of bridge construction.
The utility model discloses further set up to: the wall-mounted frame is further welded with two handrails for the constructors to support during climbing, and the two handrails are respectively positioned on two sides of the ladder stand.
Through adopting above-mentioned technical scheme, the setting of handrail makes things convenient for constructor to use when the climbing cat ladder, for constructor provides the protection, has improved the security when hanging flower basket uses.
To sum up, the utility model discloses a beneficial technological effect does:
1. the scaffold does not need to be repeatedly built during maintenance construction each time, time and labor are saved, the construction period is shortened, and the construction efficiency is improved;
2. the user can adjust the height of hanging flower basket according to the bridge of equidimension not, has improved the application scope of hanging flower basket.
Drawings
Fig. 1 is a schematic structural diagram of a hanging basket for bridge engineering of the present invention.
Fig. 2 is a partially exploded schematic view of the connecting rod, securing rod and adjustment assembly.
Fig. 3 is an enlarged view of a portion a in fig. 2.
Figure 4 is a partial structure diagram I of a hanging basket.
Fig. 5 is a partial structure diagram II of the hanging basket.
In the figure, 1, a wall hanging rack; 2. a universal wheel; 3. a connecting frame; 4. a hanging basket; 5. standing the plate; 6. a connecting rod; 7. fixing the rod; 8. fixing the bolt; 9. a long waist hole; 10. an adjustment assembly; 11. a support plate; 12. a connecting plate; 13. a stud; 14. a butting tray; 15. adjusting the nut; 16. a cross bar; 17. a fixed part; 18. a sliding part; 19. a slide plate; 20. a connecting bolt; 21. a sliding hole; 22. an actuating assembly; 23. a first substrate; 24. a second substrate; 25. a screw rod; 26. abutting against the nut; 27. a wrench; 28. inserting a block; 29. a jack; 30. climbing a ladder; 31. a handrail.
Detailed Description
The present invention will be described in further detail with reference to fig. 1 to 5.
Referring to fig. 1, for the utility model discloses a hanging flower basket for bridge engineering, including wall-hanging rack 1, universal wheel 2, link 3 and hanging flower basket 4.
The wall hanging frame 1 is arranged on the bridge floor, and the universal wheels 2 are arranged on the lower side of the wall hanging frame 1 and are in rolling connection with the bridge floor; the connecting frame 3 is welded on the wall-mounted frame 1 and stretches across the bridge guardrail, the connecting frame 3 is formed by welding a plurality of square pipes, a standing plate 5 is welded on the connecting frame 3, and the standing plate 5 is used for a constructor to stand temporarily; the welding still has cat ladder 30 on the wall built-up frame 1, and cat ladder 30 upwards extends to link 3 from the slope of wall built-up frame 1 to make things convenient for constructor to scramble, and the welding still has two handrails 31 on the wall built-up frame 1, and the both sides of cat ladder 30 are located respectively to two handrails 31, and handrail 31 supports when supplying the workman to scramble.
Referring to fig. 1 and 2, hanging flower basket 4 is located one side that link 3 kept away from wall-hanging rack 1 and is located the outside of bridge railing, and four connecting rods 6 have been welded to one side that hanging flower basket 4 is close to link 3, and the welding has the dead lever 7 with connecting rod 6 one-to-one on link 3, and dead lever 7 and connecting rod 6 can be made by the angle steel.
Referring to fig. 2 and 3, the fixing rod 7 is connected with the connecting rod 6 through a fixing bolt 8, a long waist hole 9 is formed in the fixing rod 7, and the fixing bolt 8 penetrates through the long waist hole 9 to slide; the fixing rod 7 is further provided with an adjusting assembly 10, the adjusting assembly 10 is used for adjusting the height of the hanging basket 4, and the adjusting assembly 10 comprises a supporting plate 11, a connecting plate 12, a stud 13, a butting disc 14 and an adjusting nut 15.
The backup pad 11 welds in the upside of dead lever 7, connecting plate 12 welds in the upside of connecting rod 6, the double-screw bolt 13 wears to locate in proper order on backup pad 11 and connecting plate 12, the lower extreme of double-screw bolt 13 is located to butt dish 14 an organic whole, the upper end of butt dish 14 and the downside butt of connecting plate 12, the quantity of adjusting nut 15 is at least one, adjusting nut 15 threaded connection is in the upside of double-screw bolt 13, the lower extreme of adjusting nut 15 and the upside butt of backup pad 11, constructor can adjust the height of hanging flower basket 4 through rotatory adjusting nut 15.
Referring to fig. 4 and 5, a plurality of cross rods 16 are uniformly welded between two adjacent connecting rods 6, and the cross rods 16 are used for supporting or treading when workers climb; hanging flower basket 4 includes fixed part 17 and the portion of sliding 18, fixed part 17 is in the same place with the welding of four connecting rods 6, the portion of sliding 18 slides and connects in the inboard of fixed part 17, the portion of sliding 18 has slide plate 19 near one side welding of fixed part 17, slide plate 19 slides with fixed part 17 butt, still wear to be equipped with connecting bolt 20 on the slide plate 19, connecting bolt 20 wears to locate in proper order on slide plate 19 and the fixed plate, slide hole 21 has been seted up on the slide plate 19, slide hole 21 is long waist shape setting, slide hole 21 supplies connecting bolt 20 to wear to establish and slide.
The fixing portion 17 is further provided with an actuating assembly 22, the actuating assembly 22 is used for actuating the sliding portion 18 to slide so as to adjust the length of the sliding portion 18 extending out of the fixing portion 17, and the actuating assembly 22 comprises a first substrate 23, a second substrate 24, a screw rod 25 and an abutting nut 26; the first substrate 23 is welded on one side of the fixing portion 17 close to the connecting rod 6 and far away from the sliding portion 18, the second substrate 24 is welded on one side of the sliding portion 18 close to the fixing portion 17, the second substrate 24 corresponds to the first substrate 23, the screw rod 25 sequentially penetrates through the first substrate 23 and the second substrate 24, the screw rod 25 is in threaded fit with the second substrate 24, the number of the abutting nuts 26 is two, the two abutting nuts 26 are in threaded connection with the screw rod 25, the abutting nuts 26 are respectively abutted to two sides of the first substrate 23 to clamp the abutting nuts 26, and a constructor can adjust the length of the sliding portion 18 extending out of the fixing portion 17 by rotating the screw rod 25.
The end of the screw rod 25 far away from the first substrate 23 is further provided with a wrench 27, the end of the screw rod 25 far away from the first substrate 23 is integrally provided with an insert block 28, the wrench 27 is provided with an insert hole 29, the insert hole 29 is used for the insert block 28 to be inserted, so that the wrench 27 is installed on the screw rod 25, and a constructor controls the screw rod 25 to rotate through the wrench 27.
The implementation principle of the embodiment is as follows: constructors can adjust the height of the hanging basket 4 by rotating the adjusting nut 15 and can adjust the length of the sliding part 18 extending out of the fixing part 17 by rotating the screw rod 25, so that the bridges with different sizes can be conveniently maintained and constructed; the arrangement of the wrench 27 enables the constructor to rotate the screw rod 25 by hand without the help of other tools.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a hanging flower basket for bridge engineering which characterized in that: the hanging wall comprises a hanging wall frame (1), universal wheels (2) which are arranged at the lower end of the hanging wall frame (1) and are in rolling contact with the ground, a connecting frame (3) arranged on the hanging wall frame (1), and a hanging basket (4) arranged at one end, far away from the hanging wall frame (1), of the connecting frame (3);
the welding has the board of standing (5) that supplies constructor temporarily to stand on link (3), hanging flower basket (4) are close to one side welding of link (3) and have four connecting rods (6), the welding has dead lever (7) with connecting rod (6) one-to-one on link (3), wear to be equipped with fixing bolt (8) that link firmly connecting rod (6) on dead lever (7), set up long waist hole (9) that supply fixing bolt (8) to wear to establish on dead lever (7), still be provided with on dead lever (7) and be connected with connecting rod (6) in order to adjust hanging flower basket (4) height adjusting part (10).
2. The hanging basket for bridge engineering according to claim 1, wherein: the adjustment assembly (10) comprises:
a support plate (11) welded to the upper side of the fixing rod (7);
a connecting plate (12) welded to the upper side of the connecting rod (6);
the studs (13) are sequentially arranged on the support plate (11) and the connecting plate (12) in a penetrating manner;
the abutting disc (14) is integrally arranged at one end, far away from the connecting plate (12), of the stud (13) and abuts against the connecting plate (12);
the number of the adjusting nuts (15) is at least one, the adjusting nuts are in threaded connection with one side, away from the abutting disc (14), of the stud (13) and abut against the supporting plate (11) to adjust the height of the hanging basket (4).
3. The hanging basket for bridge engineering according to claim 1, wherein: a plurality of cross rods (16) for construction personnel to climb are uniformly welded between every two adjacent connecting rods (6).
4. The hanging basket for bridge engineering according to claim 1, wherein: the basket (4) comprises:
a fixing part (17) welded integrally with the connecting rod (6);
a sliding part (18) connected to the inner side of the fixing part (17) in a sliding manner;
one side of the sliding part (18) close to the fixing part (17) is provided with a sliding plate (19) which is abutted to the fixing part (17) to slide, and the sliding plate (19) is provided with a connecting bolt (20) which sequentially penetrates through the sliding plate (19) and the fixing part (17) and a sliding hole (21) through which the connecting bolt (20) penetrates to slide;
the fixed part (17) is also provided with an actuating component (22) for actuating the sliding part (18) to be connected with the fixed part (17) in a sliding manner.
5. The hanging basket for bridge engineering according to claim 4, wherein: the urging assembly (22) comprises:
a first substrate (23) welded to one side of the fixing part (17) close to the connecting rod (6) and far away from the sliding part (18);
a second substrate (24) welded to the side of the sliding part (18) close to the fixing part (17) and corresponding to the first substrate (23);
the screw rod (25) sequentially penetrates through the second substrate (24) and the first substrate (23) and is in threaded connection with the second substrate (24);
and two abutting nuts (26) which are connected to the screw rod (25) in a threaded manner and abut against two ends of the first substrate (23).
6. A hanging basket for bridge engineering according to claim 5, wherein: one end cover that first base plate (23) was kept away from in lead screw (25) is equipped with spanner (27) that supply the hand to grip, the one end an organic whole that first base plate (23) were kept away from in lead screw (25) is provided with inserted block (28), set up jack (29) that supply inserted block (28) to peg graft on spanner (27).
7. The hanging basket for bridge engineering according to claim 1, wherein: the wall-mounted frame (1) is welded with a ladder (30) for construction personnel to climb.
8. A hanging basket for bridge engineering according to claim 7, wherein: the wall-mounted frame (1) is further welded with two handrails (31) for constructors to support during climbing, and the two handrails (31) are respectively positioned on two sides of the ladder stand (30).
CN201920775703.XU 2019-05-28 2019-05-28 Hanging basket for bridge engineering Active CN210288107U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920775703.XU CN210288107U (en) 2019-05-28 2019-05-28 Hanging basket for bridge engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920775703.XU CN210288107U (en) 2019-05-28 2019-05-28 Hanging basket for bridge engineering

Publications (1)

Publication Number Publication Date
CN210288107U true CN210288107U (en) 2020-04-10

Family

ID=70070643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920775703.XU Active CN210288107U (en) 2019-05-28 2019-05-28 Hanging basket for bridge engineering

Country Status (1)

Country Link
CN (1) CN210288107U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529585A (en) * 2021-08-12 2021-10-22 中交一公局西北工程有限公司 Guardrail construction platform and installation method thereof
CN114086471A (en) * 2021-10-25 2022-02-25 中国五冶集团有限公司 Simple and easy mobile device of bridge annex installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529585A (en) * 2021-08-12 2021-10-22 中交一公局西北工程有限公司 Guardrail construction platform and installation method thereof
CN114086471A (en) * 2021-10-25 2022-02-25 中国五冶集团有限公司 Simple and easy mobile device of bridge annex installation

Similar Documents

Publication Publication Date Title
CN210288107U (en) Hanging basket for bridge engineering
CN204753397U (en) Gallows is installed to steel case bridge temporarily
CN205777416U (en) Ladder scaffolding
CN210888010U (en) Construction handling frame
CN211847048U (en) Over-and-under type scaffold is used in building installation
CN101871258B (en) Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles
CN205712828U (en) A kind of Assembled stairs of adjustable tilt angle
CN105484453B (en) The Assembled stairs platform of gradient adjustable
CN211143685U (en) Scaffold for building
CN211115727U (en) Hydraulic and hydroelectric engineering is with overhauing cat ladder equipment
CN211597633U (en) Scaffold for building engineering that can install fast
CN209011506U (en) Convenient for adjusting the wall plastering machine of painting height
CN210396063U (en) Movable lifting scaffold for high-altitude operation of hydraulic river model
CN209163405U (en) It is a kind of to facilitate the scaffold for adjusting height
CN209429487U (en) A kind of scaffold of architectural engineering
CN216766733U (en) Simple climbing ladder for outer wall steel pipe scaffold
CN212053700U (en) Keel plate connecting device for attached lifting scaffold
CN212984569U (en) Scaffold for assembly type building construction
CN220098430U (en) Auxiliary device for pipeline installation
CN216690272U (en) Adjustable operating platform for building engineering
CN211201086U (en) Combined movable scaffold
CN204826704U (en) A horizontal lifeline system for steel construction factory building
CN215254418U (en) A assembled building equipment platform for construction
CN215255112U (en) But quick assembly disassembly's architectural decoration guardrail
CN217400300U (en) Scaffold auxiliary building platform for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant