CN101871258B - Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles - Google Patents

Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles Download PDF

Info

Publication number
CN101871258B
CN101871258B CN2010102220722A CN201010222072A CN101871258B CN 101871258 B CN101871258 B CN 101871258B CN 2010102220722 A CN2010102220722 A CN 2010102220722A CN 201010222072 A CN201010222072 A CN 201010222072A CN 101871258 B CN101871258 B CN 101871258B
Authority
CN
China
Prior art keywords
wall
ceramic tile
positioner
location
locator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102220722A
Other languages
Chinese (zh)
Other versions
CN101871258A (en
Inventor
郭卫康
郭晓勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010102220722A priority Critical patent/CN101871258B/en
Publication of CN101871258A publication Critical patent/CN101871258A/en
Application granted granted Critical
Publication of CN101871258B publication Critical patent/CN101871258B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an implement for quickly and accurately pasting sanitary wall tiles and a method of reserving gaps, arranging tiles, filling mortar and pasting tiles. The key points of the technical proposal of the invention are that the implement of the invention comprises an upper positioner, a lower positioner, upright posts, a transverse rod and the like, wherein the upper positioner and the lower positioner are respectively fixed above and below a construction wall, the upright posts are fixed between the upper positioner and the lower positioner, and the transverse rod is fixed on the upright posts near to the construction wall; the relative position of the upper positioner and the lower positioner is accurately adjusted to enable the surfaces of a plurality of upright posts near the construction wall to be positioned on the same plane and vertical to the ground, and enable a proper gap to be resrved between the transverse rod and the construction wall; the front surfaces of tiles are tightly pasted on the transverse rod near the construction wall; the tiles are sequentially arranged in the horizontal direction; the gap between the construction wall and each tile is filled by using cement mortar or cement mortar blended with cement additives after each layer of tiles are arranged and fastened; and the construction is sequentially is carried out according to the steps from bottom to top until all processes are completed. Compared with the implement and the method for manually pasting tiles, by using the implement and the method of reserving gaps, arranging tiles and filling mortar and pasting tiles in the invention, not only the verticality and the smoothness of tile wall surfaces are greatly improved but also the construction efficiency is increased by 3-5 times.

Description

The sanitary wall ceramic tile is accurately pasted utensil and reserving gaps, arranging tiles grouting method of attaching fast
Technical field the present invention relates to a kind of sanitary wall ceramic tile and accurately pastes utensil and reserving gaps, arranging tiles grouting method of attaching fast.More particularly; Accurate fast stickup utensil of sanitary wall ceramic tile and reserving gaps, arranging tiles grouting method of attaching relate to a kind of vertical and smooth accuracy of relying on the standard utensil to make sanitary wall ceramic tile metope and improve several times than the hand paste ceramic tile, and speed of application also improves the accurate fast stickup utensil of a kind of sanitary wall ceramic tile and the reserving gaps, arranging tiles grouting method of attaching of several times than the hand paste ceramic tile.
The sanitary wall ceramic tile is accurately pasted utensil and reserving gaps, arranging tiles grouting method of attaching fast, can paste adaptable across the quick high accuracy of sanitary wall ceramic tile in all industry, national defence and the civilian fitting-up engineering.
Background technology is present, and the stickup of sanitary wall ceramic tile all is hand paste in all fitting-up engineerings.The defective of manual dress tile fixing is: 1, be used to paste the cement mortar and the height of the void content between ceramic tile, cement mortar and the construction wall of joint filling, the ceramic tile and the sticking strength of construction wall are had a greatly reduced quality; 2, the verticality of sanitary wall ceramic tile surface and planeness armrest industry control system, the verticality and the flatness error of ceramic tile surface are big; 3, ceramic tile sticking construction efficient is lower, and the ceramic tile of hand paste 300mm * 200mm was pasted and to be no more than 10m in 8 hours per capita 24, the ceramic tile sticking construction is long in time limit; 5, the manual paste method of hand paste use, hand must directly contact with cement, and cement mortar is to the seriously corroded of both hands; 6, the verticality of every block of ceramic tile and planeness are all rough and uneven in surface, and the sight of sanitary wall ceramic tile surface is poor.
At present, still there is not a kind of method that can be used for the standard criterion utensil of sanitary wall ceramic tile stickup and can realize the quick accurate stickup of sanitary wall ceramic tile on the market.
Summary of the invention the object of the invention will overcome deficiency of the prior art exactly, the utensil and the reserving gaps, arranging tiles grouting method of attaching that provide a kind of sanitary wall ceramic tile accurately to paste fast.
It is following now a kind of sanitary wall ceramic tile of the present invention accurately to be pasted utensil and reserving gaps, arranging tiles grouting method of attaching division fast.
The sanitary wall ceramic tile is accurately pasted utensil fast; Its technical essential is: it mainly is made up of positioner, the column more than two or two, many cross bars or telescopic horizontal scale etc.; Described positioner is divided into body of wall fixation positioner and framework is built the method positioner; Described column more than two or two is fixed on the positioner of nearly construction wall; Described column more than two or two preferably is on the positioner that vertical direction is fixed on nearly construction wall; Closely the construct one side of wall of column more than two or two is in same plane, according to the needs of working design, and closely the construct same plane that one side constituted of wall or perpendicular to ground or favour ground of the column more than two or two; Described cross bar or telescopic horizontal scale are fixed on the column more than two or two of nearly construction wall one side, and described cross bar or telescopic horizontal scale preferably are fixed on the column more than two or two of nearly construction wall one side in horizontal direction.
The sanitary wall ceramic tile is accurately pasted utensil fast; Its technical essential is: described body of wall fixation positioner mainly is made up of last locator, lower locating device; Described upward locator, lower locating device are separately fixed at the above and below of construction wall; Described upward locator, lower locating device are respectively arranged with locating hole or alignment pin; The two ends of described every root post are provided with and last locator, the corresponding alignment pin of lower locating device or locating hole; When the two ends of column were provided with alignment pin, an end of column preferably was provided with two alignment pins, and the other end of column preferably is provided with the alignment pin of scalable adjustment; Described column support goes up locator, the locating hole of lower locating device setting or the alignment pin or the locating hole of alignment pin and every root post setting and is fixed between locator, the lower locating device, and described upward locator, lower locating device are respectively arranged with a plurality of hole for the expansion bolts.
The sanitary wall ceramic tile is accurately pasted utensil fast; Its technical essential is: described framework is built the method positioner and is divided into that triangular framing is built the method positioner and quadrilateral frame is built the method positioner; Described framework is built the method positioner and mainly is made up of montant, cross bar, brace, and described framework is built closely the construct one side of wall of method positioner and is provided with the stud location device; Framework is built the method positioner and is also comprised and be provided with locator, lower locating device; But described upward locator, lower locating device are respectively arranged with the locating hole or the alignment pin of vertical columns, and the two ends of described every root post are provided with and last locator, the corresponding alignment pin of lower locating device or locating hole.
The sanitary wall ceramic tile is accurately pasted utensil fast; Its technical essential is; Described column closely construct the one side of wall be provided with a plurality of be the cross bars of arranging up and down shelve stake or laterally scale shelve stake, described cross bar can be served as by round steel or pipe, described horizontal scale can be done flexible adjustment.
The sanitary wall ceramic tile is accurately pasted utensil fast; Its technical essential is; For guaranteeing the verticality of every root post; Described positioner also is included in far the construct stage casing of one side of wall of every root post and is provided with the location cross bar; The location the most handy square pipe of cross bar or angle bar are made, and described positioner also is included in location cross bar and construction wall to being provided with the location brace between last locator on the face wall or the lower locating device, and described location brace is made up of two straight-bars of adjusting of can doing to stretch; The length of location brace relies on the adjustment handwheel to regulate; The two ends of described location brace, go up locator or lower locating device, the location cross bar is provided with tongue and groove, an end of location brace relies on tongue and groove to be connected with the location cross bar that is connected every root post, the other end support tongue and groove of location brace is connected to last locator or lower locating device on the face wall with the wall of constructing.
The sanitary wall ceramic tile is pasted fast accurately utensil, and its technical essential is, it also comprises and is provided with ceramic tile positioning sucker disk, bungee, sucker traction cross bar.
The sanitary wall ceramic tile is pasted fast accurately utensil, and its technical essential is, it also comprises and is provided with the ceramic tile bearing support.
The sanitary wall Angular tiles is accurately pasted utensil fast; Its technical essential is; It mainly is made up of last locator, lower locating device, column, cross bar, angle adjustment bolt etc.; Described upward locator, lower locating device are overlooked and are 7 fonts, are provided with the angle adjustment bolt in last locator, lower locating device 7 font corners, and the angle at last locator, lower locating device 7 font turnings can be adjusted to the right angle through the angle adjustment bolt or is adjusted into acute angle or is adjusted into the obtuse angle.
Sanitary wall ceramic tile reserving gaps, arranging tiles grouting method of attaching; Its technical essential is; It is to use above-mentioned sanitary wall ceramic tile accurately to paste a kind of job practices of utensil fast: 1. column is accurately located; Column accurately location is divided into body of wall fixation positioner location and builds method positioner location with framework: (1). body of wall fixation positioner location: will go up the above and below that locator, lower locating device are separately fixed at the wall of constructing with expansion bolt; Preferably be separately fixed on floor and the ground; Accurately the position of locator, lower locating device is gone up in adjustment; Make on locator, the lower locating device a plurality of locating holes or alignment pin in the horizontal direction separately in line, all columns are relied on corresponding being fixed between locator, the lower locating device of alignment pin of the locating hole of going up locator, lower locating device and column, make closely the construct one side of wall of many root posts be in same plane; And make many root posts closely construct wall one side constituted that same plan range construction wall is reserved with suitable space; The diameter that the thickness in space equals cross bar adds that the thickness of ceramic tile adds the thickness of cement sand bed, according to the working design needs, and closely the construct same plane that one side constituted of wall or perpendicular to ground or favour ground of many root posts; In case of necessity far the construct stage casing of one side of wall of every root post is fastened on the cross bar of location, two of location brace is firmly connected the last locator on the face wall or lower locating device and location cross bar work with the construction wall respectively through tongue and groove; (2). framework is built method positioner location: framework is built method positioner location and is divided into triangular framing and builds method positioner location and build the method positioner with quadrilateral frame and locate; Earlier montant, cross bar, brace are built into triangular framing positioner or quadrilateral frame positioner; Rely on the stud location device correspondence on the montant to be fixed on the montant on all columns again; The relative position of adjustment montant, cross bar, brace; Make closely the construct one side of wall of many root posts be in same plane; And make many root posts closely construct wall one side constituted that same plan range construction wall is reserved with suitable space; The diameter that the thickness in space equals cross bar adds that the thickness of ceramic tile adds the thickness of cement sand bed, according to the working design needs, and closely the construct same plane that one side constituted of wall or perpendicular to ground or favour ground of many root posts; When framework is built the method positioner and is provided with locator, lower locating device; Corresponding being fixed between locator, the lower locating device of alignment pin of earlier all columns supports being gone up locating hole with the column of locator, lower locating device; The stud location device correspondence that will go up again on locator, the lower locating device support montant is fixed on the montant; The position of adjustment brace; Make closely the construct one side of wall of many root posts be in same plane, and make closely the construct same plan range construction wall that one side constituted of wall of many root posts be reserved with suitable space, the diameter that the thickness in space equals cross bar adds that the thickness of ceramic tile adds the thickness of cement sand bed; According to the working design needs, closely the construct same plane that one side constituted of wall or perpendicular to ground or favour ground of many root posts; With many cross bars or laterally scale be shelved on successively from bottom to up in horizontal direction cross bar on the column shelve stake or laterally scale shelve in the stake; 3. adjustment ceramic tile bearing support is to level; Ceramic tile is placed on the ceramic tile bearing support; Make every ceramic tile front tightly be close to cross bar or horizontal scale; And being arranged in order ceramic tile by horizontal direction, the intact ceramic tile of every arrangement is promptly with foam-plastic blocks jam-pack space or rely on ceramic tile positioning sucker disk, bungee, sucker traction cross bar that ceramic tile is fastened on cross bar or the horizontal scale; 4. every arrangement, fastening intact one deck ceramic tile are promptly filled the space between ceramic tile and the construction wall with the cement mortar of having admixed cement additire or cement mortar; 5. according to the method construction successively from bottom to up of " reserve cement sand bed space → successively arrange ceramic tile and ceramic tile is fixed on the cross bar → fill with the cement mortar of having admixed cement additire or cement mortar and reserve the space ", paste engineering until ceramic tile and all complete.
Use above-mentioned sanitary wall ceramic tile accurately to paste utensil and reserving gaps, arranging tiles grouting method of attaching sticking brick fast and compare with the hand paste of prior art, its significant beneficial effect is:
1, the cement that has reduced between sanitary wall ceramic tile and the construction wall is pasted void content, has increased the cement sticky table area between sanitary wall ceramic tile and the construction wall, has improved the sticking strength of sanitary wall ceramic tile and metope.
The position of 2, going up locator, lower locating device through accurate adjustment makes many root posts closely construct the one side of wall on same plane and perpendicular to ground, can guarantee 15m 2The verticality and the flatness error of construction wall are no more than 2mm, have improved the verticality and the planeness of sanitary wall ceramic tile surface, and this is that present hand paste technology is too far behind to catch up.
3, can improve the sanitary wall ceramic tile and paste operating efficiency, look the long-pending and ceramic tile area size of construction wall, efficiency of construction can improve 3~5 times than hand paste.
4, can shorten the ceramic tile sticking construction duration more than 50%.
What 5, the present invention used is the cement mortar method for filling; Can be with the gloves operation; Avoided hand to contact with the direct of cement, and the manual paste method that the hand paste of prior art is used, hand must directly contact with cement; This method has not only alleviated working strength of workers, and has avoided cement adversary's corrosion.
6, use the present invention to paste the sanitary wall ceramic tile surface that, not only the verticality and the flatness error of whole face wall reach minimum value, and every block of ceramic tile is all horizontal vertically flat, have improved the sight of sanitary wall ceramic tile surface.
Description of drawings
Fig. 1 sanitary wall ceramic tile (body of wall stationary positioned method) is accurately pasted the utensil lateral view fast.
Fig. 2 sanitary wall ceramic tile (body of wall stationary positioned method) is accurately pasted the utensil vertical view fast.
Fig. 3 sanitary wall ceramic tile (body of wall stationary positioned method) is accurately pasted locator, lower locating device plan view on the utensil fast.
Fig. 4 sanitary wall Angular tiles is accurately pasted the utensil vertical view fast.
Fig. 5 sanitary wall Angular tiles is accurately pasted the utensil front view fast.
Fig. 6 sanitary wall ceramic tile (triangular framing is built positioning mode) is accurately pasted the utensil lateral view fast.
Fig. 7 sanitary wall ceramic tile (quadrilateral frame is built positioning mode) is accurately pasted the utensil lateral view fast.
Among the figure: 1. go up locator, 2. lower locating device, 3. column, 4. cross bar, 5. cross bar is shelved stake; 6. locating hole, 7. alignment pin, 8. hole for the expansion bolt, 9. ceramic tile positioning sucker disk, 10. bungee; 11. sucker traction cross bar, 12. ceramic tile bearing supports, 13. ceramic tiles, 14. cement sand beds, 15. construction walls; 16. locate horizontal angle bar, 17. location braces, 18. adjustment handwheels, 19. tongue and grooves, 20. Angular tiles are accurately pasted utensil fast; 21. the angle adjustment bolt, 22. montants, 23. cross bars, 24. braces, 25. stud location devices.
The specific embodiment further describes the present invention below in conjunction with the accompanying drawing and the specific embodiment.
The sanitary wall ceramic tile of present embodiment is accurately pasted utensil fast; Its technical essential is: it mainly is made up of positioner, many root posts 3, many cross bars 4 etc.; Described positioner is divided into body of wall fixation positioner and framework is built the method positioner; Described many root posts 3 are vertical direction and are fixed on the nearly construction wall positioner simultaneously; The one side of many root post 3 nearly construction walls is in same plane and perpendicular to ground, described cross bar 4 is fixed on many root posts 3 of nearly construction wall one side in horizontal direction.
The sanitary wall ceramic tile of present embodiment is accurately pasted utensil fast; Its technical essential is; Described body of wall fixation positioner mainly is made up of last locator 1, lower locating device 2; Described upward locator 1, lower locating device 2 are separately fixed at the above and below of construction wall 15; Described upward locator 1, lower locating device 2 are respectively arranged with locating hole 6, and the upper end of described every root post 3 is provided with the alignment pin 7 of scalable adjustment, and the lower end of column 3 is provided with two alignment pins 7; Described column 3 supports go up locator 1, the locating hole 6 of lower locating device 2 settings and the alignment pin 7 of every root post setting and are fixed between locator 1, the lower locating device 2, and described upward locator 1, lower locating device 2 are respectively arranged with a plurality of hole for the expansion bolts 8.
The sanitary wall ceramic tile of present embodiment is accurately pasted utensil fast; Its technical essential is: described framework is built the method positioner and is divided into that triangular framing is built the method positioner and quadrilateral frame is built the method positioner; Described framework is built the method positioner and mainly is made up of montant 22, cross bar 23, brace 24, and described framework is built closely the construct one side of wall 15 of method positioner and is provided with stud location device 25; Framework is built the method positioner and is also comprised and be provided with locator 1, lower locating device 2; But describedly go up the locating hole 6 that locator 1, lower locating device 2 are respectively arranged with vertical columns 3, the two ends of described every root post 3 are provided with and last locator 1, lower locating device 2 corresponding alignment pins 7.
The sanitary wall ceramic tile of present embodiment is accurately pasted utensil fast, and its technical essential is that the one side of described column 3 nearly construction walls 15 is provided with a plurality of cross bars of arranging up and down that are and shelves stake 5, and described cross bar 4 usefulness stainless pipes serve as.
The sanitary wall ceramic tile of present embodiment is accurately pasted utensil fast; Its technical essential is; For guaranteeing the verticality of every root post, also be provided with the horizontal angle bar 16 in location in the stage casing of the one side of every root post 3 construction walls far away, on the horizontal angle bar 16 in location and the 15 pairs of face walls of wall of constructing between the locator 1; Also comprise and be provided with location brace 17; Described location brace 17 is made up of two straight-bars that can do flexible adjustment, and the length of location brace 17 relies on adjustment handwheel 18 to regulate, and the two ends of described location brace 17, goes up locator 1, locatees horizontal angle bar 16 and be provided with tongue and groove 19; One end of location brace 17 relies on tongue and groove 19 to be connected with the horizontal angle bar 16 in the location that is connected every root post, and the other end of location brace 17 relies on tongue and groove 19 with the construction wall the last locator 1 on the face wall to be connected.
The sanitary wall ceramic tile of present embodiment is pasted fast accurately utensil, and its technical essential is, it also comprises and is provided with ceramic tile positioning sucker disk 9, bungee 10, sucker traction cross bar 11.
The sanitary wall ceramic tile of present embodiment is pasted fast accurately utensil, and its technical essential is, it also comprises and is provided with ceramic tile bearing support 12.
The sanitary wall Angular tiles of present embodiment is accurately pasted utensil fast; Its technical essential is; It mainly is made up of last locator 1, lower locating device 2, column 3, cross bar 4, angle adjustment bolt 21 etc.; Described upward locator 1, lower locating device 2 are overlooked and are 7 fonts; Be provided with angle adjustment bolt 21 in last locator, lower locating device 7 font corners, the angle at last locator, lower locating device 7 font turnings can be adjusted to the right angle through angle adjustment bolt 21 or is adjusted into acute angle or is adjusted into the obtuse angle.
The sanitary wall ceramic tile reserving gaps, arranging tiles grouting method of attaching of present embodiment; Its technical essential is; It is to use above-mentioned sanitary wall ceramic tile accurately to paste a kind of job practices of utensil fast: 1. column is accurately located; Column accurately location is divided into body of wall fixation positioner location and builds method positioner location with framework: (1). body of wall fixation positioner location: with expansion bolt will go up locator 1, lower locating device 2 is separately fixed on the floor and ground of the wall 15 of constructing; Accurately the position of locator 1, lower locating device 2 is gone up in adjustment; Make on locator 1, the lower locating device 2 a plurality of locating holes 6 in the horizontal direction separately in line; Alignment pin 7 correspondences of all columns 3 are fixed in the locating hole 6 of locator 1, lower locating device 2, make the one side of many root post 3 nearly construction walls 15 be in same plane, and make the same plan range construction wall that one side constituted of many root post 3 nearly construction walls 15 be reserved with suitable space; The diameter that the thickness in space equals cross bar 5 adds that the thickness of ceramic tile 13 adds the thickness of cement sand bed 14; According to the working design needs, the same plane that one side constituted of many root posts 3 nearly construction walls 15 or perpendicular to ground or favour ground, for guaranteeing the verticality of every root post; Every root post 3 far is fastened on the horizontal angle bar 16 in location in the stage casing of the one side of construction walls, two of location brace 17 is done firmly to connect to the horizontal angle bar 16 in last locator on the face wall 1 and location with the wall of constructing respectively through tongue and groove 19; (2). framework is built method positioner location: framework is built method positioner location and is divided into triangular framing and builds method positioner location and build the method positioner with quadrilateral frame and locate; Earlier montant 22, cross bar 23, brace 24 are put up triangular framing positioner or quadrilateral frame positioner; Rely on stud location device 25 correspondences on the montant 22 to be fixed on the montant 22 on all columns 3 again; The relative position of adjustment montant 22, cross bar 23, brace 24; Make the one side of many root post 3 nearly construction walls 15 be in same plane; And make the same plan range construction wall that one side constituted of many root post 3 nearly construction walls 15 be reserved with suitable space; The diameter that the thickness in space equals cross bar 5 adds that the thickness of ceramic tile 13 adds the thickness of cement sand bed 14, according to the working design needs, and the same plane that one side constituted of many root posts 3 nearly construction walls 15 or perpendicular to ground or favour ground; When framework is built the method positioner and is provided with locator, lower locating device; Alignment pin 7 corresponding being fixed between locator 1, the lower locating device 2 of earlier all columns 3 supports being gone up locating hole 6 with the column 3 of locator 1, lower locating device 2; Stud location device 25 correspondences that will go up again on locator 1, the lower locating device 2 support montants 22 are fixed on the montant 22; See the locate mode on Fig. 7 the right; The position of adjustment brace 24; Make the one side of many root post 3 nearly construction walls be in same plane, and make the same plan range construction wall that one side constituted of many root post 3 nearly construction walls 15 be reserved with suitable space, the diameter that the thickness in space equals cross bar 5 adds that the thickness of ceramic tile 13 adds the thickness of cement sand bed 14; According to the working design needs, the same plane that one side constituted of many root posts 3 nearly construction walls 15 or perpendicular to ground or favour ground; 2. the cross bar that many cross bars 4 is shelved on the column 3 is in horizontal direction from bottom to up successively shelved in the stake 5; 3. adjustment ceramic tile bearing support 12 is to level; Ceramic tile 13 is placed on the ceramic tile bearing support 12; Make the front of every block of ceramic tile 13 tightly be close to cross bar 4; And being arranged in order ceramic tile by horizontal direction, the intact ceramic tile of every arrangement is promptly with foam-plastic blocks jam-pack space or rely on ceramic tile positioning sucker disk 9, bungee 10, sucker to draw cross bar 11 ceramic tile 13 is fastened on the cross bar 4; 4. every arrangement, fastening intact one deck ceramic tile 13 are promptly filled the space between ceramic tile 13 and the construction wall 15 with the cement mortar of having admixed cement additire or cement mortar; 5. according to the method construction successively from bottom to up of " reserve cement sand bed space → successively arrange ceramic tile and ceramic tile is fixed on the cross bar → fill with the cement mortar of having admixed cement additire or cement mortar and reserve the space ", paste engineering until ceramic tile and all complete.

Claims (8)

1. a sanitary wall ceramic tile is accurately pasted utensil fast; It is characterized in that; It mainly is made up of positioner, the column more than two or two, many cross bars or telescopic horizontal scale etc.; Described positioner is divided into body of wall fixation positioner and framework is built the method positioner; Described column more than two or two is fixed on the positioner of nearly construction wall one side, and described column more than two or two preferably is on the positioner that vertical direction is fixed on nearly construction wall one side, and closely the construct one side of wall of the column more than two or two is in same plane; Closely the construct same plane that one side constituted of wall or perpendicular to ground or favour ground, described cross bar or telescopic horizontal scale are fixed on the column of nearly construction wall one side of column more than two or two; Described body of wall fixation positioner is provided with locator (1), lower locating device (2); Last locator (1), lower locating device (2) but be respectively arranged with the locating hole (6) or the alignment pin (7) of vertical columns; The two ends of described every root post (3) are provided with and last locator (1), the corresponding alignment pin of lower locating device (2) (7) or locating hole (6); When the two ends of column are provided with alignment pin; One end of column preferably is provided with two alignment pins, and the other end of column preferably is provided with the alignment pin of scalable adjustment, and described upward locator, lower locating device are respectively arranged with a plurality of hole for the expansion bolts; Described framework is built the method positioner and is divided into that triangular framing is built the method positioner or quadrilateral frame is built the method positioner; Framework is built the method positioner and is built by montant (22), cross bar (23), location brace (24), and closely the construct one side of wall of positioner is provided with the stud location device.
2. sanitary wall ceramic tile according to claim 1 is accurately pasted utensil fast; It is characterized in that; Described column closely construct the one side of wall be provided with a plurality of be the cross bars of arranging up and down shelve stake or laterally scale shelve stake; Described cross bar can be served as by round steel or pipe, and described horizontal scale can be done flexible adjustment.
3. sanitary wall ceramic tile according to claim 1 is pasted fast accurately utensil, it is characterized in that, far the construct stage casing of one side of wall of every root post comprises also and be provided with the location cross bar that location the most handy square pipe of cross bar or angle bar are made.
4. sanitary wall ceramic tile according to claim 1 is accurately pasted utensil fast; It is characterized in that; It also comprises and is provided with the location brace; Described location brace is made up of two straight-bars of adjusting of can doing to stretch, and the length of location brace is relied on the adjusting of adjustment handwheel, and the two ends of described upward locator or lower locating device, location cross bar, location brace are provided with tongue and groove; One end of location brace relies on tongue and groove to be connected with the location cross bar that is connected every root post, and the other end of location brace relies on tongue and groove with the construction wall last locator or lower locating device on the face wall to be connected.
5. sanitary wall ceramic tile according to claim 1 is pasted fast accurately utensil, it is characterized in that, it also comprises and is provided with ceramic tile positioning sucker disk, bungee, sucker traction cross bar.
6. sanitary wall ceramic tile according to claim 7 is pasted fast accurately utensil, it is characterized in that, it also comprises and is provided with the ceramic tile bearing support.
7. a sanitary wall Angular tiles is accurately pasted utensil fast; It is characterized in that; It mainly is made up of last locator, lower locating device, column, cross bar, angle adjustment bolt etc.; Described upward locator, lower locating device are overlooked and are 7 fonts, are provided with the angle adjustment bolt in last locator, lower locating device 7 font corners, and the angle at last locator, lower locating device 7 font turnings can be adjusted to the right angle through the angle adjustment bolt or is adjusted into acute angle or is adjusted into the obtuse angle.
8. sanitary wall ceramic tile reserving gaps, arranging tiles grouting method of attaching; It is characterized in that; It is to use claim 1 or the described sanitary wall ceramic tile of claim 7 accurately to paste the method for utensil sticking brick fast: 1. column is accurately located; Column accurately location is divided into body of wall fixation positioner location and builds method positioner location with framework: (1). body of wall fixation positioner location: will go up the above and below that locator, lower locating device are separately fixed at the wall of constructing with expansion bolt; Preferably be separately fixed on floor and the ground; Accurately the position of locator, lower locating device is gone up in adjustment; Make on locator, the lower locating device a plurality of locating holes or alignment pin in the horizontal direction separately in line, all columns are relied on corresponding being fixed between locator, the lower locating device of alignment pin of the locating hole of going up locator, lower locating device and column, make closely the construct one side of wall of many root posts be in same plane; According to the working design needs; Closely the construct same plane that one side constituted of wall or perpendicular to ground or favour ground of many root posts is fastened on far the construct stage casing of one side of wall of every root post on the cross bar of location in case of necessity, and two of location brace is firmly connected the last locator on the face wall or lower locating device and location cross bar work with the construction wall respectively through tongue and groove; (2). framework is built method positioner location: framework is built method positioner location and is divided into triangular framing and builds method positioner location and build the method positioner with quadrilateral frame and locate; Put up triangular framing positioner or quadrilateral frame positioner earlier; Rely on the stud location device correspondence on the montant to be fixed on the montant on all columns again; Make closely the construct one side of wall of many root posts be in same plane; According to the working design needs, closely the construct same plane that one side constituted of wall or perpendicular to ground or favour ground of many root posts; With many cross bars or laterally scale be shelved on successively from bottom to up in horizontal direction cross bar on the column shelve stake or laterally scale shelve in the stake; Many cross bars or horizontal leaf sight range construction wall all are reserved with suitable space, and the thickness in space equals ceramic tile thickness and adds the cement mortar layer thickness; 3. adjustment ceramic tile bearing support is to level; Ceramic tile is placed on the ceramic tile bearing support; Make every ceramic tile front tightly be close to cross bar or horizontal scale; And be arranged in order by horizontal direction, the intact ceramic tile of every arrangement is promptly with foam-plastic blocks jam-pack space or rely on ceramic tile positioning sucker disk, bungee, sucker traction cross bar that ceramic tile is fastened on cross bar or the horizontal scale; 4. the every arrangement of ceramic tile, fastening intact one deck are promptly filled the space between ceramic tile and the construction wall with cement mortar; 5. according to the method construction successively from bottom to up of " reserve cement sand bed space → successively arrange ceramic tile and ceramic tile is fixed on the cross bar → fill with cement mortar and reserve the space ", paste engineering until ceramic tile and all complete.
CN2010102220722A 2010-06-22 2010-06-22 Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles Expired - Fee Related CN101871258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102220722A CN101871258B (en) 2010-06-22 2010-06-22 Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102220722A CN101871258B (en) 2010-06-22 2010-06-22 Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles

Publications (2)

Publication Number Publication Date
CN101871258A CN101871258A (en) 2010-10-27
CN101871258B true CN101871258B (en) 2012-11-14

Family

ID=42996327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102220722A Expired - Fee Related CN101871258B (en) 2010-06-22 2010-06-22 Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles

Country Status (1)

Country Link
CN (1) CN101871258B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888218A (en) * 2016-04-21 2016-08-24 朱炜威 Method and special device for sticking ceramic tiles by grouting slurry
CN105865429B (en) * 2016-06-14 2017-12-19 山西建筑工程(集团)总公司 A kind of ground tile paving positioning measuring device
CN109853919B (en) * 2019-04-03 2020-08-18 国家电网有限公司 Integral ceramic tile paving process and device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2321867Y (en) * 1997-10-15 1999-06-02 杨文志 Edge line base board for whitewashing layer of concrete wall
CN201245952Y (en) * 2008-07-23 2009-05-27 苏洋 Ceramic tile ground line

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2321867Y (en) * 1997-10-15 1999-06-02 杨文志 Edge line base board for whitewashing layer of concrete wall
CN201245952Y (en) * 2008-07-23 2009-05-27 苏洋 Ceramic tile ground line

Also Published As

Publication number Publication date
CN101871258A (en) 2010-10-27

Similar Documents

Publication Publication Date Title
CN209636847U (en) A kind of adjustable tower crane built-in fitting accurate positioning tool
CN102061746B (en) Steel structure assembled embedded part and construction method thereof
CN201649633U (en) Steel formwork for forming building stair treads
CN204059395U (en) The pre-buried location structure of stone bolt
CN204326548U (en) A kind of building floor leveling unit
CN108894488A (en) A kind of construction method of Novel section steel keel steel and wood composite template
CN202073323U (en) Supporting frame for regulating installing horizontality of embedded part
CN101871258B (en) Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles
CN112064833A (en) Assembled partition wall structure
CN102777042A (en) Installation technology of connecting board type inner separation wall
CN204510806U (en) The longitudinal edge cover bracket of building plain form rack system
CN201756784U (en) Tool for pasting sanitary wall ceramic tiles rapidly and accurately
CN103669566B (en) The construction method of the steel reinforced concrete pedestal on large span grid roof
CN206646817U (en) The form bracing system of the cast-in-place decorative panel of staged Arc Stand
CN104005535B (en) The beam column of a kind of Anti-electrostatic floor keel, supporting leg and attachment structure thereof
CN102900224A (en) Device and method for fixing floor tiles quickly and accurately
CN106401176A (en) Steel-wood combination roof moldboard framework construction method
CN202672683U (en) Tool for rapidly and precisely pasting ground tile
CN203109500U (en) Lifting tool for escalator truss production
CN211523694U (en) Vertical lines curtain steelframe system of cell cube aluminum plate
CN204487047U (en) T profile group founds sectional fixture
CN203160707U (en) Adjustable t-shaped controller
CN202391086U (en) Positioning device for stair steps of buildings
CN105839914A (en) Adjustable steel beam supporting device and adjustable steel beam supporting system
CN203769332U (en) Building form or floor construction control device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 435100 Hubei city of Daye Province Dongfeng Road Park Villa Building 3 unit B 602

Applicant after: Guo Weikang

Address before: 436000 Ezhou city of Hubei Province, Hubei city Leishan three square 8-4-6

Applicant before: Guo Weikang

GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20150622

EXPY Termination of patent right or utility model